CHAPTER 16 - RCC AND FORM WORK

Notes: 1. Rates include- (a) Lead up to 100 m for all materials for all items. (b) Cost of all material including cost of water. (c) All lifts for all materials unless specified otherwise. (d) Mixing of concrete in mixer. (e) Mechanical vibration of concrete. (f) Finishing to all surfaces of R.C.C. (g) Cost of curing 2. (a) Rates are for metal other than black trap, basalt or granite. (b) Blasting charges for metal are payable as per Item 514 for the quantity required vide appendix-1 (c) Extra rate for use of black trap, basalt or granite is payable as per item 733. 3. Though separate rate for centring, shuttering and formwork has been specified in respect of this chapter, however in principle all the rates given in this chapter are inclusive of formwork. 4. For nominal mix (volumetric mix concrete) the boxes of internal size 35x25 and 40 cm depth shall be used for measuring sand and aggregate. (a) The proportion of materials for nominal mix shall be used as given in table 13 of specification Vol. I para 7.5.2.4.1 of page 7- 32. It should be on the basis of weight of cement & aggregates. Nominal mix proportion by volume under special circumstances only may be permitted by the Superintending Engineer under written orders before commencing the work. A rough guide for the nominal mix proportion by volume will be 1 : 5 : 10,1 : 4 : 8, 1 : 3 : 6,1 : 2 : 4,1 : 1.5 : 3, 1 : 1 : 2, for M-5,M-7.5, M-10,M-15, M-20, & M-25 concrete respectively.

( b) For cement which normally comes in bag and used by weight ,volume shall be worked out taking 50 kg. of cement as 0.035 cum. in volume .The quantity of water per 50 kg. (0.035 cum.) of cement shall be as specified in table-13 of specification. 5 The proportioning of sand shall be done on the basis of its dry volume and in case of damp sand, allowance or bulkage shall be made as given in note 4 of chapter 6 "Mortars". The rates for form work include-(a) All lifts and all leads unless otherwise specified. (b) Providing, erection and stripping of shuttering, propping and centring and strutting.

6.

(c) Coating with oil to prevent adhesion of concrete with shuttering, inclusive of cost of refined pale paraffin mineral oil / raw linseed oil, after thoroughly cleaning the surface. 7. The form work shall be of timber, timber coated with metal sheet lining, plywood, steel (steel plates stiffened with steel angles) or any other material depending upon the requirement of work. Measurements: - R.C.C. (i) Dimensions shall be measured to nearest 0.01 m. except for the thickness of slab which shall be measured to nearest 0.005 m. The areas shall be worked out to nearest 0.01 sq. m. The cubical contents shall be worked out to nearest 0.01 cum. (ii) No deduction shall be made for the following:(a) Ends of dissimilar materials for example, beams, posts, girders, rafters, purlins, trusses, corbels and step up to 0.5 sq. m in cross section; (b) Opening up to 0.1 sq. m in area (in calculating area of an opening, the thickness of any separate lintel or sill shall be included in height. No extra labour for forming such openings or voids shall be measured); (c) Volume occupied by reinforcement; (d) Volume occupied by pipes, conduits, sheathing, etc. not exceeding 0.1 sq. m. each in cross sectional area; and (e) Moulds, drip moulding, chamfers, splays, rounded or coved angles, beds, grooves and rebates up to 10 cm in width or 15 cm in girth. (iii) Columns shall be measured from top of column base to underside of first floor slab and subsequently from top of floor slab to underside of floor slab above. (iv) In case of columns for flat slabs, flare of column shall be included with column for measurement. (v) Beams shall be measured from face to face of columns and shall include haunches, if any, between columns and beams. The depth of beams shall be measured from bottom of slab to bottom of the beam except in case of inverted beams where it shall be measured from top of slab to top of beam. Form work(vi) Dimensions shall be measured to nearest 0.01 m and area shall be worked out to nearest 0.01 sq. m. (vii) Form work shall be measured as the actual surface in contact with the concrete or any other material requiring form work. (viii)No deduction shall be made for opening up to 0.4-sq. m. 9. The following Indian standards may be referred to:I. S. No. Title

8.

