Beruflich Dokumente
Kultur Dokumente
Superintendent
MCS, Tallahassee, Florida, 2002 - 2003
* Handled the site development and construction of Tire Kingdom, a $500,000 comm
ercial building
Senior Project Manager - General Superintendent
W.G. YATES & SONS CONSTRUCTION COMPANY, Smiths Station, Alabama, 2000 - 2002
* Managed responsibilities for a $30 million contract that involved the construc
tion of two combined cycle power plants, an electrical substation, a water treat
ment plant, and a marine launch facility overseeing electrical, mechanical, and
earthwork components, as well as 30,000 cubic yards of cast-in-place concrete
Project Manager - Superintendent
MITCHELL BROTHERS INC., Tallahassee, Florida, 1995 - 2000
* Managed multiple road improvement projects in and around the City of Tallahass
ee, which included various
minor projects that ranged from $250,000 to $500,000 and major construction pro
jects, such as:
* Tharpe Street Phases I and II ($20 million)
* Thomasville Road & I-10 Interchange ($25 million)
* Pensacola Street Realignment ($20 million)
Project Engineer
CARR SMITH & ASSOCIATES, Miami, Florida, 1993 - 1995
* Managed field and office operations for the $32 million US 1- Brickel Avenue B
ridge and Roadway, under a contract between CEI and the Florida Department of Tr
ansportation (FDOT) to remove the existing bascule bridge and construct a new ba
scule bridge
Project Engineer - Office Engineer
GREENMAN-PEDERSEN, INC. (GPI), Tallahassee, Florida, 1992 -1993
* Managed field and office operations on a 10-mile road improvement project in J
efferson County, Florida, under
a contract between CEI and FDOT that was constructed by Causie Contracting, Inc.
, which consisted of bridges and 10 miles of roadway widening
Construction Manager - Superintendent
TED BIDDY & ASSOCIATES - MESSER HOME SALES, Tallahassee, Florida, 1989-1993
* Managed diverse responsibilities on a joint project to develop a mobile home s
ubdivision, which included handling engineering, drafting, permitting, construct
ion, contract negotiations, and supervisory functions
Project Engineer - Assistant Resident Engineer
PARSONS BRINKERHOFF CONSTRUCTION SERVICES, Apalachicola, Florida, 1986 - 1989
* Managed all field operations in implementing two contracts between CEI and the
FDOT, which included
2.69 miles, a $19 million AASHTO girder bridge, and related roadway and landsca
ping improvements:
* Ochlocknee Bay Bridge, Apalachicola, Florida ($19 million)
* Easterly Terminus of I-10, Jacksonville, Florida ($34 million)
Geometry Control Engineer - Senior Inspector
SKYCEI (PARSONS BRINKERHOFF CONSTRUCTION SERVICES, H. W. LOCHNER, INC.,
KISSENGER CAMPO & ASSOCIATES), Tampa - St. Petersburg, Florida, 1982 - 1986
* Worked on the $245 million Sunshine Skyway Bridge to construct a 29,040 feet i
n length, 95 feet wide,
cable-stayed bridge with the longest single span of 1,200 feet that had a verti
cal clearance of 175 feet
* Developed a survey to verify accuracy of the precast plant survey and geometry
control for all pier, superstructure segments and erection of bridge, monitorin
g quality and compliance with specifications and special provisions
EDUCATION
TROY STATE UNIVERSITY, Troy, Alabama
ASSOCIATE of SCIENCE in Mathematics, 1979
CONSTRUCTION TRAINING / AFFILIATIONS
UNIVERSITY OF SOUTH FLORIDA, Tampa, Florida,
CERTIFICATE in Bridge Design (Concrete and Steel), 1983
CERTIFICATE in Design of Concrete Mixtures, 1983
American Congress of Surveying & Mapping, Member
OSHA 30 Hour
ACI Concrete Field ID#01170870
American Red Cross, Standard First Aid, CPR/AED