Sie sind auf Seite 1von 26

LEAN OPERATIONS GROUP ASSIGNMENT Student Name.

Manish Aggarwal (1049333) Mudit Vaish (1045061) Sourabh Doshi (1048760) Shubham Goel (0957839) Module title. Module code. The Essay Title. Lean Operations. BST 546 A comparison of Construction industry (Housing) and Food processing industry (Juice) application of flexible and customer focused business strategies to their value streams. Word Count Lecturer. 4862 Owen James.

Submission date. June 22, 2011

Lean Operations Two sectors selected for the group assignment are Construction Industry and Food Processing Industry, both these industries plays significant role in the development of the global economy. Construction industry is huge Industry, it accounts for the 8.6 % Of GDP (office for national statistics, 2010) and Provides employment to 1.5 Million people in UK it self. Industry comprises of Builders Designers, Suppliers and producers, contractors and labours. Construction industry is sum up of Small and Big companies, which differs in their capacity and capability. Small Companies usually engaged in domestic construction work like- houses and shops, while big companies construct the commercial complex, Shopping malls and factories in Global market. Food processing is the largest manufacturing Sector in UK with annual turnover of 70 billion pounds and provides employment to over half million people of the country. (Food industry, 2010) Food processing involves preparation of fresh foods products by transformation of raw ingredients in to the edible food for Human and Animals eating. Food Products like- juice, Ice cream, cakes, cookies, coffees and chocolates prepared in Processing plants. Industry comprises of Suppliers, farmers, manufactures, overseas work force, distribution network and retail shops. Nestle, Unilever, Procter & Gamble are some Global food processing companies, they hold strong power in supply chain which enabled them to compete globally. Key to success in the food industry is the integrated Supply chain management, which helped the company to thrive in rapid and unpredictable market change. In the global competitive environment, companies are making constant efforts to improve their productivity, profitability and willing to take competitive advantage by offering quality products right first time, in right cost and in right place. For achieving these benefits, management is highly engaged in improvement of their in-house operations and integrating their supply chain management by building good relationship with their suppliers and Customers.

There are various issues involved in the construction and food processing Industry operations that requires improvement in order to achieve quality output and productivity. These issues can be resolved by the active participation of the concern bodies in the decision making, which can significantly increase the productivity by reducing the nonvalue adding activities. Table 1. Illustrates the major constraints present in both construction and Food Industry. Major constraints in Construction Industries Rapid change in customer Major constraints in Food processing Industries Short shelf life of the

requirements and flexibilities. Global competition Qualitative and Quantitive gaps in supply(Naim et al, 1999) Dissatisfied customer Unbalanced waiting Supplies Design decision Sustainability Increased Carbon foot print of projects In efficient process Low material resource efficiency Safety Construction Lead time Un reliable supplier Inventory management schedule/ higher for process materials flow/ and

products. Storage, transportation and preservation under controlled condition Product quality Delivery time New product development Supply chain Highly volatile market High product variety Intensified competition Dynamic demand

Waste To overcome these constraints management of both the industries need to implement some performance improvement tolls & techniques which will enable them to compete in intensified market and thrive in an environment of rapid change. For implementing suitable strategy for their business, management first needs to do analysis of their value chain, available resource and Value adding activities and non value adding activates. Value adding activities are those for which customers are willing to pay. Non -value adding activates are those activities which does not add value but requires cost, so management first need to find Non- value adding actives in their value chain and then by using available resource they need to take initiatives to reduce/eliminate those Non-value adding activities. For knowing current status of their organisation they can use Value stream mapping tool, which will reflect the opportunities to reduce the waste from the process. Management need to analyze the success and failure of both the strategy, and then accordingly select the best strategy which is best suitable in their Supply chain characteristics. (Naim et al. 1999).Supply chain is the key to the success in this global competitive world, in fact, (OMarah. 2001) suggested that in the present economy companies compete on their supply chain model Basis. Before selecting appropriate strategy among Lean, agile and Leagile, management first needs to access their capability against the desired capability of the strategy. (Harrison et al. 1999) for example, Implementation of Agile strategy requires significant capacity to meet the changing demand and infrastructure to support exchange of information with supplier through Intranet. Management also needs to identify the key competitive factors of their business such asOrder winning and Order qualifying factors. These factors are important in the strategy decision because these will guide, what are the key reasons of customer purchasing and what are qualifying level need to maintain for retaining those customer. For example- if companys order winning factor is cost and quality, then company must select Lean strategy or If companys order winning factors are timely delivery and innovative products then, company need to chose Agile strategy. Strategy analysis-

