Sie sind auf Seite 1von 52

DBS3900

Issue: 02
Date: 2011-05-09
HUAWEI TECHNOLOGIES Co., Ltd.

( 14)

(M3~M6)

(M3~M6)


( 32 mm)

5mm
M3~M6


(21mm~21mm)
(17mm~17mm)

( 10)

Copyright Huawei Technologies Co., Ltd. 2010. All rights reserved.

RRU
a

30 mm to 50 mm

60 mm to 114 mm

63 mm to 80 mm

RRU , ,
.

80m

63m

63 mm to 80 mm
50 mm to 100 mm
Metal pole

Angle steel

U-steel

RRU

RRU
10

or U-steel




WARNING

2 RRU 60 76 ,
RRU

RRU
b
. RRU

RRU
380 mm

170 mm

The recommended installation clearance meets the


requirements of the equipment for normal running and OM.
When the installation space is sufficient, the recommended
installation clearance can be adopted.

300 mm

485 mm

. RRU
The minimum installation clearance meets the
requirements of the equipment for normal running and
heat dissipation, but does not meet the requirements for
Operation and Maintenance (OM) such as checking the
status of the LEDs and opening the maintenance cavity.
When the installation space is restricted, the minimum
installation clearance can be adopted.

500 mm

. RRU
200 mm

200 mm

300 mm

Top view

Side view

Auxiliary metal pole


400 mm

280 mm

300 mm

Top view
100 mm

400 mm
280 mm

600 mm

Main metal pole

Main metal

Auxiliary

pole

metal pole

RRU
b
Recommended Horizontal Spacing for
Two RRUs Installed in Parallel

300 mm

600 mm

600 mm

Recommended Vertical Spacing for Two


RRUs Installed in Parallel
300 mm

500 mm

500 mm

Minimum Horizontal Spacing for Two


RRUs Installed in Parallel

100 mm

400 mm

400 mm

Minimum Vertical Spacing for Two


RRUs Installed in Parallel

200 mm

300 mm

300 mm

RRU
e RRU
1. .

When installing the


main bracket,
ensure that the
contact piece on
the bracket is fixed.
1200 mm1600 mm

You may fit one end of the auxiliary bracket on one dual-nut bolt assembly and then the other end on the
other dual-nut bolt assembly during the installation.

2. , 40 .

40Nm


. ,
, ,


.

3. RRU . ,
, RRU .

RF
RRU .
RRU .


RRU

RRU
f

2- RRU --

1. RRU . . 7

2.
RRU.

3. RRU.

M6X16

5Nm

4. RRU .



RRU
.

RRU
RRU
g RRU

RRU .
RRU .

h RRU

RRU .
RRU .

RRU
k

RRU
RRU

Install the PGND cable

CPRI
RRU -48V

Install the RF jumper


(RF cable between RFUs is
optional)

Antenna

RF- RFU
AISG
RRU RCU
RRU RF

Install the DC RRU power cable

RCU

AISG
RRU RCU

Install the CPRI optical cable

PGND

Install the DC RRU alarm


cable(optional)
Install the AISG multi-wire cable
between the RRU and the RCU
(optional)

Install the AISG multi-wire cable


between the RRU and the RCU
(optional)

When a dual-polarized antenna is shared by two RRUs in the same sector, the two RRUs are connected
through an RF cable between RFUs. The connections of three RRUs in the same sector are not supported.

RRU

. CPRI
RRU
RRU
PGND
SFP. for

RRU .

RRU .
RRU (
), RRU .

RRU


Cable
(16 mm) PGND

OT ( M6 )

RRU RF

DIN ""

ANT-A ANT-B RRU

DIN ""

OT ( M4 )

OT
NEG(-) RRU. The OT
()
RTN(+) RRU

DLC

1A 1B
CPRI_W RRU

DLC

2A 2B
CPRI0..CPRI5 GTMU

RRU
power cable

CPRI optical cable

SFP high-speed
cable for
cascading

SFP

....
RRU

Connected to

OT ( M8 )

SFP200 male connector

the CPRI_E port on the upper-level RRU

SFP200 male connector

the CPRI_W port on the lower-level RRU

SFP200 ""

CPRI_E port RRU

SFP200 ""

CPRI_W RRU

17

RRU
m RRU
1. RRU

M4

2. RRU



power cable



RRU
n RRU
3. RRU
RRU

Case 2

Case 1

CPRI .
RRU
PGND
RRU RF

z Press the strap on the exposed shielding layer of


the power cable tightly. Ensure that the lower edge of
the exposed shield layer does not exceed the position
shown in the figure.
z The alarm cable is preferably led out of the RRU
from the narrower cable trough in the middle of the
cabling cavity. If the cable trough is used by the CPRI
optical cable, the alarm cable is led from the wider
cable trough near the middle one. In this case, the
alarm cable must be wrapped with 10 to 17 layers of
waterproof tape so that the diameter of the cable
reaches 10 mm to 12 mm.
z To avoid sharp bending, the optical cable must be
pressed by the strap next to the power cable during
the optical cable installation.
z Waterproof fillers should be installed in the unused
cable trough.


