Sr. No. Activity Part Rate Date Qty.

52.02 0 10 4226.551
30.02 Dressing for PCC in Culverts 12 2373.253
73.02 Dressing of excavated retaining wall trenches for required levels and 12 649
slopes -
317.02 Dressing of excavated retaining wall trenches for required levels and 12 21469.68
slopes
40.01 Providing and laying tar paper bearing in Culverts 17 25.581
45.01 Providing weep holes of 100 mm diameter PVC pipe in retaining wall in 87 640
Culverts
30.01 Excavation , Disposal , Dozing for EW Excavation for foundation in 95 1084.03
Culverts
52.01 Eartwork in excavation for foundation of structures in all types of soil 95 868.782
(excluding rock) including all lifits and leads--Minor bridges VUP,PUP

73.01 Earthwork in excavation for foundation In ordinary soils of all types for 95 2082.886
RCC Wall and RE Walls in structure--Approach Ramp for Flyover VUP
Viaduct
88.01 Excavation , Disposal , Dozing for EW Excavation for foundation in all 95 3285.967
type of soil -flyovers VUP VD
162.01 Excavation & Disposal : Earth work in excavation for Drains 95 18336.65
317.01 Earthwork excavation for retaining walls in all type of soils, except rock 95 2158.929

105.01 Providing weep holes of 100 mm diameter PVC pipe in retaining wall in 145 1027
Flyover/VUP/Viaduct Portion
87.01 Weep Hole for Retaining Wall-Approach ramo fly overs vup 153 1433
167.01 Providing weep holes of 100 mm diameter PVC pipe in Drain wall 153 10045
65.01 Providing weep holes in abutments, wing walls & return walls--Minor 190 1114
bridges VUP,PUP
280.01 Application og Nitobond between existing & new structure 540 102.995
31.02 Dozing compaction grading of filter material underneath stone boulder 693 28.138
pitching in slopes and flat surfaces of abutments,wing walls and return
walls in Culverts
33.05 Fixing of Mastic Pad as Construction Joint New & Old Structures M25 840 436.326
grade in foundation / Raft of Culvert
53.05 Fixing of Mastic Pad as Construction Joint New & Old Structures of minor 840 151.114
bridges,vup,pup
75.02 Pouring concrete, curing for laying M15 below foundation--Approach 1060 142.28
Ramp for Flyover/VUP/Viaduct
318.01 PCC M15 in foundation for Retaining walls at bridge approaches 1060 135
318.01 PCC M15 in foundation for Retaining walls at bridge approaches 1060 340.172
2.01 Dismantling of Plain Cement Concrete 1400 0.001
53.06 PCC M15 for Curtain Wall of minor bridges,vup,pup 1430 165.021
2.01 Dismantling of Plain Cement Concrete 1680 52.066
85.01 Pouring RCC M25 in Retaining wall for VUP & PUP-Approach ramo fly 1700 694.222
overs vup
319.01 RCC M30 for foundation, raft incl. shuttering for retaining walls at bridge 1700 1247.031
approaches, excluding HYSD steel
86.03 SCD rate for production of RCC M25 in retaining wall for VUP & PUP 2250 993.054
323.01 RCC M30 for walls, substructure incl. shuttering for retaining walls at 2250 1023.295
bridge approaches, excluding HYSD steel
97.04 Pouring concrete, curing for laying RCC M40 for Crash Barrier in Flyover 2343 360
VUP VD
46.04 Pouring concrete, curing for laying RCC M40 in Crash Barrier for for 2373 182.4
Culverts
57.04 Pouring concrete, curing for laying RCC M40 for Crash Barrier in super 2374 217.14
structure--Minor Bridges VUP,PUP
97.04 Pouring concrete, curing for laying RCC M40 for Crash Barrier in Flyover 2374 95.2
VUP VD
163.01 Pouring and laying PCC M15 in foundation of drain and RCC reatining 3056 224.304
wall with all leads and lifts
314.03 PCC Pouring Concrete, Curing for M15 for foundation for Drains 3056 4124.565
53.03 Pouring Concrete, Curing for M15 for levelling course under foundation 3106 279.972
minor bridges,vup,pup
54.01 Pouring of M20 Plain Cement concrete for levelling course under 3106 181.538
foundations of Minor Bridges VUP & PUP
64.03 Pouring, curing & Misc works for laying CC M15 gr for levelling course 3106 10.08
below approach slabs
32.01 Pouring concrete, curing for laying M15 below foundation for Culverts , 3106 320.098
Curtain Wall , Toe Wall , Gaurd Stones in Culverts
75.02 Pouring concrete, curing for laying M15 below foundation--Approach 3106 149.526
Ramp for Flyover/VUP/Viaduct
89.03 Pouring Concrete, Curing for M15 for foundation flyovers VUP VD 3106 150.449
163.01 Pouring and laying PCC M15 in foundation of drain and RCC reatining 3106 35.411
wall with all leads and lifts
36.02 Pouring Concrete by chute RCC M20 for Toe walls / Curtain Walls / 3752 254.405
Guard stones in Culverts
37.02 Pouring Concrete by chute RCC M20 for Pipe Culverts in foundation & 3752 75.728
Substructure ( Head Walls) in Culverts
33.03 Pouring & curing of Concrete RCC Grade M 25 in Foundation and Raft of 3920 1099.531
Culvert
34.03 Pouring, curing of Concrete RCC Grade M25 for Substructure and Wing 4094 970.185
Walls of Culvert
55.04 Pouring Concrete, Curing for RCC M35 n open foundation/pile cap-- 4178 2828.999
Minor Bridges, VUP & PUP
55.07 SCD Rate for Production & Transportation of Concrete to site from BMP-- 4178 388.152
Minor Bridges, VUP & PUP
35.03 Pouring, curing of Concrete RCC Grade M 25 in Super Structure ( Slabs 4304 906.501
& Beams) of Culverts
92.02 Pouring Concrete, curing for laying Pier, Pier Cap, Pedestals in RCC 4388 2305.251
M30 (6.06 a) for Bridges--Flyover VUP VD
90.03 Pouring Concrete RCC M35 in open foundation/pile cap for --Flyover 4412 3218.899
VUP VD
56.04 Pouring Concrete, Curing for RCC M35 for RCC for sub structure--Minor 4504 1765.539
Bridges, VUP & PUP
56.06 SCD Rate for Production & Transportation of Concrete to site from BMP-- 4504 418.175
Minor Bridges, VUP & PUP
58.04 Pouring, curing & Misc works for Solid Slab - RCC M30 grade BOX 4958 1950.154
93.01 RCC M30 Grade (Excluding Steel) for box type structure-Flyover VUP 4958 552.367
VD
338.03 Pouring Concrete, Curing for M25 for drain raft & walls incl. shuttering. 5259.6 1860.246
164.01 Pouring concrete for RCC M25 Grade for Drain raft & wall 5260 1407.747
338.03 Pouring Concrete, Curing for M25 for drain raft & walls incl. shuttering. 5260 7960.92

