Sie sind auf Seite 1von 1

PDO ENGINEERING STANDARDS AND PROCEDURES

PROJECT MANAGEMENT – CFDH: UEP MECHANICAL STATIC EQUIPMENT ENGINEERING – CFDH: UEP1M ELECTRICAL ENGINEERING – CFDH: UIE (UEE)
Doc. ID Document Title Additional Notes Rev./DEM Date Doc. ID Document Title Additional Notes Rev./DEM Date Doc. ID Document Title Additional Notes Rev./DEM Date
Project Engineering – Electrical Equipment –
SP-1188 Chemical Injection Skids Ver. 2.0 May-05 SP-1099 Electrical Infrastructure - Specification for Electrical Installation Practice Ver. 5.0 Dec-06
SP-1200 Procurement Specifications for Pipeline Check Valves Ver. 1.0 Apr-02
CP-117 Project Engineering Code of Practice Ver. 3.0 Jun-04 SP-1100 Specification for Testing & Commissioning of Electrical Equipment Ver. 3.0 Jun 04
SP-1201 Procurement Specification for Pipeline Ball Valves Ver. 1.0 Jun-01
SP-1101 Electrical Infrastructure Specification for installation of Overhead Transmission Ver. 2.0 May-08
SP-2039 Mechanical Standard Drawings Ver. 1.0 Sep-05
PR-1150 Project Close Out Procedure Ver. 3.0 Apr-04 Lines
SP-2044 Specification for Screwed Fittings Rev. 1.0 Nov-05
PR-1153 Field Trouble Report Procedure Ver. 2.0 Feb 06 SP-1102A Electrical Infrastructure Specification for Design of 33kV Overhead Power Ver. 6.0 Aug-08
SP-2020 Flange Connections Bolt Torquing and Tensioning Ver. 0 Jan-06
PR-1247 Project Change Control & Standards Variance Procedure Ver. 1.0 Aug-99 SP-2051 Specification for Flushing, Pressure Testing, Pickling and Sensitive Leak Testing Ver. 1.0 Jun-06 Lines on Wooden Poles
PR-1358 Procedure for Concept Selection and Preparing a Basis for Design Ver. 2.0 Dec-04 Testing of Mechanical Equipment and Piping SP-1102B Electrical Infrastructure Specification for Design of 33kV Overhead Power Ver. 6.0 Apr-08
SP-2069 Mechanical Engineering - Specification for Pressure Vessels Ver. 0 Sep-08 Lines on Concrete Poles
SP-1134 Specification for Detailed Design of Oil & Gas Facilities Rev. 1.0 Aug-06 SP-2070 Mechanical Engineering - Specification for Air Cooled Heat Exchangers Ver. 0 Sep-08 SP-1103 Electrical Engineering Guidelines Amend’t/Suppl’t to DEP 33.64.10.10-Gen (Sep-02) Ver. 4.0 Feb-06
SP-2050 Standard Technical Construction Specification for Oil, Gas and Utilities Ver. 1.0 Jul-06 SP-1105 Electrical Infrastructure - Electrical Standard Drawings List Ver. 4.0 May-06
Facilities DEP 30.06.10.11 Equipment in LPG Installations Amended by Circular 75/08 DEM 1 Nov-03 SP-1106 Electrical Infrastructure - Specification for Coding and Identification of Ver. 2.0 May-08
SP-2061 Engineering and Operations Technical Authority System Rev. 1.0 Feb-07 DEP 30.06.10.12 Pressurised Bulk Storage Installations for LPG DEP new Requirement DEM 1 Nov-03
Overhead Line Systems
SP-2065 Document Management for Projects Rev. 1.0 Nov-08 Amended by Circular 122/08
DEP 30.06.10.13 LPG Bulk Transfer & Transportation DEM 1 Dec-04 SP-1107 Electrical Infrastructure - Specification for Electrical Protection System Ver. 3.0 Jul-08
DEP 30.48.60.13 Design & Installation of Chemical Resistant Brick Lining Apr-03 SP-1109 Specification for Earthing and Bonding Ver. 4.0 Mar-04
GU-484 Planning & Scheduling Guidelines Ver.1.0 Jul-06 SP-1110 Electrical Infrastructure - Specification for Electrical Supplies for Mobile Camps Ver. 5.0 May-06
for Process Equipment
GU-556 Vendor Project Document Deliverables Rev.1.0 Feb-07 DEP 30.75.10.30 Water Tube Boilers Dec-08 SP-1111 Electrical Infrastructure - Specification for Temporary Electrical Supplies Ver 4.0 Apr-06
GU-569 Project Cost Engineering Rev.1.0 Jan-07 DEP 31.01.10.10 Chemical
ChemicalInjection
Chemical InjectionFacilities
Injection Facilities
Facilities - WITHDRAWN DEP Withdrawn – See SP-1188 DEM
DEM 111
DEM Dec
Dec---07
Dec 07
07 for Construction & Maintenance Work
DEP 31.06.11.11 Loading Facilities for Bulk Road Vehicles DEP new Requirement DEM 1 Aug-05 SP-1112 Electrical Infrastructure - Electrical Specification for Drilling Rigs Ver. 4.0 Apr-06
DEP 01.00.09.10 Asset Breakdown for Onshore Facilities Dec-98 Amended by Circulars 26/08 & 127/08 SP-1113 Electrical Infrastructure - Specification for 132kV Substation Ver. 4.0 Apr-08
DEP 30.10.01.10 Requisitioning Index Jul-08 DEP 31.10.03.10 Symbols & Identification System – Mechanical Amended by Circular 28/08 Dec-07 SP-1114A Electrical Infrastructure - Specification for Design of 132kV Overhead Power
DEP 31.38.01.13 Compilation of Bill of Material for Piping Isometrics Amended by Circular 26/02 Dec-98 DEP 31.20.20.31 Internals for Columns Jan-09 Lines on Wooden Poles Ver. 4.0 May-08
DEP 31.21.01.11 Printed Circuit Heat Exchangers – Selection & Application Amended by Circular 116/08 Jan-05 SP-1114B Electrical Infrastructure Specification for Design of 132/220 kVOverhead Ver 2.0 May-08
DEP 40.10.01.11 Capital Project Coding System Dec-97
DEP 31.21.01.30 Shell & Tube Heat Exchangers - Amendments/Supplements to ISO 16812 Amended by Circulars 39/06, 51/07 & 95/08 May-04 Power Lines on Steel Towers
DEP 70.10.90.11 Spares Parts Amended by Circular 67/03 Sep-02
DEP 31.21.01.32 Plate & Frame Heat Exchangers- Amendments/Supplements to ISO15547 Sep-02 SP-1115 Specification for Digital Power Line Carrier Communication System Ver 2.0 Jun-04
DEP 82.00.10.10 Project Quality Assurance (Amended by Circular No. 24/98) Amended by Circulars 24/98 & 70/03 Dec-95 SP-1116 Electrical Infrastructure - Specification for SCADA of Electrical System Ver. 3.0 Jan-07
DEP 31.21.01.33 Printed Circuit Heat Exchangers – Design & Fabrication Amended by Circulator 120/08 Jan-05
DEP.82.00.10.11 Cost
CostControl
Cost Controlof
Control ofCapital
of CapitalInvestment
Capital InvestmentProjects
Investment Projects
Projects – WITHRDAWN DEP Withdrawn by Shell SP-1117 Specification for Power Transformers Amend’t/Suppl’t to DEP-33.65.40.31-Gen (Oct-01) Ver. 4.0 Nov-03
DEP 31.21.70.31 Air-cooled Heat Exchangers - Amendments/Supplements to ISO13706 Amended by Circular 96/08 Mar-01
DEP 82.00.10.30 Engineering Information Specification (EIS) Aug-05 DEP 31.22.10.32 Pressure Vessels - Amendments/Supplements to PD 5500 Amended by Circulars 22/04 & 66/06 DEM 1 Mar-01 SP-1118 Specification for Power Station Ver. 2.0 Oct-04
DEP 31.22.10.35 Manufacturing Report for Pressure Vessels Aug-05 SP-1119 Specifications for Electrical Machines Cage Induction Types Amend’t/Suppl’t to DEP 33.66.05.31-Gen (Jan-99) Ver. 4.0 Jun-06
