HRSG Erection summary wbs shree 28-May-11 13:17

HRSG Erection

A1050

Platform

A1150

Bank Ducting Erection and Insulation

A1000 A1010 A1020 A1030 A1080 A1120 A1160 A1170

Foundation Takeover Foundation Preparation Bottom Plate, Column & Beam Side Casing Drum, Lines & Links and Riser Tubes Drains, Vents and Safety Valves Hydro Test Insulation of Pipes and Drums

A1040 A1140 A1190 A1200

Module Safety Valve Escape Piping Alkali Boil Out (ABO) Safety Valve Floating (SVF)

A1060 A1110 A1130 A1180

Inlet / Outlet Duct Roof Structure and Silencer Roof Sheeting BOT Casing Insulation

A1090 A1100

Top & Bottom Casing Top Casing Insulation

A1070

Duct Insulation