Lean is business philosophy which focuses on removal of waste, reduction of cost and time to complete the process and enable the value flow to the customer. There are five principles of Lean- customer value, value adding activities, process flow, pull system and perfection by removal of waste. It identified 7 waste- transportation, motion, inventory, waiting, over-production, over-processing and defects. Leanness means developing a value stream to eliminate waste, including time, and to ensure a level schedule. (Naylor et al. 1999) Agile is market sensitive with ability to respond quickly to the customer needs with controlled cost and quality. It develops the new ways of interacting with customers and suppliers. It is best suitable in volatile market where demand is unpredictable and change rapidly. Agility means using market knowledge and a virtual corporation to exploit profitable opportunities in a volatile market place. (Naylor et al. 1999) Agility places less emphases on efficiency while Lean place less emphasis on customization. (Naylor et al. 1999) Lean is process focused while Agile is boundary focused. Agility supersedes leanness, as the lean is unable to meet the demand of dynamic market change (Booth. 1996). There are some common components in the out- come of Lean and Agile Strategies (Naylor et al 1997). Both strategies put emphasis on reducing Lead time and Quality improvement, while their emphasis on service and cost efficiency varies. Agile place comparatively more emphasis on service on the other hand Lean place more emphasis on cost rather then service.

Table 2 , (Naim et al, 1999) reflects the output of the Lean and Agile strategy

Two individual models can be used to identify which Lean or Agile strategy is best suitable for Construction industry and Food processing Industry. Fist model suggest rating of Lean and Agile strategy on the key characteristic parameter and second model provides the easy differentiation between both the strategies. Manager can simply identify which strategy should be adopted. Model 1. Lean and Agile both places equal emphasis on use of market knowledge, Visual Corporation, Value stream, integrated supply chain and time Compression in the process. Lean focuses more on elimination of waste and Level scheduling on the other hand Agile focuses on rapid reconfiguration and robustness of the process. Lean and Agile strategies can be used to reduce lead time in process with significant elimination of Waste. Both these strategies have their specific objectives and outcomes with some similarities and difference in their concepts.

Table 3. rating of Lean and Agile against standard parameter. (Naim et al, 1999)

Model 2 . Differentiation of the Lean and agile strategies can identify by current position and required position of the organisation. Management need to compare the outcomes of both the strategy and then match those out comes with desired ones. Table 4. Below reflects the strength of Lean and Agile strategy. For construction industry eight outcomes of Lean strategy is perfectly matched with the desired one but remaining three are matching with

Agile strategy. Inverse for food processing industry, here three outcomes are matching with lean and eight with Agile strategy. Table 4. Shows the strength of Lean And Agile in different parameter ATTRIBUTES OUTPUTS MARKET WINNER PERFOMANCE CHARACTERISTICS PRODUCT VARIETY DEMAND VARIABILITY INPUTS RESPONS TO MARKET LEAN COST COST EFFICIENCY AGILE SERVICE LEVEL DELIVERY/

FLEXIBILITY MORE SUITABLE FOR MORE SUITABLE FOR LOW VARIETY HIGH VARIETY MORE SUITABLE FOR MORE SUITABLE FOR LOW VARIABLITY HIGH VARIABILITY

SMOOTH DEMAND AND MAKE TO ORDER AND LEVEL SCHEDULING RESPOND QUICKLY TO MARKET

FORCASTING METHOD ALGORITHMIC SUPPLY CHAIN LONG RELATIONSHIP PATNERSHIP SMALL SOURCING DECISION APPROACH TO WASTE CAPACITY TIME COMPRESSION NO

REQUIREMENT CONSULATIVE TERM UTILISE WITH EXTENDED OF ENTRTPRISE SPEED,

THE

SUPPLIERS COST AND QUALITY REDUCE THE 7 WASTE

FLEXIBILTY

AND QUALITY FOCUS ON SERVICE

LEVEL SMOOTH CAPACITY HOLD SPARE CAPACITY REMOVE NVA AND INVEST AGGRESSIVELY SHORTEN AS LONG AS TO REDUCE LEAD TIME IT DOES NOT INCREASE

COST Source - J. Gosling, M. M. Naim, N. Fowler, and A. Feamne. (2007).

