Stranding
Conductor
Manufacturing Process
Wire Drawing
Finest Electrolytic Grade 99.9 % Pure
Copper or Aluminium
The process reduces the wire rods to
Specified or desired wire diameter.
Annealing & Tinning of fine copper wires. Conductor
(CU / AL)
Drawing
Wires
Manufacturing Process
Stranding
The individual strands are bunched together
to form a conductor of specified size.
Conductor
(CU / AL)
Drawing
Wires
Bunching
Stranding
Conductor
Manufacturing Process
Insulation
Extruders
Conductor
Laid Up
(CU / AL)
Cables
Drawing Laying Up
(For Multi Core)
Cores
Wires
Bunching Insulation
Stranding
Conductor
Manufacturing Process
Armouring
Armouring up to 72 Wires.
Round and Flat armour.
Sheathing Inner
Taping Sheathed
Conductor Armouring
cables
Laid Up
(CU / AL) Armoured
Cables
Cables
Drawing Laying Up
(For Multi Core)
Cores
Wires
Bunching Insulation
Stranding
Conductor
Manufacturing Process
Sheathing
Emboss/Print on line on outer sheath.
Sheathing Inner
Taping Sheathed
Conductor Armouring
cables
Laid Up
(CU / AL) Armoured
Cables
Cables
Drawing Laying Up
(For Multi Core)
Sheathing
Cores
Wires Finished
Cables
Bunching Insulation
Stranding
Conductor
Manufacturing Process
Quality treated wooden / steel Drums for winding the finished cables
before final testing & delivery.
Sheathing Inner
Conductor Taping Sheathed Armouring
Laid Up cables
(CU / AL) Armoured
Cables
Cables
Drawing Laying Up
(For Multi Core)
Sheathing
Cores
Wires Finished
Cables
Testing and
Packing
Bunching Insulation
Stranding
Conductor
Emphasis On Design
Conductor
Insulation
Armouring
Sheathing
Conductor
The heart of the cable is the Conductor.
Conductor
Example of selection of the no of strands in a conductor.
The cores are laid up, along with fillers & suitable
binding tape, ensuring circularity. It is an
international practice to have filler inserted
between the cores, to prevent displacement of
the cores in manufacturing as well as in laying of
cable at site.
Laying up & Inner Sheath
Many times cores are laid up with nylon/cotton
twine, which results in cores getting damaged,
which effects not just the insulation thickness
but also, the overall performance of the cable.
Laying up & Inner Sheath
CABLE WITH NON HYGROSCOPIC
POLYPROPYLENE TAPE & FILLERS
•Aluminium Rods
Emphasis On Quality : R.M.Testing
XLPE & PVC Compounds
Surface finish
No. of wires/Strip
Thickness
Diameter over outer sheath
Tensile strength & Elongation
Surface finish & Marking/Embossing
Colour of sheath & Type of Compound
Emphasis On Quality Checks
Finished Goods testing
Routine tests are carried out as per relevant standards on each cable
length.
Type tests are carried out for each LOT (One manufacturing length)
Acceptance tests and Inspections can be arranged as per requirements of
customers.
Testing Facilities should include :
Partial Discharge
FRLS Testing
Oxygen Index
Smoke Density
Halogen Gas
High Voltage / Impulse Voltage
Emphasis On Quality
Packing & Marking Packing Drums
Testing of End sealing.
Testing of packing and wooden drums
Inspection for marking and scripts
Trial Holes:
After inspection of the cable route, it is advisable to have the
knowledge of the underground obstruction. Trial holes are generally
taken at every 50 meters interval along the planned cable route up to
10 cm below the planned depth of laying. The route is then inspected
for underground obstruction e.g. water lines, drainage lines,
telephone cables, power cables or other utilities etc.
After this the cable route is finalized keeping in view that it should
be straight as far as possible and proper depth is permissible. It is
then marked suitably for trenching
Excavation work
After proper marking of the route, the excavation is started.
Generally excavation is done manually, however, depending on the
terrain other methods such as mechanical force, thrust bore or
trench ploughing can be employed. Compressed air tools are used
for breaking rocks & excavation across road.
Depth of laying
As a general rule, the desired depth of cable for underground laying is
as under -
LV Power & Control cables : 0.75 m
HV Power cables up to 11 kV : 0.9 m
HV Power cable 22 & 33 kV : 1.05 m
EHV Power cable : 1.2 m
The actual depth of laying is, however, decided
depending on the under ground obstacles. The deeper
laying cause reduction on current carrying capacity.
Clearances :
The desired minimum clearances are as under-
Power to Control cables : 0.2 m
Power to communication cables : 0.3 m
Power cables to gas/water main : 0.3 m
Inductive influence on sensitive control cable on account of near
by power cable should also be checked.
Width of trench :
The width of trench depends on no & diameter of cables to be laid. For
HV & EHV cables the width of excavation is generally as under-
No. of Cables HV Cables EHV Cables
3 0.65 m 0.8 m
4 0.85 m 1.05 m
Sand bedding:
Sand bedding of minimum 10 cm is provided for the cables laid
directly in ground for protection. The grain size of sand should
preferably be less than 8 mm. The material with high volume weight
ratio has a good distribution among grain sizes and it has normally
low thermal resistivity, even when it has lower moisture.
