Sie sind auf Seite 1von 4

ALTERNATIVE ENERGY PROMOTION CENTER

RURAL ENERGY DEVELOPMENT PROGRAMME


MICRO HYDRO VILLAGE ELECTRIFICATION PROJECT

Bill of Quantities and Specifications of


Electro-mechanical Equipment and Installations

[Name] Khola Micro Hydro Village Electrification Project

SN Particulars Specifications Unit Qty Rate Amount Remarks


I Mechanical Equipment
1.1 Turbine: The turbine runner should be of mild steel / Set 1 Refer the
crossflow/ pelton with bronze buckets with [Number] jets, having DPR for
[Number] kW shaft manual flow regulations and automatic jet details of
power deflector mechanism, rated to continuously specifications.
deliver adequate shaft output at [Number] rpm at
the operating condition of site: [Number] l/s
design flow and [Number].m net head to
generate [Number] kW from generator. The
casing should be of [Number].mm thick ms. The
set should be complete with any inlet adapter
pipe (to connect the main valve placed just
ahead of the turbine), base frame, foundation
bolts and accessories, all complete.
1.2 Power Transmission Drive System with necessary pulleys [Number] Set 1 Appropriate
System: mm and [Number] mm diameter) and 'V' / flat safety guards
Flat synthetic belts or synthetic endless belts, bearings and other should be
'V' Belts or Direct necessary components required to change the provided.
couplings necessary speed/ orientation of the drive

Or necessary couplings and accessories (for


direct couplings), with efficiency of [Number]
%, all complete.
1.3 Penstock Pipes: Mild steel penstock pipes [Number] ID and m Refer the
Mild steel penstock [Number] .mm wall thickness, with the DPR for
pipes or HDPE pipes provision of flanged joints and with necessary details of
accessories such as 'C' clamps, 'O' ring rubber specifications.
gaskets, anchor, tarpaulin sheets, nuts and bolts
all complete
or
HDPE pipes [Number] OD, [Number] kg/ cm2
pressure with all necessary accessories

The pipes should be pressure tested in the


workshop to withstand the total head (including
surge head).
1.4 Vent pipe: GI/ MS vent pipe [Number] mm ID, [Number] Set 1
GI/ MS vent pipe mm thick and [Number] m in length, with
necessary accessories for fixing, all complete
1.5 Flush cones; MS pipes [Number] mm ID having [Number] Set 2
MS pipes mm wall thickness, [Number] mm in length
(height) with the easy mechanism of removal
and fixing, all complete
1.6 Trash-racks: A. Coarse trash-rack made of steel [Number] m Set 1 A. For intake
A. Steel coarse trash- * [Number] m having [Number] mm dia. ms rod
rack [Number] m2 / [Number] angle iron for bracing and [Number]
mm * [Number] .mm flat iron strips @
[Number] mm c/c all complete
B. Fine trash-rack made of steel [Number].m *
B. Steel fine trash-rack [Number] m having [Number] mm dia. ms rod /
[Number] m2 [Number] angle iron for bracing and [Number] B. For
mm * [Number] mm flat iron strips @ forebay
[Number] mm c/c all complete
1.7 Valve : [Number] mm ID butterfly valve/ globe valve Set 1
Butterfly valve/ Globe with gear mechanism and manual hand wheels
valve with necessary accessories for fixation
1.8 Pipe coupling/ adapter: [Number] mm ID flexible plain end MS pipe Set 1
coupling and MS adapter pipe to withstand the
[Number] bar pressure, all complete
1.9 Expansion joints: Expansion joints, made of ms, should be able to Set
accommodate min of [Number] mm length for
expansion/ contraction, with all necessary
accessories, all complete
1.1 Sluice gate Leaf of gate with [Number] mm wide and Set Refer the
0 [Number] mm high, MS 6 mm thick, with frame drawing for
made of angle bars with anchors embedding in further
concrete having the opening / closing provision. details.
The sluice gate should be [Number] mm high,
having proper mechanism for hand regulation,
adequately rubber sealed, all complete
II Electrical Equipment
2.1 Synchronous generator: Synchronous generator [Number] kVA, Set 1 Refer the
[Number] kVA, brushless / with brush, rated to continuously DPR for
brushless / with brush, deliver [Number] kWe , 230/400 volts, 50 hertz, details of
rated to continuously 1500 rpm, 3 phase 4 wire electrical outputs at specifications
deliver [Number] kWe the generator terminal at 0.8 load power-factor
at the operating condition of site. The generator
should be self excited and self regulated type.
The set should be complete with base frames,
foundation bolts, couplings and accessories all
complete
2.2 Three phase electronic Three phase electronic load controller (ELC), Set 1 Refer detailed
load controller (ELC): thyrister type, [Number] kW in vermin proof specifications
metal cubicle with resistive ballast loads in the DPR.
[Number] kW (water heaters) to continuously
regulate and dump the load at the given site
condition, all complete
2.3 Control, Control, instrumentation, protection and Set 1 Switchgears
instrumentation, switchgear in a free standing steel cubicle for should be
protection systems: manual start, adequate monitoring and MCCB /
As a minimum, the protection of generator with necessary MCB for
instrumentation should incoming / outgoing terminations for inter- automatic
be for generated phasing to other components, all complete. disconnection
voltage/ frequency, load upon faults.
current, ballast voltage,
kW and kWh.

