WHEELS FROM 10” TO 63”
Avg. Minutes using standard 5 piece Avg. Minutes using OTR GFM Quick
Task
wheels Change wheels
JACKING 10 10
DEFLATE INSIDE & OUTSIDE TIRES 20 20
REMOVE NUTS - OUTER WHEEL 15 0
REMOVE OUTSIDE TIRE & WHEEL 5 5
REMOVE INSIDE TIRE 5 5
CLEAN & INSPECT HUBS 5 5
INSTALL INSIDE TIRE 5 5
INFLATE INSIDE TIRE 10 10
DEMOUNT & MOUNT OUTSIDE TIRE ON WHEEL 10 0
INSTALL OUTSIDE WHEEL & TIRE ON HUB 5 5
INSTALL NUTS ONTO BOLTS 10 0
TIGHTEN NUTS WITH IMPACT GUN 10 0
INFLATE OUTSIDE TIRE 10 10
TORQUE NUTS 10 0
REMOVE JACKS 5 5
1ST RETORQUE 15 0
2ND RETORQUE 15 0
ALL CRITICAL
AREAS ARE
INSPECTED USING
NON DESTRUCTIVE
MAGNETIC
PARTICLE TESTING
BY A CERTIFIED
TECHNICIAN IN OUR
QUALITY
DEPARTMENT
RIM AND WHEEL REPAIRS
INTERNAL REPAIR PROCEDURE
REPAIRS OR RIMS AND
WHEELS ARE PERFORMED
ACCORDING TO OUR
INTERNAL DOCUMENTED
REPAIR PROCEDURE TO
ENSURE CONSISTENCY IN
OUR PROCESSES.
RIM AND WHEEL REPAIRS
FINAL QUALITY CONTROL REPORT
ALL REPAIRED RIMS AND
WHEELS ARE INSPECTED
BEFORE AND AFTER THE
REPAIR PROCESS. OUR
FINAL QUALITY CONTROL
REPORT ENSURES
COMPLETE TRACEABILITY
AND THAT ALL CRITICAL
SPECS ARE WITHIN
TOLERANCE FOR EVERY
RIM OR WHEEL REPAIRED
BY OTR WHEEL
ENGINEERING INC.
RIM AND WHEEL REPAIRS
FULLY MACHINED FORGED SECTIONS USED
FOR REPAIRS
OTR WHEEL USES FULLY
MACHINED FORGED
SECTIONS MADE FROM
HSLA STEEL FOR RIM
SECTION REPLACEMENT
(REPAIRS). THESE
SECTIONS AND
PROCESSES USED IN
REPAIRING WHEELS ARE
IDENTICAL TO THAT OF
NEW WHEEL
MANUFACTURING
RIM AND WHEEL REPAIRS
SUBMERGED ARC WELDING
ALL SECTIONS REPLACED ON RIMS
AND WHEELS ARE WELDED USING
SUBMERGED ARC WELDING
PROCEDURE AS USED IN THE
MANUFCTURING PROCESS FOR NEW
RIMS AND WHEELS
SECTION III
WHEEL SAFETY,
MAINTENANCE AND
INSPECTION
HISTORY
z Heavy equipment over the years have been
scrapped or sold as surplus.
z Many useable parts or spares, such as
wheel assemblies remained in the inventory.
z Rim failures began to be noticed in 1990’s.
z Rims from the late 1960’s and 1970’s were
still in the inventory.
PLAN TO REDUCE RIM FAILURES
Rim Brand
Valve Hole RimBrand
Valve Hole
z Preliminary Inspection
– Visual inspection of rim assemblies should
be done every time it comes in to your shop
– All rim bases which have been dismounted
prior to their annual Nondestructive
Evaluation (NDE) inspection shall be visually
inspected for defects
POINTS TO CONSIDER
z Hardware is considered as consumable
product.
z Hardware is defined as:
z Bead Seat Bands
z Rim Flanges
z Lock Rings.
z Hardware, which is suspected of having
defects or distortion, shall be discarded.
z All hardware shall be inspected by Field and
Tire Shop Personnel prior to its' reuse.
VISUAL RIM INSPECTION CRITERIA
z Gutter section
z Back section
z Puller nuts
z Stud holes
z Bolting plate weld
z Rim base welds
z General condition
z Rim Components
(lockring, flange
and beadseat)
z Run flat
z Check last NDE
Lock Rings
Sprung / Stretched Good
Go-No
Go gauge
Lock ring
groove
Go – No Go gauges
Bead Seat Band - The bead seat band shall be visually
inspected for cracks, wear or corrosion in the area in contact
with the locking ring flange, rim base or any weld. A wire
brush may be used to clean the dirt prior to the use of the Go
No go gauge.
WORN BACK SECTION
When conducting a visual inspection, do not only look for cracks and
damage But also inspect the hardware to make sure you will achieve
optimal tire performance.
BOLT HOLES
Elongated
This tire was aired with the lock ring not seated properly and
when the lock ring let go there was enough force in this tire
that it pulled the axle out of the housing.
TIRE SIZE 10.00X15
Each wheel is assigned a specific number. This way we can track the
repairs done on each wheel along with the cost of the repairs, and issue a
detailed report to our customers when requested.
CRITERIA FOR MPI TESTING