Sie sind auf Seite 1von 5
jai Comasor € HASAN JUMA BACKER eS Js As baa & Bier _ueaaing.s Genenstine costes ay OP Qatar Petroleum = ei [sccdeewasa LER . Peo tot} DOCUMENT TRANSMITTAL NOTE. Project No: 2555 ‘Contract No: GC 09107200 CONTRACT TITLE: WATER STORAGE TANKS AND. AT RAS LAFFAN INDUSTRIAL “MESSERS ‘QATAR PETROLEUM (EDR) [rour Re. Attention: NR ABDULLA IM AL SULAITLPROJECTMANAGERRALLAFEAN | yy, See ete OurRet; | HIBIGCO9107200/0P/T70082 Sabiect Method Statement for Potable Water Tank Febrication a 26/05/2010 Total Sheets DDoccument No. Rev ae Derption Code “eee ae taak 2555-5-74-0002 1419 ‘Method Statement for Erection of Potable Water Tank Cotes O) T Approved Go to ARC 4 For Review And Comments 17 See Remarks [TZ Approved With Comments- Go TO AFC 5 teased For Approval 65 Signs AFC- ForRetenton ‘Only [19 Refoctes 1 53 Not Approved, Re Submit [6 For information And Refrence aos Wolo, 1 ta Fert a ety Taina om COUNTRY MANAGER Plein & ret enacted copy Signature Designation Date CCEDRA o | 190510 ISSUED FOR APPROVAL sk | sp | cvr Rev | DATE DESCRIPTION check. | APPR. | HJB/QP Js Aw ,b—=4 Qatar Petroleum ENGINEERING DEPARTMENT CONTRACT REF.: GC 09107200 RLC POTABLE WATER STORAGE TANKS AND PUMPS DOCUMENT TITLE: METHOD STATEMENT FOR OFF SITE FABRICATION OF POTABLE WATER TANKS AT YARD MAIN CONTRACTOR Hasan Juma Backer Trading & Contracting Co LLC PO BOK 22590, DOHA, GATAR Fak weraceaoteet (: j DOC. NO: 2555-5-74-0001 KR P.O. Box: 72550 Nay Doha = Qatar cx TANK VENDOR o Vijay Tanks & Company LLC, PO Box 107, PC 131, Hamriya, Sultanate of Oman, Zt Ba > + ZF REV.0 Sector trade. & 8 Page 1 of 4 RLC POTABLE WATER TANKS AND | Hasan Juma ai 0 PUMPS Backer \odter Petroleum BES) nctnod statement for off Site ae Fabrication of Potable water tanks at !2Ajrauns & Yard Table of Contents 1. SCOPE 2, PURPOS! iat 3. DEFINITIONS: 4, REFERENCE: oe 5. _ RESPONSIBILITIES: 6. PROCEDURE: 7. RECORDS: 8. ATTACHMENT: e ©, 20. Box: 22500 tag DONA» Qatar Sister Tradg. & C85 ‘CONTRACT No. DOG. No. REV. No. "SHEET 6c09107200 2555-5-74-0001 0 20F4 A RLC POTABLE WATER TANKS AND | Hasan Juma / WATE te : Ff mass BGS Pcioms GSS) metnos statement for oF site \raay rans Fabrication of Potable water tanks at |company Lc » vara ae 1. SCOPE 5. ~ CONTRACT No. DOC. No. 609107200 2855-5-74-0001 ‘The scope of this method statement isto establish a procedure for the fabrication of bottom, shell, (of and stairway, wakway & platforms that will be undertaken at Vijay Tanks workshop in Sharjah, UAE for 34.0 moter diameter x 16.5 meter high Cone roof Potable Water stocage tanks at Ras Laffan industrial Cit. PURPOSE: ‘The purpose of this procedure isto outine the fabrication works that will be undertaken at Vjay Tanks ‘workshop in Sharjah, UAE for the construction of Potable water storage tanks, This is only @ guideline ‘and may be altered to suit to requirements. DEFINITIONS: wu + Work Shop Manager Ps + Production Supervisor QA/ AC (1) = QA/QC inspector AFC = Approved For Construction, REFERENCE: The following documents and codes shal be referred to: @)_ The contract document of alent b) AFC drawings, ©) API-650 1 nth Edition 1st Addendum, Nov'2008, 0) ASME Sec. IX @) Quality Control Plan / ITP 2556-5-25-0111 | Contract Specification for Storage tanks.Doc.no. 2555-1052 rev 1 9) QP Engineering Standard ES 5.08.0008 Rev A 1h) NDT procedure — Shop 2555-5.25.0134 ) QP Standard ES-S-60 1) Vijay Tanks Project Quality Plan 2565-6-25.0110 RESPONSIBILITIES: ‘The personnel responsible for satisfying the requirements of this document are WM, QA QC (!) and PS. The responsiolies will be as stated in the Project Quality Pian and Inspection Test Plan PROCEDURE: ‘Annular plates: Cut to size and ft the backing strip at one end as per AFC drawings, Bottom plates cut to size as per drawing. Refer to AFC drawings for cutting details. Only sketch plates willbe cut ‘Shell plates edge prepared and bent to curvature of tank: Plates will be cut othe dimensions as stated in the AFC drawing. Edges willbe prepared as per the weld dotalls gven in drawing using a pug gas-cutting machine. Then the plates willbe bent to the curvature of tank radus ina plate-bending machine. After bending, the plates vil be stacked on a saddle (the saddle will have the same curvature of bent plates) and packed for shipment to site. B20. Bon: 22800 ‘Xy,,, Doha - Qatar SS Pest trade: RLC POTABLE WATER TANKS AND | Hesan Juma : aa 0 PUMPS | Backer erect ES) method statement for of site por Fabrication of Potable water tanks at \dupnniue Yard | 3. Curb angle cut to size and bent to curvature of tank: “The edges of each length of angle willbe bent in @ press/section bending machine tothe curvature of tank and edge prepared for welding at site. 4. Roof structure rafters cut to size = Roof Purline/Bracings and raters will be cut as per AFC drawing, 5. Roof plates: Roof plates will be cut to size as per approved drawings. 6. Shell stiffeners willbe fabricated in segments as per AFC drawing, 7. Shell Nozzles/Roof nozzles: Nozzies neck/ppe will be cut to size and welded with one end flange Reinforcing pads where required willbe cut as per drawing 8. Handrails for spiral stairway cuvbant to shape as per AFC drawing 9. Spiral stairway treads vertical posts for handrails, platform frames cut to size as per AFC drawing and ‘supplied loose for assemblywelding on tank RECORDS: Records 2s detailed in the Inspection Test Pian shall be maintained ATTACHMENTS: Nil CONTRACT No. | DOC. No. a T GC09107200 2558-5-74-0001 (so 408 { ‘ S g, 0 Box: 72580 Re, Doha = Qatar cs 2 cher Trad, & OS y Y

Das könnte Ihnen auch gefallen