Beruflich Dokumente
Kultur Dokumente
1
ALUR- Block Section could 12.20 13.30 6515- Due to TGT delatched coil Relay coil Relay received
BLLT not closed @ 24/11 24/11 16" @ NSN problem TGT could ot problem & sent to
SE/SRM @
BLLT for goods ALUR be delatched @ BLLT 02/02/2011
for path same relay replaced &
restored by JE/SKLR
Make: S&T PTJ Sl.
No:20081 Contact:8F/6B
Mfd: 06/06 D/C:01725
2
SBHR- Block Unable to close 00.55 07.15 CLE- At YDM, TGTR relay not Relay Relay received
YDM the section at 30/11 PLCT delatched same relay defective & sent to
SE/SRM @
SBHR. 30/11 replaced & restored by 27/12/2010
ESM/SBHR at YDM. Make:
PTJ. Sl. No:18490 Mfd:
08/04 D/C
No:000676. LDM:
21/11/10 LDI:10/11/10
R3 &R4 coil R: 145 ohms.
3
Dec-10
ALUR- BLOCK Premature TOL 01.25 5.00 Local Battery-28v, Line Relay Material with
BLLT @ BLLT for 19/12 19/12 Battety: I/P- 24v, O/p-56v, defective CSI/HAS
6518. I/c current- 70ma, O/g
current-70ma,
As per site
datalogger after taking
Line Clear ASR relay
momentarily dropped.
LDM:8/12/10,
LDMI:29/11/10,
4 D/C:000029.
Jan-11
YDK- Block section could 04.30 10.30 TGTR relay not Relay Relay received
SVGL not be closed at 14/01 14.01 delatched( TGTR ckt). defective & sent to
SE/SRM @
SVGL for 6518 Same relay replaced and 27/01/2011
exp. restored by JE/SBHR &
ESM SBHR@SVGL.
D/C No: 03726
Sl. No: 7606
Style: QL1
Contact : 8F/6B
Mfd:
06/99 .
5 LDMI: 27/12/10
YDK- Block TGT could not 16.20 22.20 At SVGL TAR not relay contact Material with
SVGL be established 15/01 15/01 delatched circuit LCCPR offering high CSI/HAS
for LE at YDK. relay 4D3 contact offerring resistance
TCF not set at high resistance (2Kohms)
SVGL. relay replaced and
restored by JE/S/SBHR.
Make: PTJ Sl. No.:
308/39 Mfd: 12./06
LDM:08/01/11
LDI:27/12/10 D/C No:
3728
6
11-Feb
YDK- Block Section could 00.50 04.00 PLCT At YDK PCR relay not Relay At SVGL Material with
SVGL not be closed on picked up due to TAR relay contact clip CSI/HAS
arrival of 16518 06/02 06/02 TOKN D2 contact clip sulphation sulphation
@ YDK formed, same attended & 1.TGTPR
restored by ESM/YDK, up-22.08hr
D/C-
01315, LDM-
1/2/11, LDI- 2. LCCPR
20.01.11 up-00.50hrs.
7
11-Mar NIL At YDK
block data
11-Apr
not
YDM- Block TOL buzzer not 13.30 16.30 At YDM, due to block bell code
available. Material with
SBHR arrested for 25/04 25/04 insrument bell code button button pusher CSI/HAS
spring cut
56647 passg. pusher spring cut. Same
attended & restored by
ESM/SBHR D/C No:
000698 LDM: 13/04/11
LDMI: 17/04/20111
8
ASK
nov-2010
Sl. Section Gear Nature IN Time RT TD CAUSE REMARKS
No / Date Time/
Date D/L
AMSA- Block Section could 01.50 05.30 LCT At SPGR TCKR relay contact No. Contact
SPGR not be closed at 20/11 20/11 6228 2A1 & 3A4 carbonised (offering offering high
SPGR on arrival 6536 high resistance) Relay replaced & resistance
of 6507exp restored by JE/TK @ SPGR
Make: PTJ Sl.
No:3101 Mfd: 03/99
D/C No: 000208
resistence :
2A1 - 0.3-75ohms
Resistance : 3A4 - 0.3
- 5ohms
(TCKR front contact pertaining to
PTR & NTR circuit & LR cct)
(As per TR D/L
TGTPR picked up 01.34 hrs & dn
at 01.47 hrs Line closed
code frequently gone at AMSA.
TCFPR picked
up at 05.11 hrs dn at 05.13 hrs. at
AMSA. TAR picked
up at 01.46 hrs SNR frequently up
& dn other relays not operated.)
1
DEC-2010
NIL
JAN-2011
AMSA- Block TGT could not 5.28 5.50 LCT- AT AMSA, bell code button bell code button Accd. to D/L at
SPGR established for 11.1 16590 pusher spring cut, same pusher spring cut TR, at AMSA
16590 exp. 11.1 replaced and restored by 1A ASR
ESM/AMSA. D/C:-00038 contineously
LDM;05.01.11 Chatering
LDMI:28.12.10 LDQI:30.11.10
Accd. to D/L at TR,
at AMSA 1A ASR
contineously Chatering
2
FEB-2011
NIL
MAR-2011
NIL
APR-2011
RRB- Block Line Clear could 9.00 10.10 LCT At RRB TCKR relay contact relay defective SHKR-DRU
DRU not be cancelled EBCN No: 1A2 offering high chattering
for EBCN goods 21/4 21/4 resistance pertaining to NTR NTR, PTR,
at RRB. ckt., same relay replaced and SCKR not
restored by ESM/RRB & provied
ESM/DRU at RRB. D/C
No:00043
LDM:09.4.2011
LDMI:11.3.2011 Relay Make:
S&T PTJ Sl
No:10534 Mfd:04/03
1A2 resistance: 0.99ohms
3
Remarks SE/S/TR
Material with
CSI/ASK
Material with
CSI/ASK
Material with
CSI/ASK
RRB
Sl. Section Gear Nature IN Time / RT Time/ TD CAUSE REMARKS
No Date Date
Nov-10
AJP- Block TGT Could 18.10 18.50 PLCT TCKR relay not picked up Relay
SHV not be 10/11 2080 due to NTR Relay 4C3 contact
established at 10/11 contact offering high offering
SHV for 2080 resistance (7 ohms) (front high
exp contact) same relay inter resistance
( TCF changed to LCBR relay &
set at AJP) restored by ESM/SHV @
AJP. Make: PTJ.
Style: QN1.
contact: 8F/8B.
volt: 24V.
Sl.no: 385666
Mfd:
08/2008 LDM:
01/11/10 LDMI:
14/10/2010 D/C No:
002229
1
HLK- Block On arrival of 04.02 09.30 PLCT At HLK SHKR stick not Defective
RGI 6536 section 11/11 available due to Unit No:2 meterial
could not be 11/11 7301 condenser burst
closed at RGI. (1000micro farad) same
587 replaced & restored by
ESM/SHV.
283 LDM:
30/10
CLE LDMI: 09/11
2 D/C No: 001464
590
SHV- Block On arrvial of 12.15 13.30 LCT At AJP SNR cct 32ZR @ Offering high
AJP PQRS section 20/11 20/11 relay room 5D6 contact resistance
could not be 587 offering high resistance
closed & No (14ohms) same repalced
SNR @ AJP PNKI & restored by ESM/SHV
goods @ AJP
Make: ELDYNE
Sl.No: 299526
Mfd: 01/09
D/C :
002233
LDM: 1.11.10
LDMI:14.10.10
LDQI:10.09.10
8
Apr-11
RRB- Block Line Clear 9.00 10.10 LCT At RRB TCKR relay SHKR-DRU
DRU could not be 21/4 21/4 EBCN contact No: 1A2 offering chattering
cancelled for high resistance pertaining
EBCN goods to NTR ckt., same relay NTR, PTR,
at RRB. replaced and restored by SCKR not
ESM/RRB & ESM/DRU at provied
RRB. D/C No:00043
LDM:09.4.2011
LDMI:11.3.2011 Relay
Make: S&T PTJ
Sl No:10534
Mfd:04/03 1A2
resistance: 0.99ohms
9
RRB- Block Unable to take 23.45 00.55 PLCT At RRB due to bell code bell code
NVF line clear for 28/04 29/04 button pusher spring button
16535 exp at 16535 cut.Same replace dand pusher
RRB restored by ESM/RRB. spring cut
D/C No:000355
LDM: 20/4/11
10 LDI:6/4/11
Remarks
SE/S/TR
Relay received
& sent to
SE/SRM @
06/12/2010
Material with
CSI/RRB
Relay received
& sent to
SE/SRM @
06/12/2010
Material with
CSI/RRB
Material with
CSI/RRB
Material with
CSI/RRB
Material with
CSI/RRB
Material with
CSI/RRB
Material with
CSI/ASK
Material with
CSI/RRB
JRU
Sl. Section Gear Nature IN Time / RT Time/ TD CAUSE REMARKS
No Date Date
Nov-10
JRU- Block Unable to close the 02.50 04.20 LCT At SLU bell code Defective Material with
SLU section at SLU On 03/11 03/11 button pusher spring material CSI/JRU
arrival of 6589 Exp. 6210 broken, same
replaced & restored
by ESM/JRU.
