Beruflich Dokumente
Kultur Dokumente
CROMER
713 Miller Ct. / Temple, GA 30179
W 770-542-7016 / H 770-562-5700 / pc69c50a@westpost.net
PROJECT HISTORY
BROADWAY ELECTRIC, Chattanooga, TN
Industrial, Governmental and Commercial Electrical Installer
Project Manager, Nov 2009 Present
Manage schedules, scope, resources, risks, materials purchasing, safety, qualit
y, and budgets to ensure timely and cost effective completion.
Purchasing and receiving of materials and planned for the logistical deliverer
of them.
Hire, coordinate and supervised project team of up to 85 personnel.
Power and Lighting Project for Offices and Plant Facilities.
Negotiate change orders with engineering group and implemented them in a timely
manner.
Selected Projects and Achievements
Volkswagen Assembly Plant, Chattanooga, TN $4.7 Million Added $1.5 million in e
xtras on to the original project.
Negotiated and received four additional projects while on site related to conve
yor installations.
HUNT ELECTRIC CORPERATION, St Paul, MN
Industrial, Manufacturing & Automotive, Electrical expertise coast to coast.
Project Manager, 2007 to Nov 2009
Plan and direct the day to day activities of large infrastructure initiatives f
rom project inception to sign off.
Manage schedules, scope, resources, risks, safety, quality, and budgets to ensu
re timely and cost effective implementation.
Hire, coordinate and supervise project teams of up to 250.
Negotiate change orders with engineering group and implemented them to get them
completed in a timely manner while maintaining the schedule.
Coordinating hiring and duties of an office staff which included an engineering
department that fabricated Auto-Cad Drawings as well as checking for changes to
prints as they were reissued to us.
Attend bid meetings, for future work and priced out The Proposals.
Conduct design and technical review meeting with engineers as well as field sup
ervision, and Communicated information distribution between the two.
Clarified scope of work for the field supervisors and maintain the quality cont
rol of the installation work as the electrical wiring was installed.
Supplied Hunt Electric Management as well as owners with timely and accurate up
dates of project status on weekly bases.
Selected Projects and Achievements
Empire Generating Plant Installation - $14 Million; Albany NY
Body Shop and Paint Conveyor Installation - $4 Million; GM Lordstown Ohio
Paint Shop Conveyor Systems, Phase #1 & #2 - $9 Million; GM Spring Hill TN
General Assembly, Skillet & HAC Conveyor Installation; GM Spring Hill TN
Facilitate all close-out requirements for, Paint Shop Conveyor Phase #1, #2 an
d #3, Process Projects Phase #1 and #2 , ELPO/Phosphate, Building Addition and P
rocess, and General Assembly, Skillet Project & HAC Conveyor - Valued at $18 Mi
llion; GM Spring Hill TN
ATLAS INDUSTRIAL CONTRACTORS, Columbus, OH
Full service, single source supplier for installation of industrial machinery an
d related equipment.
Project Manager, 2004 to 2007
Project Manager / Construction Manager, 2001 to 2003
Plan and direct the day to day activities of large infrastructure initiatives f
rom project inception to sign off.
Manage schedules, scope, resources, risks, safety, quality, and budgets to ensu
re timely and cost effective implementation.
Hire, coordinate and supervise project teams of up to 350.
Negotiate change orders with engineering group.
Coordinate material delivery logistics.
Selected Projects and Achievements
APL Bottle Labelers (2) and Conveyors (1,800 SF) Installation, Anheuser-Bush, C
artersville, GA, $3.5 million. Returned a $400,000 surplus through effective pro
ject control. Completed project on budget and three weeks ahead of schedule.
Warehouse Modifications, Anheuser-Bush, Cartersville, GA, $1 million. Oversaw a
ll trades for the installation of two Palletizers with in feed conveyors. Extend
ed conveyor from 8 other palletizers, which involved relocating two stretch wrap
pers. Installed eight new pick off stations.
Body Shop Installation, Toyota Motors Manufacturing, Princeton, IN, $4.5 millio
n. Project involved the equipment in underbody, side member and suspension areas
.
Cartrac Conveyor Installation, General Motors, Lordstown, OH, $411,000.
TKS Paint Booth installation, Honda, Marysville, OH, $2.9+ million
Kamatsu Press Installation, CTR, two Tandem Lines & Blanker Line, Toyota, San A
ntonio TX, $3.9+ million.
Galvanizing Line, Steelscapes, Shreveport LA, $46.5+ million
PHILLIP R. CROMER W 678-223-8834 2/2
EDUCATION
Ohio State University, Wooster, OH
Associate of Science, Animal Science (Dairy)
Georgia Quick Start PLC, Process Logic Controller Training
OSHA 10 & 30 Hour Trained
PROFESSIONAL AFFILIATIONS
IBEW LOCAL #212, Cincinnati, OH, Journeyman Electrician