Beruflich Dokumente
Kultur Dokumente
SIMPSON
8662 Hayloft Place Riverside, CA 92508
Mobile: [951] 901-9306
Mail: jsf1c4c8@westpost.net
PROJECTS:
20010-Currently
MCAGCC BEQs Pkg 9 (686, 908, 909) New
MCAGCC Marine Corps Exchange New
MCAGCC Marine Corps Exchange Camp Wilson Addition
MCAGCC Child Development Center Playgrounds Remodel
MCAGCC ADA Study for Entire Base New
MCAGCC Landscape Del Valle & Brown Intersection New
MCAGCC Landscape BEQs Bldgs 1462-1467 New
MCAGCC Landscape Main Entrance Bldg 901 New
Acted as EIC (Engineer in Charge) for the listed projects above. My duties inclu
ded:
Owners/ Government representative at regular Design,
Production, & QC Meetings.
Coordination between Branches/ Engineering disciplines in
house to provide quality technical reviews of A&E
(Architectural & Engineering) Firms proposed design(s).
Prepare project packages, to include scope of work, cost
estimates, drawings and specifications for submission to ROICC
(Resident Officer In Current Charge) for contract advertisement
and award.
2007-2010
SBM #184-Chino - New Chino, CA
SBM #185-Moreno Beach Valley - New Moreno Valley, CA
SBM #187-Bressi Ranch - New Carlsbad, CA
SBM #139-Murrieta - T.I. Murrieta, CA
SBM #161-Artesia - T.I. Artesia, CA
SBM #163-Ramona - T.I. Ramona, CA
I generated Proposed Design(s)and Construction Documents for Architectural, Plum
bing, & Mechanical along with coordinating with Structural & Electrical inclu
ding all last minute changes by retail. For all Projects of Stores I was respons
ible with the Agencies Submittals & Processing all the way through with these pr
ojects until the end of Construction Administration.
Stater Bros. Main Corporate Office, HR Building, Support Services T.I
San Bernardino, CA
Generated the Proposed Design(s) and Construction Documents, working various des
ign solutions, and furniture planning; and performed Construction Administrative
duties
2003-2007
University Professional Business Centre - Palm Desert, CA
Sept. 04 June 07
Building 1-5: worked on Construction Documents, Plan Check Comments and Proposed
Site plans.
Kaiser Permanente, T.I. and New - Palm Desert, CA
Dec. 04 March 05
Generated Construction Documents worked through to project close-out.
Sacred Heart School - Palm Desert, Ca
New classroom: Schematic Design, Construction Documents, and Construction Admini
stration.
Master Plan: Proposed Site Plan.