Beruflich Dokumente
Kultur Dokumente
in mySAP ERP
Requirements and Architecture
Customers
Summary
The New General Ledger – Motivation
Management
reporting
Segment
Extensibility
reporting
SAP Consolidation
Segment + …
Profit Center
Customer Extension
Partner Company Value in TC
+…
Partner Segment Value in LC
+…
Partner Profit Center Value in GC
Customers
Summary
New General Ledger – Benefits and Concepts
Multiple valuation
Acctg( by one common data str.and
processing)
Local GAAP
- Extensibility &Flexibility for customer
dimensions (ind. Industry)
US GAAP
- Support of multiple reporting rqmnts
(balanced books by any dimension) xxx xxx xxx
IFRS
- Support of Parallel Accounting (Parallel xxx xxx xxx xxx xxx xxx
Ledger or Parallel Accounts)
- Fast Close (Deducing Period-end
Activities)
- Increased transparency (Supporting
Corporate Governance) Multi-dimensional
- Reduced TCO
SAP AG 2006 / General Ledger in mySAP ERP, 7
General Ledger in mySAP ERP – Benefits (1)
Multi-dimensional analysis
Account Analysis, Drilldown reporting
BI Remote reporting – slide and dice for all dimensions
Pre-defined reports delivered as SAP content
Accounting Interface
Profit Center Currency
Derivation Zero balance
Determination Translation
Online Split:
Balanced Book
for any dimension
GL in
mySAP
ERP Cons. Reconc.
CoGS Ledger CO-PA Ledger
Preparation
Persistency layer
BKPF
BSEG
Documents that are only posted in one or more additional ledgers are
only written to BSEG_ADD.
Document header.
BKPF
Split totals.
Replaces GLT0.
FAGLFLEXT
...
FAGLFLEXT Totals table
GLT0
(dynamic)
Balance Display
Selection according to new dimensions (if contained in the ledger)
Display: A maximum of five dimensions can be defined in
Customizing; these dimensions can be used to restrict the display
Drilldown according to the respective characteristic with
accumulated period values
Drill-down reporting
Multi-dimensional financial reporting supporting multiple ledgers,
and delivered and user-defined characteristics
SAP BI Reporting
Remote Extractor
FI
Periodic Extractor
CO
General
... EC-CS SAP BI
Ledger
Formatted reporting, both in Excel and on the Web, lets you easily
create tailored periodic management reports
Back to Overview
Balance Sheet
Income Statement
Transaction Figures
Expenses are entered for two cost centers from which profit centers
and segments are derived. Payables are entered as one total amount.
Data entry: Expenses for two profit centers
The total tax amount is derived accordingly.
In the GL view, payables and taxes are split online by profit centers
and segments. The ratio is picked from the expense items.
In a first automatic step, additional cost are broken down according to the split info.
Payment Payment
Single
Totals Split Items
Posting Posting
Info
Table Doc 4712
The split info (PC01 40%,
PC02 60%) is also applied on
payables and bank account.
Parallel Accounting
In GL, one ledger is assigned the role of the „leading‟ ledger. Group
valuation is usually mapped in this ledger.
All company codes are automatically assigned to the leading ledger
(cannot be deactivated).
If parallel reporting is done by parallel accounts, then there is exactly one
ledger in the New GL, the leading ledger.
For parallel reporting via parallel ledgers, the customer can add
additional non-leading ledgers to the New GL.
Non-leading ledgers can be activated by company code, as required.
Option of different fiscal year variants per company code
Option of different dimensions or additional currencies per ledger.
If ledger is not specified at time of document entry: Posting to all defined GL ledgers
Typical transactions: Ingoing invoice, outgoing invoice, payment
(leading
ledger)
If ledger is specified at time of document entry: Posting to the specified ledger only
(leading
ledger)
Primary Processes
Invoices, Payments, …
Accounting Interface
Ledger L1 Ledger L2
Ledger L1 Ledger L2
Fast Close
Corporate Governance
TCO Reduction
Configuration time
Best fit – no discussions about which component to choose
Reduction of implementation costs – just one component
Reduction of costs for end user training
Daily Business
No data redundancy less data volume
No reconciliation effort
Less effort for enhancing / changing the system
Customers
Summary
New General Ledger – Availability
New Installations
New GL is the default setting for all new installations.