95.04 Launching and Erection iv) RCC M 40grade (Excluding steel) for PSC 6848 21.767
Beam slab composite structure
95.05 Girders casting, transportation & placing -Flyover VUP VD 6848 173.637
94.04 Pouring concrete, curing for laying RCC M40 in PSC soild slab- Flyover 6848 1244.39
VUP VD
41.01 Providing, laying and jointing 1200mm Dia NP-4 (as per IS:458-2003) 7677 36.85
Pipes for culvert - H.P NP-4
80.03 Compaction & Misc works for laying RCC M30 in Coping--Approach 7851 91.35
Ramp for Flyover/VUP/Viaduct
91.03 Pouring Concrete, Curing for RCC M35 in Bored piles for Bridges-- 9244 5534
Flyover VUP VD
116.01 Pouring Concrete, Curing for RCC M30 in pile foundation for ROB 9244 0
405.03 Boring of Pile in all types of strata 9244 0
81.01 Providing, cutting, bending and fixing in position of HYSD bar 12313 116.7389
reinforcement-Approach Ramp for Flyover/VUP/Viaduct
320.01 HYSD steel reinforcement for retaining walls at bridge approaches 12313 194.939
59.01 Providing, cutting, bending and fixing in position of HYSD bar 46313 148.2166
reinforcement--Minor Bridges, VUP & PUP
81.01 Providing, cutting, bending and fixing in position of HYSD bar 46313 121.9349
reinforcement-Approach Ramp for Flyover/VUP/Viaduct
111.01 Cutting &Placement of TMT -Fe 415 grade reinforcement bars 46313 29.26409
38.01 Providing, cutting, bending and fixing in position of (TMT) Fe 415 grade 46313 223.7067
reinforcement for Culverts
98.01 Cutting Bending and fixing in position of Thermomechanically treated 46313 1175.173
(TMT) Fe 415 grade reinforcement in Flyover-Flyover VUP VD

