SAUDI ARAMCO ID/PID - 18-May-05 - REV 0 (Standards Cutoff - August 2004)

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Prefab Buildings - Interior and Exterior Final Inspection SAIC-M-1034 18-May-05 CIVIL-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

12-SAMSS-014
A1 Roof panels shall be ribbed to provide adequate rigidity.
Sec. 6.5.1.b

Panels shall provide a net coverage width of 900 mm (3 ft nominal)


minimum. Roof panels shall be laid full length from ridge to eaves where 12-SAMSS-014
A2
possible to minimize the possibility of water leaks at the end laps. When Sec. 6.5.1.c
required, end lap shall be a minimum of 150 mm (6 inches nominal).

Panel joints shall interlock in such a way as to provide complete water-


12-SAMSS-014
A3 tightness and an allowance for thermal expansion for a thermal
Sec. 6.5.1.d
differential of 67°C.

Fasteners shall be provided to secure the roof panels against wind uplift, 12-SAMSS-014
A4
mechanical movement, and to maintain water-tight panel joints. Sec. 6.5.1.i

Roof and Wall Fasteners shall be attached to secondary framing


members by means of self-drilling or self-tapping screws. The screws
shall be hex head carbon steel screws assembled with an EPDM washer 12-SAMSS-014
A5
and zinc coated. In coastal areas austenitic stainless steel fasteners Sec. 6.6
shall be used. Fastener heads shall be coated the same color as the
panels.

A sealing compound shall be provided to seal ends and side laps of


panels. The material shall consist of a blend of non-toxic, synthetic resin 12-SAMSS-014
A6
base ingredients and inert extenders. Asphalt or asphalt derivatives are Sec. 6.7.1.a
not permitted.

The application of sealant shall be of a cross-sectional area to provide a 12-SAMSS-014


A7
positive seal between adjacent surfaces. Sec. 6.7.1.b

The sealant material shall have sufficient adhesion to metal and plastic 12-SAMSS-014
A8
so as to remain in place during normal handling operations. Sec. 6.7.1.c

Flashing and/or trim shall be furnished at the rake, corners, eaves, at


framed openings, and wherever necessary to provide weather tightness
12-SAMSS-014
A9 and a finished appearance. A formed panel matching the slope and
Sec. 6.7.2.a & c
profile of adjoining panels shall be provided along the building ridge.
Color will be as specified in the purchase order.

Preformed closures matching the profile of the panel shall be installed


along the eave and other locations as specified on drawings or as 12-SAMSS-014
A10
required for weather tightness, and may be made of solid or closed cell Sec. 6.7.1.d
plastic materials subject to Saudi Aramco's approval

Vendor shall submit detailed specifications covering the finish of exterior


and interior surfaces of sheet metal paneling, trim and related 12-SAMSS-014
A11
components, for Saudi Aramco written approval. The Vendor shall Sec. 7.1
maintain the quality of work and records as specified in SAES-H-100.

Page 1 of 3
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Prefab Buildings - Interior and Exterior Final Inspection SAIC-M-1034 18-May-05 Civil
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

Dissimilar Materials which are not compatible with the adjoining materials
12-SAMSS-014
A12 when exposed to moisture must be separated by means of approved
Sec. 7.2
coatings, gaskets, or other effective means.

REMARKS:

REFERENCE DOCUMENTS:
1- 12-SAMSS-014 -- Pre-Engineered Metal Buildings, 30 June 2002
2- SAES-H-100 -- Coating Materials & Application Requirements for Industrial Facilities, 31 July 2004

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 2 of 3
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Prefab Buildings - Interior and Exterior Final Inspection SAIC-M-1034 18-May-05 CIVIL-

Attachment 3
SATR NUMBER DATE APPROVED DISCIPLINE
Re-Instatement Punch List Form Civil
(Punch List by the Contractor ) SATR-A-2011 Electrical
Mechanical
PROJECT TITLE WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR

MCC No.: Test Packs No.


System Description:
Covered Verified/
ITEM Originator / Completion
Description By Accepte Remarks
No. Agency Date
Y N dBy:

01

Page 3 of 3