LDM:28.10.10,
6536 LDQI:28.10.10,
D/C
6535 NO:00004.
1
7301
DEC-10
MYK- Block TGT could not be 22.10 05.30 LCT At KAG CTR 4D3 contact Material with
KAG established at MYK 29/12 30/12 7302 contact carbonised CSI/JRU
for HVR spl. 6535 carbonised(CTR stick
6590 path) inside relay.
Relay replaced &
restored by JE/S/JRU
at KAG. LDM :
17.12.10
2 LDMI : 17.12.10
11-Jan NIL Make : PTJ - 8F/8B
Feb-11 NIL Sl No. :
11-Mar NIL
102307 Mfd :
09/1997
D/C : 095233
BVlock local : 31.2V
I/C : 70ma -
20.1V O/G : 68ma -
49V (KAG block
relays not proved in
datalogger)
HRR
Sl. Section Gear Nature IN Time / RT TD CAUSE REMARKS D/L
No Date Time/
Date
10-Nov
KNO- Block TGT could not be 16.10 16.18 LCT Due to LCCPR 4D3 contact Relay
SNH established @ 26/11 26/11 1018 high resistance (156 ohms) contact
SNH for 1018 Same relay replaced & high
Exp. TCF restored by ESM/ KNO resistance
indication Make:urban mfd: 05 /2005
available @ KNO LDM:16/11/10 LDMI:23/11/0
D/C
no:SNH /2010/000193.
1
KNO- Block Unable to close 18.02 21.40 Due to, ASR relay 5C6contact relay
S.UBL the section at S. 30/11 30/11 offering High resistance contact
UBL or 587 pass. (700ohms) of TCFR offering
delatching ckt. Same relay High
replace and restored @ S.UBL resistance
by ESM/KNO. Relay
- Make :Urban.
MFD:05/2005 Sl.
No.:B5198
LDM:25/11/10
LDMI:12/11/10 DC
No.: 000175
2
KNO- Block Unable to take 23.05 00.35 PLCT- Due to, P2R (pertaining relay
S.UBL Line Clear at 30/11 01/12 6590- TOLAR circuit) relay 2D1 contact
S.UBL for 6590 2" contact offerring high offering
resistance (6.67 ohms) at High
KNO, same relay replace and resistance
restored. Make: Urban Sl.
No.: 8675 LDM :
25/11/10 LDMI: 12/11/10
DC No.: 000180
3
10-Dec
KJG- BLOCK TGT could not be 18.20 21.20 LCT- Due to TGT button spring cut spring cut
SVNR established for 18/12 18/12 581, @ KJG. Same replaced &
581 pass.TGT not 586 restored by Esm/HVR.
available @ LDM:- 08/12/10 by ESM/HVR
KJG.TCF LDI:- 22/11/10 by JE/HVR.
available @ 24 V local-29.2 V
SVNR
4
SVNR- Block TOL buzzer could 20.40 23.50 LCT- At SVNR bell code button pusher
YLG not be arrested at 22/12 22/12 17302 pusher spring cut. Same spring cut
SVNR for HAS-N replaced & restoredby
goods. ESM/YLG.
LDM:01/12/10,
LDMI:13/12/10 (Block
relays not proved in TR
Datalogger at SVNR & YLG)
d/c no: 000214
5
SVNR- Block TGT could not 5.10 09.45 LCT At SVNR CTPR relay contact
KJG established @ 23/12 23/12 12726 2B1contact offering high offering
KJG for 16589 resistance pertaining to PTR high
exp. TCF also not circuit. Same relay replaced & resistance
set @ SVNR restored by Esm/HVR @
SVNR. Make:S&T
Sl/No:244675
contact:8F/8B QN1
Mfd:06/05 D/c
No:000 195 LDM:18/12/10
LDI:22/11/10
Resistance: 5Ω (At TR D/L
block relay not proved)
6
KJG- Block TGT could not 13.00 14.25 LCT SHKR relay not picked upat contact
SVNR established @ 23/12 23/12 11036 SVNR due to PR relay 1A2 sulphation
KJG for 11036 contact sulphation, relay
exp. TCF also not replaced & restored by
set @ SVNR JE/HVR. Sl.No:B8670
Make:Urban engg. Mfd :
Aug-2009 P2R A1A2
resistance: 5Ω
LDM:18/12/2010
7 LDI:22/11/10 D/C No:000196.
SVNR- Block TGT could not be 07.45 10.50 PLCT PCR relay contact 5C6 offering contact
KJG established at 25/12 high resistance (Pertaining to offering
SVNR for 12726 25/12 12726 PTR circuit) relay replaced & high
restored by JE/S/HVR @KJG resistance
56516
contact Resistance - 4 ohms
Make: PTJ. Mfd:
06/05 sl.no: 244465
contact: 8F/8B LDM:
22.12.2010 LDI:
21&22.11.2010
D/C No: 000196
( In SVNR &
KJG dataloggers block relays
not proved .)
8
11-Jan
KJG- Block TGT could not be 03.15 09.45 PLCT At SVNR TOLTR relay Relay At KJG
contact 24V EXT-34.07V
SVNR established for 30/01 contact 7B8 offering high 24V INT-29.5v
06535 at KJG 30/01 06535 resistance (7omhs) using in offering high up TAR up at
infd to (SVNR-TCF) 7301 CTR circuit for answer back. resistance. 03.20.19
up TAR dn at
TR @ 2726 Same relay replaced and 03.20.56
03.40 restored by JE/S/KNO. Other block
8B contact relays not proved.
At SVNR
having -27v and 7B 24V EXT-
contact having-13v at failure 31.787V 24V
time INT-30.98v up
TAR up at 03.39.13
Relay Make : PTJ, up
Sl. No.:244680, TAR dn at 03.39.42
MFD: 06/05 D/C No.: Other
block relays not
000223 proved.
LDM:16/01/11 LDI:17/01/11
9
11-Feb
DVG- Block Unable to close the 15.50 16.50 PLCT From AVC answer back code not contact Block relays not
AVC section @DVG for 11.02 progressed due to PTR relay not offering proved
11017Exp. 11.02 picked up because of PCR relay high
AVC-TGT 12080 back contact 5C6 contact offering resistance
high resistance(12ohm) & 7B8
DVG-TCF CLE contact offering high
At AVC- resistance(1K ohms).Same relay
section closed replaced & block restored by
ESM/HRR
Relay perticulars:-
Make-C.G
Sl.No-205323
MFD-11/2005
,8F/8B , QN1 LDM-
10/02/11
LDI-05/02/11(Q/I)
D/C-AVC/00031
10
DAD- Block No O/G 08.00 10.30 LCT- At BYD Block instrument Defective block relay not
BYD bell@DAD. TOL Magneto telephone coil short equipment proved in D/L
buzzer not 16/02 16/02 56911 with line ckt. Same magneto
arrested @ DAD phone replaced & restored by
for 12726 Exp. 56516 ESM/HVR .
D/C No-000066
2777 LDM-12/02/2011
LDI:-
27/01/2011
I/C V: 58V I/C I: 101mA.
11 O/G V: 56V O/G I:
11-Mar 71mA.
GDI- Block On arrival of 18.25 21.15 PLCT - At GDI, due to 4D3 contact of relay At GDI :
SNH 16209 Exp TAR 05/03 05/03 56515, SHKR relay on TAR latching defective -
buzzer not 56913, ckt offering high resistance Contact Dn TAR Up at
appeared at GDI. NMGS (R=13.5 V), same relay high 19.08.26hrs
GDI- P, replaced and restored by resistance 3 RR Dn at
TCF+TOL 56912 ESM/KNO. Relay: Make- 19.09.50hrs
SNH- CG, Sl. No.:AC295342 Mfd- Dn TAR Dn
TGT+TOL 8/07 D/C No:00214 at 19.09.50hrs
LDM:26.02.11 LDMI:12.02.11 1/2/3ASPR1
19.09.51hrs
Block relays
12 not proved.
HRR- Block TGT could not be 07.30 09.00 PLCT - At KMPS 7B8 contact of ASR relay Last TAR-HRR
KMPS established @ relay & 5D6 contact of TCFPR defective - Up at
HRR for 56911 05/03 05/03 56911 relay offering high reisistance Contact 7.08.33hrs
pertaining to TAR delatching high last
circuit. So that TAR not resistance TCFR-HRR Dn
delatched. Both relays replaced 07.09.06hrs
& block restored by MCM/HRR. TAR-HRR Dn at
R=4.2 07.09.10hrs
V D/C No: 00020.