The cable should be pulled from the top of the drum. To prevent crossing of
turns on the drum due to sudden stop in pulling, a brake should be arranged
at the cable drum as shown in figure and a man should be placed there to
operate this brake rapidly.
Pulling of cable drum:
Pulling of cable:
With temperature below 30C, the cables should be warmed before the
laying out, otherwise the bending can damage the insulation/protective
covering of cables. The cable laying should be carried out swiftly so that
the cable does not cool down too much.
Up to 1.1 kV 20 D 15 D 15 D 12 D
3.3 kV to 11 kV 20 D 15 D 15 D 12 D
22 kV & 33 kV 25 D 20 D 20 D 15 D
Above 33 kV - - 20 D
- D = outer diameter of cable
Filling:
After laying the cable, sand should be filled in the trench to completely
surround the cable. The grain size of sand shall be less than 8 mm. The
thickness of sand in all direction of the cable surface should normally not
be less than 10 cm.
Backfilling:
Normally the backfill consists of material excavated earlier from the trench.
However, bigger stones or pieces of rock should be removed.
Extra protection:
Important feeders and cables at places where high digging activity is
expected can be further protected by means of tubes, slabs or troughs
The tubes of non-magnetic material are mainly used at road crossing etc.
The tube diameter should not be less than 2 times the cable diameter. The
current rating of cables laid in tube is reduced up to 80% of the cable
rating in ground. The tubes can be filled with material e.g. Bentonite,
having thermal resistivity equal to the ground, to avoid reduction in ground
rating.
•In trenches, normally extra protection is achieved by providing flat
concrete slabs of size selected according to the expected damage.
Generally slab is 50 mm thick and of sufficient width to cover the
cables. The slabs are placed directly on the sand as shown here
below
•A very efficient protection against cable damage can be obtained by
using concrete troughs. The trough should be completely filled with
the sand.
Warning tape (Specially for EHV cables):
A pre – warning tape, e.g. of yellow PVC, should be laid in the ground
around o.2 to 0.4 metre under the surface and at least o.4 mm above the
cable. In a trench with several cables, the warning tape should not be
spaced more than 0.15 metres apart and the outermost cable should
always be covered by warning tapes.
A. Cables laid inside concrete trench with removeable C. Cables laid on cable trays exposed to air, the cables
covers, on cable trays where air circulation is restricted. touching and trays in tiers by 300 mm. The clearance
The cables spaced by one cable diameter and the trays in between the wall and the cable is 25 rnm.
tiers by 300 mm. The clearance of the cable from the wall is 25 mm.
1 0.95 0.90 0.88 0.85 0.84 1 1.0 0.84 0.80 0.75 0.73
2 0.90 0.85 0.83 0.81 0.80 2 1.0 0.80 0.76 0.71 0.69
3 0.88 0.83 0.81 0.79 0.78 3 1.0 0.78 0.74 0.70 0.68
6 0.86 0.81 0.79 0.77 0.76 6 1.0 0.76 0.72 0.68 0.66
SPACING OF CALBLES
NO. OF
NO. OF CABLE NO. OF CABLES CABLES
TRAYS IN IN GROUP TOUCHING 15 cm 30 cm 45 cm
TIERS 1 2 3 6 9
2 0.79 0.82 0.87 0.90
1 1 0.98 0.96 0.93 0.92 3 0.69 0.75 0.79 0.83
2 1 0.95 0.93 0.90 0.89 4 0.62 0.69 0.74 0.79
3 1 0.94 0.92 0.89 0.88 5 0.58 0.65 0.72 0.76
6 1 0.93 0.90 0.87 0.86 6 0.54 0.61 0.69 0.75
RATING FACTOR
B. Rating factors for ground temperature variation D. Rating factors for variation in Thermal Resistivity of soil
GROUND THERMAL
15 20 25 30 35 40 45 RESISTIVITY
TEMPERATURE(°C)
OF SOIL 100 120 150 200 250 300
(°ccm/w)
FACTOR
1.12 1.08 1.03 1.00 0.96 0.91 0.87
FACTOR 1.20 1.11 1.0 0.89 0.80 0.73
CABLE
ACCESSORIES
•SEPARABLE CONNECTORS
– LOADBREAK
– DEADBREAK
•OTHER CONNECTORS
– CABLE JOINTS
– CABLE TERMINATIONS
•Cable Joints Overview
•Utilize permanently crimped connectors
•Housings/Tubings are fully insulated,
shielded and sealed
– Direct buried, vault, submersible and other
severe service applications
– Units designed and tested per IS/VDE/IEEE
Standards to assure system matched
performance and ratings equal to cable
Terminations &
Cable Basics
While Cable Basics uses the Cable
Termination as the base example, the
same principles apply anywhere a
shielded medium or high voltage cable
is terminated.
Elbows, Joints, etc.
Conductor
+ Conductor shield
Conductor
+ Insulation
+ Conductor shield
Conductor
+ Semi-Con Shield
+ Insulation
+ Conductor shield
Conductor
In case of premolded
terminations
The addition of a stress control
tube tends to “smooth” the
stress concentrations in case
of heat shrink terminations
Only in case of
premolded terminations
This same cone shape
is incorporated into
most Cable Accessories
This same cone
shape is incorporated
into most Cable
Accessories
Right angle boot is
used in case of
Heat shrink
Terminations
Thank You