High erosion rate mainly occurs on Typical tyre drop structure design
exposed loose dump that newly
constructed prior to being rehabilitated Giant tyres from mining heavy
until the cover crop vegetation well equipments have generally been
established. Waste dumps are designed disposed and buried in landfill – or just
being disposed in a nominated there’s no negative impact chemically
graveyard area. Their size and weight, to the parameters of water quality.
being virtually indestructible
engineered compound of rubber and Re-using the scrap or waste material
steel make their disposal or re-use indeed involves challenges and
intricate and expensive. Recycling will difficulties - compared to other
be costly as the KPC site – as well as conventional materials. Though, it is
general mine sites - located in remote worth doing when the overall benefit
area, distant away from rubber considered – waste management point
industries. of view inclusive.
To date, estimated more than 3000 old Non-woven geofabric lied on the base
tires have been re-used for drainage of the tyre to prevent fine material
works sitewide within mining from the channel bed washed away by
boundary, mostly for drop structure in
final rehabilitation area. Because the water flow. Then tyres can be arranged
big size of the tyres, they are mostly to form the drop structure. The tyres
used in area with big catchment so that shall be bolted each other to ensure the
the structure will not be over-designed. integrity of the structures. Without
Water quality monitoring shows that being bolted to each other, the tyres
structures – which weigh 2 tons structures edge backfilled with topsoil.
individually – can be ruined by the Contour drains – if any – shall be
water discharged. This did happen reworked to ensure that runoff water
before on a substandard structure, with enters the drop structure at the right
the combination of big catchment area position and level. Finally, the cover
and the high rainfall intensity. crop seed sowed along both edges.
Nowadays, the bolting technique has Faster re-vegetation with cover crop
been improved. The tyres arranged on will stabilize and reduce erosion on the
the channel as per final setout can topsoil along the structure banks.
directly be drilled and bolted in place. Seeds trapped between rock fill grow,
In the old time, the tyres were arranged provides more filtering effect to catch
temporarily on other spot, the bolt sediment - though shall be monitored
positions marked, drilled and then as to not restrict flow below required
again arranged to its final position on discharge capacity.
the channel for being bolted to each
other. Backhoe with suitable webbing
sling used to support placing the tyres
into the correct arrangement.