Sie sind auf Seite 1von 4

USED TYRE DROP STRUCTURE in lifts to gain dumping capacity as big

as reasonably possible. The fact that


the dump typically has steep slope
worsen the risk of erosion. Final shape
Used tyres of big trucks with diameter of rehabilitated dump has a typical
up to 3.4m have been re-used for single slope of 1V:4H.
drainage construction material in PT.
Kaltim Prima Coal with satisfactory To control the potential of erosion – as
performance. an integral part with rehabilitation and
surface water quality control – a Dump
Drainage & Rehab (DDR) plan is
developed. This DDR plan describe
how a disturbed area will be
rehabilitated and re-vegetated so that
the area become stable and converted
into final rehabilitation area to comply
statutory requirements and reflect the
best practice in mining business.

To control the destructing effect of


water flowing down the steep slope,
Drop structure in rehab area drop structure is constructed. The
energy from flowing water is
Located on the east coats of Borneo – dissipated, slowing its velocity thus
Indonesia, PT. Kaltim Prima Coal reducing its erosive force.
(KPC) operates open pit coal mine on a
region called Sangatta. It is a giant The idea of re-using old tyre for
operation that produced 27.5 million construction material for drop structure
tons last year. Here, the annual rainfall firstly emerged along with the more
depth reached 3000mm (in 2005), and more abundance of old tyre as a
where rain typically falls as a quick byproduct from heavy equipment
thunderstorm. operation. Even this byproduct requires
cost for waste handling. Back then, the
Massive operation of earthworks on tyre graveyard space did not cope with
open cut mining system combined with the volume of old tyre to be disposed.
high precipitation creates an obvious
impact of erosion.

Efforts have been continuously done


by the Company to reduce the erosion
rate occurs. Proper management on
erosion control will eventually
improve the quality of surface water
flows beyond mine boundary.

High erosion rate mainly occurs on Typical tyre drop structure design
exposed loose dump that newly
constructed prior to being rehabilitated Giant tyres from mining heavy
until the cover crop vegetation well equipments have generally been
established. Waste dumps are designed disposed and buried in landfill – or just
being disposed in a nominated there’s no negative impact chemically
graveyard area. Their size and weight, to the parameters of water quality.
being virtually indestructible
engineered compound of rubber and Re-using the scrap or waste material
steel make their disposal or re-use indeed involves challenges and
intricate and expensive. Recycling will difficulties - compared to other
be costly as the KPC site – as well as conventional materials. Though, it is
general mine sites - located in remote worth doing when the overall benefit
area, distant away from rubber considered – waste management point
industries. of view inclusive.

Re-using the tyres for constructing In the construction stage, some


drainage structures has proven to be challenges involve on the process of
beneficial – both from economic and transporting, lifting, handling and
environmental point of view. installation detail. Some years of
Monitoring visually suggests that tyre experience – since 1998 – has refined
drop structures is the most durable and the technique to install the tyres easier
best suited to the characteristic of KPC and quicker.
post-mined rehab area. This flexible
structure can withstand the vibration The first step is the earthwork for
from the blasting which is a daily preparing the open channel where the
activity in mining area. It can also deal drop structure going to be built.
well with settlement issue occur in new
dumping area.

Drop structure, post- construction Drop structure, 8 months after construction

To date, estimated more than 3000 old Non-woven geofabric lied on the base
tires have been re-used for drainage of the tyre to prevent fine material
works sitewide within mining from the channel bed washed away by
boundary, mostly for drop structure in
final rehabilitation area. Because the water flow. Then tyres can be arranged
big size of the tyres, they are mostly to form the drop structure. The tyres
used in area with big catchment so that shall be bolted each other to ensure the
the structure will not be over-designed. integrity of the structures. Without
Water quality monitoring shows that being bolted to each other, the tyres
structures – which weigh 2 tons structures edge backfilled with topsoil.
individually – can be ruined by the Contour drains – if any – shall be
water discharged. This did happen reworked to ensure that runoff water
before on a substandard structure, with enters the drop structure at the right
the combination of big catchment area position and level. Finally, the cover
and the high rainfall intensity. crop seed sowed along both edges.

Nowadays, the bolting technique has Faster re-vegetation with cover crop
been improved. The tyres arranged on will stabilize and reduce erosion on the
the channel as per final setout can topsoil along the structure banks.
directly be drilled and bolted in place. Seeds trapped between rock fill grow,
In the old time, the tyres were arranged provides more filtering effect to catch
temporarily on other spot, the bolt sediment - though shall be monitored
positions marked, drilled and then as to not restrict flow below required
again arranged to its final position on discharge capacity.
the channel for being bolted to each
other. Backhoe with suitable webbing
sling used to support placing the tyres
into the correct arrangement.

A spillway under construction

Lifting heavy tyres, placing them into a


relatively precise setout and working
with hand driller machine expose
workers to hazards in the workplace. Sediment trapped within drop structures
Therefore risk assessment or job safety
analysis conducted prior project The shape and dimension of the tyres
commencement ensures that any are fixed and cannot be modified. This
known hazards during the whole makes the designing of tyre drop
activities of construction are structure setout is more art rather than
appropriately addressed and controlled. technical. This is especially the case
when designing a drop structure with
Special drill bit for portable hand two or more tyres on the channel base,
driller machine has also been improved having cornering, constricting or
so that the work can be done quicker widening section.
and more safely.

The void within and between tyres are


filled with rocks and both sides of drop
Cornering section

Waste re-use is an environmental


concept that should be widely
encouraged for the sake of our planet.
Engineers and designers are challenged
to be more creative maximizing the use
of materials that previously were no
more than just a waste.

Das könnte Ihnen auch gefallen