Sie sind auf Seite 1von 4

1.

PERSONAL DATA
NAME: Montero Gutierrez, German Cesar.
ADDRESS: 3715 Fall Branch Dr Katy, TX 77450.
E-MAIL: gmf341d6@westpost.net
PHONE: 956 7894432 STUDIES: B.Sc. Mechanical Engineer (1997)
Drilling Specialist (1999)
Project Management (2004)
DATE OF BIRTH: September 1st, 1973. CAREER: Senior Oil and Gas Drilling Enginee
r.
US Legal Permanent Resident.
2. CAREER SUMARY:
Senior Drilling, Completion and Work Over Engineer with eleven years of experie
nce in land and offshore operations. Drilling and testing cost estimation for AF
E's, budget control and operation and services planning. Drilling and completion
daily operations supervision. Time and cost reducing oriented by using project
knowledge curve, best practices and innovation. Strong knowledge in pore pressur
es and fracture gradient prediction, hole stability, casing point and number of
stage selection, mud program planning, well design, casing design, directional d
rilling planning, cementing design, drill string design and down hole dynamics,
bit selection, hydraulics, off set well analysis, logging planning, coring, line
r services, wellhead selection and QHSE planning and manage. Most recent positio
n: Manager of Drilling Engineering of ATG VII project (Chicontepec basin PEMEX).
3. SKILLS:
* Drilling Engineering Manager experienced, ATG VII Chicontepec Project, PEMEX M
exico 2009 - 2010. Team Building and started Drilling Engineer Department from z
ero.
* Geopresure Prediction using Drillworks Predict in Tight Gas Sands, North Mexic
o 2005 - 2009, Reynosa Monterrey and Cuervito Field. High success in casing poin
t selection to isolate low and high pressure zones and design the best mud densi
ty curve reducing mud losses and drilling time.
* Strong Drilling experience in tight gas wells, North Mexico 2005 - 2009, Reyno
sa Monterrey and Cuervito Field.
* Improved Casing Design using Landmark Stress Check Software, several fields in
Venezuela and Mexico 2001 - 2010.
* Solid knowledge in well design, cementing, directional planning, bit selection
, drill string design, hydraulics, coring, mud engineering, wellhead selection,
liner services, well detailed drilling program, well control, mud loss control t
echniques and detailed cost estimation.
* Focused in ensure the highest levels of safety, quality and integrity in well
design and drilling operations.
* Experience in cost estimation for AFE's. Budget and project control.
* Proactive, smart, hard working, excellent relation with multi task teams, lead
er, strong knowledge in Drilling Engineering and Well Design.

