FEATURES OF A PROJECT
⇔ A project can be identified by its features. The special features of a project
that would differentiate from any other on going activity are given below:
⇔ A project fixed set of objectives. Once the objectives have been achieved,
the project ceases to exist.
⇔ It has a specific life span.
⇔ Project has a separate entity and normally entrusted to one responsibility
centre.
⇔ Project calls for a teamwork.
⇔ Project has a life cycle reflected by growth, maturity and decline.
⇔ Uniqueness is a salient feature of any project. No two projects are exactly
similar.
⇔ Change is an inherent feature in any project out its life.
⇔ Project is based on successive principle and hence it is difficult to learn
fully the end results at any stage.
⇔ A project works for a specific set of goals with the complex set of
diversified activities.
⇔ High level of sub-contraction of work can be done in a project.
⇔ Every project has risk and uncertainty associated with it.
⇔ Project needs feasibility any appraisal studies. So that the sponsors sweet
dream becomes realizable.
TAXNOMY OF PROJECTS
Much of what the project will comprise and consequently its
management will depend on the category it belongs to. The location, type,
technology, size, scope and speed are normally the factors which determine the
effort needed in executing a project. Though the characteristics of all projects
are the same, they cannot be treated alike. Recognition of this distinction is
important for management. Classification of project helps in graphically
expressing and highlighting the essential features of the project.
Projects are often categorized in terms of their speed of implementation
as follows:
NORMAL PROJECTS
Adequate time is allowed for implementation.
All the phases in a project are allowed to take their normal time.
Minimum requirement of capital.
No sacrifices in terms of quality.
CRASH PROJECTS
Requires additional costs to gain time.
Maximum overlapping of phases is encouraged.
DISASTER PROJECTS
Anything needed to gain time is allowed in these projects. Round the
clock work is done at the construction site. Capital cost will go up very high.
Project time will get drastically reduced.
Besides that, projects in general are classified on several basis as given
in the following illustrative list.
- United Nations Asian and Pacific Development Institute Categories of
projects
CLASSIFICATION OF PROJECT
The project can be classified on several bases. Major classifications of
the projects are given below:
1. On the basis of Expansion:
1. Project expanding the capacity
2. Project expanding the supply of knowledge
2. On the basis of Magnitude of the resources to be invested:
1. Giant projects affecting total economy
2. Big projects affecting at one sector of the economy.
3. Medium size projects
4. Small size projects (depending on size, investment & impact)
3. On the basis of Sector:
1. Industrial project
2. Agricultural Project
3. Educational Project
4. Health Project
5. Social Project
4. On the basis of objective:
1. Social objective project
2. Economic objective project.
5. On the basis of productivity:
1. Directively productive project.
2. Indirectively productive project.
6. On the basis of nature of benefits:
1. Quantifiable project
2. Non-quantifiable project
7. On the basis of government priorities:
1. Project without specific priorities
2. Project with specific priorities
8. On the basis of dependency:
1. Independent project
2. Dependent project
9. On the basis of ownership:
1. Public sector project
2. Private sector project
3. Joint sector project
10. On the basis of location:
1. Project with determined location
2. Project where location is open.
11. On the basis of social time value of the project:
1. Project with present impact
2. Project with future impact
12. On the basis of National Policy:
1. Project determined by inward looking policy
2. Project determined by outward looking policy
13. On the basis of risk involved in the project:
1. High risks project
2. Normal risks project
3. Low risks project
14. On the basis of economic life of the project:
1. Long term project
2. Medium term project
3. Short-term project.
15. On the basis of technology involved in the project:
1. High sophisticated technology project
2. Advanced technology project
3. Foreign technology project
4. Indigenous technology project
16. On the basis of resources required by the projects:
1. Project with domestic resources
2. Project with foreign resources
17. On the basis of employment opportunities available in the
project:
1. Capital intensive project
2. Labour intensive project
18. On the basis of management of project:
1. High degree of decision making attitude
2. Normal degree of decision making attitude
3. Low degree of decision making attitude
19. On the basis of sources of finance:
1. Project with domestic financing
2. Project with foreign financing
3. Project with mixed financing
4. Project with financial institutions
20. On the basis of legal entity:
1. Project with their own legal entity
2. Project without their own legal entity
21. On the basis of role played by the project:
1. Pilot project
2. Demonstration project
22. On the basis of speed required for execution of the project:
1. Normal project
2. Crash project
3. Disaster project
IDENTIFICATION OF PROJECT:-
Once a project proposal is identified, it needs to be examined. To begin with, a
preliminary project analysis is done. A prelude to the full blown feasibility study , this
exercise is meant to assess
i. Whether the project is prima facie worthwhile to justify a feasibility study and
ii. What aspects of the project are critical to its viability and hence warrant an
depth investigation.
Project identification & preparation
Project identification
• Porter model
• Life cycle approach
• Experience curve
• Scouting for project ideas
• Preliminary screening
Porter model
• Threat of the new entrants
• Rivalry among existing firms
• Pressure from substitutes products
• Bargaining power of buyer
• Bargaining power of the seller
Life cycle approach
• 4 stages of most products
• 1) pioneering stage
• 2)rapid growth stage
• 3)maturity and stabilization stage
• 4)decline stage
The products of the project should be in a rapid growth stage. If the products of the
project in a decline stage it is better not to invest in that particular type of project.
The experience curve
• Investments aimed at reducing costs are essential to the long term survival.
• Cost per volume declines with the accumulated volume of production
Scouting for project ideas
• Analysis then performance of the existing industry
• Examine the inputs and outputs of various industries
Preliminary screening
• Compatibility with the promoter
• Consistency with government priorities
• Availability of inputs
• Adequacy of market
• Reasonable cost
• Acceptability of risk level
Features of a Project
- A clear termination point (temporary).