DEP 31.22.20.31 Pressure Vessels - Based on ASME Section VIII DEM 1 Jan-09 SP-1120 Specifications for High Voltage Switchgear and Control Assemblies Amend’t/Suppl’t to DEP 33.67.51.31-Gen (Jul-98) Ver. 3.0 Jun-04
DEP 31.22.30.14 Glass-Fibre Reinforced Epoxy, Polyester and Vinyl Ester Vessels & Tanks DEP new Requirement Sep-02 SP-1121 Specifications for Low Voltage Switchgear and Control Assemblies Amend’t/Suppl’t to DEP 33.67.01.31-Gen (Jan-98) Ver 4.0 Jun-05
Amended by Circular 82/08 SP-1144 Infrastructure Power Systems Department – Oil and Gas Directorate Service Ver. F May-05
Design / Drafting – Level Agreement
DEP 31.24.00.30 Fired Heaters - Amendments/Supplements to ISO13705 Amended by Circular 46/05 DEM 1 Dec-04
DEP 31.24.00.31 Calculation of Heater-Tube Thickness- Endorsement of ISO 13704 DEP new Requirement Dec-07 SP-1242 HSE Specification for Activities in the Vicinity of Overhead Power Lines Ver 4.0 Oct-04
SP-1131 Specification for Hand Over and As Built Documentation Ver. 3.0 May-06 SP-1267 Specification for Synchronous AC Machines Amend’t/Suppl’t to DEP-33.65.11.31-Gen (Jan 99) Ver.2.0 Jun-06
DEP 31.24.40.12 Fabric Expansion Joints- Endorsement of RAL-GZ719 Nov-06
SP-1132 Plant Design Reference Manual Ver. 3.0 Apr-06
DEP 31.27.21.10 Filters for Removing Particles from Hydroprocesser Feeds DEP new Requirement Mar-01
SP-2047 Specification for the Preparation and Content of Engineering Ver. 1.1 Apr 06 PR-1168 Power Systems – Emergency Response Procedure Ver 7.0 Mar-09
- Type Selection and Design Rules Amended by Circular 118/08
DEP 31.36.10.30 Hydraulic Systems for Remote Operation of Shut-off Valves DEM 1 Sep-07 Volume VII: Power Systems Operstions Interior
PR-1232 Design Integrity Review Procedure Ver. 1.0 Mar-99 PR-1259 Infrastructure Management Procedure Ver. 2.0 Sep-99
PR-1666 Project Drawing Procedure Ver. 1.0 May-06 DEP 31.37.00.11 Instrument Air Supply Jan-05
DEP 31.38.01.10 Piping Classes – Basis of Design Amended by Circulars 52/07, 46/08 Apr-06 PR-1265 Procedures for Maintaining Power System Network Models Ver. 2.0 Nov-06
DEP 31.38.01.11 Piping - General Requirements Amended by Circulars 82/06, 07/08 & 111/08 DEM 1 Aug-05 PR-1353 Electrical System Faults & Analysis Procedure Ver. 4.0 Jun-05
DEP 00.00.06.06 Index to Standard Drawings Jan-09 PR-1421 Infrastructure Power Systems Department MHEW Interconnector Operation Ver 3.0 Dec-04
DEP 31.38.01.12 Piping Classes - Refining And Chemicals (150, 300, 600, 900, 1500, 2500) Jan-09
DEP 00.00.07.30 Content and Drafting of a Functional Specification, and a Technical Specification, Nov-06 Maintenance Procedure
DEP 31.38.01.13 Compilation of Bill of Material for Piping Isometrics Amended by Circular 26/02 Dec-98
and the Classification of Products, Processes and Services PR-1613 Procedure for Assessment of Protection Relay Testing Engineers Ver. 1.0 Oct-04
DEP 02.00.00.10 Preparation & Microfilming of Technical Drawings Amended by Circulars 15/99, 64/01 & 56/03 Oct-95 DEP 31.38.01.15 Piping Classes – Explor’n And Production (150, 300, 600, 900, 1500, 2500) 150# Amended by Circular 43/07 DEM 1 Jan-06
DEP 31.38.01.21 Compilation of a Specification For Piping Systems Dec-98
DEP 31.38.01.29 Pipe Supports Jan-05 GU-290 Infrastructure Power Systems Department – Power Systems Asset Management Ver. 2.0 Apr-06
DEP 31.38.01.31 Shop & Field Fabrication of Piping Amended and Supplemented by SP-1173 (Mat & Corr) Aug-05 GU-323 Infrastructure Power Systems Department - Key Business Control Ver. 3.0 May-06
Amended by Circular 06/07 Documentation Guidelines
Standards Administration – DEP 31.38.60.10 Hot Tapping on Pipelines, Piping and Equipment Amended by Circular 34/08 DEM 1 Apr-06
DEP 31.46.00.31 Acoustic Insulation for Piping- Amendments/Supplements to ISO 15665 DEP new Requirement Apr-06 DEP 33.64.10.10 Electrical Engineering Design Amended & Supplemented by SP-1103 DEM 1 Jan-08
SP-1122 Specification for Project Quality Plan Including Design Deliverables Verification Matrix Ver. 2.02 Feb-08 DEP 34.51.01.31 Vertical Carbon Steel Storage Tanks – Selection & Design based on EN 14015 Dec-07 Amended by Circulars 01/08 & 52/08
DEP 34.51.11.30 Mounded horizontal Cylindrical Vessels for Pressurised Storage of LPG at DEM 1 Apr-06 DEP 33.64.10.11 Electrical Network Monitoring and Control System – Application Jan-99
PR-1561 WinPCS Procedures Rev. 0 Mar-04 Ambient Temperatures- Endorsement of EEMUA 190 DEP 33.64.10.12 Electrical Supply and Generation-Design and Operation Jan-99
DEP 34.51.90.10 Demolition of Storage Tanks - Endorsement of EEMUA 154 Apr-06 DEP 33.64.10.32 Electrical Network Monitoring and Control System for Industrial Dec-08
GU-453 Guidelines for WinPCS Users Rev. 02 Jul-06 DEP 64.51.01.31 Vertical Tanks – Erection and Testing (based on EN 14015) Jul-08 Networks - Specification
DEP 70.08.10.11 Mechanical Maintenance Equipment, Tools and Bolt Tensioning Dec-05 DEP 33.64.10.33 Electromagnetic Compatibility (EMC) Requirements Amended by Circular 17/04 Sep-02
EP-2006-5500 Opportunity and Project Management Guide May-06 DEP 70.10.01.10 Equipment Record Cards Aug-05 DEP 33.65.11.31 Synchronous AC Machines – Amendments/Supplements to IEC 60034-1 & Amended and Supplemented by SP-1267 Jun-07
DEP 70.10.80.11 Cleaning of Equipment DEP new Requirement Jan-98 IEC 60034-14
DEP 00.00.00.30 DEP Publications - Creation, Maintenance & Use of DEP’s Apr-03 Amended by Circular 42/04 DEP 33.65.11.32 Packaged Unit AC Generator Sets Apr-03
DEP 00.00.05.05 DEP Index Jan-09 DEP 80.36.00.30 Relief Valves - Selection, Sizing and Specification DEM 1 Dec-08 DEP 33.65.40.31 Power Transformers – Amendments/Supplements to IEC 60076-01 & Amended and Supplemented by SP-1117 Jul-08
DEP 00.00.10.05 Standard Forms Index Jan-09 DEP 80.46.30.11 Interlocking Systems for Safety/Relief Valves Amended by Circular 105/08 DEM 1 Dec-07 IEC 60076-11
DEP 00.00.20.10 The Use of SI Quantities – Endorsement of ISO-31, ISO-1000 & ISO 80000 Dec-07 DEP 33.65.50.31 Static DC Uninterruptible Power Supply (DCUPS) Units Dec-08
DEP 33.65.50.32 Static AC Uninterruptible Power Supply Unit (Static A.C.UPS unit) Amended by Circular 55/08 Jul-08
DEP 33.66.05.31 Electrical Machines - Cage-Induction Types – Amendments/Supplements Amended and Supplemented by SP-1119 Jun-07
MECHANICAL ROTATING EQUIPMENT ENGINEERING – CFDH: UEC to IEC 60034-1 & IEC 60034-14 Amended by Circular 56/08
Doc. ID Document Title Additional Notes Rev./DEM Date DEP 33.66.05.33 Electrical Variable Speed Drive Systems Jan-07