ASR : Make-CG, Sl
No:31943 Mfd: 07/99
TCFR : Make-
CG, Sl No:31942 Mfd: 07/99
13
KMPS- Block Unable to set TGT 08.17 10.05 PLCT At KMPS TAR relay not relay At KMPS
HRR @ KMPS 06/03 06/03 12726 delatched because in TAR defective -
delatching ckt TGTPR 7D8 Contact TCF
56273 contacts offering high high code
56911 resistance. Same relay resistance transmitted
replaced & restored by from KMPS to
ESM/CLI. R:- 6.6 Ω HRR at
Relay: Make:CG 08.15.22 hrs.
Style:QN1 Sl.NO:31944 TOLAR-HRR
Mfd:07/99 Up at 08.15.28
LDM:23/02/11 LDI:17/02/11 TOLAR-HRR
D.C Dn 08.15.30
No:KMPS/2011/000037 hrs. Block
relays not
proved in HRR
D/L.
14
SVNR- Block TGT could not be 14.20 17.20 PLCT- At SVNR TGTR not picked up Relay
KJG established at 13/03 13/03 11017, due to TGBR relay contact contact
SVNR for 11017 56274, No. 4B3 offering high offering
56913, resistance. Same relay high
56515, replaced and restored by resistance
JE/S/KNO. R=10ohms.
16507, D/C No:0234 LDM:10.3.11 Block relay not
56912 LDMI:26.2.11 Relay proved
Make:PTJ Mfd:06/05 Sl
No:244727 (Block relays not
proved in Data Logger)
16
HVR- Block TGT could not be 04.00 04.30 LCT At HVR Bell code button Bell code
BYD established at 18/03 18/03 CLE pusher spring cut. Same button
HVR for CLE replaced & restored by pusher
JE/S/HVR. D/C : 00001 LDM spring cut
: 04.3.11 LDMI: 07.3.11
17
11-Apr
DVG- Block TOL buzzer not 15.20 16.50 PLCT Due to bell code button contact bell code
AVC arrested at DVG 25/04 25/04 cut at DVG. Same replaced & button
for EBRN goods. 11017 restored by ESM/HRR. contact
D/C No: cut
At DVG - DVG/000037
TCF+TOL LDM: 16/4/11
At LDI:21/4/11
AVC - TGT+TOL
18
Remarks
SE/S/TR
Relay
received &
sent to
SE/SRM @
24/12/2010
Relay
received &
sent to
SE/SRM @
24/12/2010
Material with
CSI/HRR
Material with
CSI/HRR
Material with
CSI/HRR
Relay
received &
sent to
SE/SRM @
27/12/2010
Relay
received &
sent to
SE/SRM @
27/12/2010
Relay
received &
sent to
SE/SRM @
27/12/2010
Relay
received &
sent to
SE/SRM @
05/02/2011
Relay
received &
sent to
SE/SRM @
17/02/2011
Material with
CSI/HRR
Relay
received &
sent to
SE/SRM @
07/03/2011
Relay
received &
sent to
SE/SRM @
07/03/2011
Material with
CSI/HRR
Relay
received &
sent to
SE/SRM @
16/03/2011
Material with
CSI/HRR
Material with
CSI/HRR
TLB FAILURE SUMMARY
1 Relay failure
QN1 29
LATCH 11
Baised 0
2 Unit Defective 2
3 Spring cut
BCB 11
LC 2
TCF/TGT 2
4 Other failure 66
Total 123
1 Premature TOL 18
2 TAR not picked up 4
3 TAR not delatched 10
TGT could not be
4 established 37
TCF Not set
5 0
Line closed could not be
established
6 25
Unable to take/cancel
7 Line clear 4
TOL/TAR buzzer not
8 arrested 8
9 TOL buzzer not come 2
10 TAR buzzer failed 10
11 No SNR 4
12 No Free indication 1
TOTAL 123
MYS TLB B/I failures from NOV-10 TO APR-11
Sl. Section Gear Nature IN Time / RT Time/ TD CAUSE
No Date Date
NOV-10
MYS-AP Block TGT could 03.15 05.00 LCT Push back cancellation
not be 13/11 13/11 CLE applied & restored by
establishe ESM/MYS.
d for CLE
at AP.
1
KRNR- Block On arrival 20.30 22.45 Due to Line close button
HAH of 266 17/11 17/11 pusher spring cut same
pass replaced & restored by
unable to MCM/KRNR at HAH.
close the LDM:
section at 12/11/2010 LDMI:
HAH 30/10/10 D/C No:
2 0068
KDO-NTW Block Section 05.50 10.15 LCT Subsiquenlty got right. On
could not 21/11 21/11 204 investigation found at KDO
be closed 1CR relay 6C5 contact
@ KDO offering high resistance
on arraival (pertaining to initial pick up
of 201 of CTR ckt) Relay replaced
pass. & restored by ESM/AP.
3
KRNR- Block TGT could 08.15 10.30 LCT At KRNR TAR relay not
HAH not be 20/11 20/11 265 delatched since LCCPR
establishe 262 front contact No. 3D4
d @ HAH offering high resistance
TCF @ (0.3kohms) same relay
KRNR for replaced & restored by
265pass JE/S/MYS (LCCPR front
contact pertaing to TAR
relay Circuit)
D/C: 0095
Make: PTJ
Sl.No: 355518 Mfd: 11/07
LDM: 17/11/10
LDMI:18/10/10
(As per TR D/L TCFPR-
HAH dn at 06.11 but TAR
not dn at that time at
KRNR)
4
KDO-NTW Block TGt could 15.34 17.05 LCT While tracing the cicuit fault
not be 19/11 19/11 LE disappeared circuit kept
establishe 213 under observation &
d @ NTW restored by JE/S/MYS @
for LE KDO D/C: 000065
LDM:14.11.10
LDQI: 26.10.10 Block local
(TCF @ : 27 Volts I/C : 65 ma &
KDO) 50 V
O/G : 74ma & 56V
5
DEC-10
KDO- Block No SNR 5.25 5.35 202- On arraival of 202 pass
NTW at KDO. 01/12 01/12 PLCT at NTW automatically
SNR appeared and
Block restored by
traffic staff.
6
JAN-11
MGF- Block Prematu 11.25 12.15 PLCT On arrival of 56270 at
HLN re TOL 08/01 08/01 56720 HLN TAR buzzer
at MGF appeared & line close
for established. checked
56270 the circuit & block
restored by ESM/HLN.
ESM/HLN night
camped at stn for
observation.
LDM:
21/12/10 LDMI:
09/12/10 D/C
No: 0068 At HLN
I/C
Current: 67 mA
O/G current:
70 mA
O/C Voltage: 53.5 V
I/C
voltage: 17.89V.
I/P to
DC-DC convertor:
20.41
7 O/P of DC-
DC convertor: 75.4V
MGF- Block Section 20.00 01.30 LCT At MGF block
AKK could 15/01 16/01 17301 instrument Bell code
not be 16517 button pusher spring
closed cut. Same replaced &
@ MGF restored by
on ESM/KRNR. LDM :
arrival of 10.01.11
56265 LDMI : 07.12.2010
pass D/C No. : 00085
As per TR datalogger
at HLN :
TCFR Up
at 11.17HRS
TAR-
MGF up at 11.56.57
LCCPRUp at
12.15hrs
TAR - MGF dn at
12.15.12
TCFR Dn at 12.15hrs
8
FEB-11
MYS- Block Prematu 11.05 11.20 12613- On arrival of 12613
MNGT re TOL 13/02 13/02 15" @ Exp. at MNGT. TAR
appeare Sig. buzzer appeared and
d at Mys block restored by
for JE/CN/MYS.@ MNGT.
12613
Exp.
MYS-
TGT+TO
L
MNGT-
TCF+TO
9
L
MGF- BLOC Prematu 7.07 10.00 PLCT Push back cancellation
AKK K re TOL 15/02 applied at AKK & block
@ MGF 15/02 56266 restored by ESM/AKK.
for
56266.
10
MAR-11
11
APR-11
HLN- Block TOL not 22.53 07.20 PLCT- At HLN TOLAR not
MVC appeare 15/4 16/04 17301- picked up due to t
d at 5" TOLTR relay 2B1
MVC for 16517, contact offering high
12781 16518 resistance (R-48
exp ohms). Same relay
MVC replaced & restored by
- TCF JE/S/MYS.
Make:PTJ 8F/8B
HLN - SL.No: 345421
TGT+TO mfd: 09/07 d/c no:
L 00066 LDM: 12/4/11
LDMI: 9/3/11
At HLN:
o/g I-68ma V-
49.5v
i/c I-69ma V-17.38v
12
PR-11
REMARKS
Pushback
cancellation
Pusher
spring cut
contact
offering high
resistance
relay contact
Offering
high
resistance
Subsequentl
y got right.
