100%(6)100% fanden dieses Dokument nützlich (6 Abstimmungen)
1K Ansichten51 Seiten
DRAWING is the PROPERTY OF HYUNDAI MIPO DOCKYARD CO., LTD. IT MUST NOT BEPARTlALLY OR WHOLLY COPIED OR USED for ANY OTHER PU RPOSE WITHOUT PRIOR WRITTEN PERMISSION' OF HMO. SHIP No. S027 Series 0W(l NO. DATE DESCRIPTION DRAWN CHECKED APPROVED Apr.06'10 ORI.
DRAWING is the PROPERTY OF HYUNDAI MIPO DOCKYARD CO., LTD. IT MUST NOT BEPARTlALLY OR WHOLLY COPIED OR USED for ANY OTHER PU RPOSE WITHOUT PRIOR WRITTEN PERMISSION' OF HMO. SHIP No. S027 Series 0W(l NO. DATE DESCRIPTION DRAWN CHECKED APPROVED Apr.06'10 ORI.
Copyright:
Attribution Non-Commercial (BY-NC)
Verfügbare Formate
Als PDF, TXT herunterladen oder online auf Scribd lesen
DRAWING is the PROPERTY OF HYUNDAI MIPO DOCKYARD CO., LTD. IT MUST NOT BEPARTlALLY OR WHOLLY COPIED OR USED for ANY OTHER PU RPOSE WITHOUT PRIOR WRITTEN PERMISSION' OF HMO. SHIP No. S027 Series 0W(l NO. DATE DESCRIPTION DRAWN CHECKED APPROVED Apr.06'10 ORI.
Copyright:
Attribution Non-Commercial (BY-NC)
Verfügbare Formate
Als PDF, TXT herunterladen oder online auf Scribd lesen
CLASSIFICATION] THIS DRAWING OR DOCUMENT IS THE PROPERTY OF HYUNDAI MIFO
Cc DOCKYARD CO., LTD. AND IT MUST NOT BE PARTIALLY OR WHOLLY COPIED
‘OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN PERMISSION}
OF HYUNDAI MIPO DOCKYARD(HMO).
TOTAL( 98 ) SHEETS WITH ACOVER
DEPT NAME SHIP TYPE
BASIC DESIGN DEP'T 37,000 DWT CLASS BULK CARRIER
‘SHIPNO, ‘SHIP NAME
NORD SEOUL / NORD BARCELONA
8027728129180 (NORDEN) NORDAUCKLAN / NORD ROTTERDAM,
8031/32/33, H6040/41/42 (INTERORINET)
‘ORIENT DISPATCH / ORIENT BEARING / ORIENT BELT,
ORIENT DEFENDER / ORIENT DELIVERY / ORIENT DISPATCH
APPROVED: — T. W. PARK —S RAUL OF DRA
CHECKED: 8,H, OH Sno
PROCEDURE OF SEA TRIAL
DRAWN: S.H.LEE
SALE SH Lee tere roan REND
HYUNDAI N 6A000B004 2
MIPO DOCKYARD CO.,LTD.
ULSAN KOREA CONSOLIDATED
P05-0006-01DATE
PLAN HISTORY
DESCRIPTION
‘Apr.06'10
Originally prepared for S027 Seris.
Jul.23'10
Revised according to the Onner's coments
1) Added the spped trial at the tonest APM. (P. 10)
l2) Addod the man-overboard trial .(P.18)
ls) Corrected the measurement for vibration
lbased on 180 6854-2000(€) .(P.21~80)
|4)_ Added the main engine moor ing trial .(P.89)
Oct.12'10
[Corrected the test condition from scant ling
Jdraft to sea trial condition according to
[the Omer's agreement. (P.55)BASIC PARTSTANDARD NO.
‘\ PROCEDURE OF SEA TRIAL
1 | HDs-s6-B035
1, PRINCIPAL PARTICULARS,
Ship No. '$027/28/29/30 (NORDEN)
8031/32/33, H6040/4142 (INTERORINET)
Ship name NORD SFOUI./NORD RARCHLONA/ NORD AUCKLAND /NORD ROTTERDAM,
Owner NORDEN / INTERORIENT
Classification DNV+IAL, Bulk Carrier ESP, BC-A(TTold No.2&4 may be empty),
Grabl20], CSR, 0, BIS, TMON, BWM-E(s), DG-B.
