The dimensions of the plot on which the villas are to be erected is 47.0 x 30.0 m each. In between there
are 2.2 m high 3D walls to delimit the plots.
Construction time for the erection of the 200 villas is estimated to be about 6 months. To realize this
project, approximately 2,000 m² panels will have to be produced and fitted daily. During the main
construction time 6 – 8 shotcrete pumps and a manpower of approximately 1,250 persons is required.
2. Service Area
length: 10.10 m
width: 5.00 m
height: 4.50 m
The entire project requires about 250,000 m² panels. For the erection of 3D walls and slabs some
23,000 m³ wet-mix concrete have to be processed.