Upgrade Installations
Customers are not required to change and may continue using Classic GL.
Customers may run a separate migration project at a later point of time.
The New General Ledger of mySAP ERP provides all benefits listed
before to new customers.
The New General Ledger is ready to use and strongly recommended for
customer projects.
TCO reduction
Industry Specific Intl. Accounting Standards
Ledgers
B/S by Grant, Fund, Title … Compliance & Transparency
Accounting Interface
Profit Center Currency
Derivation Zero balance
Determination Translation
Online Split:
Balanced Book
for any dimension
GL in
mySAP
ERP Cons. Reconc.
CoGS Ledger CO-PA Ledger
Preparation
Customers
Summary
METRO – New GL Customer
“We generate a balance sheet and profit and loss statement at the profit
center/store level. The function for online document splitting enables a very
high degree of automation.”
“The elimination of manual postings and other processes at the end of the
period significantly reduces the number of errors and thus greatly contributes
to ensuring compliance.”
SAP AG 2006, Conf Call with Gartner on New GL, Stefan Karl, 45
HDI – New GL Customer
Dieter Bankosegger ,
Head of the Financial Accounting Department
SAP AG 2006, Conf Call with Gartner on New GL, Stefan Karl, 46
Requirements and Architecture
Customers
Summary
Benefits of the General Ledger in mySAP ERP
Which are important OSS notes concerning New General Ledger (NewGL) in
mySAP ERP?
How can we migrate from the old G/L to the New G/L?
mySAP ERP 2004 – Must apply for Development Assistance
mySAP ERP 2005 – Must apply for Development Assistance
Migration principles
Date of migration is at the beginning of a fiscal year (current or future)
Year-end closing of old fiscal year must be completed prior to
migration and activation of New GL
After successful data migration, New GL will be activated
Source ledger of migration can be determined by company code and
account
Ensure that prior to the Date of Migration (year end) you have a
well-defined and validated blueprint design for migration
Don‟t wait until near year end to commence the migration project
Plan on 6 month project window minimum
Where document splitting will be used, configuration and testing
of all document splitting MUST be completed prior to the date of
migration in order to support validation (simulation)
prior to activation
Any scenarios that differ from the above standard scenarios are
migrated project-by-project based on scenario 5
Benefits:
Resource Estimation
Scope:
Number of Company Codes – How many? Complexity
of footprint
Use of Document Splitting – Are all transactions split?
Effects of Intercompany processing on Splitting
Use of Parallel Accounting – Current situation
(Accounts Approach v. Ledger Approach
Foreign Currency Revaluation and Postings
Planning and Allocations
Integration with other Modules – Use of EC-PCA, FI-SL,
CO-OM, Fixed Assets
Current Reporting Environment and Report Delivery
Organizational Structures:
Intercompany Processing
Volumes:
Data Sources:
Interfaces:
Data Validation:
Step11––Must
Step Mustbe
beCompleted
CompletedPrior
PriortotoData
DataMigration
MigrationStart:
Start:
Balance Carry-Forward
For:
The Data to be Migrated to New General Ledger Data Tables
Open Items from closed/old fiscal year
Documents posted in current/new fiscal year
Worklists are assigned to each Migration Plan
Each Migration Plan requires two worklists minimum
Prior Year Open Items
Current Year New Documents
Worklists can be created 2 ways
In Cockpit Environment (All at Once)
Individually (One at a time)
NOTE: The following two reset options can only be achieved using the
transaction codes:
FAGL_MIG_RESTORE_OP
Removing individual open items from new tables;
Warning: May cause inconsistencies in the balances if the data is not
build correctly with the repeat migration.
FAGL_MIG_RESTORE_RP
Removing individual documents from new tables;
Warning: May cause inconsistencies in the balances if the data is not
build correctly with the repeat migration.
Cut-Over
Move to Phase 3 of Project and set the switch to close the project
Effects
Other migration functions used during the migration process are also de-
activated