Sie sind auf Seite 1von 5

Republic of the Philippines PHILIPPINE PORTS AUTHORITY BATANGAS PORT DEVELOPMENT PROJECT - PHASE II Barangay Sta Clara, Batangas

City

Variation Order No. 3 Bill No. 3-Civil Works


Item No. Description Unit Local 5.4 5.4.1 5.4.1.1 5.4.1.2 5.4.1.3 5.4.1.4 5.4.1.5 Electrical Works Exterior Communication Conduits fittings and miscellaneous materials Communication Manholes & Service Box Wires, cables including Terminal lugs, Termination kits, Main Distribution Frame (MDF) Civil Works Total - 5.4.1 5.4.2 5.4.2.1 Power System Conduits fittings and miscellaneous materials l.s mts. mts. mts. mts. mts. mts. mts. mts. mts. mts. mts. mts. mts. mts. 1.0 1.0 l.s l.s l.s set l.s 0.00 0.00 1.0 1.0 1.0 1.0 1.0 0.00 0.00 1.0 1.0 1.0 1.0 1.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Unit Price Foreign Quantities Within the Limit of this Variation Order As Per B.O.Q. Revised (New) Amount Quantity Local Amount Foreign Amount Quantity Total Amount Variance

Total

New Pay item Ductbanks New Pay item 30 conduits x 110mm dia. New Pay item 20 conduits x 110mm dia. New Pay item 19 conduits x 110mm dia. New Pay item 18 conduits x 110mm dia. New Pay item 16 conduits x 110mm dia. New Pay item 13 conduits x 110mm dia. New Pay item 12 conduits x 110mm dia. New Pay item 11 conduits x 110mm dia. New Pay item 8 conduits x 110mm dia. New Pay item 6 conduits x 110mm dia. New Pay item 4 conduits x 110mm dia. New Pay item 2 conduits x 110mm dia. Communication Ductbank New Pay item 2 conduits x 110mm dia. New Pay item 4 conduits x 110mm dia. Subtotal - 5.4.2.1 5.4.2.2 Electrical Manholes l.s nos. nos. nos. nos. nos. nos. nos. 1.0 1.0

New Pay item Manhole w/ 4,4 conduits New Pay item Manhole w/ 6,4 & 4 conduits New Pay item Manhole w/ 6 & 6 conduits New Pay item Manhole w/ 6 & 6 conduits New Pay item Manhole w/ 16 & 16 conduits New Pay item Manhole w/ 4,13 & 16 conduits New Pay item Manhole w/ 13, 12 & 2 conduits

Republic of the Philippines PHILIPPINE PORTS AUTHORITY BATANGAS PORT DEVELOPMENT PROJECT - PHASE II Barangay Sta Clara, Batangas City

Variation Order No. 3 Bill No. 3-Civil Works


Item No. Description Unit Local New Pay item Manhole w/ 19, 12 & 12 conduits New Pay item Manhole w/ 20, 19 & 16 conduits New Pay item Manhole w/ 20, 20 & 12 conduits New Pay item Manhole w/ 8, 20, 18 & 30 conduits New Pay item Manhole w/ 30, 12 & 11 conduits New Pay item Manhole w/ 20, 2, 2 & 18 conduits New Pay item Manhole w/ 20, 20, 14 & 12 conduits New Pay item Manhole w/ 20 & 12 conduits New Pay item Manhole w/ 4 & 4 conduits Subtotal - 5.4.2.2 5.4.2.3 5.4.2.4 Wires, Cables Including Terminal lugs, Termination Busways and miscellaneous materials l.s l.s mts. mts. mts. mts. mts. mts.

Unit Price Foreign

Total

Quantities Within the Limit of this Variation Order As Per B.O.Q. Revised (New) Amount Quantity Local Amount Foreign Amount Quantity

Total Amount

Variance

nos. nos. nos. nos. nos. nos. nos. nos. nos.

1.0 1.0

1.0

2 New Pay item 3/C 300mm XLPE 15KV (AWA) 2 New Pay item 3/C 150mm XLPE 15KV (AWA) 2 New Pay item 1/C 125mm XLPE 15KV (AWA) 2 New Pay item 3/C 80mm XLPE 15KV 2 New Pay item 3/C 50mm XLPE 15KV

130.0 66.0 99.0 500.0

Original Item

3/C 80mm 2 XLPE 5KV

2 New Pay item 100mm (SDBC) Bare Copper Wire

mts. pcs. sets sets sets

New Pay item 20mm dia.x3000m Copper Clad Ground Rod Termination/Splicing kit and Installation New Pay item 15KV Termination Kit New Pay item 5KV Termination Kit New Pay item 15KV Splicing Kit Subtotal - 5.4.2.3.& 4 5.4.2.5 5.4.2.5.1 5.4.2.5.2 5.4.2.5.3 5.4.2.5.4 5.4.2.5.5 5.4.2.5.6 5.4.2.5.7 5.4.2.5.8 Transformer/Switchgear Pad mtd./transformer, oil immersed 112.5KVA 3P, 4.16Kv-240V Ditto, except 500KVA, 3P, 4.16KV-480V Ditto, except 75KVA, 3P, 4.16KV-480V Ditto, except 150KVA, 3P, 4.16KV-240V Ditto, except 750KVA, 3P, 4.16KV-240V Ditto, except 225KVA, 3P, 4.16KV-480V Ditto, except 2MVA, 3P, 4.16KV-480V Power Transformer, oil immersed

sets set set set set set set set

2.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0

Republic of the Philippines PHILIPPINE PORTS AUTHORITY BATANGAS PORT DEVELOPMENT PROJECT - PHASE II Barangay Sta Clara, Batangas City