DEP 33.67.01.31 LV Switchgear & Control Gear Assemblies – Amendments/Supplements Amended and Supplemented by SP-1121 Nov-06
SP-1252 Instrument Air Compression Package Ver. 2.0 Oct-05 to IEC 60439-1
SP-2013 High Energy ( ≥500kW) Centrifugal Pumps Ver. 1.0 Jun-04 DEP 33.67.51.31 High-Voltage Switch Gear and Control Gear Assemblies for Rated Voltages Amended and Supplemented by SP-1120 Nov-06
SAFETY ENGINEERING – CFDH: MSE42 SP-2030 Low Energy (≤500kW) Centrifugal Pumps Amend’t/Suppl’t to DEP 31.29.02.30-Gen Ver. 0 Jun-05 between 1kV & 52kV – Amendments/Supplements to IEC 62271-200 Amended by Circular 57/08
SP-2033 Functional Specification for PDO Machinery Health Monitoring Systems - MHMS Rev. 02 Jun-05 DEP 33.68.30.32 Electrical Trace Heating Dec-00
Doc. ID Document Title Additional Notes Rev./DEM Date SP-2045 Mechanical Engineering Procurement Specification for Beam Pump Units Ver. 02 May-06 DEP 63.10.08.11 Field Commissioning & Maintenance of Electrical Installations & Equipment Aug-00
Fire Engineering SP-2054 Specification for Centrifugal Compressor Packages Ver. 0 Jul-06

SP-1075 HSE Specification – Fire and Explosion Risk Management Rev. 2.0 Jul-02 GU-396 Engineering of Process Pumps Guideline Ver. 1.0 May-05 Electrical Safety Operational Procedures (ESOP’s)–
SP-1084 Fire gas and Smoke Detection Systems Owner: Control and Automation Ver. 2.0 Dec-06 GU-397 Engineering of Process Gas Compression Guideline Ver. 1.0 May-05
SP-1104 Electrical Safety Rules Ver. 8.0 Oct-04
DEP 31.25.00.10 Hoisting Facilities And Weather Protection For Rotating Equipment Nov-08 SP-1108 Electrical Safety Operating Procedures Ver. 8.0 Oct-04
Equipment Layout DEP 31.29.00.10 Installation of Rotating Equipment - Amendments /Supplements to API RP 686 Amended by Circular 83/04 Nov-03 SP-1108 (1) Issue of PDO Electrical Safety Rules and Electrical Safety Operational Procedures Ver. 7.0 Oct-04
DEP 31.29.00.30 Oil Mist Lubrication Systems Amended by Circular 98/08 Jul-08 SP-1108 (2) Locking Procedures, Provision of Key Safes and Issue of Keys Ver. 7.0 Oct-04
SP-1127 Layout of Plant Equipment and Facilities Owner: Process Engineering Ver. 2.0 Jun-04 DEP 31.29.00.32 Petroleum and Natural Gas Industries – High Speed Special Purpose Gear Units Nov-03 SP-1108 (3) Selection Training Assessment and Appointment of Electrical Persons (EPS) and Ver. 7.0 Oct-04
SP-1190 Design for Sour Service Specification Owner: Process Engineering Ver 2.0 Nov-04 - Amendments / Supplements to ISO 13691 Appointed Persons (APS)
DEP 31.29.00.33 Shaft Sealing Systems for Centrifugal and Rotary Pumps Amended by Circular 83/08 DEM 1 Jun-07 SP-1108 (4) Preparation and use of Switching Programmes for High Voltage Systems Ver. 7.0 Oct-04
- Amendments/Supplements to ISO 21049:2004 SP-1108 (5) Voltage Testing and Phasing-out Devices Ver. 7.0 Oct-04
DEP 31.29.00.36 Flexible Couplings for Mechanical Power Transmission – Special Purpose Applications DEP new Requirement Dec-07 SP-1108 (6) Earthing Equipment for use on High Voltage Apparatus Ver. 7.0 Oct-04
Design HSE Cases - Amendments/Supplements to ISO 10441 SP-1108 (7) Notice of Commissioning of High Voltage Apparatus Ver. 7.0 Oct-04
DEP 31.29.02.11 Pumps - Type Selection and Procurement Procedure Amended by Circular 85/08 Jun-07 SP-1108 (8) Basic Rules for Plant Operation Ver. 7.0 Oct-04
SP-1258 HSE Specification – Quantitative Risk Assessment Rev. 2.0 Jun-02
DEP 31.29.02.30 Centrifugal Pumps - Amendments/Supplements to ISO-13709:2003 Amended by Circular 86/08 Jun-07 SP-1108 (9) Procedure for Third Party Interfaces Ver. 7.0 Oct-04
DEP 31.29.06.30 Centrifugal Submerged Motor Pump (in Refrigerated Products or Pressurised Apr-03 SP-1108 (10) Identification of High Voltage Underground Cables Ver. 7.0 Oct-04
EP2005-0310-ST Design HSE Cases Ver. 1 Sep-07
Storage Service) SP-1108 (11) Mechanical Rules for Operating Machines and Other Plant Ver. 7.0 Oct-04
EP95-0300 Hazard & Effects Modelling New Requirement Rev. 0 Oct-95
DEP 31.29.12.30 Reciprocating Positive Displacement Pumps and Metering Pumps Amended by Circulars 01/02, 25/04, 50/04 & 84/08 Dec-99 SP-1108 (12) Provision of Substation Safety Operational Equipment and information Ver. 7.0 Oct-04
EP95-0314 Physical Effects Modelling Rev. 0 Oct-98
- Amendments/Supplements to API 674 and API 675 SP-1108 (14) Loss of Electrical Safety Documents and Electrical Keys Ver. 7.0 Oct-04
DEP 31.29.40.10 Compressors Selection, Testing & Installation Amended by Circular 87/08 Nov-06 SP-1108 (15) Boundary Procedure for the Infrastructure Power System High Voltage Electrical Ver. 7.0 Oct-04
DEP 31.29.40.30 Centrifugal Axial Compressors - Amendments/Supplements to API 617 Amended by Circular 88/08 Apr-06 Systems - Interior
Life Saving Equipment DEP 31.29.40.31 Reciprocating Compressors - Amendments/supplements to API 618 Amended by Circulars 06/00, 48/01, 16/03, 26/04 Dec-99 SP-1108 (16) Provision of Switchgear Operating Procedures (SOPS) and Procedures for Ver. 7.0 Oct-04
& 89/08 Appointed Persons (PAPS)
SP-1234 HSE Specification - Personal Protective Equipment Rev. 2.0 Jul-02 DEP 31.29.40.32 Rotary Type Positive Displacement Compressors - Amendment/Supplements to API 619 Amended by Circulars 27/04, 40/06, 54/07, 30/08 Dec-99 SP-1108 (17) Boundary Procedure for Coastal Area EW/ORC/PDO Electrical System Ver. 7.0 Oct-04
& 124/08 SP-1108 (18) Reporting of Electrical Accidents/Incidents and Supply Failures Ver. 7.0 Oct-04
DEP 31.29.40.33 Packaged, Integrally Geared, Centrifugal Plant and Instrument Air Compressors Jan-08 SP-1108 (21) Application of LV Earthing Devices to Low Voltage Switchboards Ver. 7.0 Oct-04
HAZID / HAZOP - Amendments/Supplements to API 672 SP-1108 (22) Live Line Working and Live Line Washing Practices Ver. 7.0 Oct-04
DEP 31.29.42.30 Liquid Ring Vacuum Pumps And Compressors - Amendment/Supplements to API Std 681 Amended by Circular 91/08 Dec-04 SP-1108 (23) Identification of High OR Low Voltage Switchgear Subject to an Operational Restriction Ver. 7.0 Oct-04
PR-1696 HAZOP Procedure Owner: Process Engineering Ver. 2 Dec-08 DEP 31.29.47.30 Centrifugal Fans - Amendments/Supplements to API 560, Appendix E Amended by Circular 91/08 Jan-98 SP-1108 (23/SI) Operational Restriction on HOLEC CAPITOLE 3 & 3N Low Voltage Switchboards Ver. 7.0 Oct-04
EP95-0312 HAZID Rev. 0 Sep-95 DEP 31.29.60.32 Lubrication, Shaft-Sealing and Control Oil System and Auxiliaries Amended by Circulars 56/07 & 67/07 Nov-06 SP-1108 (24) Provision of Miscellaneous Safety Equipment for Operational Purposes Ver. 7.0 Oct-04