Major constraints of both industries discussed in the table 1.)Can not be resolved by any single strategy (Lean or Agile), management need to Implement Leagile the combination of Lean and Agile strategy. In leagile strategy the strategies of Lean supply and Agile supply be combined at decoupling point for the proper supply chain management. Leanness is used at up stream while agility is used at down stream from the Decoupling point. (Manson-Jones et al. 2000) In construction industry key issues of delivery, flexibility, desire of improved service level and make to order, requires Agile strategy while Lean strategy will provide cost efficiency, quality product and Waste elimination. In Food industry key issues are cost efficiency, smooth capacity and waste elimination from the process and hence require Lean strategy on the other hand to meet the changing demand of the market and to utilize the short life cycle of the food products Agile strategy is required. Hence, management should implement leagile strategy. Techniques used to understand current business environment Study of business circumstances is crucial to understand the working procedure of business and the environment in which it works. The management is responsible to perform audit periodically to analyses the current business environment. There are various methods used by the management for analysis, which can be used by most type of industrial sector. The techniques used are Value stream mapping As per Rother,M and Shook,J 2003 - Value stream mapping is a process of creating a big picture map showing all the processes which are involved in the business to deliver the product which customer had demanded. It uses different symbols to show all the processes right from the time the company receives the order, until the product is delivered to the end customer in the right condition.

Value stream mapping differentiate between the value adding activities and the non-value adding activities (waste), helps in understanding customer requirement. The identification of non-value adding activities is the one of the goal of creating the picture; therefore setting future state vision acting as a blueprint for lean operations. It also helps depict the current flow of processes and the areas where improvement can be made. With the help of value stream mapping the company can reduce there waste, thereby streamlining work processes, cutting lead times, reducing costs and increasing quality. Value stream mapping for construction industry Construction industry is a unique sector which has many distinctive features if compared with other manufacturing sectors; these features include high productive volume, controllable production flow and use of large inventory as work in progress due to high lead time. This all features enable the usage of VSM. (Yu, Haitao. et al. 2007).Due to large number of process, the mapping process is divided into 5 stages Analysis From the Fig 1 of value stream mapping we can easily calculate the amount of wastage in the activity process, the first observation from the map was that the lead time was very high. The duration of stage 1 was approx 65.5 days whereas the total lead time of the stage was approx 50 days which account for only 76%. In this example site managers book the downstream sub trade immediately followed by the start date of the upstream task. Generally due to temporary contract relationship between the builder and the contractor make delay in the schedule being magnified by ripple through effect. In the construction industry there is a huge delay in the process cycle due to various reasons like extreme weather conditions. Therefore the next schedule task cannot be started and causes disturbance in the scheduling process. As a result, there is a conflict between predetermined scheduled process and the unpredictable reality which results in the wastage.

Source Yu, Haitao. et al. 2007,

Value stream mapping for food processing (drinks) The processes involved in processing of drinks are complex and there are large numbers of value adding and non-value adding activities. Therefore value stream mapping is best suitable to study the current business environment. There are certain challenges which need improvement. Analysis From the Fig 2, we can calculate the lead time of the whole process which is 19 days approx and the value adding activities is 67 minutes. The percentage of value adding activities is just 5.9%.The most of the wastage is accounted as transportation and this map is most suitable with perishable foods that require special handling. Many of the food processes combines continuous flow and batch systems which adds complexity. Therefore the process needs to be designed carefully to reduce waste. As a result the process needs to be shortened by reducing transportation waste sustaining the quality and the cost of the product.

Figure 2 showing the value stream map for food processing industry.

Supply chain Supply chain management is the management of a network of interconnected businesses involved in the ultimate provision of product and service packages required by end customers (Harland, 1996). Supply chain is very important for company success and customer satisfaction. It can also be used as a toll to improve quality and reducing cost. Supply chain of construction industry

Contract receiver

Satisfaction Satisfaction

V a l u e A d d i n g c h a r t

Architect

Engineer

Design Development phase

Contractor

Subcontractor

Construction process phase

Supplier

Figure 3 Supply chain of construction industry

In construction companies all the parties involved, be they client, main contractor, designer, surveyor, sub-contractor, or supplier are therefore part of a supply chain. They have there own role in the company. The supply chain starts with the customer order and ends with the customer satisfaction, by together integration of architect, engineer etc to work as per the customer requirement. Supply chain helps to know the flow of activities and the path in which the work is done in the industry. The supply chain of construction industry is complex and consists of number of parties constantly interacting with each other to satisfy the customer. Supply chain of food processing industry

Figure 4 Supply chain of food processing industry Source - Folinas,D. et al . (2006).