I. S. No. 269-1989 383-1976 455-1989 456-2000 457-1957

Title Specification for 33 grade ordinary Portland cement(fourth revision) Specification for course & fine aggregate from natural source for concrete(third revision) (Reaffirmed2006) Specification for port land slag cement(fourth revision)(amendment No.1,2,3,4,5,6&7) (Reaffirmed2005) Code of practice for plain and reinforced concrete (third revision) (Reaffirmed2005) (with amendment No. l). Code of practice for general construction of plain and reinforced concrete for Dam and other massive structures. (Reaffirmed2005) Method of test for strength of concrete(amendment No.2) (Reaffirmed2004) Method of sampling (Reaffirmed2004) & analysis of concrete.

516-1959 1199-1959 1343-1980 1489-1991 1791-1985 2386(Pt -1)1963 2386(Pt -2)1963 2386(Pt -3)1963 2386(Pt -4)1963 2386(Pt -5)1963 2386(Pt -6)1963 2386(Pt -7)-

Code of practice of prestress concrete (first revision) (Reaffirmed2004) Specification for port land pozzolana cement (second revision)(amendment No.1,2,3,4,5,6&7) (Reaffirmed2005) Specification for Batch type concrete mixers (second revision) (Reaffirmed2005) Method of Test for aggregate for concrete part-I particle size & shape (Amendment No.1) (Reaffirmed2007) Method of Test for aggregate for concrete part-2Estimation of deterious material & organic impurities(Amendment No. I ) (Reaffirmed2007) Method of Test for aggregate for concrete part-3 Specific gravity, density, voids, absorption & bulking. (Reaffirmed2007) Method of Test for aggregate for concrete part-4 Mechanical properties (Amendment No.1) (Reaffirmed2007) Method of Test for aggregate for concrete part-5 soundness. (Reaffirmed2007) Method of Test for aggregate for concrete part-6 measuring mortar making properties of fine aggregate (Amendment No.1) (Reaffirmed2007) Method of Test for aggregate for concrete part-7 Alkali

I. S. No. 1963 2386(Pt -8)1963 2405-(Pt-2)1980 2430-1986 2505-1998 2506-1985 2514-1963 3535-1986 3812-2003 40311996(Pt-1 to15) 4032-1985 4082-1996 4634-1991 4656-1968 4925-2004 6452-1989

Title aggregate activity. (Reaffirmed2007) Method of Test for aggregate for concrete part-8 petrigrapahic examination (Reaffirmed2007) Specification for industrial sieve part-2 perforated plants. (Reaffirmed2006) Method for sampling (Reaffirmed2005) of aggregate for concrete.

General requirements for concrete- vibrators, immersion type (second revision). (Reaffirmed2004) General requirement for screed board concrete vibrators. (Reaffirmed2005) Specification for (Reaffirmed2001) concrete vibrating tables.

Methods of sampling hydraulic cement (First revision). (Reaffirmed2004) Specification for fly-ash for uses pozzolana & admixture (second Revision). Methods of physical test for hydraulic cement.

Methods of chemical analysis of hydraulic cement (first Revision) (Reaffirmed2005) Recommendation on stacking & storing of construction material at site (second Revision). (Reaffirmed2003) Method of testing performance of batch type concrete Mixers(Reaffirmed2005) Specification for (Reaffirmed2001) form vibrators for concrete.

Specification for concrete batching and mixing plant. (Reaffirmed2005) Specification for high Alumina cement for structure use (amendment No.1,2 & 3) (Reaffirmed2005) relative relative to to cement cement concrete. concrete.

6461-Pt-1 to Glossary of terms 7)-1972 (Reaffirmed2007) 6461-Pt-8 to 12)-1973 6909-1990 Glossary of terms (Reaffirmed2007)

Specification for super sulphate cement (Amendment

I. S. No. 7861-(Pt-1)1981 8041-1990 8112-1989 9103-1999 IRC-21-2000 SP-23-1982 SP-24-1983

Title No.1,2,3 & 4) (Reaffirmed2005). Code of practice for extreme whether concreting part-1 hot whether. (Reaffirmed2007) Specification for rapid hardening Portland cement (second Revision) (Amendment No.1,2,3 & 4) (Reaffirmed2005) Specification for 43 Grade ordinary Portland cement (Amendment No.1,2,3,4,5 & 6) (Reaffirmed2005). Specification for admixture for concrete. (Reaffirmed2006) Standard Specification & code of practice for road bridges. Hand-book on concrete mixes based on Indian Standard (with amendment No.1). Explanatory hand-book on Indian Standard Code for plain & rein- forced concrete (IS-456-1978). Specification for road and bridge work (By Ministry of Shipping and Transport road wing) Gandhi sagar dam specification. Concrete manual{U.S.Department of the interior water and power resources service} Report on committee on cost control river valley projectvolume-III, january-1981(Government of India-Ministry of Irrigation).