- Amendments/Supplements to API 614 SP-1108 (25) Preparation Issue Clearance Cancellation and Retention of Electrical Safety Documents Ver. 7.0 Oct-04
DEP 31.29.70.11 Combustion Gas Turbines Selection, Testing, Installation Amended by Circular 31/04 Dec-98 SP-1145 Guide to Safety Operability (SAFOP) Studies on Electrical Systems Ver. 3.0 Oct-03
DEP 31.29.70.31 Combustion Gas Turbines - Amendments/Supplements to API 616 Amended by Circular 31/04 Dec-99
Operations Safety DEP 31.29.70.32 Gas Turbine Combustion Air Intake And Exhaust Systems Amended by Circular 47/05 Dec-99
DEP 31.29.80.30 Diesel Engines Dec-00
GU-363 Guideline for the Use of Scaffolding Owner: MSE Team Ver. 1.0 Aug-00 DEP 31.29.90.30 Spark Ignited Gas Fuelled Engines Mar-01
CONTROL & AUTOMATION ENGINEERING – CFDH: UPOA2 (UES)
Doc. ID Document Title Additional Notes Rev./DEM Date
Instrument Equipment

PROCESS ENGINEERING – CFDH: UEP1 MATERIALS SELECTION & CORROSION ENGINEERING – CFDH: UEC/1 (UER) SP-1081 Quarter-Turn ON/OFF Actuators Based on DEP 31.40.70.30 Ver. 3.0 Dec 05
SP-1084 Fire, Gas and Smoke Detection Systems Based on DEP 32.30.20.11 Ver. 2.0 Dec-06
Doc. ID Document Title Additional Notes Rev./DEM Date Doc. ID Document Title Additional Notes Rev./DEM Date SP-1087 Control Valves - Selection, Sizing And Specification Based on DEP 32.36.01.17 Ver. 2.0 Dec-05
General - SP-1089 Instrument Impulse Lines Based on DEP 32.37.10.11 Ver 1.0 Jan 01
SP-1125 Isolation of Process Equipment Specification Ver. 3.0 May-04 SP-1090 Instrument Signal Lines Based on DEP 32.37.20.10 Ver. 2.0 Dec 05
SP-1126 Drain Systems Specification Ver. 2.0 May-04 Specification
ERD-43-15 Specificationfor
Specification forPolyethylene
for PolyethyleneLiners
Polyethylene Liners in
Liners inCarbon
in CarbonSteel
Carbon SteelFlowlines
Steel Flowlines&
Flowlines &Pipelines
& Pipelines
Pipelines ERD WITHDRAWN – see SP-2094 N/A
N/A
N/A Nov
Nov--98
Nov -98
98 SP-1192 Human-Machine Interface in a Control Room Based on DEP 32.00.00.11 Ver. 1.0 Oct-00
SP-1127 Plant Equipment Layout Specification Ver. 2.0 Jun-04 Specification On
On--Line
Line
Line Process
ProcessStream
StreamAnalysis
Analysis––– Analyser
AnalyserHousing
Housing --- WITHDRAWN
ERD-48-04 Specificationfor
Specification forQualification
for Qualificationand
Qualification and Inspection
and Inspectionof
Inspection ofShrink
of ShrinkSleeves
Shrink Sleevesfor
Sleeves forCorrosion
for CorrosionProtection
Corrosion Protection
Protection ERD WITHDRAWN – see DEP 31.40.30.34 N/A
N/A
N/A Jan
Jan--96
Jan- 96
96 SP-1204 On- Process Stream Analysis Analyser Housing See DEP 32.31.50.13
SP-1166 Specification for Identification of On-Plot Pipework Ver. 2.0 Sep-04 of
ofPipeline
of Pipeline Field
Pipeline FieldJoints
Field Joints---Amendments/Supplements
Joints Amendments/Supplementsto
Amendments/Supplements toMF
to MFReport
MF ReportMF
Report MF94
MF 94--0290
94 -0290
0290 Rev.1
Rev.1
Rev.1 SP-1205 Instrumentation
Instrumentationof
Instrumentation ofDepressuring
of DepressuringSystems
Depressuring Systems ---
Systems WITHDRAWN See DEP 32.45.10.10
SP-1190 Design for Sour Service Specification Ver. 2.0 Nov-04 SP-1206 C & A Standard Drawings Ver. 1.0 Feb-01
SP-1128 Specification for Cathodic Protection Design Ver. 2.0 Dec 05 SP-1243 Corporate Philosophy for Control and Automation Ver. 1.0 May 04
PR-1696 HAZOP Procedure Ver. 2.0 Dec-08 SP-1129 Specification for Construction, Installation and Commissioning of Cathodic Protection Systems Ver. 2.0 Sep-05 SP-1245 Fieldbus Control System Specification Ver. 2.0 Nov-06
SP-1130 Specification for Cathodic Protection Materials and Equipment Rev. 1.0 Sep-99
GU-568 Water Treatment for Waterflooding Ver. 1.0 Dec-06 SP-1136 Cathodic Protection Drawings Ver. 2.0 Dec 05 PR-1094 Instrumented Protective Functions Test Procedure Rev. 1.0 Aug-04
SP-1189 Specification for Duplex Stainless Steel Line Pipe - Amendments/Supplements to API 5LC Ver. 1.0 Dec-00 PR-1293 Main Oil Line (MOL) Metering Systems Verification Procedure Rev. 1 May-09
DEP 01.00.01.30 Definition & Determination of Temp. & Press. Levels DEM 1 Dec-08 SP-1195 Specification for the Wall Thickness Measurement of Pipelines by Automated Ver. 1.0 Jan-01 PR-1304 Engineering & Operations Product Flow Measurement Rev. 2.0 Nov-07
DEP 01.00.02 11 Preparation of Process Flow Schemes & Process Engineering Flow Schemes DEM 1 Apr-03 Ultrasonic Techniques PR-1315 Measurement Equipment Calibration/Re-certification Procedure Ver. 1.0 Feb-00
DEP 01.00.02.12 Preparation of Safeguarding Memoranda & Process Safeguarding Flow Schemes Amended by Circular 115/08 DEM 1 Oct-01 SP-1246-1 Specification for Painting and Coating of Oil and Gas Production Facilities Ver. 1.0 Jul-03
DEP 20.00.10.10 Basic Data and Phase Behaviour Methods Apr-03 PR-1809 Production Measurement Management System Procedure Ver 1.0 Nov-08
- Part-1 Technical Requirements for Coating System
DEP 20.04.10.10 Glycol Type Gas Dehydration System Amended by Circulars 50/06 & 74/08 Jan-05 SP-1246-2 Specification for Painting and Coating of Oil and Gas Production Facilities Ver. 1.0 Jul-03
DEP 20.05.50.10 Heat Transfer Fluid (HTF) Systems DEM 1 Apr-06 - Part-2 New Construction Coating System GU-437 SIL Assessment & Implementation Guidelines Ver. 2.0 May-09
DEP 20.05.60.10 Fuel Systems Amended by Circular 121/08 DEM 1 Nov-06 SP-1246-3 Specification for Painting and Coating of Oil and Gas Production Facilities Ver. 1.0 Jul-03 GU-513 Guidelines for Alarm Management and Rationalisation Ver. 1.0 Dec-05
DEP 20.21.00.31 Fouling Resistance For Heat Transfer Equipment Dec-98 - Part-3 Maintenance of Coating Systems
DEP 30.10.05.11 Plant Model Construction & Review Jan-05 SP-1246-4 Specification for Painting and Coating of Oil and Gas Production Facilities Ver. 1.0 Jul-03 DEP 32.01.20.10 Data Acquisition and Control Architecture (DACA) Amended by Circulars 52/06, 04/07 & 57/07 Aug-05
DEP 31.22.05.11 Gas/Liquid Separators Type Selection and Design Rules Amended by Circular 03/08 & 14/08 Dec-07 - Part-4 Surface Preparation, Application and Inspection of Coating Systems DEP 32.01.21.10 DACA - Roles & Responsibilities Amended by Circulars 58/07, 08/08 & 99/08 Nov-06
DEP 31.22.05.12 Liquid/Liquid and Gas/Liquid/Liquid Separators - Type Selection and Design Rules Amended by Circular 17/08 Jan-08 SP-1246-5 Specification for Painting and Coating of Oil and Gas Production Facilities Ver. 1.1 Feb-05 DEP 32.01.22.10 DACA - Procedural Controls / Configuration Management Jun-07
