Complete HPSEB EIA study for Sainj hydroelectric project
CHAPTER-2
PROJECT DESCRIPTION
2.1 GENERAL
The Sainj hydroelectric project has been contemplated as run off the river scheme
which envisages construction of barrage across river Sainj near village Niharani,
located on the right bank of the river. The power house is proposed with two units of
50 MW each to be located near confluence of Jiwa Nallah and river Sainj, which is
about 300 m upstream of the proposed power house of the Parbati Stage-II Hydro-
electric Project. The energy generation of 399.57 GWh at 90% dependable year and
project.
Proposal – I
The proposal envisaged diversion of inflow of Sainj river with diversion barrage
+24.50 m high near Niharni at El + 1730m, 3.76 dia, 6.30 km long HRT with 2 Nos.
adits, i.e. one adit +320 m long meeting HRT at RD 930 m on left bank of Kartaul
nallah and +430 m long meeting HRT at RD 4750 m, u/s of the Surge Shaft, a Surge
1347.80 m on the right bank of river Sainj near village Suind, for generating 100 MW
of power utilizing a gross head of 409.60 m, 2 No. units each of 50 MW with vertical
axis Pelton turbines shall generate 399.57 GWH of energy in 90% dependable year.
The feasibility of all the proposed components were checked at site alongwith
Geological Survey of India (GSI) team. The proposal was found to be most suitable,
as it is facilitated with two nos. construction adits to the Head Race Tunnel, which
Proposal – II
The alignment of water conductor of this proposal is about 400 m towards the uphill
side of the proposal-I. The features of this proposal are similar to proposal-I, except
that the HRT length increases from 630 km to 645 km and only one No. adit of length
+600 m in reverse grade at Kartaul nallah has been available. During the site visit
alongwith GSI team, no rock face was encountered on left bank of Kartaul nallah for
adit portal and also adit to the tunnel alignment was available to reduce the
construction time of tunnel. The tunnel alignment also passes under a maximum
In addition, all approaches to the tunnel face shall be longer lengths, which will also
increase the construction time, considering the above factors, the alternative was
ruled out.
Proposal – III
The alignment of water conductor system of this proposal is about +450 m towards
valley side of the Proposal-I. The proposal envisages construction of a rock fill dam
+30 m high at El. 1728 m, near village Niharni, 3.50 m dia, 625m long HRT to carry a
design discharge of 27.60 cumecs, with one No. adit about 1.5 km u/s of Surge
Shaft. In this proposal the HRT opens on the banks of Kartaul nallah and crosses it
by an pipe aqueduct +120 m long, supported on RCC pillars, a Surge Shaft, +545 m
long Pressure Shaft, and underground Power House at El. 1336 m, generating 100
MW of Power with a gross head a 415.10 m by 2 Nos. vertical shaft Francis type
Turbine each of 50 MW and shall generate about 409 GWhr of energy in 90%
dependable year.
• Aqueduct over Kartaul nallah will always remain under threat of washing away
due to occurrences of flash floods in the nallah as a result of heavy rains and
cloud bursts in the catchment area.
• The hill slops along the bank of Kartaul nallah at aqueduct crossing require
heavy slope protection works, resulting into significant expenditure. The
structure will also be under threat due to falling boulders on the pipe
aqueduct.
All the above three proposals were studied and the proposal No.-1 was found to be
- A Head Race Tunnel (HRT) on the right bank of river Sainj, of about +6.3 km
long with 3.76 m diameter designed to carry a discharge of 28.70 cumec.
- Two intermediate adits 320 m and 430 m long and 4 m D-shaped proposed at
RD 930 m and 4750 m respectely to facilitate construction of HRT.
- An underground restricted orifice surge shaft at the end of HRT - adit to top
elevation +1766.5 m and another adit at Bottom Elevation +1672.37m is
proposed to facilitate the construction of surge shaft
- A tail race tunnel (TRT) of 400 m long and 4.8 m D-shaped, will constructed
for discharging the water back into river Sainj.
The salient features of the project are given in Table-2.1. The layout plan has been
shown in Figure-2.2
TABLE–2.1
Salient features of Sainj hydroelectric project
----------------------------------------------------------------------------------------------------------------
Location
State Himachal Pradesh
District Kullu
River Sainj, a tributary of river Beas
Barrage site Near village Niharni
Power house site Near village Suind
Hydrology
Reservoir
Full reservoir level (FRL) 1752.00 m
Maximum reservoir level (MRL) 1753.00 m
Minimum draw down level (MDDL) 1738.50 m
Gross storage upto FRL 1752 m 42.31 ha.m.
Live storage 38.41 ha.m.
Peaking available 4 hrs.