OPTG
(subseque
ntly got
right)
Subseque
ntly got
right
Defective As per
material TR
datalogg
er at HLN
:
TCFR Up
at
11.17HR
S
TAR-
MGF up
at
11.56.57
LCCPRU
p at
12.15hrs
TAR
- MGF dn
at
12.15.12
TAR
MGF Up
23.49.50
hrs
At MGF
D/L not
provided
TOLAR-
MVC Dn
21.52.37
up @
06.18 of
16/04
relay contact
Offering
high
resistance
HAS
Sl. No Section Gear Nature IN Time / RT Time/ TD
Date Date
Nov-10
BNTL- Block Section could not be 19.06 21.30 LCT
PADL closed @ BNTL on 13/11 13/11 NIL
arrival of 637pass
1
ALUR- Block Section could not 12.20 13.30 6515-
BLLT closed @ BLLT for 24/11 24/11 16" @
goods ALUR
for path
2
SBHR- Block Unable to close the 00.55 07.15 CLE-
YDM section at SBHR. 30/11 30/11 PLCT
3
Dec-10
DOGL- Block TGT could not 12.10 13.30 LCT-
KVGL established for 11/01 6516
CLE@DOGL,TCF set 11/01
@KVGL
4
ALUR- BLOCK Premature TOL @ 01.25 5.00
BLLT BLLT for 6518. 19/12 19/12
5
Jan-11
YDK- Block section could not be 04.30 10.30
SVGL closed at SVGL for 14/01 14.01
6518 exp.
6
YDK- Block TGT could not be 16.20 22.20
SVGL established for LE at 15/01 15/01
YDK. TCF not set at
SVGL.
7
KVGL- BLOCK TGT could not be 10.00 12.55 PLCT
DOGL established at KVGL for 27/01
DKNLPGA goods. 27/01 DKNLPG
TCF set at DOGL. goods.
8
HHT- Block TGT could not be 18.05 22.30 LCT
BGPA established for 56265 29/01
pass 29/01 56265
9
YDM- Block No TOL at YDM for 19.45 23.30 PLCT-
NRJ HAN goods 30/01 30/01 HASN16
518
10
KVGL- Block TGT could not be 04.00 09.20 PLCT
YDK established for 16517 30/01
at KVGL (YDK- 30/01 16517
TCF)
11
11-Feb
KVGL- Block TGT could not be 09.00 16.30 PLCT
DOGL established @ KVGL 04/02 04.02 MNGTN
for MNGTN goods goods
12
DOGL- Block Unable to set TGT for 5.50 08.40 PLCT
KVGL PINKI goods @ DOGL 05/02
05/02 PINKI
goods.
13
YDK- Block Section could not be 00.50 04.00 PLCT
SVGL closed on arrival of
16518 @ YDK 06/02 06/02 TOKN
14
DOGL- Block For Hasan 'N' Goods 03.40 04.05 PLCT
KVGL Premature TOL 12/02 12/02 Has'N'&
appeared at KVGL. 16517
KVGL-
TGT+TOL
DOGL-TCF
15
11-Mar
HAS- Block TGT could not be 2.00 5.00 PLCT
MVC established for 16518 06/03 06/03 16518
exp.@HAS 17302
EBCN
16
SBHR- Block NO TAR buzzer for 13.20 13.55
YDM 56646 pass.
(No 14/03 14/03
entry in
control)
17
11-Apr
ALUR- Block TGT Could not be 00.30 03.15 PLCT
BLLT established @ BLLT for
16518 07/04 07/04 16518
16517
DN LE
18
BNTL- Block TGT Could not be 20.30 22.10 LCT
NRF established @ BNTL 07/04 07/04 16518
for 16518 exp.
19
YDM- Block TOL buzzer not 13.30 16.30
SBHR arrested for 56647 25/04 25/04
passg.
20
CAUSE REMARK
S
Checked all in
stick circuit of ASR,
PCR and ASTRrelay
changed by
JE/S/SKLR at BLLT
and block restored.
LDM:8/12/10,
LDMI:29/11/10,
D/C:000029.
TGTR relay not Relay
delatched( TGTR ckt). defectiv
Same relay replaced e
and restored by
JE/SBHR & ESM
SBHR@SVGL.
D/C No: 03726
Sl. No:
7606
Style: QL1
Contact : 8F/6B
Mfd: 06/99 .
LDMI:
27/12/10
At SVGL TAR not relay
delatched circuit contact
LCCPR relay 4D3 offering
contact offerring high high
resistance (2Kohms) resistan
relay replaced and ce
restored by
JE/S/SBHR. Make:
PTJ Sl. No.:
308/39 Mfd: 12./06
LDM:08/01/11
LDI:27/12/10 D/C
No: 3728
At KVGL in ASR circuit Dry
C4 contact clip of soldering
TOLAR relay dry solder
same resoldered &
restored by ESM/YDK.
D/C no:
03529
LDMI: 17/01/2011
LDM: 20/01/2011
On arrival of Automatic
ESM/HAS checked ally got
right
the circuit but fault
disappeared .
ESM/HAS night
camped at HHT for
observation.
I/C
v: 49.5v
O/G V:
68.5v
I/C I: 70mA
O/G I: 70mA
LDQI:28/01/2011
LDM:17/01/11
LDI:20/01/11
Due to TAR relay not Automati At
delatched @ KVGL. cally got DOGL
Same several times right
tested & fault not TCFPR
repeated. Restored by up
ESM/YDK. R3- R4 -09.00
voltage - 31 V hrs.
D/C No: TGT
03532 code
LDM: 20/01/11 progress
LDI: 02/02/11 ed from
DOGL .
Ext V:
30&25 V
Int: 25V
Block
Local:
up: 31 V
Dn: 31V
KVGL
D/L not
connect
ed to
TR.
In KVGL, B/I TAR Relay KVGL
relay not delatched contact D/L not
due to LCCPR relay clip dry network
4D3 contact dry solder ed
soldered, same re-
sodered & restored by
ESM/YDK. D/C-
03533, LDM-20.01.11,
LDI-02.02.11
At YDK PCR relay not Relay At SVGL
picked up due to TAR contact
relay D2 contact clip clip
sulphation formed, sulphati
same attended & on 1.TGTP
restored by ESM/YDK, R up-
22.08hr
D/C-01315,
LDM-1/2/11,
LDI-20.01.11
2.
LCCPR
up-
00.50hrs
.
At
YDK
block
data not
available
.
TAR up
@ 04.01
LCCPR
up @
04.01
TAR dn -
04.09
When tracing the ckt Subsequ HAS
fault not found ad not ently got block
repeated and restored right relays
by ESM/HAS. not
LDM:28.2.11 proved.
LDMI:5/1/211
D/C No:03611
At
HAS :
o/g I:
78ma o/g V:65v
i/c I: 66ma
While tracing the ckt Tested & AT
fault not found. During found ok SBHR
testing failue not
repeated. Block
instrument found 1A RR
working in normal. Up-
Restored by 12.39 hr
JE/SBHR.
TAR
R1,R2-29Volt 1TAR
24Volt INT-32 Up-
Volt 12.42 hr
O/G & IC current-
71/70mA LDM-
18/02/2011, TAR-
LDI- YDM-
11/03//,D/C No- Not up
000497
1A
RR Dn-
12.45 hr
1
TAR Dn-
12.45 hr
TAR-
YDM
Up-
While tracing the Automati At BLLT
circuit fault cally got
disappeared. Circuit right
kept under
observation. Fault not TCF
repeated. d/c no: code
03287 tranmitte
LDM: d to
05/04/11 ALUR
LDMI: 12/03/11 (more
times)
I/C V &I: 18V/75mA.
O/G Analog
V/I: 55V/ 72 mA. voltages
Block local: --ok
30v.
At ALUR
TCFPR
not
picked
up @
ALUR
analog
Subsiquently got right. Subsiquen
Checked the circuit & tly got
right
faut not repeated.
LDM : 7.4.11 LDMI :
23.3.11 Block local :
29V O/G : 62V
I/C : 20V
At YDM, due to block bell code
insrument bell code button
pusher
button pusher spring spring cut
cut. Same attended &
restored by
ESM/SBHR D/C No:
000698 LDM:
13/04/11 LDMI:
17/04/20111
ASK
nov-2010
Sl. No Section Gear Nature IN Time / RT Time/ TD
Date Date
ADHL- Block Premature TOL @ 08.20 11.40 PLCT
HVL ADHL for 2079 exp. 12/11
(HVL-Line 12/11 2079
closed
ADHL-TCF & TOL ) 1018
6202-6"
@ ADHL
1 K
AMSA- Block TGT could not be 02.45 07.40 LCT
SPGR established at 17/11
AMSA. 17/11 584
(Late 6590
infor to 224
TR at
03.15)
2
ASK- Block Premature TOL 10.25 10.55 LCT
BVR @BVR for 1018 21/11 21/11 1018
exp.