2.4 Control and power [Number] mm2 4 core cupper armored cable Set 1 Refer the
cable inside [Number] m, for interconnecting generator, drawing for
powerhouse: control panel, ELC, ballast, sensors etc, all details.
complete
2.5 Power cable: [Number] mm2 4 core aluminum armored cable Set 1 Refer the
[Number] m from control panel feeder terminals drawing for
(main switch) to the first pole, all complete details.
2.6 Material for - 3 mm* 600 mm *600 mm copper plate as Set Refer the
powerhouse earthing, earth electrode, [Number] SWG copper wire drawing for
including equi-potential strip [Number] m, [Number] kg of coke, details.
bonding [Number] kg of salt etc. all complete
2.7 Materials for power Power house wiring with [Number] mm2 copper L.S.
house wiring including conductors, exposed wiring in PVD conduits,
necessary lighting and with [Number] light points and [Number] power
power fixtures points, all complete.

4' * 40 watt tube lights-2 nos,


75 watt bulbs with holders-3 nos, and
single phase power socket- 2 nos with necessary
number of switches and wires.

III Transmission / Distribution Systems


3.1 Conductors: ACSR ACSR conductors, suspended overhead, with
conductors minimum of 4.5 ground clearance, having
clearance of 300 mm between them. These
should have approved current rating by NS.
a. Squirrel[Number] Resistance:>1.374 ohms/ km m
mm dia
b. Gopher [Number] Resistance:>1.098 ohms/ km m
mm dia
c. Weasel [Number] Resistance:>0.9116 ohms/ km m
mm dia
d. Rabbit ([Number] Resistance:>0.5449 ohms/ km m
mm dia
e. Dog [Number] mm Resistance:>0.2745 ohms/ km m
dia
3.2 Insulators (shackle) a. Large (110 mm * 110 mm) Nos
with 'D' Irons with b. Medium (90mm * 75 mm) Nos
necessary nuts, bolts, c. Small (55 mm * 55 mm) Nos
etc. all complete
3.3 Stay sets Should include guy wire, turn buckle, rod, Sets
insulators and plates, all complete
3.4 Lightning arrestors: Lightning arrestors to be provided at every 500 Set
0.5 kV with necessary m for current carrying conductors. All joints
stand and accessories, along the earth path should be able to carry a
all complete lightning strike of 20kA.
3.5 Earthing arrangements: [Number] SWG copper earth wire, 3mm Sets Should be
*600*600 copper plate as earth electrode with within the
necessary coke, lime, salt, nut, bolts, washer etc. limit, the pit
all complete. should be in
moist place.
3.6 Service Wire: 4 mm2/ 6 mm2 concentric aluminum service m/
cable rolls
3.7 Current limiting Miniature Circuit Breaker (MCB) with 0.5 Nos
devices: Ampere breaking current with appropriate
lockers, all complete
3.8 Electric Poles:
Mild steel tubular pole [Number] m high with [Number] mm top Nos With
diameter and [Number] mm bottom diameter, 3 appropriate
mm wall thickness, having top cap and bottom protective
plate including all necessary accessories, all coating.
complete. The lower 1.5 meter should be
bitumen painted.

b. Wooden poles Wooden poles, of hard wood, [Number] m high,


with [Number] mm top diameter and [Number]
mm bottom diameter, with lower 1.5 meter
bitumen painted, all complete

4 Miscellaneous
4.1 Spare Parts and Tools: Spares and tools for turbine, generator, control L.S.
panel and load controlling set etc. as deemed
necessary. 10% of bolts, one set gaskets and
seals, one set of bearings of turbine and
generators thyristers-.[Number]
belt-one set
4.2 Installation, erection, Mechanical Equipment Installations L.S.
testing, commissioning Electrical Equipment Installation L.S.
including maintenance Erection / Fixation of Transmission/ Distribution L.S.
for one year, all Lines
complete Testing / Commissioning L.S.
e. Maintenance for one year L.S.
TOTAL
(1+2+3+4):

Note: The above amount is inclusive of all taxes wherever applicable.