Page 1 1/25/2022

TipBeam1
Clerk in charge

16.86

Loadings [kN],[m] 1 2 3 4 5 6
1 2 3 4 5 6 7

1,250 1,000 350


Lengths [mm]
561 1,000 1,000
Staff conditions: Total length: 5,161 [mm]

No. Length Mom.inertia Modul E V-Shear per. B-Mom.per. Parts


[mm] [cm4] [kN/cm2] [kN] [kNm]

1 561 4,500 Doka H 20 I 1,000 11.00 5.00 10


2 1,250 4,500 Doka H 20 I 1,000 11.00 5.00 10
3 1,000 4,500 Doka H 20 I 1,000 11.00 5.00 10
4 1,000 4,500 Doka H 20 I 1,000 11.00 5.00 10
5 1,000 4,500 Doka H 20 I 1,000 11.00 5.00 10
6 350 4,500 Doka H 20 I 1,000 11.00 5.00 10
Page 2 1/25/2022
TipBeam1
Clerk in charge

Bearing conditions:

No. Bearing condition Spring


[kN/mm]

1 Joint
2 Bearings
3 Bearings
4 Bearings
5 Bearings
6 Bearings
7 Joint

Active loadings:

Trapez.load qk,left qk,right Distance Length

[kN/m] [kN/m] [mm] [mm]

0.00 16.86 0 2,600


16.86 16.86 2,600 2,561
Page 3 1/25/2022
TipBeam1
Clerk in charge

Staff Point Deflection Rotation Moment V_Shear Utilization


# # [mm] [rad] [kNm] [kN] [%]

1 0 -0.3 0.000 0.00 0.00 0


1 -0.3 0.000 0.00 -0.01 0
2 -0.2 0.000 0.00 -0.04 0
3 -0.2 0.000 -0.01 -0.09 1
4 -0.2 0.000 -0.01 -0.16 1
5 -0.1 0.000 -0.02 -0.26 2
6 -0.1 0.000 -0.04 -0.37 3
7 -0.1 0.000 -0.07 -0.50 5
8 -0.1 0.001 -0.10 -0.65 6
9 0.0 0.001 -0.14 -0.83 8
10 0.0 0.001 -0.19 -1.02 9
2 0 0.0 0.001 -0.19 3.04 28
1 0.1 0.001 0.16 2.53 23
2 0.1 0.000 0.44 1.93 18
3 0.2 0.000 0.64 1.22 13
4 0.2 0.000 0.74 0.41 15
5 0.2 0.000 0.73 -0.50 15
6 0.2 0.000 0.61 -1.51 14
7 0.1 0.000 0.35 -2.63 24
8 0.1 0.000 -0.05 -3.84 35
9 0.0 0.000 -0.61 -5.16 47
10 0.0 0.000 -1.34 -6.57 60
3 0 0.0 0.000 -1.34 7.01 64
1 0.0 0.000 -0.70 5.80 53
2 0.0 0.000 -0.19 4.53 41
3 0.0 0.000 0.20 3.19 29
4 0.1 0.000 0.45 1.79 16
5 0.1 0.000 0.56 0.32 11
6 0.1 0.000 0.51 -1.21 11
7 0.0 0.000 0.31 -2.80 25
8 0.0 0.000 -0.05 -4.46 41
9 0.0 0.000 -0.58 -6.15 56
10 0.0 0.000 -1.28 -7.84 71
4 0 0.0 0.000 -1.28 8.18 74
1 0.0 0.000 -0.55 6.50 59
Page 4 1/25/2022
TipBeam1
Clerk in charge

Staff Point Deflection Rotation Moment V_Shear Utilization


# # [mm] [rad] [kNm] [kN] [%]

2 0.0 0.000 0.02 4.81 44


3 0.1 0.000 0.41 3.12 28
4 0.1 0.000 0.64 1.44 13
5 0.1 0.000 0.70 -0.25 14
6 0.1 0.000 0.59 -1.93 18
7 0.1 0.000 0.32 -3.62 33
8 0.0 0.000 -0.13 -5.31 48
9 0.0 0.000 -0.75 -6.99 64
10 0.0 0.000 -1.53 -8.68 79
5 0 0.0 0.000 -1.53 8.93 81
1 0.0 0.000 -0.72 7.24 66
2 0.1 0.000 -0.08 5.55 50
3 0.1 0.000 0.39 3.87 35
4 0.1 0.000 0.69 2.18 20
5 0.1 0.000 0.83 0.50 17
6 0.1 0.000 0.79 -1.19 16
7 0.1 0.000 0.59 -2.88 26
8 0.1 0.000 0.22 -4.56 41
9 0.0 0.000 -0.32 -6.25 57
10 0.0 0.000 -1.03 -7.93 72
6 0 0.0 0.000 -1.03 5.90 54
1 0.0 0.000 -0.84 5.31 48
2 0.0 0.000 -0.66 4.72 43
3 0.0 0.000 -0.51 4.13 38
4 0.0 0.000 -0.37 3.54 32
5 0.0 0.000 -0.26 2.95 27
6 0.0 0.000 -0.17 2.36 21
7 0.0 0.000 -0.09 1.77 16
8 0.0 0.000 -0.04 1.18 11
9 0.0 0.000 -0.01 0.59 5
10 0.0 0.000 0.00 0.00 0
Page 5 1/25/2022
TipBeam1
Clerk in charge

Reactions Joint ME R
[kNm] [kN]

2 0.00 4.06
3 0.00 13.58
4 0.00 16.02
5 0.00 17.60
6 0.00 13.83

Sum of reactions 65.10


Page 6 1/25/2022
TipBeam1
Clerk in charge

16.86

Loadings [kN],[m] 1 2 3 4 5 6
1 2 3 4 5 6 7

1,250 1,000 350


Lengths [mm]
561 1,000 1,000
13.58 17.60
Bearing [kN]
4.06 16.02 13.83
per 11.00
max -8.68

V_Shear [kN]
max 8.93
per 11.00

per 5.00
max -1.53

Bend.moment[kNm]

max 0.83
per 5.00

max < -0.9

Deflection [mm]

max < 0.9