TCF-TOL @ BVR
3
HVL- Block Premature TOL @ 11.25 12.00 TD
ADHL ADHL 17/11
(ADHL- 17/11 2726-
TGT+TOL 16" at
HVL-TCF+TOL) ADHL
Sig. for
piloting
4
AMSA- Block Section could not 01.50 05.30 LCT
SPGR be closed at SPGR 20/11 20/11 6228
on arrival of 6536
6507exp
5
DEC-2010
ASK- BLOCK TOL buzzer not 02.55 03.20 PLCT
ADHL stopped at ASK for
6227 exp 26/12 26/12 7314
ADHL-
HVL
6
ASK- Block TGT could not be 22.20 23.55 LCT
ADHL- established @ 29/12 29/12 56223-
HVL ADHL towards ASK 10"
ASK- TCF
established
7
NTR- Block TAR buzzer failed 11.10 11.25
GBB for LE @ NTR 19/12 19/12
8
BSN- Block TGTcould not 23.30 2.00 LCT-
RDI established at BSN 19/12 20/12 DKNLP
for AVCN goods. G 6589
TCF done at RDI. Exp
7311
Exp
9
TTR- BLOCK TGT could not be 11.20 11.48 PLCT -
HVL established at HVL 29/12 DKN
for DKN goods. 29/12
At TTR ---TCF +
TOL.
10
JAN-2011
AMSA- Block TGT could not 5.28 5.50 LCT-
SPGR established for 11.1 11.1 16590
16590 exp.
11
SPGR- Block Premature TOL for 21.15 21.38 16535
NTR RPM goods @ 31/01 31/01 Exp- 17"
SPGR for
PLCT @
NTR
12
NTR-GBB Block On arrival of 6535 at 07.16 07.35
GBB TAR buzzer failed 05/01 05/01
13
On arraival of 12079
at MLSA Line closed
not established at
07.25 08.00 LCT-
MLSA-TK Block MLSA (but TK- Line
08/01 08/01 11018
closed Set) TK-
TGT+TOL
MLSA- TCF+TOL
14
BLKR- BLOCK No TOL at BLKR, 22.10 22.40 LCT
VNR hence section 05/01 05/01
could not be closed
at BLKR on arrival 56274
of 56227 pass.
(BLKR-
TCF VNR
-TGT-TOL)
15
BVR- Block On arrival of 01.40 01.55 LCT
VNR 16210Exp. At VNR 26/01 26/01
TAR Buzzer failed 12782
16
DRU- Block No TAR buzzer on 06.20 06.40 LCT
BLKR arrival of 56273 @ 20/01 20/01 56228
DRU
DRU-TCF ,
BLKR-TGT
17
FEB-2011
BLKR- Block Premature TOL @ 18.40 18.55 PLCT-
VNR BLKR for 12080 17/02 17/02 12080-
exp. 2"@stn
VNR-TCF
BLKR-TGT+TOL
18
MAR-2011
DRU- Block TGTcould not be 06.30 08.30 PLCT
BLKR established at 08/03 08/03
DRU. Premature
TOL at BLKR.
BLKR-
TCF+TOL
DRU-LC.
19
RRB- BLOCK TOL buzzer not 10.44 11.30
DRU came at DRU for 20/03 20/05
12726.
RRB-
TGT+TOL
DRU- TCF
20
HVL- Block No SNR @ TTR 05.25 06.45 LCT
TTR for 56224 02/04 02/04 56224
16536
TTR-
TOL+ TCF
HVL- Line
closed
21
APR-2011
RRB- Block Line Clear could 9.00 10.10 LCT
DRU not be cancelled for 21/4 21/4 EBCN
EBCN goods at
RRB.
22
DRU- Block While taking line 05.20 06.00 PLCT
BLKR clear for 16536 @ 28/04 28/04 16536
DRU. Premature @DRU
TOL @ BLKR.
BLKR: TCF+
TOL DRU: Line
Closed
23
CAUSE REMARK
S
On arrival of 6202 exp at Subsequ
ADHL TCFR Picked up etnly got
condition, TOLAR down right
condition after while
tracing the circuit fault not
found subsequently got
right & restored by
MCM/ASK.
Block charger
(on)-29.08v
DC-DC converter -I/P-
22.15v o/p-72.63v Line :-
o/g- 59v & 73 ma,
(datalogger at TR only
SNR relay is proved at
BVR)
1TPR Dn at 10.56.39
55TPR
Dn at 10.58.18
Accd. D/L:
110v Signal-116.37v to
117.23v
At RDI:24v Blk-
27.27v to 30.62v
24v Ext-
29.50v to 31.66v
110v Signal-115.00v
On arrival of DKN goods Subsequ
at TTR TAR buzzer ently got
appeared & block restored right
by ESM/TTR.
LDM: 10/12/2010
LDI: 24/12/2010 D/C
no: 10/048
At TTR
I/C V: 16V
O/G V: 53.1V
I/C I: 63mA
O/G I : 64 mA
Block local: 27.04 V
1. TAR-
NTR
Lastly up
at
07.00hrs.
Dn at
07.04 hrs.
2. 32
TAR up at
07.15.03
hrs TAR-
NTR not
up 32A
RR Dn at
07.16
32TAR Dn
at
07.16.13
hrs
3.
TAR-NTR
up at
09.10hrs.
4.
32A/32B
TSSLR
not up.
Subsequ At
ently got MLSA :
right
1TAR
After arrival of 11018 at
Up at
MLSA subsequently TAR
07.22.22
buzzer appeared at MLSA
hrs
both side section closed by
TAR-
SM. Block restored by
TK Up at
ESM/TK. D/C
07.22.27
No.:- 000112,
hrs
LDM:02.01.11,LDMI:29.12.10
1TAR Dn
At MLSA
at
I/C
07.22.43
Current: 50 mA
hrs
O/G current: 50 mA
Line
O/C Voltage: 46.4
closed
V I/C
pluse
voltage: 16.6V.
transmitt
Local battery V: 27.9 V.
ed.
At TK
TAR-
TK Dn at
O/G Voltage:
07.57hrs
58.7V I/C
voltage: 13.9V.
60v Blk
Local battery voltage:
Dn- 31-
28.5V
36v
24v Blk
-21-23v
Subsequently got right. subsequ
Push back cancellation ently got
applied by SM/VNR and right
restored by Traffic. Accd.
TR Datalogger: At VNR
TGTPR-BLKR Up at
21.47.08hrs TGTPR-
BLKR Dn at 22.39.59hrs
On arrival of 12782 Exp. At push back At VNR :
BVR TAR buzzer cancelatio
n
appeared at BVR and
applied push back 1ZR Up
cancelation and block at
cleared and restored by 01.35.59
Traffic staff. LDM : hrs
14.01.11 LDMI : 19.1.11 1TPR
24v Up at
EXT- 30v 01.38.20
24v INT - 29V hrs
Block local - 29V 25TPR
at failure time UP at
01.38.54
hrs for
this
1TAR
not
picked
up at
R.Room
dn @
10.31.27
Up
ACPPR
dn @
10.31.29
Up
ACCPR
up @
10.38.55
On arrival of ESM/TTR Automati At TTR :
checked the circuit but cally UP ZR
fault disappeared. Circuit picked Up & Dn
kept under observation & up from
block restored by 05.11.11
ESM/TTR LDM : hrs to
13.3.11 05.11.38
LDMI : 22.3.11 hrs Up
( Block relays not ZR Up &
proved at TTR data logger) Dn frm
05.33..0
9 hrs to
05.33.18
hrs
At RRB TCKR relay relay SHKR-
contact No: 1A2 offering defectiv DRU
high resistance pertaining e chatterin
to NTR ckt., same relay g
replaced and restored by NTR,
ESM/RRB & ESM/DRU at PTR,
RRB. D/C No:00043 SCKR
not
LDM:09.4.2011 provied
LDMI:11.3.2011 Relay
Make: S&T PTJ
Sl No:10534
Mfd:04/03 1A2
resistance: 0.99ohms
On arrival of 16536 to BLKR
BLKR, TAR buzzer D/L not
appeared. Same restored network
by Traffic @ BLKR. S& T ed
staff not attended.
RRB
Sl. No Section Gear Nature IN Time / RT Time/ TD CAUSE
Date Date
Nov-10
JRU- Block TGT could not 02.35 03.00 LCT Subsiquently got
HLK established at 04/11 04/11 6589 right. Checked
HLK for 6589 exp. the circuit &
restored by
ESM/HLK.
1
AJP- Block TGT Could not be 18.10 18.50 PLCT TCKR relay not
SHV established at 10/11 2080 picked up due to
SHV for 2080 exp 10/11 NTR Relay 4C3
contact offering
( TCF set at AJP) high resistance (7
ohms) (front
contact) same
relay inter
changed to LCBR
relay & restored
by ESM/SHV @
AJP.
Make: PTJ.
Style: QN1.
contact: 8F/8B.
volt: 24V.
Sl.no: 385666
Mfd:
08/2008
LDM: 01/11/10
LDMI:
14/10/2010
D/C No: 002229
2
HLK- Block On arrival of 6536 04.02 09.30 PLCT At HLK SHKR
RGI section could not 11/11 stick not available
be closed at RGI. 11/11 7301 due to Unit No:2
condenser burst
587 (1000micro farad)
same replaced &
283 restored by
ESM/SHV.