DEP 31.40.10.14 Pipeline Overpressure Protection DEM 1 Nov-03 - Part-5 Approved Coating Systems DEP 32.01.22.11 DACA - Procedural Controls / Restore & Backup Amended by Circular 10/08 Jan-08
DEP 37.05.10.11 Diesel Oil Systems in Oil and Gas Production Facilities Dec-98 SP-2034 Specification for Internal FBE Coating of Line Pipe Ver. 1.0 Sep 05 DEP 32.01.22.12 DACA - Procedural Controls / incident Management Amended by Circulars 60/07 & 100/08 Mar-07
DEP 80.00.10.10 Area Classification (Amendments/Supplements to IP 15) DEM 1 Nov-03 (Amendments/Supplements to API REP 5L7) DEP 32.01.22.13 DACA - Procedural Controls / Disconnect Procedure Amended by Circular 11/08 Jun-07
DEP 80.45.10.10 Design of Pressure Relief, Flare and Vent Systems DEM 1 Jan-09 SP-2041 Specification for Selection of Cracking Resistant Material of H2S Containing Environments Ver. 1.0 Oct-05 DEP 32.01.23.11 DACA - Technical Controls / Infrastructure Architecture Amended by Circulars 59/07 & 09/08 Mar-07
DEP 80.45.10.11 Overpressure and Underpressure – Prevention and Protection DEP New Requirement Oct-08 SP-2094 Specification for Polyethylene Liners in Carbon Steel Flowlines & Pipelines Replaces ERD-43-15 Ver. 1.0 Aug-09
DEP 80.45.10.12 Emergency Depressuring and Sectionalizing DEP New Requirement Jan-09 DEP 32.01.23.12 DACA - Technical Controls / Remote User Access Amended by Circular 61/07 Mar-07
PR-1180 Performance Testing of Coating Systems for Pipeline Rehabilitation Ver. 2.0 Nov-05 DEP 32.01.23.13 DACA - Technical Controls / Wireless Security Amended by Circular 62/07 Nov-06
EP 93-1315 Deoiling Manual Rev. 1.1 Nov-93 PR-1234 Safe Working Procedures for Cathodic Protection Systems Ver. 2.0 Mar-01 DEP 32.01.23.14 DACA - Technical Controls / Minimal Access Mar-07
EP 95-0312 HAZID Hazard Identification Technique Rev. 0 Sep-95 PR-1503 Procedure for Determining Pipeline’s (ACR) Assessed Corrosion Rate Rev. 01 Jan-02 DEP 32.01.23.15 DACA - Technical Controls / Authentication & Authorisation Jun-07
EP 95-0313 HAZOP Hazard & Operability Technique Rev. 0 Oct-95 PR-1642 Procedure
Procedurefor
Procedure for COSASCO”””Retrieving
for““COSASCO
“COSASCO RetrievingEquipment
Retrieving EquipmentOperation,
Equipment Operation,Corrosion
Operation, CorrosionMonitoring
Corrosion Monitoring
Monitoring Transferred to Pipelines Eng. Ver. 1.0 Jul-05 DEP 32.01.23.18 DACA - Technical Controls / PCD Network Drawings Jan-08
EP 98-5632 Best Practices Guide - Gas Sweetening Technology Dec-98 and
and Weight
and Weight Loss
Weight Loss Coupon
Loss Coupon Analysis
Coupon Analysis
Analysis DEP 32.01.23.19 DACA - Technical Controls / Architectural Requirements for Applications Amended by Circulars 63/07 & 05/08 Jun-07
EP 99-5266 Removal of Heavy Metals from Waste Water – Desk Study Feb-99 Utilizing Product Data
EP 99-5508 Key Multiphase and Hydrate Learning Points from the Main Gas Condensate Sep-99 GU-368 Guidelines For The Protection Of Buried Sections of Surface Laid Pipelines/Flowlines Rev. 0 May-00 DEP 32.01.25.10 DACA - System Security/ Virus Management Jun-07
Systems in the Shell Group GU-475 Corporate Flowline Materials Selection Guideline Ver. 1.0 Sep-04 DEP 32.01.25.11 DACA - System Security/ Patch Management Jun-07
EP 99-5806 Best Practice in Produced Water Treatment Dec-99 GU-486 Screening & Monitoring Bacteria Guidelines Ver. 1.0 Oct 05 DEP 32.01.26.11 DACA - Assurance Risk Assessment Amended by Circular 101/08 Mar-07
EP 2003-5184 Shell Expro Topsides Solids Management Guide Sep-03 DEP 32.01.40.31 Smart Fields – Production Critical Real Time Data Dec.07
DEP 30.10.02.11 Metallic Materials-Selected Standards Sep-02 DEP 32.10.03.10 Instrument Symbols and Identification on Process Engineering Flow Schemes Amended by Circular 44/08 DEM 1 Apr-06
EP 2007-5644 EP Guideline on Process Safeguarding Nov-07
DEP 30.10.02.13 Non-Metallic Materials-Selection & Application Amended by Circulars 36/06 & 02/07 Apr-03 DEP 32.24.20.30 Control System and Instrumented Protective Functions for Fired Equipment DEM 1 Apr-06
EP 2005-5186 Heat Exchanger Selection Guideline Rev. 3.0 Oct-05
DEP 30.10.02.31 Metallic Materials-Prevention of Brittle Fracture DEM 1 Dec-08 - System for a Single-Burner Furnace (S 24.024 & S 24.026)
GS.06.50701 Guidelines for the Hydraulic Design and Operation of Multiphase Flow Pipeline Systems Jan-06 DEP 32.24.20.33 Control System And Instrument Protection Functions for Fired Equipment Dec-98
DEP 30.10.73.10 Cathodic Protection Amended by Circulars 10/04, 48/06 & 24/08 Nov 03 DEM 1
GS 06.53139 Guide for Fluid Characterization using C7PLUS Method in HYSYS Dec-06 DEP 30.10.73.31 Design of Cathodic Protection Systems for Onshore Buried Pipelines DEP New Requirement Dec-92 - System For An Automatically Started, Gas Fired, Natural Draught,
DEP 30.46.00.31 Thermal Insulation- Amendments/Supplements to the CINI Handbook Amended by Circular 106/08 Jan-05 Multi-burner Furnace, Safeguarded By Pilot Burners (S 24.033)
DEP 30.48.00.31 Protective Coatings for Onshore Facilities DEP New Requirement Jan-09 DEP 32.24.20.37 Control System And Instrumented Protective Functions for Fired Equipment DEM 1 Dec-07
Ammended & Supplemented by SP-1246 - System For A Manually-started, Forced Draught, Multi-Burner
DEP 30.48.30.31 Cement Lining of Pipes DEP New Requirement Dec-98 Furnace Or Boiler (S 24.021)
Amended by Circular 15/03 DEP 32.24.20.38 Control System And Instrument Protective Functions for Fired Equipment DEM 1 Apr-06
DEP 30.48.40.31 Thermal Spray Coatings of Aluminium & 85/15 Zinc / Aluminium Alloy Jul-08 - System For An Automatically-Started, Forced Draught, Multi-Burner
CIVIL ENGINEERING – CFDH: UIB4 (UEB) DEP 30.48.41.31 Electroless Nickel Plating - Amendments/Supplements to ASTM B 733 Jan-08 Furnace or Boiler (S 24.030 or S 24.034)
DEP 30.48.60.10 Rubber-Lined Process Equipment DEP New Requirement Aug-05 DEP 32.24.20.40 Control
ControlSystem
Control System&
System && Instrument
InstrumentProtective
Instrument Protective Functions
Protective Functionsfor
Functions for Fired
for Fired --- WITHDRAWN
Fired DEP Withdrawn by Shell
Doc. ID Document Title Additional Notes Rev./DEM Date Equipment
Amended by Circular 109/08 Equipment–––System
Equipment Systemfor
System foraaa Tangentially
for TangentiallyGas
Tangentially Gas Fired
Gas FiredCO
Fired COBoiler
CO Boiler(S
Boiler (S24.036)
(S 24.036)
24.036)
