Sie sind auf Seite 1von 3

RANDALL A.

BOKEMEYERPROJECT MANAGEREXPERIENCE SUMMARYAccomplished


Project Manager with over thirty-five years of EPC leadership
experience accompanied with an MBA Degree. Accomplishments include
scope developments, design proposals, FEL studies, project
scheduling, budget controls, project execution planning, manpower
loading, procurement packages, monthly progress reporting and client
relationships. Other company accomplishments include being a member
of Mustangs Environmental Focus Group and working closely under the
direction of VP over Corporate Services. Local Groups include Member
of PMP Houston Chapter and Project Management Institute.
EMPLOYMENT HISTORY MUSTANG ENGINEERING, HOUSTON,
TX
2006 a" 2010Project
Manager
2010Accomplished and managed the relocation of 36R compressors site
within Elk Hills with a cost saving of over a million dollars in
revenue. Responsibilities included the supervision of all
disciplines, planning, estimating, scheduling, procurement and cost
controls. Work in conjunction with Occidental Management Project Team
including weekly progress reports and targeted milestones.CLIENT:
Occidental of Elk Hills, Inc., Bakersfield, Ca.Project Manager
2009Accomplished and assembled a dynamic engineering team under my
supervision to manage and support operations for commissioning and
start up of an LNG Plant for Trunkline Pipeline LNG Company.
Supervised entire engineering Team and worked closely with
Trunkline's VP Plant Operations to develop Initial Start-Up Plan.
Schedule was on time and under budget. CLIENT: Trunkline LNG, Lake
Charles, La.Project
Manager
2008Managed and supervised all disciplines responsible for the
detailed modification of a Mild Hydrocracker Unit (MHC) to a Diesel
Hydrotreater (DHT) using ABB Lummus's Syn-Sat Technology.
Accomplished many client milestones by selecting competitive vendor
bids evolving into many cost savers. Under my supervision and
leadership the project was completed on time and under budget.
CLIENT: Big West of California, Bakersfield, California Project
Manager
2007Accomplished the revamping of the existing FCC Fluid Catalyst
Cracking Unit Reactor. Installation of a new stand pipe with slide
valves for a pressure balanced unit to slide valve control for
catalyst transfer. Client was fully satisfied with the outcome of the
project which was completed on schedule and under budget. CLIENT:
Placid Refining Company LLC, Port Allen, Louisiana Project
Manager
2006Conoco Phillips is planning a technology upgrade to their FCCU
during Turnaround scheduled for mid 2009. Responsible for an FEL-1
study which included the installation of external riser cracking with
close coupled cyclones, (2) Catalyst Coolers, O2 Enrichment
capabilities, and to add another CO Boiler. Accomplishments included
a thorough study of the existing reactor and added recommendations to
cost reductions. CLIENT: Conoco Phillips, Linden, New Jersey
REF-CHEM, PASADENA,
TX
2005 - 2006Project ManagerAccomplished and
managed the PRV Enhancement Project for Valero Refining. Upgraded
vent systems to meet EPA Standard Codes. By-passes were installed
and all atmospheric reliefs were rerouted to a closed system. Work
directly with Valero management to accomplish this project. CLIENT:
Valero Refining Company, Houston, TexasPARSONS MANAGEMENT
CONSULTANTS SERVICES, INC., HOUSTON, TX 1998 -
2005PROJECT
MANAGER
2001 - 2005Managed this project under my supervision while delivering
piping components for refinery applications and plant expansion.
Managed entire engineering projects, developing project scopes,
managing manpower utilization, and providing on site client
relationships. CLIENT: Lyondell-CITGO Plant, Houston, TexasPROJECT
ENGINEER
LEAD
1998 - 2001Accomplished realized cost savings of $400,000 and earned
letter of recognition by reusing existing cooling tower and water
system, thereby eliminating need to replace tower with new one.
Developed safety checklist for chemical plant project, taking
proactive approach to identifying and reporting safety
hazards.CLIENT: Chevron-Phillips Plant, Houston, TexasGDS
ENGINEERS, HOUSTON,
TX
1996 - 1998PROJECT ENGINEER LEADResponsible for organizing and
managing responsibilities within the piping design group for refinery