CLE
LDM:
590 30/10
LDMI: 09/11
D/C
No: 001464
3
SHV- Block On arrvial of PQRS 12.15 13.30 LCT At AJP SNR cct
AJP section could not be 20/11 20/11 32ZR @ relay
closed & No SNR @ 587 room 5D6 contact
AJP offering high
PNKI resistance
goods (14ohms) same
repalced &
restored by
ESM/SHV @ AJP
Make:
ELDYNE
Sl.No: 299526
Mfd:
01/09
D/C : 002233
LDM: 1.11.10
LDMI:14.10.10
LDQI:10.09.10
(As
per TR D/L 32
TAR picked up
12.07 & dn at
12.08)
4
Dec-10
HLK- Block Section could not 01.50 03.35 PLCT At RGI Bell code
RGI be closed at RGI 05/12 05/12 button pusher
On arrival of 7302 2630 spring broken
Exp. 6590 same replaced &
(HLK- 6536 restored by
TGT+TOL ESM/HLK.
RGI-
TCF+TOL) LDM:
28/11/10
LDQI: 29/11/10
LDMI: 03/12/10
D/C No:
001536.
5
HLK- Block Premature TOL 11.18 11.47 Subsequently got
JRU for 1018 @ HLK 07/12 07/12 right . ESM
camped at HLK.
(TCF & TOL - JRU Fault not
& TGT repeated.
&TOL - HLK)
LDM:
01/12/10
LDMI: 09/11/2010
D/C
No: 001470.
6
Feb-11
HLK- Block TGT could not be 09.25 10.05 LCT At HLK TGT
RGI established at 02/02 02/02 12726 button pusher
HLK fo 12726 exp spring cut. Same
replaced &
restored by
ESM/HLK D/C :
0001494 LDM :
19.01.11 LDMI :
24.01.11 LDQI :
07.01.11 Last
replaced on :
03/2010
7
AJP- Block No out going bell 02.00 03.15 LCT At NVF bell code
NVF at NVF hence 16/02 16/02 16589 button pusher
Unable to take line 17302 spring cut and
clear for 16589 same replaced
Exp. and restored by
JE/S/RRB @
NVF.
LDM:07/02/11
LDMI:24/01/11
D/C No.:001051
8
11-Mar
HSD- Block On arrival of LE @ 15.13 15.35 At SHV on arrival
SHV HSD unable to 08/03 08/03 of 56914 pass.
close the section. Block working
Normal,
Failure
susequently got
right
9
HSD- Block Premature TOL at 17.15 17.24 LCT Subsiquently got
SHV SHV for 12725 17/03 17/03 12725 right. Checked
exp. the circuit but fault
HSD : TCF+ not repeated.
TOL Restored by
ESM/SHV.
Block local : 30V
I/C : 70ma
O/G :
70ma - 42V
10
DRU- Block On arrival of 15.25 16.25 Due to Line
RRB 56270 unable to 21/03 21/03 Closed Button
close the section pusher spring cut.
@ RRB. Same replaced
and restored by
ESM/II/DRU @
RRB.
D/C No: 002056.
LDM: 21-02-
2011 LDI: 11-
03-2011
11
HLK - Block TGT could not be 13.40 14.30 Due to bell code
RGI established for 29/03 29/03 button pusher
56913 pass @ spring cut at RGI.
RGI. Same attended &
restored by
ESM/HLK D/C
No: 001572
LDM: 19/03/11
LDI: 21/03/11
12
Apr-11
RRB- Block Line Clear could 9.00 10.10 LCT At RRB TCKR
DRU not be cancelled 21/4 21/4 EBCN relay contact No:
for EBCN goods 1A2 offering
at RRB. high resistance
pertaining to NTR
ckt., same relay
replaced and
restored by
ESM/RRB &
ESM/DRU at
RRB. D/C
No:00043
LDM:09.4.2011
LDMI:11.3.2011
Relay Make: S&T
PTJ
Sl No:10534
Mfd:04/03
1A2 resistance:
0.99ohms
13
RRB- Block Unable to take line 23.45 00.55 PLCT At RRB due to
NVF clear for 16535 28/04 29/04 bell code button
exp at RRB 16535 pusher spring
cut.Same replace
dand restored by
ESM/RRB.
D/C No:000355
LDM: 20/4/11
LDI:6/4/11
14
REMARK
S
Subsequ
ently got
right
Relay
contact
offering
high
resistan
ce
Defectiv
e
meterial
Offering
high
resistance
Bell
code
button
pusher
spring
broken
Subsequ
ently got
right
TGT
button
pusher
spring
cut.
bell
pusher
spring
broken
suseque
ntly got
right
Subsiqu
ently got
right
Bell
code
button
defectiv
e/spring
broken
Bell
code
button
defectiv
e/spring
broken
SHKR-
DRU
chatterin
g
NTR,
PTR,
SCKR
not
provied
bell
code
button
pusher
spring
cut
JRU
Sl. No Section Gear Nature IN Time / RT Time/ TD
Date Date
Nov-10
JRU- Block Unable to close the 02.50 04.20 LCT
SLU section at SLU On 03/11 03/11
arrival of 6589 Exp. 6210
6536
6535
1
SLU- Block TGT Could not be 03.25 05.10 7301
LCT
MYK established to6210 10/11 10/11
Exp. at SLU 6536
6210
7302
2
DEC-10
3
JRU- Block TOL buzzer not 13.25 15.40 LCT
AMC stopped at JRU for 21/12 21/12 252
252 Pass.
JRU- TCF+TOL
AMC-
TGT+TOL
4
SLU- Block TGT could not 03.15 06.05 LCT-
MYK established for 16210
16210 exp at SLU. 29/12 29/12
5
MYK- Block TGT could not be 22.10 05.30 LCT
KAG established at MYK 29/12 30/12 7302
for HVR spl. 6535
6590
6
11-Jan
THKU- Block TGT could not be 06.00 6.55 PLCT
CHKE established at THKU 23/01
(infd to for EBRN. 23/01 EBRN
TR at CHKE-TCF set.
06.20
hrs)
7
SLU- Block On arrival of Has 15.30 17.30
MYK BTPN goods unable to 25/01 25/01
close the section at
SLU.
SLU-TCF+TOL
MYK-TGT+TOL
8
MYK- Block Premature TOL at 02.03 02.16 PLCT-
SLU MYK for 16590EXP 28/01 28/01 16590
9
Feb-11
JRU- Block TAR buzzer not 14.20 15.10 PLCT
BBH appeared for LE 04/02 04/02
@BBH. 56252
EBCN
goods.
10
SLU- Block TAR buzzer not 16.25 18.30 PLCT
MYK stopped at SLU 11/02 11/02 56515
hence unable to 2080
clear the section.
11
SLU- Block TGT could not be 01.10 06.00 LCT
MYK established for 02/04 02/04 16535
16535 exp @SLU 7301
16589
12
SLU- Block Free indication failed 11.50 12.45 LCT-
JRU for cancellation 10/4 56516,1
(S&T applied at SLU for 10/4 1018
Const) 56516
13
CAUSE REMARK
S
LDI: 28/10/2010
(Accd D/L:
MYK D/L at TR
TCFPR-SLU Up at
02.45.24hrs
1TAR Up at
02.55.00hrs
TAR-
SLU Up at
02.55.00hrs
At KAG CTR 4D3 contact
contact carbonis
carbonised(CTR ed
stick path) inside
relay. Relay
replaced & restored
by JE/S/JRU at
KAG. LDM :
17.12.10
LDMI : 17.12.10
Make : PTJ - 8F/8B
Sl No. :
102307 Mfd :
09/1997
D/C : 095233
BVlock local : 31.2V
I/C :
70ma - 20.1V O/G
: 68ma - 49V
(KAG block relays
not proved in
datalogger)
While tracing the Subsequ At both
circuit, fault ently got stn
disappeared, circuit right datalogg
kept under er not
observation. TGT networke
code could not d.
transmit from CHKE.
At
CHKE :Block local
V:26.7 V I/C V: 19.6V
I/C I : 65mA O/G
V: 72V O/G I : 67 mA
At THKU: I/C
V: 65 V I/C I : 70mA
O/G V: 65 V O/G I :
70 mA
On arrival of automatic As per
ESM/JRU both side ally got TR
TAR picked up same right. D/L ,At
delatched and clear MYK :
the section. Section SNR-
cleared and fault SLU
disappeared and infd showing
the problem to UP & Dn
ASTE/P/MYS for After
checking the circuits. completin
g TGT
code.