Civil / Structures - DEP 31.10.00.10 Material Traceability and Positive Material Identification (PMI) DEP New Requirement Dec-07 DEP 32.24.20.42 Control System and Instrumented Protective Functions for Fired Equipment DEM 1 Apr-03
Amended by Circular 27/08 – System CO-fired Gas Turbine Waste Heat Recovery Units
SP-1143 Specification
Specificationfor
Specification forEarthmoving
for Earthmovingand
Earthmoving andConstruction
and ConstructionEquipment
Construction Equipment
Equipment ----------------- WITHDRAWN SP Withdrawn Ver. 1.0 Jun 99 DEP 31.21.01.31 Selected Construction Materials for Shell-&-Tube Heat Exchangers Dec-04 DEP 32.31.00.10 Instrument Engineering Procedures Jul-85
SP-1187 Application and Selection of Standard Pipe Supports Ver. 2.0 Dec-04 DEP 31.24.40.31 Materials for High Temperature Conversion Process Furnace Parts Dec-00 DEP 32.31.00.32 Instrument for Measurement and Control Jul-99
SP-1273 Civil & Building Standard Drawings Index Ver. 1.0 May-04 DEP 31.40.00.19 Corrosion Mitigation Strategy for Wet Sour Gas Carbon Steel Pipelines DEM 1 Apr-03 DEP 32.31.00.34 Instrumentation Documents and Drawings Dec-95
SP-1274 Guide to Civil Engineering Materials Testing Ver. 1.0 Jan-04 DEP 31.40.10.19 Glass Fibre Reinforced Plastic Pipeline and Piping Systems Mar-07 DEP 32.31.09.31 Instrumentation for Equipment Packages May-04
SP-1275 Civil & Building Works Design Criteria Manual Ver. 1.0 Jun-04 DEP 31.40.10.20 Spoolable Fibre-Reinforced Plastic Pipes Amended by Circular 37/08 Aug 05 DEP 32.31.50.10 On-line Process Stream Analysis Sample Take-off & Transportation Amended by Circulars 44/99 & 18/00 Apr-03
SP-1276 Standard
StandardControl
Standard ControlBuildings
Control Buildings ---Design
Buildings DesignRequirements
Design Requirements&
Requirements &Standard
& StandardDrawings
Standard Drawings
Drawings - WITHDRAWN SP Withdrawn Ver. 1.0 Sep-04 DEP 31.40.20.32 CRA Clad or Lined Steel Pipe - Amendments/Supplements to API Spec 5LD Amended by Circular 25/02 Oct-95 DEP 32.31.50.11 On-line Process Stream Analysis - Sample Conditioning Sep-02
SP-1277 Transportable Accommodation Units Ver. 1.0 Dec-04 DEP 31.40.20.36 Weldable
WeldableMartensitic
Weldable MartensiticStainless
Martensitic StainlessSteel
Stainless SteelLine
Steel LinePipe
Line Pipefor
Pipe foruse
for use in Oli&
inOli
use in Oli & Gas
& GasOperations
Gas Operations
Operations - WITHDRAWN Mar-01 DEP 32.31.50.12 On-Line Process Stream Analysis- Analysers Amended by Circulars 45/99 & 10/00 Apr-03
SP-1278 Site
SiteSelection
Site Selection&
Selection &Soil
& SoilInvestigation
Soil InvestigationManual
Investigation Manual–––Eng.
Manual Eng.Guidelines
Eng. Guidelines
Guidelines –-------------- WITHDRAWN SP Withdrawn – See DEP 34.11.00.10 Ver. 1.0 May-04 ---Amendments/Supplements
Amendments/Supplements to
Amendments/Supplements to API
to APISpec
API Spec5LC
Spec 5LC
5LC Amended by Circular 42/06 DEP 32.31.50.13 On-Line Process Stream Analysis – Analyser Houses DEP New Requirement - Replaces SP-1204 Aug-05
SP-1279 Specification for Civil & Building Construction - Index Ver. 1.0 Feb-04 DEP 31.40.30.31 External Polyethylene & Polypropylene Coating for Line Pipe Apr-03 Amended by Circulars 02/08 & 47/08
SP-1279-A Specification for Civil & Building Construction - General Requirements Ver 1.0 Feb-04 DEP 31.40.30.32 External Fusion-Bonded Epoxy Powder Coating for Line Pipe Apr-03 DEP 32.32.00.11 Turbine Fiscal Metering Systems for Liquid Hydrocarbon Sep-02
SP-1279-B Specification for Civil & Building Construction - Demolition and Alterations Ver 1.0 Feb-04 DEP 31.40.30.34 Thermoplastic Lined Pipelines DEP New Requirement Dec-99 DEP 32.32.00.12 Fiscal Flow Measurement of Natural Gas Dec-99
SP-1279-C Specification for Civil & Building Construction - Excavation and Earthworks Ver 1.0 Feb-04 Amended by Circulars 05/02 & 39/08 DEP 32.45.10.10 Instrumentation of Depressuring Systems DEP New Requirement - Replaces SP-1205 DEM 1 Nov-03
SP-1279-D Specification for Civil & Building Construction - Concrete Works Ver 1.0 Feb-04 DEP 31.40.30.35 Internal Coating of Line Pipe for Non-Corrisive Gas Transmission Service DEP New Requirement Dec-05 Amended by Circular 119/08
SP-1279-E Specification for Civil & Building Construction - Blockwork Ver 1.0 May-04 - Amendments/Supplements to ISO 15741 DEP 32.80.10.10 Classification and Implementation of IPF’s DEM 1 Oct-01
SP-1279-F Specification for Civil & Building Construction - Roofing Ver 1.0 Jan-04 DEP 31.40.30.37 External Field Joint and Rehabilitation Coating Systems for Line Pipe DEP New Requirement Jan-08 DEP 32.80.10.30 Instrumentated Protective Systems DEM 1 Jul-96
SP-1279-G Specification for Civil & Building Construction - Structural Steel Works Ver 1.0 Feb-04 DEP 39.01.10.11 Selection Of Material For Life Cycle Performance (EP) Material Selection Process DEM 1 Jan-09 DEP 61.38.10.10 Shop and Field Fabrication of Orifice Meter Runs Apr-06
SP-1279-H Specification for Civil & Building Construction - Metal Works Ver 1.0 Feb-04 DEP 39.01.10.12 Selection of Materials for Life Cycle Performance (EP) – Upstream Equipment DEP New Requirement Jan-09 DEP 62.10.08.11 Inspection & Functional Testing of Instruments Amended by Circular No.03/2001 Nov-03
SP-1279-J Specification for Civil & Building Construction - Carpentry and Joinery Ver 1.0 Feb-04 DEP 39.01.10.32 Specification of nickel base alloy 718 (UNS N07718) for oil and gas drilling and DEP New Requirement Dec-08
SP-1279-K Specification for Civil & Building Construction - Ironmongery Ver 1.0 Feb-04 production equipment - amendments/supplements to API spec 6A718
SP-1279-L Specification for Civil & Building Construction - Glazing Ver 1.0 Feb-04 DEP 39.01.20.10 L-80 13% Cr. Casing and Tubing - Amendments/Supplements to ISO/DIS 11960.2 Oct-95
SP-1279-M Specification for Civil & Building Construction - Floor, Wall & Ceiling Finishes Ver 1.0 Feb-04 DEP 39.01.20.30 Corrosion-Resistant Alloy Seamless Tubes For Use as Casing Tubing and Dec-00
SP-1279-N Specification for Civil & Building Construction - Painting & Decorating Ver 1.0 May-04 Coupling Stock - Technical Delivery Conditions- Endorsement of ISO 13680
SP-1279-P Specification for Civil & building Construction - Fencing & Gates Ver 1.0 May-04 DEP 70.10.70.11 Preservation of Old and New Equipment and Piping Standing Idle Jul-99 FEED OFFICE ENGINEERING – Manager: UEP1 **** FOR USE IN FEED OFFICE ONLY****
SP-1279-Q Specification for Civil & Building Construction - Landscaping Works Ver 1.0 May-04
