Sie sind auf Seite 1von 4

PROFESSIONAL SUMMARY

JAMES DUPAS III CITIZENSHIP: United States of America


1603 Bodart Circle TWIC card holder
Houston, Texas 77090
281-537-7322 home 281-639-1221 cell
PIPING DESIGN LAYOUT SPECIALIST - SENIOR DESIGNER - CHECKER
SUMMARY OF EXPERIENCE:
Experience in conceptual layout and design in the preparation of construction wo
rking drawings, model assembly, checking, PDMS/PDS Smart plant/Cadworks, QA chec
king, M.T.O., scheduling, manpower requirements, and supervision. I have excelle
nt working and design knowledge of equipment, process, stress and instrumentatio
n.
Background includes large grass root sites, both lumps sum and cost reimbursable
s. Major additions and revamps of existing units, construction management and su
pervision. Layout and checking offshore production platforms.
Responsibilities include all aspects of mechanical activities as well as the ove
rall management of the project. Two years pipe fitter and code welder.
SIGNIFICANT EXPERIENCE IN THE FOLLOWING INDUSTRIES:
Process Chemical Plants
Refineries
Polymer Plants
Tower/Vessel Design
Pipe Supports
Stress Supports
Offshore process equipment and platforms
Air and water purification systems
Pneumatic bulk conveying systems
Pipeline
Nuclear
WILLIAM JACOB MANAGEMENT, Houston, Texas (2/09- 8/09)
SENIOR DESIGNER/CHECKER, Peregrino Platform revamp 1&2 Project
Platform upgrade check piping ISO's for construction. Check interconnecting wel
l head to drill deck piping and assemble construction packages. PDMS
REFINERY TECHNOLOGY INC., Houston, Texas (7/07- 12/08)
SENIOR PRINCIPAL DESIGNER, Reliance Petroleum/Jamnagar Refinery
Oversee RTI's piping design installation. Cat cracker unit. Regenerator, reactor
to 3rd stage separator 102" O.D. pipe with 5 " refractory lining, 3rd stage to
expander 80" O.D. 1 " thick stainless steel pipe with expansion joints and sprin
g can system.

PROFESSIONAL SUMMARY
2
JAMES DUPAS III

REFINERY TECHNOLOGY INC. cont,


SENIOR PRINCIPAL DESIGNER, Sohar Refining/Oman
Inspect defective expansion joint replacement for future redesign of 48" O.D. x
10'-0" long 4" refractory lined.
SENIOR PRINCIPAL DESIGNER, BP Rotterdam FCC Expansion Update
Install new third and fourth stage separators. 75" O.D. coldwall to third stage
separator, 57.5" O.D. coldwall pipe to offsite chamber with 30" hotwall bypass,
52.5" O.D. hotwall pipe to existing expander. AutoCad2008/Cadworks
FLUOR INC, Houston, Texas (7/06- 7/07)
LEAD CHECKER, Marathon Plant Expansion Offsites Facilities, Garyville, LA
Lead checker using PDS Smart Plant Review, check piping layout of 9 designers fo
r proper design and clearances.
DESIGN SPECIALIST, Woodriver Refinery Core Project, Roxanna, Illinois
Lead designer waste water treatment plant expansion and revamp. FEL 2 & 3 estima
te and conceptual layout of piping for final design. AutoCAD 2006
WORLEYPARSONS, Houston, Texas (1/06 - 7/06)
PRINCIPAL DESIGNER/CHECKER, Exxon Mobil Chemical, Beaumont, TX Q.C. Check ISOS f
or construction revamp to Benzene, USC 1 & 2 Alky units.
CB & I MATRIX, Beaumont, Texas (8/04 - 1/06)
SENIOR DESIGNER/CHECKER, HCU/Lube Oil addition & revamp. Motiva Refining, Port A
rthur, Texas
Field verify existing pipe rack, generate new pipe rack drawings on AutoCAD 2006
route all new modification piping in rack for revamp. Check all new pump pipin
g in revamp unit.
LEAD SENIOR DESIGNER, Sinclair Refining, Sinclair, Wyoming
Relocate project HCU/KHT plant relocation from California to Wyoming with proces
s modifications. Layout all new process equipment and modifications to existing
piping. Coordinate all standards, stress packages, iso generation and checking
for issue. AutoCAD 2006

PROFESSIONAL SUMMARY
3
JAMES DUPAS III
BAY LTD. CONSTRUCTION COMPANY, Friendswood, Texas (8/03 - 4/04)
OFFICE ENGINEER, Valero Refining, Houston, Texas
Design capital projects, purchase material and supervise construction.
ALLIANCE ENGINEERING, Houston, Texas (10/02 - 3/03)
LEAD CHECKER, Conoco Ocean Energy, Magnolia TLP (Tension Leg Project)
Reviewed all piping layouts in PDMS model. Checking all PDMS CATS/SPECS for dat
a base. Supervise three checkers for iso check to issue.
EXCEL ENGINEERING, Houston, Texas (4/02 - 10/02)
SENIOR DESIGNER CHECKER, El Paso Project
South Timbalier Block 204 "B-AUX". Marathon Project, Alba Field Development Plat
form "B & B2".
JACOBS ENGINEERING GROUP, Denver, Colorado (9/00 - 4/02)
SENIOR DESIGNER CHECKER, Frontier Refinery, Cheyenne, Wyoming
Field assignment in Frontier Refinery. Capital updates of Coker and Crude, expa
nsion. P & ID and line list updates of Alky, Cat and Gas Con, Butamer, Coker and
Crude Units.
BAY LTD. CONSTRUCTION COMPANY, Friendswood, Texas (6/00 - 9/00)
SUBCONTRACTOR COORDINATOR, Valero Refining, Texas City, Texas
Coordinate subcontractors for in plant work. Hydrogen and Satgas Expansion a
nd turnaround, Crude Unit update and turnaround.
FLUOR DANIEL, INC., Houston, Texas (11/93 - 11/99)
PRINCIPAL DESIGNER
STONE & WEBSTER ENGINEERING CORPORATION, Houston, Texas (11/92 to 7/93)
SENIOR DESIGNER/CHECKER
LITWIN ENGINEER & CONTRUCTORS, INC., Houston, Texas (10/87 to 11/92)

SENIOR DESIGNER/CHECKER

PROFESSIONAL SUMMARY
4
JAMES DUPAS III
M.W. KELLOGG, Houston, Texas (6/86 to 10/87)
SENIOR DESIGNER/CHECKER, FIELD ENGINEER
JACOBS ENGINEERING, INC., Houston, Texas (6/85 to 6/86)
SENIOR DESIGNER/CHECKER
STERNS CATALYTIC, Denver, Colorado (10/84 to 6/85)
SENIOR DESIGNER
BECHTEL PETROLEUM, INC., Houston, Texas (1/79 to 5/80) (12/80 to 10/84)
SUPERVISING DESIGNER/ QUALITY ASSURANCE CHECKER
BECHTEL POWER, Ann Arbor, Michigan
SENIOR CONSTRUCTION ENGINEER
EDUCATION:
Spring Branch High School
2 Years Computer Programming
South Texas Junior College - 2 years Engineering
Bechtel Management Training
ASME Piping Engineering Seminar
Autocad 14
Autocad 2000 - 2008
Cadpipe
CAD Intergraph 2D
University of Houston - Intergraph PDS
Microstation Version 5.0 (DuPont)
Cadcentre - Facet PDMS

Das könnte Ihnen auch gefallen