Sie sind auf Seite 1von 2

Ahmad Walton, LEED AP

21706 Owl Canyon Dr.


Spring, TX 77388
281-217-9703
aw5af5a2@westpost.net
OBJECTIVE
To obtain a position in facilities management that would allow a more varied ex
posure to multiple aspects of project management in the construction industry.
RELATED EXPERIENCE
Hoar Program Management a division of Hoar Construction
Assisted in; estimating, pre-construction services, bid and award, owner's repre
sentative services, submittals, RFI's, change-orders, project close-out, and war
ranty claims for one of ENR's top 25 builders in the United States and SHRM's to
p 10 Best Places to Work For in 2009. Also, as an employee of Hoar Program Mana
gement, worked as an Owner's Representative/Project Manager in order to represen
t the client's best interests while constructing a project. While acting as Own
er's Representative, managed Architects, Engineers, and General Contractors whil
e representing the owner and protecting them from risk and the budget from cost
overruns. LEED AP status was achieved in November 2008.
Project Coordinator 2007to 2009
Hoar Program Management
Regions Bank - Chalmette, LA
* New Construction 4700 sqft. S.O.G. steel framed building.
Regions Bank - New Roads, LA
* Coordinated active bank closure while building a new 5000 sqft. branch on same
site simultaneously in a remote location not easily accessible to contractors o
r vendors.
Regions Bank - Kenner, LA
* Active branch completed exterior/interior renovation. Coordinated work on an o
vernight and weekend schedule so as not to interfere with branch operations.
Project Engineer 2009 to Present
Hoar Program Management
Coushatta Medical Clinic
* 7,000 sqft. S.O.G. wood framed Medical facility with Walgreens pharmacy.
Coushatta Casino & Resort
* LDOT road work and partial interior renovation to operational casino.
Texas Tech University Stadium Expansion (preconstruction only)
Regions Bank - Houston Heights
* New Construction 5000 sqft. S.O.G. steel framed building with drainage challen
ges.
Mobile Maritime Museum (preconstruction only)
Coushatta Heritage Center (museum)
* Removed GC and took over a job that was over budget and off schedule. Re-mobi
lized subcontractors, acted as Owner's rep and handled outstanding payments to s
ubcontractors. Found grants to complete project and suggested various value eng
ineering features to save the client more than 2 million dollars.
Coushatta New Hotel (currently in preconstruction)
* Proposed 401 room new hotel to be built on casino site.
Project Manager/ Owner's Representative 2009 to Present
Hoar Program Management
Regions Bank- Pasadena, TX
* Active branch interior renovation/build-out.
Regions Bank- Katy, TX
* Active branch partial interior renovation/build-out.
Regions Bank- Little Rock, AR
* Active branch interior renovation/build-out and employee relocation.
Regions Bank- Baton Rouge, LA
* Active branch interior and exterior renovation/build-out and employee relocati
on.
Coushatta Wastewater Treatment Plant- Kinder, LA (under construction)
* .8 MGD WWTP with lift station
* LDOT 1.5 mile road
Facility Coordinator/ Senior Financial Services Representative 2005 to 2007
First Service Credit Union
Acted as Facility Manager for a financial institution valued at more than $225 m
illion with 11 branches from The Woodlands Texas to Bay City, Texas. (More than
109 miles one way) Troubleshoot and coordinated solutions to various problems o
n a daily basis between the 11 branches.

EDUCATION
Lone Star College, Houston, TX
University of Houston- Downtown, Houston, TX
Thomas Edison State College, Trenton, NJ
REFERENCES
Available upon request.

Das könnte Ihnen auch gefallen