SP-1279-R Specification for Civil & Building Construction - Roads & Paving Works Ver 1.0 Feb-04 Doc. ID Document Title Additional Notes Rev./DEM Date
SP-1279-S Specification for Civil & Building Construction - Graded Roads, Rig Locations, Ver 1.0 Feb-04 Welding - FEED Office Management
Airstrips, Tank Pads & Bund Works
SP-1280 Guideline to Swimming Pools Ver. 1.0 Sep-04 SP-1097 Specification for Welding of Duplex Stainless Steel Pipelines Ver. 2.0 May-05 PR-1741 FEED Office - Quality Management System Manual Rev. A03 May-09
SP-1281 Safe Road Works – Engineering Guidelines Ver. 1.0 Dec-04 - Amendments/Supplements to API Std 1104 PR-1742 FEED Office - Risk & Opportunity Management Procedure Rev. A01 Apr-08
SP-1282 Specification for Reinforced Concrete - Production & Construction Guidelines Ver. 1.0 May-04 SP-1167 Specification for Welding on Pressurised Pipes Amend’t/Suppl’t to DEP.30.10.60.30–GEN Ver. 2.0 Oct-06
SP-1283 Specification for Standard Sunshades - Design requirements & Standard Drawings Ver. 1.0 Sep-04 (Dec-98) PR-1743 FEED Office - Project On-Boarding Procedure Rev. A01 Apr-08
SP-1284 Specification for Sign & Signboards - Standard Signs Catalogue Ver. 1.0 May-04 SP-1173 Specification for Welding on On-Plot Pipe-Work Amend’s/Suppl’t to DEP 31.38.01.31-GEN Ver. 1.3 Apr-09 PR-1757 FEED Office - Self Assessment Procedure
- Amendments/Supplements to ASME B31.3 & DEP 30.10.60.18-GEN PR-1764 FEED Office - New entrant Induction Program Procedure Rev. A01 Apr-08
DEP 34.00.01.30 Structural Design & Engineering Dec-07 SP-1174 Specification for Welding of Class 2 & Class 3 Pipelines Ver. 2.0 Dec-04 PR-1765 FEED Office - Knowledge Management (Lessons Learned) Rev. A01 May-08
DEP 34.11.00.10 Site Investigations Manual Dec-99 - Amendments/Supplements to API Std 1104 PR-1766 FEED Office - Project Close out Procedure Rev. A01 May-08
DEP 34.11.00.11 Site Preparations & Earthworks Including Tank Foundations and Tank Farms Amended by Circular 60/08 Apr-03 SP-1176 Non-Destructive Examination Ver. 2.0 Oct-05
DEP 34.11.00.12 Geotechnical & Foundation Engineering Apr-87 - Amendments/Supplements to ASME BPV Code Section V
SP-1177 Specification for Welding of Class 1 Pipelines Ver. 2.0 Oct-05 HSE/Technical Safety
DEP 34.13.20.31 Road Paving , Surfacing, Slope Protection & Fencing Apr-03
DEP 34.17.00.32 Design & Engineering of Buildings Amended/Supplemented by SP-1275 Sep-02 - Amendments/Supplements to API Std 1104
PR-1744 FEED Office - Managing of Safety During Vendor and Contractor Site Visits Rev. A01 Apr-08
Amended by Circulars 19/03, 37/06, 05/07 & 61/08 PR-1776 FEED Office - HSE Action Close-out Procedure Rev. A01 Apr-08
DEP 34.17.10.30 Blast Resilient & Blast Resistant Control Buildings / Field Auxilliary Rooms Amended by Circulars 27/07, 62/08 DEM 1 Sept-02 PR-1272 Standard Welding Procedure Qualification Records for On-Plot Piping Ver. 2.0 Jun-05
PR-1274 Standard Welding Procedure Qualification Records For Class 2 Pipelines Ver. 2.0 Jun-05 PR-1777 FEED Office - HSE Induction Requirements Procedure Rev. A01 Apr-08
DEP 34.17.10.31 Laboratories Apr-06
DEP 34.19.20.11 Fireproofing of Steel Structures Amended by Circular 59/06 DEM 1 Dec-99 PR-1276 Standard Procedure Qualification Records for Welding on to Pressurised Pipes Ver. 2.0 Jun-05
DEP 34.19.20.31 Reinforced Concrete Structures Dec-07 PR-1659 Pipeline Emergency Repair PQR’S Welding / Pipeline Procedures Ver. 1.0 Oct 05
DEP 34.24.26.31 Steel Stacks - Amendments/Supplements to CICIND Model Code Apr-03 Engineering
DEP 34.28.00.31 Steel Structures Jan-09 DEP 30.10.60.18 Welding of Metals Amended and Supplemented by SP-1173 May-04
- Amendments/ Supplements to API RP 582 Amended by Circulars 01/06, 44/07 & 16/08 SP-2067 FEED Office - PDMS Model specification Rev. A01 Sept-08
DEP-30.10.60.30 Welding on Pressurised Pipes Amended and Supplemented by SP-1167 Dec-98
- Amendments/Supplements to ANSI / API RP 1107 Amended by Circulars 15/02 & 21/04 PR-1727 FEED Office - Preparation of "Basis for Design" Procedure Rev. A01 Jun-08
Building Services - DEP-30.10.60.31 Oxidation of Stainless Steel Weldments Dec-98 PR-1728 FEED Office - Preparation of Project Specification (FEED Output) Procedure Rev. A01 Apr-08
DEP 61.40.20.30 Welding of Pipelines and Related Facilities DEP New Requirement Jun-93 PR-1729 FEED Office - Technical Integrity Assurance Procedure Rev. A01 May-08
SP-1285 Specification for Civil & Building’s Utility Services - Index Ver. 1.0 May-04 - Amendments/Supplements to ANSI/API STD 1104 Amended by Circulars 20/00 & 41/04 PR-1730 FEED Office - Engineering & Projects Calculation Procedure Rev. A01 Apr-08
SP-1285A Specification for Civil & Building’s Utility Services - General Requirements Ver. 1.0 May-04 DEP 61.40.20.31 Field Welding of Duplex and Super Duplex Stainless Steel Pipelines DEP New Requirement Jul-99 PR-1733 FEED Office - Engineering Technical Query Procedure Rev. A01 May-08
SP-1285B Specification for Civil & Building’s Utility Services – Air Conditioning Works Ver. 1.0 Sep-04 - Amendments/Supplements to API 1104 PR-1734 FEED Office - Design Review Procedure Rev. A01 Apr-08
SP-1285C Specification for Civil & Building’s Utility Services - Plumbing Works Ver. 1.0 Dec-04 PR-1735 FEED Office - Codes and Standards Procedure Rev. A01 May-08
SP-1285D Specification for Civil & Building’s Utility Services – Fire Protection Works Ver. 1.0 Sep-04 PR-1736 FEED Office - Site Survey Procedure Rev. A01 Apr-08
SP-1285E Specification for Civil & Building’s Utility Services – Electrical Installation Ver. 1.0 Dec-04 QA-QC
PR-1748 FEED Office - Equipment Criticality Assessment Procedure Rev. A01 Jun-08
SP-1171 Specification for Quality Assurance Requirements for Ver. 2,0 Dec-07 PR-1749 FEED Office - Register of Holds Procedure Rev. A01 Jun-08
DEP 31.76.10.10 Heating, Ventilation and Air Conditioning for Plant Building Amended by Circular 43/08 Jul-98 PR-1750 Contract and Third Party Services Management Procedure Rev. A01 Aug-09
DEP 31.76.10.11 Installation, Testing and Balancing, and Commissioning of HVAC Systems Apr-06 Product and Service
PR-1752 FEED Office – Project Execution Procedure (Define Phase) Rev. A01 Aug-09
DEP 34.14.20.31 Drainage & Primary Treatment Facilities Amended by Circulars 59/01, 41/03 & 03/07 DEM 1 Dec-93 PR-1753 FEED Office - Weight Reporting and Weight Control Procedure Rev. A01 Jul-08
Inspection- PR-1754 FEED Office - Layout Development Procedure Rev. A01 Sept-08
PR-1758 FEED Office - Technical Information Notice Procedure Rev. A01 Jun-08