SNR-
SLU Up -
15.14.18
hrs SNR-
SLU Dn -
15.14.31
hrs
( SNR-
SLU
chatterin
g ) Last
SNR-
SLU Dn-
14.13 hrs
After arraival of push back At MYK:
16590 Exp at cancellatio
n
SLU,applied push ASTR
back cancellation Up at
and restored by 01.49.48
Traffic. hrs
TGTPR
Up at
01.49.58
hrs
ASTR
Dn at
01.50.02
hrs
24V
BLK-
28.18V
24V
EXT-
31.92V
24V INT-
33.82V
TCFPR -SLU Up -
1.01.21 hrs TGT
code transmitted
from MYK
Miscellne
ous
After arraival of automati
11018 at JRU push cally got
back canellation right.
applied at SLU &
block restored by
ESM/JRU. D/C
No: 00047
HRR
Sl. No Section Gear Nature IN Time / RT Time/ TD
Date Date
10-Nov
GDI- BLOCK On arrrival of 585 09.28 10.20 PLCT
YLG pass TAR Buzzer 11/11
failed at GDI. 11/11 585
1
SVNR- Block No TOL hence TAR 03.50 08.45 LCT
YLG failed at YLG on 14/11 14/11
arrival of Millanium 6589
goods
2
SVNR- Block On arrival of 19.20 20.00 LCT
YLG 581pass TAR 20/11 20/11 2725
buzzer failed @
YLG
3
SNH- Block TGT could not be 12.08 14.33 Lct
KNO established @ SNH 22/11 22/11 283
(TCF at KNO) 2079
1018
1017
4
DVG- Block On arrival of 588 14.30 16.50 LCT
THN pass.section could 26/11 26/11 1018
not be closed @ 2080
THN .
5
BYD- Block No SNR @ HVR 14.50 15.20 LCT
HVR for 1017 Exp. 26/11/ 26/11 1017
6
KNO- Block TGT could not be 16.10 16.18 LCT
SNH established @ SNH 26/11 26/11 1018
for 1018 Exp. TCF
indication available
@ KNO
7
KNO- Block Unable to close the 18.02 21.40
S.UBL section at S. UBL or 30/11 30/11
587 pass.
8
KNO- Block Unable to take Line 23.05 00.35 PLCT-
S.UBL Clear at S.UBL for 30/11 01/12 6590-2"
6590
9
10-Dec
HRR- Block Cancellation 07.22 08.45 LCT
KMPS applied.Free
Indication 10/12 10/12 LE,HAS
appeared.But BTPN ,
counter not jumped 585
to higher number at
KMPS & Unable to
close the section
10
DVG- Block Premature TOL @ 03.00 06.00 LCT
AVC DVG for 6589 exp, 12/12 6589-
12/12 18" at
stn
11
KJG- BLOCK TGT could not be 18.20 21.20 LCT-
SVNR established for 581 18/12 18/12 581,
pass.TGT not 586
available @
KJG.TCF available
@ SVNR
12
BYD- Block Premature TOL for 2.45 3.40 LCT-
DAD 6535. at BYD 22/12 22/12 6535
13
SVNR- Block Section could not be 20.22 22.45 LCT-
KJG closed on arrival of 22/12 22/12 56916,
12725 exp at SVNR. 17302
14
SVNR- Block TOL buzzer could 20.40 23.50 LCT-
YLG not be arrested at 22/12 22/12 17302
SVNR for HAS-N
goods.
15
SVNR- Block TGT could not 5.10 09.45 LCT
KJG established @ KJG 23/12 23/12 12726
for 16589 exp. TCF
also not set @
SVNR
16
KJG- Block TGT could not 13.00 14.25 LCT
SVNR established @ KJG 23/12 23/12 11036
for 11036 exp. TCF
also not set @
SVNR
17
YLG- BLOCK TGT could not be 19.20 21.20 LCT
SVNR established at YLG 25/12
for 56912 25/12 56912
TCF indication
available at SVNR.
18
SVNR- Block TGT could not be 07.45 10.50 PLCT
KJG established at 25/12 25/12 12726
SVNR for 12726
56516
19
SVNR- BLOCK TGT could not be 18.50 22.00
KJG established @ 26/12 26/12
SVNR for 16507
20
CLI- BLOCK TGT could not be 15.50 17.00 PLCT
KMPS established at 29/12 29/12 12080
-HRR KMPS for 12080.
TCF-TOL at HRR.
21
11-Jan
KJG- Block TGT could not be 16.54 19.45 LCT-
SVNR established for 15/01 15/01 56913
56913 at KJG. TCF
set at SVNR
22
KJG- Block TGT could not be 03.15 09.45 PLCT
SVNR established for 30/01
06535 at KJG 30/01 06535
infd to (SVNR-TCF) 7301
TR @ 2726
03.40
23
11-Feb
DVG- Block Unable to close the 15.50 16.50 PLCT
AVC section @DVG for 11.02
11017Exp. 11.02
AVC-TGT 12080
DVG- CLE
TCF
At AVC-section closed
24
KJG- Block TAR buzzer not 11.45 12.50
HVR appeared for KKF 14/02 14/02
goods @ HVR .
HVR:TOL+TGT
KJG:TOL+TCF
25
SVNR- Block TAR buzzer not 16.23 17.05 PLCT
KJG came at SVNR for 14/02 14/02 56587
BTPN
goods.Section could
not be closed.
26
DAD- Block No O/G bell@DAD. 08.00 10.30 LCT-
BYD TOL buzzer not
arrested @ DAD for 16/02 16/02 56911
12726 Exp. 56516
2777
27
11-Mar
SVNR- Block No SNR at KJG. 14.10 15.20 PLCT
KJG On arrival of 03/03 03/03 1017
1036@SVNR 2080
section could not be
closed @ SVNR.
28
GDI- Block On arrival of 16209 18.25 21.15 PLCT -
SNH Exp TAR buzzer not 05/03 05/03 56515,
appeared at GDI. 56913,
GDI-TCF+TOL NMGSP,
SNH- 56912
TGT+TOL
29
HRR- Block TGT could not be 07.30 09.00 PLCT -
KMPS established @ HRR 05/03 05/03
for 56911 56911
30
KMPS- Block Unable to set TGT 08.17 10.05 PLCT
HRR @ KMPS 06/03 06/03 12726
56273
56911
31
TGT could not be
established for PLCT
SVNR- 23.05 1.40
Block 12630 exp @ 12630
KJG 10/03 11/03
SVNR. At exp
KJG:- TCF
32
SVNR- Block TGT could not be 14.20 17.20 PLCT-
KJG established at 13/03 13/03 11017,
SVNR for 11017 56274,
56913,
56515,
16507,
56912
33
GDI- Block Unable to Line 7.01 7.29 17301-
SNH close at GDI for 15/03 15/03 10 for
17301 exp. LCT
GDI-TCF(L.C)
SNH-TGT(no
L.C)
34
HVR- Block TGT could not be 04.00 04.30 LCT
BYD established at HVR 18/03 18/03 CLE
for CLE
35
KNO- Block TGT could not be 13 .00 13.26
S.UBL established for 21/03 21/03
12079 exp @ KNO.
No SNR @ S.UBL
36
11-Apr
KJG- Block Line close could not 19.00 21.30 56515-
SVNR be established on 08/4 08/4 PLCT
arrival o 16507 at
KJG.
37
SVNR- Block TGTcould not be 11.08 12.15 PLCT-
KJG established at KJG 12/4 12/4 56273,
for 56273 pass. HASSA
SVNR- RCD
TCF
38
AVC- Block while taking line 13.05 13.20 11018
HRR clear for 11018 22/04 -6" for
@AVC Premature 22/04 PLCT.
TOL appeared @
HRR .
AVC line
closed condition
39
YLG- Signal On arrival of 56516 08.52 09.30 PLCT
SVNR passg to SVNR, No 25/04 25/04
TAR buzzer @ 17309
SVNR. 56911
40
DVG- Block TOL buzzer not 15.20 16.50 PLCT
AVC arrested at DVG for 25/04 25/04 11017
EBRN goods.
At
DVG - TCF+TOL
At
AVC - TGT+TOL
41
CAUSE REMARKS
On arrival of subsequently
HASBTPN Goods got right
automatically TAR
buzzer appeared
& restored by
ESM/KNO. @
YLG
LDM:
06/11/10
LDMI: 22/10/10
D/C No:000196
(Relay room
busbar voltage-
26V I/P &
O/P=26v R1 & R2
of TAR=26V in
the B/I.)
On arrival of subsequently
ESM/YLG from got right
GDI observed that
TOLAR relay not
delatched at YLG
and same
delatched and
restored and fault
not repeated
LDM:13-11-10
LDMI:18-10-
10 LDQI:24-10-10
D/C No. :
000201
LDMI:20/10/2010
LDQI:10/11/2010
On arrival of tested &
SE/II/HRR Several found ok
time tested the
block found
working in order
fault not repated &
restord by
SE/S/HRR @
DVG
D/C:000006
LDMI:9&10/11/10
LDM:23/11/10
On arrival of
ESM/HVR tracing
the circuit & fault
disappeared &
SNR automatically
appeared & fault Subsequently
not repeated got right
ESM/HVR Night
Camped at HVR .
Due to LCCPR Relay contact
4D3 contact high high
resistance (156 resistance
ohms) Same relay
replaced &
restored by ESM/
KNO
Make:urban mfd:
05 /2005
LDM:16/11/10
LDMI:23/11/0
D/C no:SNH /
2010/000193.