121.01 Providing, cutting, bending and fixing in position of TMT Fe 415 bar 46313 651.3281
reinforcement for ROB
166.01 Cutting, Bending and Placing o Fe 415 steel in drains 46313 737.6976
t Bill Qty. rrent Qty. Date Amt. Bill Amt . Current Amt.
4226.551 0 42265.51 42265.51 -
2373.253 0 28479.04 28479.04 -
570 79 7788 6840 948.00

21469.68 0 257636.2 257636.2 -

25.581 0 434.88 434.88 -


640 0 55680 55680 -

1084.03 0 102982.9 102982.9 -

661.901 206.881 82534.31 62880.61 19,653.70

1793.936 288.95 197874.2 170423.9 27,450.25

3163.377 122.59 312166.9 300520.8 11,646.05

18159.49 177.165 1741982 1725151 16,830.68


2158.929 0 205098.3 205098.3 -

1027 0 148915 148915 -

1339 94 219249 204867 14,382.00


10045 0 1536885 1536885 -
1114 0 211660 211660 -

102.995 0 55617.3 55617.3 -


28.138 0 19499.63 19499.63 -

436.326 0 366513.8 366513.8 -

151.114 0 126935.8 126935.8 -

126.48 15.8 150816.8 134068.8 16,748.00

135 0 143100 143100 -


340.172 0 360582.3 360582.3 -
0.001 0 1.4 1.4 -
165.021 0 235980 235980 -
52.066 0 87470.88 87470.88 -
640.085 54.137 1180177 1088145 92,032.90

1247.031 0 2119953 2119953 -

861.527 131.527 2234372 1938436 295,935.75


1023.295 0 2302414 2302414 -

240 120 843480 562320 281,160.00

182.4 0 432835.2 432835.2 -

217.14 0 515490.4 515490.4 -

95.2 0 226004.8 226004.8 -

199.94 24.364 685473 611016.6 74,456.38

4124.565 0 12604671 12604671 -


279.972 0 869593 869593 -

181.538 0 563857 563857 -

10.08 0 31308.48 31308.48 -

313.131 6.967 994224.4 972584.9 21,639.50

120.216 29.31 464427.8 373390.9 91,036.86

150.449 0 467294.6 467294.6 -


35.411 0 109986.6 109986.6 -

254.405 0 954527.6 954527.6 -

75.728 0 284131.5 284131.5 -

1088.611 10.92 4310162 4267355 42,806.40

970.185 0 3971937 3971937 -

2828.999 0 11819558 11819558 -

386.373 1.779 1621699 1614266 7,432.66

906.501 0 3901580 3901580 -

2228.223 77.028 10115441 9777443 337,998.86

3139.033 79.866 14201782 13849414 352,368.79

1765.539 0 7951988 7951988 -

371.964 46.211 1883460 1675326 208,134.34

1950.154 0 9668864 9668864 -


495.755 56.612 2738636 2457953 280,682.30

1860.246 0 9784150 9784150 -


1253.267 154.48 7404749 6592184 812,564.80
7960.92 0 41874439 41874439 -

21.767 0 149060.4 149060.4 -

173.637 0 1189066 1189066 -


809.383 435.007 8521583 5542655 2,978,927.94

36.85 0 282897.5 282897.5 -

91.35 0 717188.9 717188.9 -

5534 0 51156296 51156296 -

0 0 0 0 -
0 0 0 0 -
104.2269 12.512 1437406 1283346 154,060.25

194.939 0 2400284 2400284 -


148.2166 0 6864356 6864356 -

121.9349 0 5647172 5647172 -

29.26409 0 1355308 1355308 -


222.0477 1.659 10360527 10283694 76,833.25

1170.422 4.751 54425795 54205762 220,033.06

572.4451 78.883 30164957 26511648 3,653,308.37

727.1516 10.546 34164990 33676573 488,416.89


Sr. No. Activity Part Rate Date Qty.
73.02 Dressing of excavated retaining wall trenches for required levels and 12 649
slopes -
52.01 Eartwork in excavation for foundation of structures in all types of soil 95 868.782
(excluding rock) including all lifits and leads--Minor bridges VUP,PUP