IMONo. 1954473619544748/95447509544762 (NORDEN)
.9527697/9527702/9522958, 952288 /9522893/9522908 (INTERORIENT)
LOA. : 18640 M
LBP. 178,00 M
Breadth — (mid): 27.80 M
Depth (mild.) 15.60 M
Design Draft (ext.) 9.800 M
Scantling Draft (ext.) 10.90 M
Deadweight abt. 10,900 Tonnes(at summer Load draft)
Main engine : Type; HYUNDAL-B&W 6S46MC-C7
Output. MCR: — 7,860KW x 129.0 RPM
NCR: 6,680 KW x 122.2 RPM
Propeller Type + Fixed Pitch Propeller
No. of blade 4
Dia x Pitch ratio(W7R) —; 5,600. x 0.7434
Rudder Type
Area,
Max. Rudder turning Angle: 35.0 Deg.
Speed Service speed at the design draft and at the normal continuxcus
rating( 6,680 KW) of main engine with 15% sea margin atthe condition of clean
bottom in calm(BF 0) and deep sea to be about 14.80 Knots,
TIVUNDAT SMIPO DOCKVARD 00... 1D. P05-0005-09
5A PROCEDURE OF SBA TRIAL.
REY. |STANDARD NO.
1 | HDs-56-8035
DEADWEIGHT ITEMS WEIGHT
405.2
BUNKER
NO.1 T.8 & D.B.W.B.TK(P) 820.0
NOL1 T!8 & D.B.W.B.1K(s) 979.6 1
NO.2 T'S &D.B.W.B.TK(P) 1274.2 1
NO.2 TS &D.B.M.B.TK(S) 1274.2 1
NO:3 D:B..8.TK(P) 924.8 1
NO.2 D.B.W:B.TK(S) 924.8 4
NO.4 0°B.W:B.7K(P) stat 4
NO\4 0:8.W-B.7K(S) gti 4
NO:5 0.B.W-8.7K(P) 961.8 1
N.6 0.B.W.8.TK(S) 861.8 1
APT (C) 195.0
0.0
WATER BALLAST 10084 4
DEADWEIGHT 10579:6
LiGHTWEroHT 9294.0
DISPLACEUENT 19813.6
DRAFT EQUIV. 4.89.4
TAI BY STERN 2.09
DRAFT FORWARD 2.67 W
DRAFT AFT 6.30 u
DRAFT MEAN 4.90 u
Los. 7.08 W
Lice. 6.52 M
u.T.c. 421.92 TH
1..c. 41.07 Tem
BUNKERING CONDITIONS (SEATRIAL COND)
Tee)
mes)
rew.rs)
2.7.0.9. TK¢O)
FILL
2. SEA TRIAL CONDITION
FREE
L.c.g.
FROM SURFACE
Ws; MOWENT
(My
~88.64
65.98
65.83,
39.03,
39.03
40.98
40.93
“17132
-17.32
745.62
745.62
83.81
1.19 0.01 6.673931
TRANSV. ETACENTRE KUT 1
VERT, CENTRE OF GRAY. KG
ETAC. HEIGHT ou
FREE SURFACE CORR. 600
CORR. METAG. HEIGHT GOW
PROPELLER IMMERSION
HEELING ANGLE
1.0.6.
8.194
0.214
7.994
55.8%
HYUNDAL WIPO DOCKYARD CD. LTD. P05-0005-09
6REV. [STANDARD NO.
A\ PROCEDURE OF SEA TRIAL
1 | HDs-s6-B03s
3, DRAFT MEASUREMENT
1) Prior tothe official sea trial, ship's draft(fore, mid, aft) shall be measured by remote control draft
reading gauges, if installed
‘But the gauges to be calibrated and confirmed before sea tril with owner.
2) Observation
= Draft
[Condition] Location Port Starboard Mean
Fore M
Design | Mid M M| M
Af M| M| : M
3)The specific grivity of'sea water to be used the data from the Inclining experiment and dwt
‘measurement.
HYUNDAI MIPO DOCKVARD CO. LTD. P05-0005-09
%REY. | STANDARD NO.
Lh PROCEDURE OF SEA TRIAL.
1 | BDs-56-Bo35
1) Purpose
‘The test to be carried out with the following engine load in order to setle the relation between ship's
‘speed engine loads.
2) Condition
+ Sca Trial condition ( Refer to 2.)
3) Method
Progressive speed trials are carried out at the following engine load.
*. Design Load Condition
Engine load POWER RPM Rin
(Kw) ‘ofpropelter | Dir.