The supply chain of food processing industry is quite simple, consisting of only few parties such as manufacturer, packaging, distribution/transportation then retailer and ultimately customer. In the above supply chain shows the flow of product, data and the finance. The manufacturer supplies the product list to the customer in terms of data, which in return lead to the demand for a particular product. Therefore the next function is the physical flow through various channels passing through packaging and different distribution channel. Then finally upon the delivery of the product the payment in received through the channels in the reverse order. As per the discussion by Wowzio, 2009.Effective supply chain means the efficient flow of timely and quality information between the manufacturer and the customer, which will help the manufacturer supply the material to the customer at right time in the desired condition. But in the real world there are many situations which go against the planned schedule creating fluctuations in the supply chain of the product. The fluctuation in the planned demand can be due to any of the concerned group in the supply chain, by offering too much or too little. This is due to lack of coordination. The unplanned demand from the customer can lead to high fluctuation in the supply chain as shown by the diagram below. Demand oscillation becomes higher while travelling up the supply chain resulting in overestimation at each level of the chain.

Figure 5 Bull whip effect Source: Bullwhip effect in supply chain. Feb 2008

Theory of constraints Thinking process (theory of constraints) of Eliyahu M. Goldratt'si 1990 is a technique which is used to identify, analyse and proposing the feasible solutions for the organisational problem. This technique gives answer to 3 major questions What to change? What to change to? How to cause the change?

Therefore to answer the particular question we are just interested in what to change (current circumstances), and the solution to this is given by current reality tree. Current reality tree is a technique to analyse the organisations problems and afterwards by identifying the cause to the problem can help in the removal of problems. Lacreda,D P. et al.(2010) Process engineering focuses on the architectural framework of the organisation to understand analyses and improve the processes involved. This is graphical flow representation representing the flow activities in the organisation. This process is generally used in chemical and biological industry. Paim (2002) Sustainability Management of the business is responsible in both the business, he/she plays major role to sustain the Leagile in their business. Often it becomes important for the management to trade off between the cost lead-time and demand volatility. For construction industry to meet the deadline of the delivery time, management often took decision which affects cost of the project. If management is cost conscious then it will effect customer satisfaction. Same with the food industry to meet the competitors price, management often need to do compromise in the quality. Hence, to sustain Leagile in this competitive business, management need to take some strong action in their current business environment, it involves change in human resource, Production techniques and trading practice of the organization.

Sector-1: The Food Processing Industry The production and consumption of food like any other human activity has an impact upon the environment. The food chain involves the agricultural production and its inputs, processing, distribution and consumption of food. The concept of sustainability has been newly integrated into manufacturing industry, but only recently has this concept been incorporated into food processing involving the conversion of agricultural products into final food products (Husti, I. 2006). The problems associated with the food processing industry can be rectified to an extent and the entire supply chain process can be made more efficient using the Leagile strategy. The various factors affecting the sustainability of the food processing chain include: agribusiness development; supply network improvement; the environmental considerations; economic impact; packaging, distribution and retail; consumer behaviour in context to purchase and grounding; and the establishment of sustainability in the food production practice and educating customers (Husti, I. 2006) Food manufacturing system is an integrated system which is designed for food processing industry. This system creates industry-centric functionality within a totally flexible, world-renowned technology platform. Food manufacturing deals with the entire process of an enterprise i.e. sales operations, customer relations, manufacturing, warehousing etc. This industry is affluent with features that are important for main operations. The system also deals with the capabilities related to precise sub-sectors of the food processing industry (Blocher 2005). The prospective in applying lean and agile strategy in food processing industry should not involve the execution of one strategy at the expense of the other. Careful concern and application of Leagile strategy is required in the total food processing supply chain. The decoupling point plays an important role in defining the leagile supply chain. In food processing it is frequently linked with the strategic stock that buffers the supply chain from changes in customer demand, in terms of both volume and variety. Association with the decoupling point is the issue of deferment and late configuration. Thus, cultivating what is required abundantly by supply chain in which the product is decided from the outset, that is, from consumers. In this supply chain all businesses are at times lean and all respond to supply chain (Naim et al, 1999).