73.01 Earthwork in excavation for foundation In ordinary soils of all types for 95 2082.886
RCC Wall and RE Walls in structure--Approach Ramp for Flyover VUP
Viaduct
88.01 Excavation , Disposal , Dozing for EW Excavation for foundation in all 95 3285.967
type of soil -flyovers VUP VD
162.01 Excavation & Disposal : Earth work in excavation for Drains 95 18336.65
87.01 Weep Hole for Retaining Wall-Approach ramo fly overs vup 153 1433
75.02 Pouring concrete, curing for laying M15 below foundation--Approach 1060 142.28
Ramp for Flyover/VUP/Viaduct
85.01 Pouring RCC M25 in Retaining wall for VUP & PUP-Approach ramo fly 1700 694.222
overs vup
86.03 SCD rate for production of RCC M25 in retaining wall for VUP & PUP 2250 993.054

97.04 Pouring concrete, curing for laying RCC M40 for Crash Barrier in Flyover 2343 360
VUP VD
163.01 Pouring and laying PCC M15 in foundation of drain and RCC reatining 3056 224.304
wall with all leads and lifts
32.01 Pouring concrete, curing for laying M15 below foundation for Culverts , 3106 320.098
Curtain Wall , Toe Wall , Gaurd Stones in Culverts
75.02 Pouring concrete, curing for laying M15 below foundation--Approach 3106 149.526
Ramp for Flyover/VUP/Viaduct
33.03 Pouring & curing of Concrete RCC Grade M 25 in Foundation and Raft of 3920 1099.531
Culvert
55.07 SCD Rate for Production & Transportation of Concrete to site from BMP-- 4178 388.152
Minor Bridges, VUP & PUP
92.02 Pouring Concrete, curing for laying Pier, Pier Cap, Pedestals in RCC 4388 2305.251
M30 (6.06 a) for Bridges--Flyover VUP VD
90.03 Pouring Concrete RCC M35 in open foundation/pile cap for --Flyover 4412 3218.899
VUP VD
56.06 SCD Rate for Production & Transportation of Concrete to site from BMP-- 4504 418.175
Minor Bridges, VUP & PUP
93.01 RCC M30 Grade (Excluding Steel) for box type structure-Flyover VUP 4958 552.367
VD
164.01 Pouring concrete for RCC M25 Grade for Drain raft & wall 5260 1407.747
94.04 Pouring concrete, curing for laying RCC M40 in PSC soild slab- Flyover 6848 1244.39
VUP VD
81.01 Providing, cutting, bending and fixing in position of HYSD bar 12313 116.7389
reinforcement-Approach Ramp for Flyover/VUP/Viaduct
38.01 Providing, cutting, bending and fixing in position of (TMT) Fe 415 grade 46313 223.7067
reinforcement for Culverts
98.01 Cutting Bending and fixing in position of Thermomechanically treated 46313 1175.173
(TMT) Fe 415 grade reinforcement in Flyover-Flyover VUP VD

121.01 Providing, cutting, bending and fixing in position of TMT Fe 415 bar 46313 651.3281
reinforcement for ROB
166.01 Cutting, Bending and Placing o Fe 415 steel in drains 46313 737.6976
t Bill Qty. Current Qty. Date Amt. Bill Amt . Current Amt.
570 79 7788 6840 948.00

