PINK CITY EXPRESSWAY LIMITED

Long-term Bank Loan CARE BBB

Rating lane road to 6-lane highway with service lane on either


side from 42.7 km to 273 km (length 225.6 km) of NH-8
CARE has assigned a ‘CARE BBB’ [Triple B] rating to (Gurgaon-Kotputli-Jaipur Section) in the states of
the Long-term Bank Loan facilities of Pink City Haryana and Rajasthan on BOT basis. The project is
Expressway Pvt. Ltd. (PCEPL). This rating is applicable toll-based and was awarded by National Highways
for facilities having tenure of more than one year. Authority of India (NHAI) to consortium led by ETA-KMC
Facilities with this rating are considered to offer consortium on a competitive bidding process, wherein
moderate safety for timely servicing of debt obligations. the consortium quoted the highest revenue share of
Such facilities carry moderate credit risk 48.06% with NHAI which shall increase by 1% every
year till the end of concession period of 12 years. PCEPL
The rating is assigned to long term bank loans and non
was incorporated on April 2, 2008 and the Concession
fund based facilities aggregating Rs.2025.19 crore.
Agreement (CA) was executed between NHAI and
The rating derives comfort from financial strength and PCEPL on June 6, 2008. ETA group and associates hold
experience of sponsors in Build, Operate & Transfer majority shareholding of 51% in PCEPL with the balance

(BOT) projects, strategic location of the stretch, 49% being held by KMC group.

achievement of financial closure, sponsors’ commitment


Project cost and Funding
towards project in the form of an undertaking to fund
cost overrun and shortfalls in equity contribution. The The total project cost is estimated to be Rs.3009crore
rating also factors in the collection from existing toll and is proposed to be financed through term debt of
plazas, creation of Debt Service Reserve Account Rs.1900.19crore, internal accrual out of existing toll
(DSRA) and fixed-price nature of the Engineering, plaza aggregating to Rs.396.28crore and the rest by way
Procurement and Construction (EPC) contract. of equity in a debt-equity mix of 1.71:1. Financial closure
for the project has already been achieved with debt tie-
The rating is, however, constrained by project execution up for the entire portion from banks and equity infused
risk, moderate gearing levels, and risk related to to the tune of Rs.215.86 crore as on July 31, 2009.
Operation & Maintenance (O&M) and inherent toll-based PCEPL proposes to create a DSRA during the entire
nature of BOT projects with associated traffic risks. project life as stipulated in the Common Loan Agreement
and maintain two quarter’s repayment in the form of bank
Further, ability to sustain growth amidst competing toll
guarantees. PCEPL shall establish the Escrow Account
roads and alternative transport routes and timely
wherein all fees collected by PCEPL from the users of
completion of project would be the key rating sensitivity.
the Project Highway shall be exclusively deposited. The
Background CA also defines the priorities in accordance with which
the above funds are to be applied under different
PCEPL is a Special Purpose Vehicle (SPV) floated by conditions. All statutory dues shall have a priority
ETA Group of Dubai and KMC Group of Hyderabad to followed by EPC expenses, O&M expenses, senior debt
undertake the improvement, operation and maintenance servicing, NHAI dues, subordinate debt repayments and
including strengthening and widening of the existing 4- any reserve creation thereafter.

CREDIT ANALYSIS & RESEARCH LIMITED 1


Sponsors’ Profile of Gurgaon (one of the most prominent outsourcing &
offshoring hubs in South Asia), the highway has attained
The majority stake of 51% in the SPV is held by ETA a strategic importance. Besides this, the policies of the
group through two of its group companies namely Haryana government to develop various industrial hubs
Emirate Trading Agency (ETA) LLC and ETA Star
and expanding the existing industrial area has led to
Holding Limited (ESHL). These companies are mainly
increased use of the said highway. Further, Rajasthan
in the business of shipping & chartering, projects &
being not only a tourist destination but also a business
contracting work, trading (coal, cement, fertilizers,
destination attracts regular traffic from northern and
plastics, sand, oil products, etc.), operating bus transport
western India, through this highway. The present heavy
services, real estate, etc. KMC Construction has track
traffic on this 4 lanes highway has resulted in congestion
record in road & bridges sector with long experience in
and saturation in capacity due to which the need has
development of road, highway, bridges earth movement
arisen of widening the highway from 4 lanes to 6 lanes.
projects and development & maintenance of airport
runways and taxi tracks. As per traffic studies at the existing three toll plaza
locations viz. Shahjanpur, Manoharpur and Daulatpur,
Sponsor Undertakings
the total freight traffic (LCV, 2-axle, multi-axle trucks)
The sponsors have furnished an undertaking to the accounts for a significant 63% of the total vehicular traffic
lenders of PCEPL, inter-alia, with the following and this is the major traffic feature of the project stretch.
provisions: The CA specifies the vehicle category-wise toll rates
and provides for yearly escalation in toll rates which
Both the sponsors shall be jointly & severally liable to
would be based on the Wholesale Price Index (WPI).
meet their equity contribution towards the project cost.