Due to, ASR relay relay contact
5C6contact offering High
offering High resistance
resistance
(700ohms) of
TCFR delatching
ckt. Same relay
replace and
restored @ S.UBL
by ESM/KNO.
Relay -
Make :Urban.
MFD:05/2005
Sl. No.:B5198
LDM:25/11/10
LDMI:12/11/10
DC No.:
000175
LDM:
29/11/2010
LDMI: 19/11/2010
D/C No:
000027.
On arrival of subsequently
HASN goods, got right
TAR buzzer
appear and self
restored by Traffic
staff. (ESM not
attended).
LDM:01/12/10,
LDMI:13/12/10
(Block relays not
proved in TR
Datalogger at
SVNR & YLG)
d/c no:
000214
LDI:22/11/10
Resistance: 5Ω
(At TR D/L block
relay not proved)
SHKR relay not contact
picked upat SVNR sulphation
due to PR relay
1A2 contact
sulphation, relay
replaced &
restored by
JE/HVR.
Sl.No:B8670
Make:Urban engg.
Mfd : Aug-
2009 P2R
A1A2 resistance:
5Ω
LDM:18/12/2010
LDI:22/11/10
D/C No:000196.
Subsequently got Subsequently
right . Tested and got right
found working
in order. ESM
night camped but
Fault not repeated
.
LDM-
21.12.10 LDI-
05.12.10
LDQI---
24/10/2010
D/C No--
000206
PCR relay contact contact
5C6 offering high offering high
resistance resistance
(Pertaining to PTR
circuit) relay
replaced &
restored by
JE/S/HVR @KJG
contact
Resistance - 4
ohms Make:
PTJ.
Mfd: 06/05
sl.no: 244465
contact:
8F/8B LDM:
22.12.2010 LDI:
21&22.11.2010
D/C No:
000196
LDM: 18/12/2010
LDMI:
13/12/2010
D/C No:
000197
Tested the block Automatically
instrument several got right.
times, fault
disappeared &
fault not repeated.
Restored by
ESM/HRR.
LDM : 02/12/10
LDMI : 22/12/10
D/C No:
HRR/00005
At HRR
Relay
perticulars:-
Make-
C.G
Sl.No-
205323
MFD-
11/2005 ,8F/8B ,
QN1
LDM-10/02/11
LDI-05/02/11(Q/I)
D/C-AVC/00031
After departure of Push back At HVR :
2079 Push back cancellation.
cancellation Up
applied at KJG. TAR
TAR picked up up@11.
both side & block 02.48
restored by Up TAR
ESM/HVR. dn @
11.03.43
for KKF.
D/C No-000066
LDM-
12/02/2011
LDI:-
27/01/2011
I/C V:
58V I/C I:
101mA.
O/G V:back
Push 56V Push back At KJG:
O/G I: 71mA.
cancellation cancellation
applied at KJG & applied -MISC
block restored by 4
ESM/HRR. RECR
D/C dn @
No:KJG/2011/02/1 13.46.20
9 hrs.
4RECR
up @
14.33.21
hrs
14.22 -
0V
14.22.55
- 109V
14.23.24
-
111.72V
12
V
indicatio
At GDI, due to relay At GDI :
4D3 contact of defective -
SHKR relay on Contact high
TAR latching ckt resistance Dn
offering high TAR Up
resistance at
(R=13.5 V), same 19.08.26
relay replaced and hrs 3
restored by RR Dn
ESM/KNO. at
Relay: Make-CG, 19.09.50
Sl. No.:AC295342 hrs
Mfd-8/07 Dn TAR
D/C No:00214 Dn at
LDM:26.02.11 19.09.50
LDMI:12.02.11 hrs
1/2/3AS
PR1
19.09.51
hrs
Block
relays
not
proved.
At KMPS 7B8 relay Last
contact of ASR defective - TAR-
relay & 5D6 Contact high HRR Up
contact of TCFPR resistance at
relay offering high 7.08.33h
reisistance rs
pertaining to TAR
delatching circuit. last
So that TAR not TCFR-
delatched. Both HRR Dn
relays replaced & 07.09.06
block restored by hrs
MCM/HRR. TAR-
HRR Dn
R=4.2 V at
D/C No: 00020. 07.09.10
ASR : Make-CG, hrs
Sl No:31943
Mfd: 07/99
TCFR : Make-
CG, Sl No:31942
Mfd: 07/99
At KMPS TAR relay At
relay not defective - KMPS
delatched Contact high
because in TAR resistance
delatching ckt
TGTPR 7D8 TCF
contacts offering code
high resistance. transmitt
Same relay ed from
replaced & KMPS to
restored by HRR at
ESM/CLI. 08.15.22
R:- 6.6 Ω hrs.
Relay: TOLAR-
Make:CG HRR Up
Style:QN1 at
Sl.NO:31944 08.15.28
Mfd:07/99 TOLAR-
HRR Dn
LDM:23/02/11 08.15.30
LDI:17/02/11 hrs.
D.C Block
No:KMPS/2011/00 relays
0037 not
proved
in HRR
D/L.
Automatically No
While tracing the got right. Block
circuit, fault relay
disappeared, proved.
circuit kept under
observation and
block restored by
JE/S/KNO at KJG.
ESM camped at
KJG & SVNR.
LDM:
02.03.11 LDMI:
24.02.11 D/C
No: 0222
At
KJG: I/C I : 72mA
I/C V : 18.2 V O/G
I : 75mA O/G V :
45.34V DC-DC
converter I/P: 28.1V
O/P 65.5V,
Block Local: 31V.
As per TR
D/L : At SVNR:
24V Block local up
: 28.19V.Block
local Dn-not
proved. At KJG:
24V Ext: 29.02 @
22.53Hrs
At SVNR TGTR Relay contact
not picked up due offering high
to TGBR relay resistance
contact No. 4B3
offering high
resistance. Same
relay replaced and
restored by
JE/S/KNO.
R=10ohms. D/C
No:0234
LDM:10.3.11
LDMI:26.2.11
Relay Make:PTJ
Mfd:06/05 Sl Block
No:244727 relay not
(Block relays not proved
proved in Data
Logger)
Due to TAR @GDI Miscellaneous At GDI:-
not de-latched,
same delatched &
block restored by
ESM/YLG. Block DN TAR
tested several Up-6.57
times found hr &
working in
order.Ckt kept Dn-6.57
under obsevation. hr. Block
relay not
TAR R1R2- proved.
26.78v
D/C-
00210
LDM:12.3.11
LDI(JE)-
12/16.3.11
LDI(SE)-
8/9.3.11
At HVR Bell code Bell code
button pusher button pusher
spring cut. Same spring cut
replaced &
restored by
JE/S/HVR. D/C :
00001 LDM :
04.3.11 LDMI:
07.3.11
Before arrival of Subsequently
ESM/KNO SNR got right
indication
appeared @
S.UBL. Checked
SNR ckt in Block
ckt no fault found
and restored by
ESM/KNO @
S.UBL.
D/C
No:S/U/2011/0001
89
LDM: 09-3-11 LDI:
22/2/11
LDQI: 4/2/11 LDJI:
19/02/11.
At SVNR: Subsequently At KJG:
got right.
Block Block
instrument tested relays
sevaral times, not
fault not found and proved.
fault also not Up
repeated and ZR,Dn
block restored by ZR, Dn
JE/S/KNO. TAR
D/C No: 000241 Data not
available
LDM:06.4.11 .
LDI:28.3.11 Analog
JE/S/KNO & Block
ESM/KNO night Local &
camped at SVNR. Line
voltage
not
proved.
At
SVNR:
While
train
receivin
g at KJG
frequentl
y power
While tracing the Block relays
circuit, fault not proved
disappeared,
circuit kept under
observation and
restored by
JE/S/YLG.
D/C No: 00244
LDM:06.4.11
LDI:28.3.11
Block Local- 29.32
v
Line O/G V-
41.84v I-68mA
I/C V-
16.84v I-71mA
On arrival of Automatically At HRR :
11018 exp @ got right. block
HRR TAR buzzer relays
appeared & line not
close established. proved.
24 V Bl.
LDM: 2/4/11 DN:
LDI: 13/4/11 31.42V
D/C no: @ 12.37
AVC/00063 hrs.
At AVC:
60V
Block.L1
HRR -
59.02v
@ 12.56
hrs 24V
Ext
1:30.88
V 24V
Ext II:
30.48V
24V
Block nt
proved.
On arrival of Automatically
56911 passg to got right.
YLG. TAR buzzer
appeared and
push back
cancellation
applied and block
restored by traffic
staff. S& T staff
not attended.
Several times
checked, fault not
repeated
LDM:
17/04/11 LDMI:
24/04/11
D/C No:
YLG/2011/230
Due to bell code bell code
button contact cut button contact
at DVG. Same cut
replaced &
restored by
ESM/HRR.
D/C No:
DVG/000037
LDM: 16/4/11
LDI:21/4/11