661.901 206.881 82534.31 62880.61 19,653.70

1793.936 288.95 197874.2 170423.9 27,450.25

3163.377 122.59 312166.9 300520.8 11,646.05

18159.49 177.165 1741982 1725151 16,830.68


1339 94 219249 204867 14,382.00
126.48 15.8 150816.8 134068.8 16,748.00

640.085 54.137 1180177 1088145 92,032.90

861.527 131.527 2234372 1938436 295,935.75

240 120 843480 562320 281,160.00

199.94 24.364 685473 611016.6 74,456.38

313.131 6.967 994224.4 972584.9 21,639.50

120.216 29.31 464427.8 373390.9 91,036.86

1088.611 10.92 4310162 4267355 42,806.40

386.373 1.779 1621699 1614266 7,432.66

2228.223 77.028 10115441 9777443 337,998.86

3139.033 79.866 14201782 13849414 352,368.79

371.964 46.211 1883460 1675326 208,134.34

495.755 56.612 2738636 2457953 280,682.30

1253.267 154.48 7404749 6592184 812,564.80


809.383 435.007 8521583 5542655 2,978,927.94

104.2269 12.5119999 1437406 1283346 154,060.25

222.0477 1.65899972 10360527 10283694 76,833.25

1170.422 4.75099986 54425795 54205762 220,033.06

572.4451 78.8829999 30164957 26511648 3,653,308.37

727.1516 10.54599974 34164990 33676573 488,416.89


Serial No. Tender IteReferenceActivity Trade Quantity Unit Main Activ
45.01 5.11 5/5.01/5/5.11
Providing weep holes of 100 mm
Miscellane 1750 Nos Providing w
62.01 6A.09 6/6.01/6/6A.09
Providing & Fixing in position Miscellane 20 Nos Providing
65.01 6A.12 6/6.01/6/6A.12
Providing weep holes in abutmeMiscellane 1114 Nos Providing
87.01 6B.12 6/6.04/1/6B.12
Weep Hole for Retaining Wall-Approach ra 1500 Nos Weep Hole
95.04 6C.06 (iii) 6/6.05/6/6C.06
Launching
( and Erection iv) RCCConcrete W 21.767 Nos RCC M 40gr
100.01 6C.09 6/6.05/6/6C.09
Providing & Fixing in position Miscellane 401 Nos Providing a
105.01 6C.14 6/6.05/6/6C.14
Providing weep holes of 100 mm Miscellane 1372 Nos Providing
124.01 6E.10 6/6.03/6/6E.10
Providing and fixing 150mm diaMiscellane 20 Nos Providing a
125.02 6/6.03/0/ Expansion Joint Fixing for Expan
Structure 95 Nos Providing a
129.01 6E.14 6/6.03/6/6E.14
Providing weep holes of 100 mmMiscellane 1316 Nos Providing P
167.01 8.04 8/8.01/8/8.04
Providing weep holes of 100 mm Miscellane 10045 Nos Providing
248 16/16.01/1/Materials Issued to Sub contractor's Own 5 Nos
264 16/16.01/1/VNC Base Camp 10 Nos
265 16/16.01/1/Casting of Loading Blocks 1 Nos
266 16/16.01/1/Casting of Test Pile 2 Nos
267 16/16.01/1/Excess Consumption / Wastage 0.01 Nos
268 16/16.01/1/Extra Pile 1 Mtr. Pile Casting 1 Nos
269 16/16.01/1/Safety Blocks Casting 1 Nos
270.01 16/16.01/1/Chairs & Laps / Shortage Notional 1 Nos Chairs & L
398.01 6A.09 (b) 6/6.01/6/6A.09
Providing
( and fixing bearings tr Structure 1.00E-05 Nos Providing a
Date Rate Amount Status Material I Plant Incl Remarks uction No. Created Breated On
5/12/2009 87 152250 Approved No No GKKUMAR11/9/2010
5/12/2009 1745 34900 Approved No No 0 PLAN_HO 4/2/2010
5/12/2009 190 211660 Approved No No 25 GKKUMAR11/9/2010
5/12/2009 153 229500 Approved No No Providing Weep Hole PLAN_PJ01/30/2011
5/12/2009 6848 149060.4 Approved No No 42 GKKUMAR2/16/2011
5/12/2009 1745 699745 Approved No No PLAN_PJ0 ###
5/12/2009 145 198940 Approved No No PLAN_PJ0 ###
5/12/2009 1745 34900 Approved No No 2 PLAN_HO 4/2/2010
5/12/2009 523 49685 Approved No No 2 PLAN_HO 4/2/2010
5/12/2009 189 248724 Approved No No 2 PLAN_HO 4/2/2010
1/25/2010 153 1536885 Approved No No 37 PLAN_PJ0 1/9/2011
5/12/2009 0.1 0.5 Approved No No PLAN_PJ03/29/2010
5/12/2009 0.01 0.1 Approved No No PLAN_PJ04/24/2010
5/12/2009 0.01 0.01 Approved No No PLAN_PJ04/24/2010
5/12/2009 0.01 0.02 Approved No No PLAN_PJ04/24/2010
5/12/2009 0.01 0 Approved No No PLAN_PJ04/24/2010
5/12/2009 0.01 0.01 Approved No No PLAN_PJ04/24/2010
5/12/2009 0.01 0.01 Approved No No PLAN_PJ04/24/2010
5/12/2009 0.01 0.01 Approved No No PLAN_PJ04/24/2010
5/12/2009 698 0.01 Approved No No 12 GKKUMAR11/9/2010