wastewater containment projects as well as design for other projects,
CLIENT: Phillips 66 PlantM.W. KELLOGG, HOUSTON, TX
1995 - 1996 __PROJECT ENGINEER LEADAccomplished the rebuild of an
ammonia plant due to explosion. Redesigned the 1500 lb. steam system
for Terra Industries Facility.CLIENT: Terra Industries, Sioux City,
IASTUBBS-OVERBECK ENGINEERING COMPANY, HOUSTON,
TX 1994PROJECT ENGINEER
LEADAccomplishments included the total redesign of effluent disposal
systems, design and layout of EO Flare Unit and offsite piping. Also
involved with estimating, scheduling, proposals and client
relationships.CLIENT: Hoechst-Celanese, Bayport, TXPETROCON
ENGINEERING, HOUSTON, TX
1993PROJECT ENGINEER LEADAccomplishments included a new proposed
equipment arrangement and the complete design of the finishing
expansion project which included off-sites piping and a new extruder
building.CLIENT: Exxon Chemical Co., Mont Belvieu, TXSTONE &
WEBSTER ENGINEERING, HOUSTON,
TX
1991 a" 1993PROJECT ENGINEER
LEAD
Accomplished and design skid units for Tacoma Refinery in Tacoma, WA.
Responsible for detailed engineering design of a Tail gas, Sulfur and
Amine skid.CLIENT: Tacoma Refinery, Tacoma, WAPROJECT ENGINEER
LEAD
Accomplished new design and layout of a wastewater treatment facility,
fourth ethylene product compressor, and secondary acetylene
converter. Also a process efficiency improvement, which included an
auxiliary boiler, cooling tower, heat exchangers and cooling water
pumps. This project exceeded client expectations by completing on
time and under budget.CLIENT: Mobil Chemical Company, Houston,
TXPROJECT ENGINEER LEAD
1991Responsible for managing and supervision for design and layout of
a slurry de-ashing unit for the removal of slurry ash in the heavy
cycle oil.CLIENT: Plant Utility Reliability and Efficiency study,
Valero Refining Co., Corpus Christi, TXBROWN & ROOT, HOUSTON,
TX
1985 - 1991ENGINEER
LEAD
Accomplishments included the design and layout of the total Reduced
Sulfur (TRS) System. High and low condensable gases were collected
and sent to the existing lime kiln and boiler house. _Instrumental
in earning quality Group of the Year award for outstanding production
and quality of work on paper mill product, with Brown & Root._CLIENT:
Courtland Paper Mill, Decatur, AlabamaPROJECT ENGINEER
LEADAccomplished the design and layout of crude rerun storage
facilities, pipe racks, rerun pump building and heaters. Designed
and coordinated firewater storage tank area and utilities building.
Also checked piping drawings for the emulsion treaters, firewater and
freewater knockout area, aeration basin and clarifiers.CLIENT: Exxon
Chemical Co., Santa Barbara, CAPROJECT ENGINEER LEADResponsible
for a study which consisted of design and construction of mill wide
expansion rebuild of paper machines, rework of existing pulp line,
and rebuild of two recovery boilers, addition of one new kiln and one
new pulping line and wood yard expansion.CLIENT: Inland Orange, Inc.,
Orange, TXPROJECT ENGINEER
LEAD
1985Accomplishments included the design and layout for a new press
section, pulper vat and pumps to the existing paper machine.
Designed new shower piping to the machine rolls. Designed the NCG
system for Total Reduced Sulfur (odor abatement system).CLIENT: Union
Camp Corporation, Savannah, GASTUBBS-OVERBECK ENGINEERING COMPANY,
HOUSTON, TX 1984PROJECT ENGINEER
LEADAccomplishments included the design and layout of a hydrogen
compressor unit to supply hydrogen to boilers in a cogeneration power
plant. Also supervised the design of pipe racks, sump area and
materials control...CLIENT: Hoechst-Celanese Plant, Bay Port, Texas
BROWN University of Phoenix, Houston, TXAssociate of Science
Degree a" Business ManagementSan Jacinto College, Pasadena, TXTime
management StudiesQuality control and safety training
programsPROFESSIONAL LICENSES / AFFILIATIONSMember of PMP
Houston Chapter Member of Project Management InstituteMustang's
Environmental Focus Group MemberCertificate of Technologya"
Management Development SOFTWAREPiping; CADAM basics2D
Intergraph Micro-station 3D Intergraph Micro-stationPASCE 3D
Micro-stationAutoCAD with Windows 2000AutoCAD with Windows
2005SureTrac 3.0 project Manager