Diversion Structure
Type Gated Barrage
Max. height from river bed 24.50 m
Elevation of top of barrage El. 1754.50 m
Average bed level El. 1730.00 m
Spillway
Design flood 1800 cumec
Type Gated spillways with radial gates
Nos. of spillways, Crest elevation 3 Nos. El. 1733.00 m
Clear waterway of spillways 8 m each
Energy dissipation Depressed stilling basin
El. 1726.00 m
Length 45 m
Downstream bed level El. 1729 m
----------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------
Intake structure
Type Surface
Sill level El. 1735.00 m
No. & size of opening 4 No., 4.0 m x 19.50 m
Total drawdown discharge 35.88 cumec
Approach Tunnel
No. 1
Velocity 2.85 m/sec
Length 100 m
Design discharge from intake 35.88 cumec
Desilting Arrangement
Surge Shaft
Pressure Shaft
Type Underground
Size 1 No., 2.75 m dia,
+550 m long
Velocity 4.83 m/sec
----------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------
Power House
Type Underground
Installed capacity 100 MW
No. and capacity of unit 2 Nos. 50 MW each
Size of machine Hall 59.40 m x 18.90 m x 29.70 m
Type of turbine Pelton, Vertical Axis
Maximum net head 400.70 m
Minimum net head 387.20 m
Power Generation
Installed capacity 2 x 50 MW
Annual energy generation:
Cost Estimate
The power generated will be fed into the northern region grid through a 220 KV
power absorption in the grid. The project has a distinct advantage of very easy
The project is located in the vicinity of the Great Himalayan National Park (GHNP)
and Sainj Wildlife sanctuary. The boundary of the GHNP is at a distance of about 1.5
km from the barrage site. Likewise, boundary of the Sainj Wildlife Sanctuary is at a
The proposed Sainj hydroelectric project shall comprise of the following components:
- Barrage
- Reservoir
- Intake structure
- Desanding arrangement
- Head race tunnel
- Surge shaft
- Pressure shaft
- Power house
- Tail race tunnel
Barrage
A 35 m long and 24.5m high barrage including abutments and piers with crest level
of barrage bays at El 1733 m has been proposed to pass the estimated design flood
at FRL El 1752.00m. The proposed barrage comprises 3 bays of 8.00 m each with
Reservoir
The reservoir spreads over an area of 4.06 ha and is about 500 m long. The full
reservoir level (FRL) is fixed at El 1752.00m. The minimum draw down level (MDDL)
has been fixed at El 1738.50 m. The reservoir is so formed has a gross storage
capacity of 42.31 ha-m at FRL and 3.90 ha-m at MDDL. Available diurnal storage of
38.41 ha-m is sufficient for running the power station as a peaking station at full
installed capacity for 4.00 hours per day during the period of lean flows.
Intake Structure
The intake structure comprising single intake 4 no. openings, has been proposed on
the right bank of river, to handle a discharge of 35.88 cumec. A semi-circular trash
rack structure with reinforced concrete columns has been proposed for intake. Crest
elevation of intake is proposed as 1735m. Intake gate has been proposed for
Desanding arrangement
has been proposed + 100m d/s of barrage on the right bank of river sainj. Two nos
desanding chambers each (145m x 15m x 7.5m), flushing gallery and other auxiliary
structures has been proposed. Two adits to inlet and outlet ventilation cum hoisting
gallery have been proposed for their operation if required for the cleaning of the
chambers. Deflushing tunnel of 670 m length, 4.00m D- shaped has been proposed
to flush out the silt as accommodated in the hoppers of desanding chambers. A gate
has also been proposed at its tail end to prevent the entry of water/debris during
The head race tunnel 3.76 m dia, 6300m modified horse shoe type has been
proposed to carry a design discharge of 28.70 cumec from the junction point of
feeder tunnels of desilting chamber to the surge shaft. The tunnel is located along
right bank of river Sainj. Two intermediate adits have been proposed for the
been proposed along the left bank of Kartaul nallah, meeting the HRT at RD 930m.
Surge Shaft
The underground restricted orifice type surge shaft of 9m dia and 87.00 m height has
been proposed at the outlet end of Head Race Tunnel at RD 6300m top level of
approaching the top at El 1767.00m and other at the bottom at El 1672.87 m has
been proposed.
Pressure Shaft
A 2.75m-dia-pressure shaft with centerline at El 1674.75 m will take off from surge
shaft for leading the water in to turbines. In the initial 50 m horizontal reach, a valve
gallery has been proposed to accommodate butterfly valve. After top horizontal
reach pressure shaft of 1.95m dia, 30 m each length, takes off from the main
Power House
The proposed underground powerhouse is located on the right bank of Sainj river
near Suind. The erection bay and transformer hall floor levels are proposed at El
1347.8m. The approach to power house and transformer hall cavern is through 7m
The outflow from the bottom of turbine will be to tail race tunnel 4.80 m D-shaped,
400 m length. A vertical lift gate has been proposed at the tail end to prevent entry of
Project roads
Approach roads 5/7 m wide of total length 19.50 km will be constructed to connect
different sites of the project. The existing road from Suind to Neuli (8 Km long) has
Bridges
Five number of RCC bridges have been proposed on Sainj river and other nallahs
Colony at Sundarnagar
organization will be constructed at Sundarnagar Mandi. The same can be used for
Colony at Ropa
barrage and power house sites. Labour huts, stores and field offices will be
Office complex for the construction of barrage, power house complex, penstock,
Adequate provision of building for Hospital, school etc. has been made in the project
estimate under Sub-Head K-buildings to cater for construction force. First aid posts
The total land required for the project is 56.763 ha. The category wise detail of land
TABLE-2.2
The lists of major equipment to be used during construction phase are listed as
below:
• Crushers
• Batching plant
• Aggregate processing plant
• Dumpers
• Concrete Mixer
• Excavator
• Loader
• DG Sets
• Compactor
• Compressor
• Concrete pump
• Ventilation Blower
• Boomer
The project is proposed to be completed within a time frame of about 4.5 years.