, .

4.
RRU.
M4

1.4
, , ,
, .
50% .

, . ,
,
. RRU
,

For details on how to add the OT terminals to the


DC RRU power cable, see page 45.


14 .
,

RRU
o

RRU+19 .

BBU

DCDU-03B
LOAD0


RRU

(1) RRU . -48

(2) CPRI .

. RRU -48 LOAD0 .. LOAD5 DCDU-03B.


. RRU DCDU-03B, OT
. , OT PGND
DCDU-03B.

RRU

Appendix
a Binding the RRU and Installation Components
1. Bind the RRU by leading the lifting rope along the lower part of the adapting piece
and through the handle, bind the main and auxiliary brackets with the lifting rope, and
then bind the steering rope with the handle of the RRU, as shown in the following
figures.

RRU
RRU .
20 , 25. ,
RRU



RRU.

Appendix
a Binding the RRU and Installation Components
2. Lifting the RRU and Installation Components to the Tower

Pulley

Steering rope

Lifting rope

z Installer A climbs onto the tower. Then, installer


A fixes the pulley to the support of the tower
platform and leads the lifting rope through the
pulley.
z Installer C uses a lifting rope to bind the RRU
and installation components as shown in the
preceding figure and then ties a knot in the steering
rope at the handle of the RRU.
z Installer B pulls the lifting rope, and at the same
time, installer C pulls the steering rope away from
the tower to prevent the RRU and installation
components from colliding with the tower.
z Installer A holds the RRU and installation
components and untie the ropes.

3. Lifting the CPRI Optical Cable up to the Tower


z
25 200 .

1
1
160

For the tower made of steel pipes, tie the black


jacket to the corrugated pipe at the position
150 mm away from the color tape, and then lift
the optical cable up to the tower.

For the tower made of angle steel girders,


carry the optical cable onto the tower when
climbing up to the tower.

Corrugated pipe

Color tape

Appendix
b OT
. RRU.
-48V DC

NEG ( - )
OT

Label for preparing


the power cable

RTN ( + )



.
0

10 20 30 40

14mm

jacket and shielding layer off the power cable.

.
8mm

OT .

15

15mm

OT- RRU
.

Appendix
c

OT DCDU

OT

Appendix
d
. 20
. .

.
,
.
,
50%
20
.

1. .

2. .



ends of the tape

1.

2.

()
,

DIN

.


!
3.


.
,
2 3
.

10..15 .

4.

5.

6.

7.

!
1.

, ,
1/3. .
, .

2.

20 ,
10 .



3.


, :

4.

( 2)

( 2)

5.

,

( 2)
( 2)
1
2
3

:
, 4, 5, 6
, , .

BBU 19
a

N
1
2
3

CPRI .

BBU


.....
...
CPRI GTMU
CPRI RRU
BEG(-) RTN(+) DCDU
03B
PWR1 UPEU
LOAD6 DCDU-03B

!
19

EMUA
(1)

(2)

(5)
(8) RS-485

(3)

(10)
\

(11)

(12) RS-232

(13)

(14) Commissioning serial port

(4)
(7) 16/32

(6)
(9)

24VW
12VW
Water

24 V DC power output
12 V DC 12-

GND

24VS
( 3
POWER+)
Smoke
( 1
POWER - )

24 V DC 24

(
)

12VG (bar
S+ on the
sensor )
GATE (bar
S- on the
sensor )

24VT
TEMP
24VH
HUMI

( T + )
( T - )
( RH + )
( RH - )

24 V DC 24

24 V DC 24

Si+ Si- ( 1 32)

S1 S16.
!

CPRI BBU RRU

!
BBU -> RRU CPRI_W.

BBU

RRU1

RRU2

RRU3

EMUA

RRU1

RRU2

RRU3

RRU4

RRU5

RRU6

...

...

LOAD6 DCDU2

PWR BBU

LOAD0 of the DCDU2

PWR RRU1

LOAD1 of the DCDU2

PWR RRU2

LOAD2 of the DCDU2

PWR RRU3

LOAD7 of the DCDU2

PWR EUMA

LOAD0 of the DCDU1

PWR RRU1

LOAD1 of the DCDU1

PWR RRU2

LOAD2 of the DCDU1

PWR RRU3

LOAD3 of the DCDU1

PWR RRU4

LOAD4 of the DCDU1

PWR RRU5

LOAD5 of the DCDU1

PWR RRU6

WCDMA

EUMA

GSM

DCDU BBU

DCDU1 MONITOR
DCDU2 MONITOR


...

...

EXT ALM1 port of UPEU


EXT ALM0 port of UPEU

SPD ALM port


SPD ALM port

DCDU BBU

Cable
EMU
monitor

...

...

