lifting cap
of boom calculated
point no overhung (T) weight remarks
1 2.5 45 10.6
2 2 68 10 refer load
3 1.5 85 10 curve
(465xD)
330.708
10,24 deg m
(D)
EL + 100.000
59.08
m
3 D View
1,63 deg
52,52m 52,52m
3
2
59,08m (A) 1,5m
1,5m 3,60m
1
widht of 0,95m
trench 0,58 deg
1,63deg (F)
59,09m Plan View
Note: 59,09m Distance is allowed as the wt. Coming on first side boom is approximately 10,6 T Based on overhung of 2,5m and
safety factor 4 the, capasity of first side boom is 45 T.
1st pipe layer 2nd pipe layer 3rd pipe layer
52.52 52.52
59.08
m
EL + 103.000
EL + 100.000
0.95 m
EL + 99.050
59,07m
Elevation View
S X
0.97 354.53
OD= 711 mm
Rad= 355.5 mm
B
52.52
D C O
26.26
0,9m
A
3,6m 1,5m
0,95m
FIG-1
FIG-2
LOWERING CALCULATION
Calculation of Deflection During lowering -positioning
Max.Horizontal distance
between c.l. Of trench-c.l.of pipe (m) 3.6