Item No. Item 1601 Providing and placing in position M20 R.C.C. excluding cost of reinforcement, but including form work, vibration, finishing, curing etc. complete with graded metal of maximum size(a) 40 mm (b) 20 mm (c) 12.5 mm. 1602 Providing and placing in position M15 R.C.C. excluding cost of reinforcement, but including form work, vibration, finishing, curing and cleaning etc., complete with graded metal of maximum size(a) 40 mm

Unit

Rate

Remark

cum cum cum

4097.00 4253.00 4323.00

cum

3492.00

Item No.

Item (b) 20 mm (c) 12.5 mm Providing and placing in position M10 R.C.C. excluding cost of reinforcement but including form work, vibration, finishing, curing and cleaning etc. complete with graded metal of maximum size(a) 40 mm (b) 20 mm Providing and placing in position controlled concrete for R.C.C. excluding cost of reinforcement but including form work, vibration, finishing, curing and cleaning etc. complete with graded metal of maximum size 40 mm(a) M 25 (b) M 20 (c) M 15 (d) M 10 Providing and placing in position controlled concrete for R.C.C. excluding cost of reinforcement but including form work, vibration, finishing, curing and cleaning etc. complete with graded metal of maximum size 20 mm(a) M 25 (b) M 20 (c) M 15 (d) M 10 Providing and placing in position controlled concrete for R.C.C. excluding cost of reinforcement but including form work, vibration, finishing, curing etc. complete with graded metal of maximum size 12.5 mm(a) M 25 (b) M 20 (c) M 15

Unit cum cum

Rate 3633.00 3714.00

Remark

1603

cum cum

2774.00 2978.00

1604

cum cum cum cum

5406.00 4182.00 3576.00 2859.00

1605

cum cum cum cum

5556.00 4338.00 3714.00 3053.00

1606

cum cum cum

5618.00 4404.00 3794.00

Item No. Item 1607 Labour only for mixing in mixer, laying, vibration, finishing, curing and cleaning(a) Items 1601 to 1603 (b) Items 1604 to 1606 1608 Extra for each additional floor or every additional 3 m or part thereof for R.C.C. and PC.C. work in superstructure. 1609 Shuttering for reinforced concrete in foundation, column, footing etc. including all leads and lifts for all materials. 1610 Form work for R.C.C. in-situ, thickness not exceeding 20 cm, for slabs, lintels, beams, columns, etc. including all leads and lifts for all materials(a) Up to 1.5 m height (b) Add for every additional 1.5m or part thereof above 1.5m height. 1611 Form work for PC.C. work in-situ, thickness not exceeding 1 m, including all leads and lifts for all materials(a) Up to 1.5 m height (b) Add for every additional 1.5m or part thereof above 1.5m height. 1612 Labour only for assembling, erection and dressing with oil as cleansing of form work including subsequent removal(a) Item 1609 and 1611 (b) Item 1610 1613 Add in Item 1610 for thickness(a) 20 to 30 cm (b) 30 to 60 cm (c) over 60 cm 1614 Add in 1611 for thickness exceeding 1 m 1615 Formwork for pre-cast reinforced or plain cement concrete work including all leads and lifts for all materials.

Unit

Rate

Remark

cum cum cum

539.00 620.00 53.00

sq. m

116.00

sq. m sq. m

159.00 27.00

sq. m sq. m

159.00 27.00

sq. m sq. m sq. m sq. m sq. m sq. m sq. m

41.00 57.00 80.00 159.00 240.00 80.00 44.00

Item No. Item 1616 Labour only for assembling, erection and dressing with oil for cleansing of form work. 1617 Add in 1610 and 1611 for form work of cornices, curved moulding, staircases, circular columns, posts and struts, arches, well steining, cut and ease waters, and curved walls. 1618 Extra rate for form work for propping from lower floor upwards at the time of execution of upper floors in the multistoried buildings. 1619 Centering with earth or moorum including watering ramming and its removal. 1620 20 mm thick mud plaster surfacing of centering including ramming etc. complete. 1621 Labour only for item 1620. 1622 Labour only for removing earth centering including surface plaster.

Unit sq. m

Rate 28.50

Remark

sq. m

10% Extra

sq. m

13.80

cum

126.00

sq. m

12.60

sq. m cum

8.10 52.50