- Might be part of a broader program.
- A distinct mission (unique).
- The main virtue of a project involves in identification of a nice, neat work
package within a bewildering array of objectives, alternatives, and activities.
- Mostly used as a means of implementing strategy.
- Progressively elaborated i.e. scope and details of the projects evolve as one
undertakes the project even though distinguishing features of the project are
stated initially.
PROJECT CHARACTERSTICS:-
A project is a big work –but it is basically a work –one whole thing. This means that
while there may be contributions from different people ,it can still be recognized as one
whole thing
1. Objectives:- A project has a fixed set of objectives. Once the objectives have been
achieved, the project ceases to exist.
2. Life span:- A project cannot continue endlessly. It has to come to an end.
3. Single entity:- A project is one entity while the participants in the project are many .
4. Team work:- A project calls for team work, the team constituted of members belonging
to different disciplines, organizations & even countries
5. Life cycle:- A project has a life cycle reflected by growth, maturity & decay
6. Uniqueness:- No two projects are exactly similar even if the plants are exactly identical
or are merely duplicated. The location ,the infrastructure, the agencies and the people
make each project unique.
7.Change:- A project sees many changes throughout its life. Some changes will change
the entire character. Some may not have major impact.
8. Successive Principle:- What is going to happen during the life cycle of a project is not
fully known at any stage
9. Made to order:- A project is always made to order of its customer
10. Unity in diversity:- A project is a complex ,set of thousands of varieties. The varieties
are in terms of tech.,equipment and materials ,machinery and people, work culture and
ethics. But they are remain inter related.
11. Risk and uncertainty:- Every project has risk uncertainty associated with it. The
degree of risk & uncertainty will depend on how a project has passed through its various
life cycle phases. All ill defined project will have extremely high degree of risk &
uncertainty.
• The whole complex of activities involved in using resources to gain benefits to
constitutes a project. it is a specific activities with a specific starting point and
specific ending point intended to accomplish a specific objective.
Feasibility study
A feasibility study is an important tool for decision-making. Accurate and
adequate information about the project like technology, location,
production capacity, demand, and impact on existing operations, cost
and benefits to the company, time span for execution, resources needed
should be spelt out in the report. Alternatives if any should also be
suggested.
Market research or demand analysis, technical viability studies, financial or commercial
feasibility studies are other wise known as functional or support studies to aid the
decision-making.
A preliminary feasibility study and the detailed project report later
prepared would aid the management to appraise the project in different
aspects. Project is appraised generally in the following areas. If one
can remember the acronym METRE, then he can remember the various
aspects of project appraisal easily. METRE stands for
M – Management
E - Economic viability (this includes market, commercial and financial
T – Technical feasibility
R- Risk and returns
E – Environment
A project may be acceptable in terms of the market potential, technical
feasibility, financial viability and returns. The risks associated with the
project may be acceptable.
But if the project does not suit the philosophy of the management, or
Align with the business goal of the firm a company may not pursue such
a project.
The Management appraisal is of two kinds. The first one is the appraisal
with regard to the current management, its goals, strategic perspective
and synergies of the new project. The second is the project’s
management set up, organizational structure organizational climate,
expected management – labour relations etc.,
A strategic perspective would mean what the company wants to achieve,
when it wants to achieve it and how much it is willing to expend in
resources to achieve it. In short, the Synergy, time and cost (STC) would
primarily determine whether the project would get a go ahead.
“ the most tangible expression of a
company’s strategy is the allocation of fund. Few things determine the
future of the company as directly as the way it spends the money. Those
activities which are treated generously are presumably the real basis of
the company’s future”
FEASIBILITY REPORT:-
It is prepared to present an indepth techno commercial analysis carried out on the project
idea for consideration of the financial institutions and other authorities empowered to
take the investment decision .
According to the guidelines published by the planning commission a feasibility report
should include.
1. Raw material survey
2. Demand study
3. Technical study
i) product pattern
ii) process selection
iii) plant size
iv) rew material requirements
4. Location study
5. Project capital cost estmates and source of finance
6. Profitability and cash flow analysis
7. Cost benefit analysis.
1. Raw material survey:- Available in natural form as deposit, either on the surface
or underground, in one part or different parts of the country . Necessary
arrangements in that case are to be made for extracting the same from the main
raw material body and transport it to the processing centre. Avaiable as finished
product or by product from some operating plants or likely to be available in the
near future from some plant or plants under consideration.
2. Demand study:- A demand study normally would establish
a) Demand
b) Supply
c) Distribution
d) Prices
3. Technical Study:
Product pattern:- In case of process plant, the selected process would determine
the various co- products and by- products that are possible. In such cases ,
quantities of all such products have to be established . In some cases, by utilizing
the by-products, a further set of products can be obtained. The total spectrum of
products- co-products and by – products represents is known as the product
pattern.
Process selection:- A good technology package for a chemical process plant
should consists of
i) Basic design data, process description and specification
ii) Process flow diagram
iii) Equipment list
iv) Process data sheets for all equipments
v) Process piping & instrumentation diagrams
vi) Instrument data sheets
vii) Utility summary
viii) Indicative plot plan
ix) Utility P & I
x) Pipeline list- process and utility
xi) Operating instructions
4. Location study:- Project sites are selected on several considerations. The basic are
i) Availability of land, soil characteristics and cost of the land
ii) Approach to site
iii) Source of raw material transportation requirement
iv) Transportation and marketing of finished product.
v) Source and availability of water
vi) Availability of power & source
vii) Availability of skilled manpower
viii) Social amenities in the area
ix) Availability of tax incentives
x) Facilities for drainage and effluent disposal
xi) Availability of engineering and maintenance facilities
xii) Acceptance of the project by the local bodies.