MON1 UPEU (
BBU)

RS485 EMUA

NOTES

.
1.

RRU,

,
,
,

0,5
3

).

),

-48V
2. RRU
.
,

, .
3.

4.


,
.

S,

RRU , .
,

5.
() .
, ,
!
, ,
.. .
( 2
),
(, , )
6. .
7. RRU
, .. .
,
.
8. 19 . , ,
.
9.

(
,
)
. (,
). ,

10. , - .
, .

,
0,5..1.

11. S- ,
.
12. , , ,
., ,
.

13. RRU

, , ,
,

The Hardware Quality Inspection Summary

internal

The right DBS3900 installation Summary


(20110509)

Confidential Information of Huawei.

2011-05-09

page 1 of total 24
No Spreading without Permission

The Hardware Quality Inspection Summary

internal

Hardware Inspection Summary


Project name: MTS FE SWAP
Site 1 Example of customer 19 rack installation

1U, ,
, ,
. .

Confidential Information of Huawei.

2011-05-09

page 2 of total 24
No Spreading without Permission

The Hardware Quality Inspection Summary

internal

RRU DCDU
,
4 ( ).
.
2-3 .
.
, RRU ( BBU)
:
RRU



(RRU) :
CPRI
DCDU (load 0..8)

Confidential Information of Huawei.

2011-05-09

page 3 of total 24
No Spreading without Permission

The Hardware Quality Inspection Summary

internal

Confidential Information of Huawei.

2011-05-09

page 4 of total 24
No Spreading without Permission

The Hardware Quality Inspection Summary

internal


, .
DCDU , DCDU 2G, DCDU 3G;
DCDU 1, DCDU 2
, DCDU
.

Confidential Information of Huawei.

2011-05-09

page 5 of total 24
No Spreading without Permission

The Hardware Quality Inspection Summary

internal

EMUA
(), .

Confidential Information of Huawei.

2011-05-09

page 6 of total 24
No Spreading without Permission

The Hardware Quality Inspection Summary

internal

Confidential Information of Huawei.

2011-05-09

page 7 of total 24
No Spreading without Permission

The Hardware Quality Inspection Summary

internal

Confidential Information of Huawei.

2011-05-09

page 8 of total 24
No Spreading without Permission

The Hardware Quality Inspection Summary

internal

,
.

Confidential Information of Huawei.

2011-05-09

page 9 of total 24
No Spreading without Permission

The Hardware Quality Inspection Summary

internal

!!
1 , ,
.

Confidential Information of Huawei.

2011-05-09

page 10 of total 24
No Spreading without Permission

The Hardware Quality Inspection Summary

internal

Confidential Information of Huawei.

2011-05-09

page 11 of total 24
No Spreading without Permission

The Hardware Quality Inspection Summary

internal

Confidential Information of Huawei.

2011-05-09

page 12 of total 24
No Spreading without Permission

The Hardware Quality Inspection Summary

internal

Confidential Information of Huawei.

2011-05-09

page 13 of total 24
No Spreading without Permission

The Hardware Quality Inspection Summary

internal

Confidential Information of Huawei.

2011-05-09

page 14 of total 24
No Spreading without Permission

The Hardware Quality Inspection Summary

internal

Confidential Information of Huawei.

2011-05-09

page 15 of total 24
No Spreading without Permission

The Hardware Quality Inspection Summary

internal

: , RRU, ,
,
,
( , 0,5
).
3 ,
( ),
.

Confidential Information of Huawei.

2011-05-09

page 16 of total 24
No Spreading without Permission

The Hardware Quality Inspection Summary

internal

(16 ..)
(), .

Confidential Information of Huawei.

2011-05-09

page 17 of total 24
No Spreading without Permission

The Hardware Quality Inspection Summary

internal

Confidential Information of Huawei.

2011-05-09

page 18 of total 24
No Spreading without Permission

The Hardware Quality Inspection Summary

internal

Confidential Information of Huawei.

2011-05-09

page 19 of total 24
No Spreading without Permission

The Hardware Quality Inspection Summary

internal


( !).

.

Confidential Information of Huawei.

2011-05-09

page 20 of total 24
No Spreading without Permission

The Hardware Quality Inspection Summary

internal

Confidential Information of Huawei.

2011-05-09

page 21 of total 24
No Spreading without Permission

The Hardware Quality Inspection Summary

internal

RRU .
,
S, .
RRU /,
, (, )
(, ).
, .

Confidential Information of Huawei.

2011-05-09

page 22 of total 24
No Spreading without Permission

The Hardware Quality Inspection Summary

internal

Confidential Information of Huawei.

2011-05-09

page 23 of total 24
No Spreading without Permission

The Hardware Quality Inspection Summary

internal

RUS-DBD
CIS, Far East, Kuvshinov Ruslan
2011-05-09

Confidential Information of Huawei.

2011-05-09

page 24 of total 24
No Spreading without Permission

Das könnte Ihnen auch gefallen