SP-2046 Static Equipment – Pipeline & Flowline Risk-Based Inspection Process - WITHDRAWN Withdrawn by PDO PR-1768 FEED Office - Project Deliverables - Checking and Approval Procedure Rev. A01 Apr-08
PR-1769 FEED Office - 3D & 2D Drafting Manual Procedure Rev. A01 Jun-08
PR-1013 Static Equipment Inspection and Maintenance Procedure Ver. 3.0 May-05 PR-1773 FEED Office - Equipment Supplier Document Requirements Procedure Rev. A01 Jul-08
PR-1778 FEED Office - Standard Calculation Spreadsheet QC Procedure Rev. A01 May-08
GU-256 Static Equipment Inspection Guideline Ver. 2.0 May-05
GU-363 Guideline for the Use of Scaffolding Ver. 1.0 Aug-00 GU-603 FEED Office - Project Deliverables Guideline ORP Phase 3: Define Rev. A01 Apr-08
GU-432B Guideline for Automated Ultrasonic Testing Scope Ver. 1.0 May-03
PIPELINE & FLOWLINE ENGINEERING – CFDH: UIP (UEL) Definition for Class 1 Piggable Pipelines
Doc. ID Document Title Additional Notes Rev./DEM Date GU-450 Guideline for Inspection and Integrity Assessment of Ver. 1.0 Nov-03 Cost & Planning
Carbon Steel Non-Piggable Pipelines
PR-1737 FEED Office - Finance Flow Procedure Rev. A01 Jun-08
SP-1032 Specification for the Design of Pipeline Block Valve Stations Ver. 2.0 Oct-98
DEP 61.10.08.11 Field Inspection prior to Commissioning of Mechanical Equipment Amended by Circular 71/08 Mar-07 PR-1738 FEED Office - Business Review Procedure Rev. A01 May-09
SP-1199 Procurement Specification for Pipeline Split Tees Ver. 1.0 Apr-01
DEP 70.51.10.11 Field Inspection, Maintenance and Repair of Vertical Steel Storage Tanks Amended by Circulars 53/03 & 112/08 Jul-98 PR-1746 FEED Office - Time writing Procedure Rev. A01 May-08
SP-1208 Pipeline Construction Specification Ver. 2.0 Sep-05
PR-1770 FEED Office - Planning & Progress Reporting Procedure Rev. A01 May-08
SP-1210 Pipeline Operations and Maintenance Ver. 2.0 Dec-03
PR-1771 FEED Office - Cost Planning Work-flow Procedure Rev. A01 Jun-08
SP-1211 Onshore Pipeline Engineering Ver. 2.0 Nov 04
SP-1212 DEP 31.40.40.38-PDO Hydrostatic Pressure Testing of New Pipelines Based on DEP 31.40.40.38-Gen Ver. 1.0 Apr-03 Lifting & Hoisting - GU-616 FEED Office - Standard CTR Catalogue Rev. A02 Mar-09
SP-1235 DEP 31.40.60.12-PDO Pipeline Repairs - Supplement to ASME B31.4 & B31.8 Based on DEP 31.40.60.12-Gen Ver. 1.0 Jan-03
SP-1236 DEP 31.40.21.31-PDO Pipeline Isolating Joints - Amendments/Supplements to MSS SP-75 Based on DEP 31.40.21.31-Gen Ver. 1.0 Dec 02 CP-189 Lifting and Hoisting Code of Practice Ver. 0 Sep-07
SP-1251 Training Requirements for Lifting Operations Personnel Ver. 3.0 Feb-08
PR-1067 Infrastructure - Emergency Response Document Part III Contingency Plans Ver. 8.0 Jul-09 PR-1708 Lifting & Hoisting – Inspection, Testing and Certification Ver. 0 Sep-07 Quality Management
- Vol. 4: Main Oil Line PR-1709 Lifting & Hoisting – Lift Planning / Execution Ver. 0 Sep-07
PR-1146 Engineering and Operations Flowline Cold Cutting Procedure Ver. 3.0 Dec-06 PR-1726 FEED Office - Control of QMS Documents Procedure Rev. A02 Mar-09
PR-1235 Main Oil Line System Management Procedure Rev. 02 Jun-08 PR-1745 FEED Office - Customer Feedback Procedure Rev. A02 May-09
PR-1236 South Oman Gas Line System Management Procedure Rev. 02 Jun-08 PR-1756 FEED Office - Control of Non-Conformance, Corrective Actions and Preventative Rev. A02 Apr-09
PR-1416 Procedures for the Use of Pipe-RBA Methodology Rev. 1 Mar-03 Actions
PR-1504 Facilities Change Proposal Procedure for Main Oil Line, South Oman Gas Line Rev. 0 Feb-02 PR-1759 FEED Office - Audit Procedure Rev. A03 Apr-09

PR-1506
and MAF Terminal
Pipeline Hot Tap Management Procedure Rev. 01 Oct-02
Notes: PR-1772 FEED Office - Management Review Procedure Rev. A02 May-09

PR-1522
PR-1629
Procedure for Analysis of Pipeline Road Crossing
Installation of Epoxy Grouted Sleeve & Clock Spring Repairs
Rev. 0
Ver. 1.0
Oct-02
Mar-05
1. This Document can be accessed from LiveLink: http://sww4.pdo.shell.om/CMFportal/Default.aspx Information Management
PR-1642 Procedure for “COSASCO” Retrieving Equipment Operation, Corrosion Monitoring
and Weight Loss Coupon Analysis
Moved from Mat & Corr Ver. 1.0 Jul-05 2. DEP’s are Shell Documents and can be accessed from: http://swwep-deps.shell.com/ PR-1722 FEED Office - Information Management Services to FEED Office Procedure Rev. A01 Apr-08
PR-1723 FEED Office - Information Documents and Rec
3. PDO Management System Documents are available on Livelink: http://sww4.pdo.shell.om/CMFportal/Default.aspx
GU-379 Pipeline Emergency Repair Manual (Class 1 Pipelines) Rev. 4 Nov-04 Heirarchy:
GU-501 Pipeline Engineering Excavating and Working Around Live Pipelines Rev. 1 Oct-05
a) CMF Corporate Management Framework Mandatory
DEP 31.40.10.12 Design Of Multiple-pipe Slug Catchers DEM 1 Jan-09 b) PL Policy Mandatory
DEP 31.40.10.13 Design of Pipeline Pig Trap Systems Amended by Circular 35/08 DEM 1 Nov-06
DEP 31.40.10.16 Upheaval Buckling of Pipelines DEP New Requirement Apr-06 c) CP Code of Practice Mandatory
DEP 31.40.20.33
DEP 31.40.20.35
Line Pipe Induction Bends - Amendments / Supplements to ISO 15590-1
Line Pipe for Non-Critical Service - Amendments / Supplements to ISO3183-1 Amended by Circular 19/02
Sep-02
Dec-99
d) PR Procedure Mandatory
e) SP Specification Mandatory
DEP 31.40.20.37
DEP 31.40.21.30
DEP 31.40.21.31
Line Pipe for Critical Service - Amendments / Supplements to ISO 3183-3
Pipeline Fittings- Amendments / Supplements to ISO-15590-2
Pipeline Isolation Joints - Amendments / Supplements to MSS SP75
Amended by Circular 43/06

Amended by Circular 38/08


DEM 1 Dec-00
Jun-07
Dec-99
f) GU Guideline Non-Mandatory CAUTION
DEP 31.40.21.33 Pig Signallers : Intrusive Type Amended by Circular 35/04 Sep-02 4. The Hardcopy of this Document (Wall Chart) is issued every 6 Months in Arrears - Check with the Electronic
DEP 31.40.21.34 Carbon And Low Alloy Steel Pipeline Flanges For Use in Oil & Gas Operations
- Amendments/Supplements to ISO 15590-3
Jun-07
Document for Current Status
MAKE SURE YOU HAVE LATEST REVISION
DEP 31.40.50.30
DEP 31.40.60.11
Precommissioning of Pipelines
Pipeline Leak Detection Amended by Circular 41/08 DEM 1
Jan-05
Sep-02 5. All changes since last revision are shown in BOLD (CHECK IN LIVELINK or SHELL DEP WEBSITE)
DEP 31.40.60.12 Pipeline Repairs DEP New Requirement DEM 1 Apr-06
Ammended & Supplemented by SP-1235
Revision: 12a
D um n N GU-611 Issue Date: Aug 2009

Das könnte Ihnen auch gefallen