Continuous Process Improvement / Six Sigma / Change Management / Project Managem
ent Cost Control / Manufacturing Engineering Materials Management / Multi-Site M anagement ISO 9000 / TQM / Enterprise Resource Planning (ERP) / Enterprise Lev el Applications Policies & Procedures / Inventory Control / Business Planning & Reengineering Organizational Development / Security Facility Design & Construction / Warehousi ng Shipping & Receiving / Logistics / Environmental Safety / Training Manufacturing & Engineering Liaison / New Product Development / Scheduling Methods & Standards / Operating Procedures Developed, planned, and implemented manufacturing strategies for processes and p roducts; managed budget and department expenses; integrated quality assurance, p roduction planning and scheduling; and achieved production goals. A hands-on le ader, on the production floor; driving the organization and having a track recor d for continuous improvement in the areas of cost reduction, product quality, pr oductivity, and safety. Led cross-functional, multi-skilled workforce and track ed competencies; providing leadership and development for continuous performance improvement, as required. Spearheaded efficient factory design that required no contractor re-works or cha nge orders, completing project ahead of schedule and within budget. Led startups , conceived and implemented creative solutions; managed Oracle ERP manufacturing implementations, streamlining processes, improving quality and conception-to-sh ipping cycle time. Managed all manufacturing production processes, meeting or ex ceeding established goals. Developed processes, ensuring production lines were balanced, led continuous imp rovement efforts, and performed process mapping of departmental activities to in crease efficiency. Energetic, hard-charging leader; removing team barriers to ensure achievement of all Key Performance Indicators. Exhibit genuine compassion for people, building trust that propels others to go beyond what is expected. Led, trained, motivate d, coached and developed individuals and teams. Excellent organizational, analyt ical and communication skills.
PROFESSIONAL CAREER HISTORY
First Sergeant, 301st Fighter Wing, Security Forces Squadron, US Air Force Reser ves, 2008 to Present. Liaison between Commander and unit, leading and managing 7 0+ security forces personnel. Ensures discipline, morale and recognition are pro perly administered. Earlier tours include: Logistics First Sergeant in Iraq, 200 3 to 2004, and 2010 leading over 150+ logistics personnel and Noncommissioned Of ficer in Charge, 1979 to 1988. Senior Consultant, Oracle Applications projects, Deloitte Consulting, LLP, 2004 to 2008. Led teams implementing software applications for industry-leading clien ts. Manage/lead client interface regarding Oracle manufacturing-related applicat ions. Develop clients requirements, configure software and manage/troubleshoot d ata conversions. Project Implementations included: Implemented Inventory/Engineering modules for Deloittes clients manufacturing f acility in Czech Republic, on time and within budget, streamlining processes and improving cycle time from conception to shipping. Managed inventory data conversions troubleshooting and loading for Industry lea der in data center networking solutions and services. Implemented Inventory module for converting a global manufacturing facility int o a contract manufacturing methodology spanning 17 countries for a global compan y that designs and manufactures semi-conductor test equipment. Developed and man aged several conversions, customized reports, configurations, documentation, and testing scenarios. PEARLETTA ULLRICH, CPIM PAGE 2 Principal Consultant, ERP, Technology Solutions Company, 1998 to 2003. Organized , planned, managed, coordinated and supported Oracle implementations. Analyzed m anufacturing/assembly processes, evaluated business gaps/issues, conducted train ing, developed process flows, and identified solutions and improvements. Project Implementations include: Managed Technology Solutions ORACLE manufacturing implementation for major clie nts subsidiary branch, delivering on-time (<120 days), within budget and no prod uction disruption. Implemented Purchasing, Master Scheduling/MRP and for three locations for clien t that designs and manufactures metal building systems and metal building compon ents. Implemented Oracles Master Scheduling/Material Requirements Planning, Workflow, and Purchasing, modules for global contract manufacturer, which provides design and manufacturing solutions/services for networking, telecom, industrial, medic al and other markets. Four modules were implemented within 90 days, including po st-production support. Implemented corrective actions and conducted training for purchasing for a deve lopment and manufacturing company of advanced semiconductor wafers and electroni c digital imaging devices. Identified post-implementation issues in purchasing, order entry and shipping operations. Developed action plans and procedures for operations, process flows, and outsid e processing procedures for manufacturing client specializing in large-sized die sel engines and generators. Analyzed, researched, and solved data and process is sues. Managed and led an ORACLE manufacturing implementation at a subsidiary branch o f a major corporation, a large-sized plumbing products company. Manufacturing Oracle, Manufacturing Manager, Manufacturing Engineer, Logistics/S upply Supervisor. Motorola, 1989 to1998. Led up to 160 employees and four team l eads for multiple shifts. Managed daily business operations to include quality, materials planning, inventory control, productivity, delivery and costs. Conduct ed tests and pilots for managing routings and processes for manufacturing integr ation testing. Evaluated/documented process improvements. Managed and monitored monthly budgets and capital expenditures. Spearheaded new Motorola manufacturing plant startup, leading to manufactured, packaged and shipped product within 30 days. Conceived and implemented innovative solution, improving quality 22% at Motorol a. Redesigned, realigned processes/layouts, increasing Motorola velocity/productiv ity 51%. Managed the Work in Process Application Module. Conducted tests and pilots for various scenarios of managing routings and processes for manufacturing integrati on testing. Led team improving new product launch, shortening Motorola concept-to-ship proc ess by 60-90 days with residual improvements in quality, manufacturability and d esign. o Evaluated and documented manufacturing process improvements. Managed ship acce ptance process and projects for manufacturing new products. Led team consisting of Development, Manufacturing, Marketing, Warranty, Training, Publications, Fin ance, Procurement, Material Planning, and Quality towards improving how we launc h and begin shipping new products. Deployed factory engineering teams and facility engineering teams to complete f acility move within two days, shipping product on the third day. Managed and monitored monthly budgets and capital expenditures. EDUCATION / TRAINING / CERTIFICATIONS / MISCELLANEOUS INFORMATION MBA, Chapman College. BS, Industrial Technology, Southern Illinois University. A ssociate Degrees in HR, Administrative Management and General Education. Certifi ed in Production and Inventory Management (CPIM) APICS. Oracle Master in Applic ations IT Professional, Oracle University. Currently working toward Six Sigma Ce rtification, Villanova University (Achieved Six Sigma Green Belt Certificate and currently taking course for Lean Six Sigma), Active Secret Security Clearance.