HRSG Erection
A1050
Platform
A1150
Foundation Takeover Foundation Preparation Bottom Plate, Column & Beam Side Casing Drum, Lines & Links and Riser Tubes Drains, Vents and Safety Valves Hydro Test Insulation of Pipes and Drums
Module Safety Valve Escape Piping Alkali Boil Out (ABO) Safety Valve Floating (SVF)
Inlet / Outlet Duct Roof Structure and Silencer Roof Sheeting BOT Casing Insulation
A1090 A1100
A1070
Duct Insulation
Activity ID
Work Products and
Page 1 of 2
Documents
Activity Name
© Oracle Corporation
HRSG Erection summary wbs shree 28-May-11 13:17