4. JOB EXPERIENCE:
4.1 Resume:
Drilling and Work over Engineer with 11 year of experience in the oil industry.
Serve as Manager of Drilling Engineer for ATG VII Chicontepec project, started t
he Drilling Engineering Department from zero having successful designs along all
wells drilled in fields Furbero (HT/HP, Cretaceous extremely hard limestone), S
oledad, Gallo and Coyula. Responsibilities: customer - client relationship with
PEMEX, well basket, design leadership and engineering decision making.
Before working with H&L and Associates in 2009, worked for Meyer and Associates
at Cuervito Fronterizo field (Petrobras Project in Burgos Basin (tight gas sand)
, PEMEX) as Senior Gas Well Drilling and Completion Engineer in 2008, main dutie
s were Geopressure Analysis and hole stability, Casing Seat Selection, Well Plan
ning, Directional Drilling, Well Design, Casing Design, Drill String Design and
Down Hole Dynamics, Bit Selection, Hydraulics, Cementing design, Detailed Well D
rilling Program, logging planning, contingency plans for circulations loss and w
ell control, Drilling Operations, Engineering On Site Supervisor, government per
mits and end off well report.
From 2005 to 2007 worked as Senior Gas Well Drilling and Completion Engineer for
Repsol YPF at Reynosa Monterrey Field (Burgos Basin, Pemex), Geopressure Predic
tion and Underbalance Drilling were most interesting issues of this project. Rey
nosa Monterrey Field is known for being the most complex tight gas reservoir in
North Mexico, drilled more than 60 wells reducing drilling time and cost by rede
fining well design. Main duties: government permits, Well Design, Detailed Drill
ing Program, Supervision of Drilling Operations, Drilling Cost Estimations and A
FE's and End of Well Report.
I started my career as Well Drilling and Completion Engineer with a Specializati
on in Drilling Engineering at PDVSA CIED (Development and Training International
Center of PDVSA). Served at PDVSA (Venezuelan oil company) as Well Drilling and
Completion Engineer in land and off shore operations from 1998 to 2003 in Barua
- Motatan and Ceuta Field, well design, drilling program, offshore daily drilli
ng operations supervision, on site engineer supervisor, AFE estimation, budget c
ontrol and contracts analysis were main duties.
4.2 Actual Job
Company H&L and Associates of Mexico.
Project Several Bidding Process for PEMEX in North Mexico.
Position Senior Oil and Gas Well Drilling Engineer (March 2010 - Until now).
Period Seven months.
4.3 Previous Jobs:
Company H&L and Associates of Mexico.
Project ATG VII, Chicontepec Basin (Zapata - PEMEX Project).
Position Manager of Drilling Engineer (June 2009 - February 2010).
Period Nine months.
Company H&L and Associates of Mexico.
Project Technical Support for Halliburton of Mexico.
Position Senior Oil and Gas Well Drilling Engineer (January 2009 - May 2009).
Period Five months.
Company Meyer and Associates of Mexico.
Project Petrobras, Cuervito Fronterizo Field (Burgos Basin PEMEX).
Position Senior Gas Well Drilling Engineer (January to December 2008).
Period One year.
Company Repsol Exploracion Mexico.
Project Reynosa - Monterrey Field (Burgos Basin PEMEX).
Position Senior Gas Well Drilling Engineer (Feb 2005 - November 2007).
Period Three years of experience.
Company PDVSA.
Project Barua - Motatan Field.
Position Contracts Analyst (Aug 2002 - Jan 2003).
Period Seven Months.
Company
PDVSA.
Project Barua - Motatan Field.
Position Oil Well Drilling and Workover Engineer (Sep 1999 - Jul 2002).
Period Two years and nine months.
Company PDVSA.
Project Ceuta Field.
Position Drilling and Workover Trainee Engineer (Sep 1998 - Sep 1999).
Period One year.
5. ABILITIES - KNOWLEDGES
4.1 LANGUAGES:
ENGLISH: Excellent in conversation, reading and writing.
SPANISH: Native tongue.
4.2 COMPUTING ABILITIES:
Microsoft Windows, Microsoft Word, Power Point, Excel, Project, Corel Draw, Land
mark software for well design and data management: Dim`s for Windows, Compass, W
ell Cat, Casing Seat, Well Plan (torque and drag, hydraulics, Stress Check), Dri
llworks Predict, Auto Cad.
6. EDUCATION:
University of Zulia (1997)
B. Sc. Mechanical Engineer
Maracaibo, Zulia State, Venezuela.
PDVSA CIED (1998 - 1999)
Drilling Engineering Specialist
Maracaibo, Zulia State, Venezuela.
Rafael Belloso Chacin University (2002 -2004)
M. Sc. Project Management
Signatures Finished
Maracaibo, Zulia State, Venezuela.

7. TECHNICAL COURSES:
04/05/10 to 06/05/10 Hydraulics Fracturing (BJ Services of Mexico).
29/04/08 to 03/05/08 IADC Well CAP (Vallen, IADC ID W417)
08/07/02 to 12/07/02 Deep wells Completion (Well Cat Landmark software) (CIED).
19/07/01 to 03/08/01 English conversational level (PDVSA CIED).
27/06/01 to 18/07/01 English level VI (PDVSA CIED).
05/06/01 to 25/06/01 English level V (PDVSA CIED).
09/10/00 to 27/10/00 Well Planning by Landmark (Dims for Win, Data Analyzer, We
ll Profile, Compass for Win, bottom Assembling, Hydraulics, Torque and Drag, Cri
tical Speed, Casing Seat, Stress Check. (PDVSA CIED).
13/07/00 to 13/07/00 APICE cementing methodology (PDVSA CIED).
22/05/00 to 26/05/00 Geomechanic, Level I. (PDVSA CIED).
20/03/00 to 24/03/00 Training to reduce unscheduled events (W.E.L.S. LTD, PDVSA
CIED).
28/02/00 to 28/02/00 Safety in vehicles driving (PDVSA CIED).
21/02/00 to 23/02/00 Safety in drilling. (PDVSA CIED).
14/09/98 to 26/05/99 Integral Specialization in Drilling Engineering. (PDVSA CI
ED).
Production geology.
Reservoir engineering, Level I.
Drilling engineering basics.
Production engineering, Level I.
Open and cased hole logs.
Well completion and workover.
Formation damage and stimulation.
Windows (Microsoft Office).
High performance team building.
Drilling fluids technology.
Solid control.
Drilling fluids troubleshooting.
Drill strings design.
Results interpretation of Mud-Loggin units.
Reology, hydraulics and bits.
Abnormal pressures detection.
Safety in drilling operations.
Casing design.
Casing and liner cementing.
Stuck pipe prevention and well control.
Directional drilling.
Planning and evaluating the well drilling program.
Completion and Workover fluids.
Drilling Information Management for Windows (Landmark).
Economic engineering (Economic Analysis of Project).
Down hole wire line operations.
18/09/97 to 11/09/97 Advanced English (CEVAZ).
17/04/97 to 17/09/97 Intermediate English (CEVAZ).
16/08/96 to 16/04/97 Basic English (CEVAZ).

Das könnte Ihnen auch gefallen