(30% Jof MER. 3.930 1055 2
(75% JofMCR. 5.895 120.7 2
785% SMCRINGR) | 6681 125.9 2
MCR. 7.860 132.9 2
* Above R.P.M. shows propeller R.P.M. incorporating R.P.M. rargin(ahout 3% at design draft).
* Speed trial of each load to be carried out at two directions of run and the speed of each run to be
measured by three nautical mile distance.
** End point of the first nan is start point reverse run.
‘** For subsequent vessels, the speed trial only for NCR(85% MCR) to be carried out during
endurance test for speed confirmation,
4) Observation
Run number, direetion(north or south), ship's speed, revolution, engine outpul(KW), wind direction
.& velocity, sea condition & weather, sea depth, wave height & angle,
HYUNDAL MIPO DOCKYARD CO.,LTD. P05-0005-09
8REV. |STANDARD NO,
A\ PROCEDURE OF SEA TRIAL
1 | HDS-36-B035
speed shall be measured by Differential Global Positioning System with comection to
calm and deep sea condition and official speed shall be determined by the mean of the
‘consecutive runs and the correction shall be applied in accordance with NSMB methods
if the sea state during speed measurement is exceeding Beaufort No.0 of wind scale
‘The shaft revolution and brake KW may be averaged similarly.
5.2) All the observation items are to be conducted under condition that ship's speed and shaft
revolution are regulated.
Approach run must be of sufticient distance to secure steady condition.
5.3) Main engine power and RPM to be measured by indicator card for official record.
YUNDAT MIPO DOCKYARD 00., LTD. P0s-0005-09
9REV. |STANDARD NO.
A PROCEDURE OF SEA TRIAL
1 | HDs-56-B035
RESULT OF SPEED TRIAL
ENGINE LOAD. 50%
DIRECTION
OF RUN
3%.
OBSERV. ITEM.
SEA DEPTH),
TEST STARTING TIMEGEO)
RELATIVE] DIRECTION
WIND _[vELocrrv(wis)
ELAPSED TIME(SEC)
SPEED IN KTS.
RPM.
KW
SPEED(KTS)
MEAN [RPM
KW
ENGINELOAD NCR ES)
DIRECTION 3
OFRUN| = 2.16 t
MCR,
OBSERV. ITEM
‘SEA DEPTH(M) A
TEST STARTING TIML(SEO) 4 [ate
RELATIVE] DIRECTION A Ps
WIND |veLocrrvim’s)| 6-7 om AZ,
ELAPSED TIME(SEC) a sak yah) 42. Ig
‘SPEED INKTS 1g
RPM. a q 42024
KW i
‘SPEED(KTS) AS 4
MEAN aM 12
Ta de thea he ra 44
A yale PED A re
eae 110 be te TF Ue
‘environmental conditions su.
HYUNDAT IPO DOCKVARD CO... LTD. POS-0005-09 392 - Sh
10 2.46SPEED VS POWER CURVE
11,000
[GUARANTEE SPEED AT DESIGN
DRAFT WITH 15% S.M : 14.8 KTS
19,000 | -
bead MODEL TEST S-P CURVE
i ‘AT DESIGN DRAFT
oe + 44
2
000 | — MODEL TES SP.
aa - AT. BALLAST DRAFT. —___
aa] [el
as Be
3,000 = 2 ge
E SE
ge 8 a
5s] BE
2,000 - = 1 :
1 12 13 1 speephots) v 18 9
11REV. |STANDARD NO]
A\ PROCEDURE OF SEA TRIAL
1 | HDS-36-B035
5. TURNING TRIAL,
(st ship only)
1) Purpose
‘To know ship's turning maneuverability, max. advance, max. transfer and max. tactical diameter
2) Condition
+= Sea trial condition ( Refer to 2. )
3) Method
With the ship initially at teast 90 % of the ship's speed corresponding to 85 % of the maximum engine
output(NCR), move the rudder quickly to hard over starboard 35” and hold until ship has made two
complete circle.
Return rudder to midship and hold until full ahead speed is restored.
Move the rudder quickly to hard over port 35” and hold until ship has made two complete circle.
4) Observation
4.1) Ship's speed by DOPPLER SPEED LOG.
4.2) Ship's heading angle by GYRO COMPASS
4.3) Shaft RPM.
4.4) Wind direction & velocity, weather, sea state and sea depth atthe start of the test
4.5) Necessary time for completing the turning test
4.6) Initial turning test to be conducted for the first vessel only, but the test data achived
from the first vessel to be provided for subsequent vessels,