To meet any cost overrun and shortfall in resources of EPC contractor


PCEPL in respect of completion of the Project.
The EPC contract was awarded to KMC Constructions
To cover any shortfall in respect of lenders dues in the Private Ltd. & ETA Star Infrastructure Ltd. The contract
event of termination of the Concession Agreement due is of “Fixed price fixed time” nature and contractors are
to Concessionaire event of default. responsible for maintenance of existing roads and
To arrange to meet any shortfall in major maintenance project facilities and traffic management. The EPC
expenditure contractors have subcontracted the same to eight
contactors at aggregate cost of Rs.1788.78 crore. The
To bring additional funds to meet any deficiency in toll
subcontracts have price escalation clause in it. However,
receipt treated as a part of project cost.
PCEPL is insulated from price variation and all the risk
To bring cash support required during the operation is to be borne by EPC contractors.
phase of the project to ensure that all financial covenants
are complied with. Routine and Major Maintenance

Operations The CA specifies the O&M standards and specification


and the manner in which PCEPL would carry out O&M
The project is on existing Delhi-Mumbai section of NH- of the facility. Also, the CA provides PCEPL to control
8 that passes through 2 states connecting Haryana & and regulate traffic on the Project Highway, thereby
Rajasthan traversing through towns of Manesar, reducing leakage.
Dharuhera and Bawal industrial hubs of the state of
Haryana and through Behror, Kotputli, Shahpura and PCEPL has given the O&M contract to seven contractors
Manoharpura in Rajasthan. After the rapid development at an aggregate contact price of Rs.2.62 crore on the

2 CAREVIEW
basis of Letter of Intent (LOI). All the O&M contractors expected to meet first milestone (completion of ~25%
have reasonable experience in carrying out O&M of of project work) with in the projected timeline of March
several roads across India. 3, 2010.

Project progress and status on approvals as on Competing/Alternate facilities


September 23, 2009
Two roads, part of SH-13 starts at Gurgaon and passes
The company has started the construction of highway via Sohna, Nuh, Firozpur, Alwar, Umren, Sariska, Thana
in parts wherever the land was acquired. Of the total gazi and joins NH-8 (at km 197.4) before Shahpura and
land required for construction, ~85% including the another SH-25 starts at Bhiwadi and passes via Tijara,
existing Right of Way (RoW) has been made available Alwar, Rajgarh, and Bandikui towns before terminating
to PCEPL. The pending RoW constitutes electrical utility at NH-11 (Agra – Jaipur Road).Both these roads can
shifting, land encroachment and few religious and urban provide some competition to the project stretch by way
structural encumbrances on part of the project stretch, of diversion of traffic. The impact of such alternative
for which necessary procedure for shifting / acquisition transport routes on the growth prospects of PCEPL
is under way. The project is running smoothly and remains to be seen.

October 2009

Disclaimer
CARE’s ratings are opinions on credit quality and are not recommendations to sanction, renew, disburse or recall the concerned bank
facilities or to buy, sell or hold any security. CARE has based its ratings on information obtained from sources believed by it to be
accurate and reliable. CARE does not, however, guarantee the accuracy, adequacy or completeness of any information and is not
responsible for any errors or omissions or for the results obtained from the use of such information. Most entities whose bank
facilities/instruments are rated by CARE have paid a credit rating fee, based on the amount and type of bank facilities/instruments.

CREDIT ANALYSIS & RESEARCH LIMITED 3


CARE is headquartered in Mumbai, with Offices all over India. The office addresses and contact numbers are given below:

HEAD OFFICE: MUMBAI


Mr. D.R. Dogra Mr. Rajesh Mokashi
Managing Director Dy. Managing Director
Cell : +91-98204 16002 Cell : +91-98204 16001
E-mail : dr.dogra@careratings.com E-mail: rajesh.mokashi@careratings.com

Mr. Ankur Sachdeva


Head - Business Development
Cell : +91-9819698985
E-mail: ankur.sachdeva@careratings.com

4th Floor, Godrej Coliseum, Somaiya Hospital Road, Off Eastern Express Highway,
Sion (East), Mumbai 400 022 Tel.: (022) 67543456 Fax: (022) 67543457
Website: www.careratings.com

OFFICES

Mr.Mehul Pandya Mr.Sundara Vathanan


Regional Manager Regional Manager
32 TITANIUM Unit No. 8, 1st Floor, Commander’s
Prahaladnagar Corporate Road, Place No. 6, Rajaram Mohan Roy Road
Satellite, (Opp. PF Office), Richmond Circle,
Ahmedabad - 380 015. Bangalore - 560 025.
Tel - 079 4026 5656 Tel - 080 2211 7140/41
Mobile - 98242 56265 Mobile - 98803 60878
E-mail: mehul.pandya@careratings.com E-mail: sundara.vathanan@careratings.com

Mr.Ashwini Jani Mr. Rahul Patni


Regional Manager Regional Manager
Unit No. O-509/C, Spencer Plaza, 401, Ashoka Scintilla
5th Floor, No. 769, 3-6-520, Himayat Nagar
Anna Salai, Hyderabad - 500 029
Chennai 600 002 Tel - 040 4010 2030
Tel: 044 2849 7812/2849 0811 Mobile - 91600 04563
Mobile - 91766 47599 E-mail: rahul.patni@careratings.com
E-mail :ashwini.jani@careratings.com

Mr. Sukanta Nag Ms. Swati Agrawal


Regional Manager Regional Manager
3rd Floor, Prasad Chambers 710 Surya Kiran,
(Shagun Mall Building) 19 K.G. Road,
10A, Shakespeare Sarani New Delhi - 110 001.
Kolkata - 700 071. Tel - 011 2331 8701/2371 6199
Tel - 033 2283 1800/1803 Mobile - 98117 45677
Mobile - 98311 70075 E-mail :swati.agrawal@careratings.com
E- mail: sukanta.nag@careratings.com

CREDIT ANALYSIS & RESEARCH LIMITED 1