Sie sind auf Seite 1von 3

Self Employed August 2007 to August 2008

Position: Senior Designer


Tools: Auto Cad 2005
Responsibilities: Prepared design drawings for Ford Chicago phosphate Ecoat s
ystem rework. Designed phosphate stage 12 and
Ecoat stage 0 tank and housing. Field Engineering support.
Process Solutions & Engineering June 2007 to August
2007
Position: Senior Designer
Tools: Auto Cad 2002
Responsibilities: Prepared various bid set drawings.
Comptech Corporation November 2006 to J
une 2007
Position: Senior Designer
Tools: Auto Cad 2005
Responsibilities: Performed various duties at Durr Industries. Design paint
spray booth drawings, plant layouts, and bid set drawings.
Comptech Corporation February 2006 to April 2006
Position: Senior Designer
Tools: Auto Cad 2004
Responsibilities: Designed supply and return ductwork, routing for heated
flash, color 1, color 2 and reprocess booths for the Sterling Heights Assemb
ly
Plant.

Process Solutions & Engineering July 2005 to November 200


5
Position: Senior Designer
Tools: Auto Cad 2002
Responsibilities: Worked on the Chassis spray booth paint system for Ontario
International Truck Plant. Designed heated flash, cooler, sludge equipmen
t
Building and sludge storage tank.

Air & Liquid Systems Inc. March 2003 to August 2004


Position: Senior Designer
Tools: Auto Cad 2000 & 2004, Excel & Word 97
Responsibilities: Designed and detailed sludge removal equipment. Designed
water test booths, pump and filter skids for booths at Shreveport & Orion
Assembly Plants. Also, was field supervisor for installation of Orion wat
er test
Booth, dealing with in plant trades to install equipment.
Apex Engineering Co. Sept 2002 to January 2003
Position: Project Manager
Tools: Excel, Word 97
Responsibilities: Designed an oil mist eliminator collection system at the St
erling Heights Visteon Plant. This project included the design of rooftop suppo
rt platforms and supply and return ductwork with supports.
Gallagher Kaiser Corp. November 1994 to February 2001
Position: Project Engineer/Senior Designer
Tools: GDS, SDRC 2D, Excel, Word 97
Project Engineer Responsibilities: Worked with Detroit Axle Plant Enginee
rs for layout of axle paint finishing system. Sized equipment, fans, pumps, and
steam heat exchangers. Worked with in-house trades to install system, Millwrig
hts to install conveyor and equipment, Pipe Fitters for all piping to washer, sp
ray booth and oven, including process, steam, compressed air and natural gas. W
orked with Electricians for wire and conduit routing, electrical schematics for
wire number and control panel connections.
Senior Designer Responsibilities: Designed miscellaneous and spray booths
Including airflow calculations for supply and exhaust ductwork. Miscellan
eous
platform design and detailing, including stair accesses, handrail and plat
e
Layouts. Also worked on design of paint system at Daimler Chrysler
Technology Center. Coordinated with other designers giving them
assignments and coordinating with them to control interference's between n
ew
And existing equipment. Designed ovens, including return and supply
Ductwork sizing and routing. Worked on phosphate E-Coat systems, includin
g
Pipe sizing and system layouts.
Durr Industries August 1992 to November 1994
Position: Senior Designer
Tools: AutoCAD 12
Responsibilities: Performed various field engineering tasks at Georgetown Toy
ota Plant. Checked both consultants and in-house drawings for specification com
pliance, main spray booth supply and exhaust ductwork sizing and routing, sludge
system pipe routing and sizing, and structural support steel platform layout an
d installation.

Trigon Engineering February 1991 to August 1992


Position: Project Engineer
Tools: AutoCAD 11
Responsibilities: Ran projects, re-worked a phosphate E-Coat system, includin
g pipe sizing and layout and details. Re-worked several spray booths including
supply and exhaust duct routing and sizing, and sheet metal rework.
Mitoma Enterprises July 1990 to February 1991
Position: Vice President
Responsibilities: Performed various duties for Durr Industries which includ
ed booth and oven related ductwork sizing, layout and detail for shop fabricatio
n.
Satellite Design June 1989 to July 1990
Position: Subcontractor
Tools: AutoCAD 11
Responsibilities: Performed various duties at Durr Industries which included
designing ovens, coolers, and industrial ventilation systems.

PROJECT EXPERIENCE
Michael Dzieszkowski has over 30 years experience in the Paint finishing
Industry and has worked on numerous projects. Recent major projects include
* Ford Motors Chicago Phosphate, Ecoat system rework
* Chrysler Motors Sterling Heights booth rework
* General Motors Shreveport La.& Lake Orion,MI Water Test Booth Design & insta
llation
* Chrysler Motors Axle painting System Design & installation
* Ford Motors Kansas Ecoat system rework, Oven Relocation
* Ford Motors Wixom Phosphate, Ecoat system, Conveyor Rework
* Toyota Motors- Georgetown Kentucky Paint Booth Installation
EDUCATION
Macomb County Community College, Warren, Michigan.
Major Subjects:
Chemistry, Physics, Engineering Drawing I and II, Pre-calculus, Calculus I, Comp
uter Drafting.
Eisenhower High School, Washington, Michigan. Graduated in 197
4.
Major Subjects:
History, English, Drawing I and II, Vocational Mechanical Drawing.

Das könnte Ihnen auch gefallen