CATHODIC PROTECTION GROUP

N. A. TECHNICAL SUPPORT DEPT 2011


RT CORROSION INSPECTION UNIT
S/L WS DATE STATUS EQUIPMENT DESCRIPTION REMARKS INSPECTOR

1 RTP-065/11 13-Mar-11 OPEN-I/P QW-859 CP System Unavailable A/C Power Source for QW-859 CP System Site was visited on 04/12/2011 and materials with services will be planned and calculated soon HUAQ

2 RTP-064/11 13-Mar-11 OPEN-I/P QW-858 CP System Unavailable A/C Power Source for QW-858 CP System Site was visited on 04/16/2011 and materials with services will be planned and calculated soon HUAQ

3 RTP-059/11 05-Mar-11 OPEN-I/P QW-84 Unavailable A/C Power source for QW-84 Cathodic Protection System Site was visited on 04/16/2011 and materials with services will be planned and calculated soon HUAQ

4 RTP-058/11 05-Mar-11 OPEN-I/P QW-77 Unavailable A/C Power source for QW-77 Cathodic Protection System Site was visited on 04/12/2011 and materials with services will be planned and calculated soon HUAQ

5 RTP-057/11 05-Mar-11 OPEN-I/P QW-76 Unavailable A/C Power source for QW-76 Cathodic Protection System Site was visited on 04/16/2011 and materials with services will be planned and calculated soon HUAQ

6 RTP-056/11 05-Mar-11 OPEN-I/P QW-56 Unavailable A/C Power source for QW-56 Cathodic Protection System Site was visited on 04/12/2011 and materials with services will be planned and calculated soon HUAQ

RTP-054/11 02-Mar-11 OPEN-I/P QW-548 CP System Missing Transformer Rectifier and Unavailable A/C Power source for QW-548 CP System PMT: one system to protect the three wells (69, 20 and 548). HUAQ
7
RTP-053/11 02-Mar-11 OPEN-I/P QW-82 CP System Unavailable A/C Power source for QW-82 CP system Upgrade is needed due to no power feeds the site, power was taken from adjacent site to feed only the lighting. (it is not under PMT) HUAQ
8
RTP-052/11 02-Mar-11 OPEN-I/P QW-108 CP System Missing transformer Rectifier and Unavailable A/C Power Source for QW-108 CP System Site was visited on 04/12/2011 and materials with services will be planned and calculated soon HUAQ
9

10 RTP-051/11 02-Mar-11 OPEN-I/P QW-81 CP System Missing Transformer Rectifier and Unavailable A/C Power Source for QW-81 CP System Site was visited on 04/12/2011 and materials with services will be planned and calculated soon HUAQ

11 RTP-046/11 20-Feb-11 OPEN-I/P QW-88 CP System Unavailable A/C Power Surce for QW-88 CP. PMT: new well will be drilled. CP system is under construction and will protect both wells. HUAQ

12 RTP-045/11 20-Feb-11 OPEN-I/P QW-80 CP Unavailable A/C power source for QW-80 CP Site was visited on 04/12/2011 and materials with services will be planned and calculated soon HUAQ

13 RTP-043/11 16-Feb-11 OPEN-I/P QW-862 CP System Unavilable A/C Power Source for QW 862 Site was visited on 04/12/2011 and materials with services will be planned and calculated soon HUAQ

14 RTP-042/11 16-Feb-11 OPEN-I/P QW-75 CP system Unavailable A/C Power Source for QW-75 Site was visited on 04/12/2011 and materials with services will be planned and calculated soon HUAQ

15 RTP-015/11 15-Jan-11 OPEN-I/P QW-25 CP System Unavailable A/C Power source for QW-25 CP System Site was visited on 04/12/2011 and materials with services will be planned and calculated soon HUAQ

16 RTP-014/11 15-Jan-11 OPEN-I/P Q13-QW-20 CP System Unavailable A/C Power Source for QW-20 CP Protection PMT: one system to protect the three wells (69, 20 and 548). HUAQ

17 RTP-011/11 09-Jan-11 OPEN-I/P QW-69 Cathodic Protection System. Unavailable A/C Power Source for QW-69 Cathodic Protection System. PMT: one system to protect the three wells (69, 20 and 548). HUAQ

18 RTP-010/11 09-Jan-11 OPEN-I/P QW-58 Cathodic Protection System. Unavailable A/C Power Source for QW-58 Cathodic Protection System. Site was visited on 04/12/2011 and materials with services will be planned and calculated soon HUAQ

RTP-221/09 14-Sep-09 OPEN-I/P INCOMING T/LS CRUDE & WATER Installation of soil access points Waiting for maintenance 04/19/2010. HUAQ
19
RTP-218/09 14-Sep-09 OPEN-I/P W-02 Repairing of the QW-070 and the WSW-824broken negative cables. Rejected on 5/23/2011 because the QW-70 CP cable still broken. HUAQ
20
RTP-217/09 14-Sep-09 OPEN-I/P W-19A Repairing of the QW-714 broken negative cable Waiting for closure form 04/19/2010. Rejected by CP insp. On 10/10/2010 HUAQ
21

22 RTP-192/09 12-Aug-09 OPEN-I/P Q08-D-015/D-071/D-015/D-071,and D-041 Rectify the galvanic anode shorted to the bottom plate FOR T&I HAAQ

23 RTP-184/09 02-Aug-09 OPEN-I/P QW-51 AND QW-67 R-02 Replacement of QW-51 and QW-67 rectifiers and anodes. SFC will be created under PR# 3000355653 HAAQ/HUAQ

24 RTP-055/09 22-Mar-09 OPEN-I/P WS-52/53 WSW Repairing of the broken negative cable from WSW wellhead to the Junction box No. 5 (Q13-CPJB-05). ME crew to clean the Surface of the flange to assure continuity of circuit loop. Rejected on 5/23/2011 because the WSW CP cable still broken. HUAQ

RTP-045/09 09-Mar-09 OPEN-I/P W-11 QW-059 and WSW-912. Re-connection and/or Installation of the casing negative cable of QW-059/ WSW-912 negative drain cable base plate. HUAQ
25 ME crew to connect CP plate on wells. Rejected on 5/23/2011 because the Water supply well WSW-912 still disconnected & utilized by RIG

26 RTP-033/09 03-Mar-09 OPEN-I/P W-8A


Repairing of the broken negative cable from QW-642 wellhead to the Junction box No. 5 (Q13-CPJB-05). SFC will be created under PR# 3000355810
HUAQ

27 RTP-035/09 01-Mar-09 OPEN-I/P ANODES FOR QATIF WELL (QW-12)


Replacement of depleted anodes protecting QW-12 at Qatif Fields. Design package# 0018837 under approval
HUAQ

28 RTP-230/08 01-Nov-08 OPEN-I/P Flank 7,8,G2X1, and G2M1 Bringing the potential of the Flank Lines to the criteria Set by Saudi Aramco. Design request has been initiated 4000039190 HAAQ

29 RTP-100/07 01-May-07 OPEN-I/P QW-08 ICCP ANODE FEEDER CABLE Replacement of a faulty twenty years old cp cable. Site was visited on 04/12/2011 and materials with services will be planned and calculated soon M2 is required to execute this W/S HAAQ/HUAQ

30 RTP-051/04 01-May-07 OPEN-I/P QW-857 ICCP ANODE DEPLETED Replacement of a depleted anodes (Added to RTP-035/09 design package) Site was visited on 04/12/2011 and materials with services will be planned and calculated soon MMK/ASS

Zarib Hussain 1 CPIGWorksheet.