Variation Order No. 3 Bill No. 3-Civil Works


Item No. Description Unit Local 7.5MVA, 3P, 13.8/4.16KV New Pay item 750KVA, 13.8KV Pri./4.16KV sec. Oil-immersed pad mounted New Pay item Ditto, except 2MVA, 3P, 13.8kV-4.16kV New Pay item Ditto, except 2MVA, 3P, 13.8kV-480V New Pay item Ditto, except 1MVA, 3P, 13.8kV-240V

Unit Price Foreign

Total

Quantities Within the Limit of this Variation Order As Per B.O.Q. Revised (New) Amount Quantity Local Amount Foreign Amount Quantity

Total Amount

Variance

set 2.0 set set set set

1.0 1.0 1.0 1.0 1.0

New Pay item Ditto, except 750KVA, 3P, 13.8kV-480V New Pay item Ditto, except 750KVA, 3P, 13.8kV-240V New Pay item Ditto, except 500KVA, 3P, 13.8kV-480V New Pay item Ditto, except 400KVA, 3P, 13.8kV-480V New Pay item Ditto, except 150KVA, 3P, 13.8kV-480V New Pay item Ditto, except 112.5KVA, 3P, 13.8kV-240V Subtotal - 5.4.2.5.1 to 8 5.4.2.5.9 5.4.2.5.10 Metalclad Switchgear, Outdoor type 13.8KV, 1200a, 3P, 13.8KV-4.16KV Medium Voltage, switchgear, Outdoor type 13.8KV. Main: 3000A, 3P, VCB, 4.16KV Draw-out Type New Pay item First Private Pole consisting of concrete pedestal/ pole. LBS, Lightning Arrester, Fuse-Cut and Power Fuses New Pay item Switchgear/supply and installation 13.8KV Automatic Transfer Switch Main: 2-1250A, 3P, VCB, 13.8KV Draw-out Type Tie CB: 2-1250A, 3P, VCB, 13.8KV Draw-out Type Brs.5-630A, 3P, VCB, 13.8KV New Pay item Switchgear/supply and installation (PPA Substation)* 13.8KV Automatic Transfer Switch Main: 2-600A, 3P, VCB, 13.8KV Draw-out Type Brs.2-600A, 3P, VCB, 13.8KV New Pay item Switchgear/supply and installation (A-1 Substation)** 13.8KV Automatic Transfer Switch Main: 2-600A, 3P, VCB, 13.8KV Draw-out Type Tie CB: 2-600A, 3P, VCB, 13.8KV Draw-out Type Brs.5-600A, 3P, VCB, 13.8KV New Pay item Automatic Capacitor Bank rated at

set set

set set

1.0 1.0

set

1.0

set

1.0

1.0

set

1.0

Republic of the Philippines PHILIPPINE PORTS AUTHORITY BATANGAS PORT DEVELOPMENT PROJECT - PHASE II Barangay Sta Clara, Batangas City

Variation Order No. 3 Bill No. 3-Civil Works


Item No. Description Unit Local 400kvar, 3P, 8 steps, 50kvat each NEMA-1 New Pay item 4.16KV Low Voltage Switchgear** Main: 2-600A, 3P, VCB, 7.2KV Draw-out Type Tie CB: 1-600A, 3P, VCB, 7.2kV Draw-out Type Brs.4-600A, 3P, VCB, 7.2kV Subtotal - 5.4.2.5.9 to 10 5.4.2.6 Civil Works Subtotal - 5.4.2.6 Total - 5.4.2 5.5.1 5.5.1.1 5.5.1.16 5.5.1.9 5.5.1A Power Plant Diesel Engine 1200kW, 4.16kV, 60Hz., 3 including all ancillaries (except Item 5.5.1.9 and 5.5.1A) Fuel Underground Storage Tank (8000L) Overhead Crane 3 Tons for Maint. Building set set 1.0 1.0 1.0 1.0 1.0 1.0 set 1.0 Unit Price Foreign Quantities Within the Limit of this Variation Order As Per B.O.Q. Revised (New) Amount Quantity Local Amount Foreign Amount Quantity Total Amount Variance

Total

New Pay item Generator including delivery of generator parallelling Switchgear complete with controls panel meterings and wiring harness. a) 3x1500kVA, 1800rpm, 0.8p.f, 3P, 60hz. Model3512BTA packaged diesel electric genset. b) 13.8KV Automatic Synchronizing Panel Main: 600A, VCB, 3P, 15KV Branches: 4-600A, VCB, 3P, 15KV Draw-out Type Draw-Out Type Total - 5.5.1 & 5.5.1A Grand Total - 5.4.2, 5.5.1. & 5.5.1A set 1.0 set 3.0

Republic of the Philippines PHILIPPINE PORTS AUTHORITY BATANGAS PORT DEVELOPMENT PROJECT - PHASE II Barangay Sta Clara, Batangas City

Variation Order No. 3 Bill No. 3-Civil Works


Item No. Description Unit Local Unit Price Foreign Quantities Within the Limit of this Variation Order As Per B.O.Q. Revised (New) Amount Quantity Local Amount Foreign Amount Quantity Total Amount Variance

Total

Das könnte Ihnen auch gefallen