To add on to the leagile aspect of the sustainability factor, development of people involved in the food processing supply chain is equally important. It includes teaching, guiding and motivating the staff involved the technicalities of the lean and agile thinking. The supplier customer flow should be leagile for the best output. Here, fundamental change in the behavior of staff is equally important. Continuous improvement in also one of the prime principle behind leagile approach (especially in the food processing supply chain) boosts the sustainability prospects. Recycling of the products and waste reduction should be stressed upon for future sustainability. Sector-2: The Construction Industry In context to the leagile project delivery involving construction and real estate development, the challenges faced are enormous (as in removing/ reducing the problems) in this industry. To focus on some prime problems of this sector, issues with time (timeliness), no or little control on the costs, substandard performance and safety problems. By using leagile principles, we can definitely improve the grounds for the current or future construction needs. (Barlow and Gann 1999). In spite of these generic problems, faced by construction industries in the world, there have been many attempts to open lessons from leagile production. By and large, process modeling has been a forerunner in the elimination of non-value added actions and managing supply chain programs which are designed to lead to time compression and reduced total costs (Evans et al. 1997). The work in Japan has been expansively acknowledged (Gann 1996). The prospective for applying leagile construction should not involve the implementation of one approach at the expense of the other. There is a need for a careful consideration and application of both paradigms within the entire supply chain. The decoupling point plays an important role in defining the leagile supply chain. In construction it is normally associated with the strategic stock buffering the supply chain from changes in demand of the consumer (in terms of both volume and variety). In association with the decoupling point is the subject of delay and late pattern. The first one is buy to order supply chain in which the merchandise is configured from the outset (ie. from raw materials). In this supply chain all businesses are agile and all respond to changing customer requirements.

In this supply chain, long lead-times is prominent. The other acute is the ship to stock structure in which a standard product is provided from a well defined range. Although lead-times are very short, the danger of obsolescence is to be considered. The motto here is to arrange the product late so as to allow a substantial element of flexibility and hence customers choice with the best use of standardized components (Naim et al, 1999). Here are two examples of the leagile application in industry: Benetton delayed the dyeing of their jumpers until the very end of the supply chain process. So, with standardized jumpers which were customized lately, customers choice is achieved without longer lead-times and without the risk of obsolescence (Gattorna and Walters 1996). Initially, Hewlett-Packard manufactured printers for a global collective demand and Customized it for local markets preceding to their shipment for the regional distribution centres. Unfortunately, the demand forecasts were never accurate and had high obsolescence risks. The solution for this was to postponing the decoupling point as late aspossible and customising the printers in the regional distribution centres when the pulled the orders (Davies 1993). A final glance on the sustainability picture in respect to the construction industry supply chain must surely include the parameters like development of the people involved with the work starting from the supplier heading towards the customer. The entire staff should be well versed with the concepts and the principles of the lean & agile (ie. leagile) strategies. Regular trainings, workshops and motivational clichs should be regularly delivered to the people involved directly and indirectly in the supply chain. These moves definitely help in giving the best output paving the way towards the so-called sustainability. Again, as in the food processing supply chain, the construction industrys supply chain should definitely by-pass the improvement cycles at regular intervals. Recycling of products and reduction of waste directly or indirectly should be carefully dealt with cause it forms an important aspect in the sustainability arena. To sum up, plots and moves like lowering the carbon foot print (especially in the construction sector) and on-site project management is again like a shining star shining in the sky of sustainability.

Barriers to the chosen lean and agile Strategy: The implementation of leagile strategy in both construction and food processing industry is not free from barriers. These barriers are the root of some other barriers and which are influenced by some other barriers. These barriers pose certain challenges both for management and policymaker in these industries. It is very important for management to identify the barriers so that the chosen strategy can be implemented successfully. Construction industry: In construction industry many barriers in the implementation of the strategy can be observed due to this house builders faced constrains both in internal and external market. Construction sector need to learn from other industries. In UK house building, innovation and changes are very slow in comparison to other industries due to these barriers. Several institutional factors constrained the level of customization felt by house builder. The consumers in UK are conservative in their taste in selecting housing style. The UK consumer still likes to prefer traditional style house with two storage, pitched roof, semi detached house, and in a limited range of style which built the base of British Housing Industry. This conservatism in the UK market limits innovation. Changes are possible only to a limited extent means house can be built by a degree of improvement of building elements without the radical transformation of product itself. The standardize housing system introduced in 1960s and timer framing concept of housing introduced in 1980s develop a impact on consumer that they do not want to adopt new style in housing. Because of this preference difference Housing market conservatism is very strong in Britain when compared to elsewhere in Western Europe The planning system militates against design forms that are different from those that have already been approved. Due to this final user of the house cannot change or experiment with design and its component. The UK construction industry heavy relies on subcontractors. The sub-contracting has many criticisms also. Sub-contracting involves the risk of bad practice. Subcontractor generally over commits themselves. They generally have limited skills so that its not

easy for them to change techniques. They usually in hurry to complete the task as early as possible and they do not train construction worker properly and threaten quality. The market has undersupply of new housing because of this speculative house builders face limited competition. , as there are few alternative sources of new supply the social housing sector is targeted at specific population groups and self-build sector is hardly a viable alternative because of problems in obtaining suitable land. The house builder comprehend that they face an environment of constant feast and famine (cf. Ball 1999). So that houses are built to suit the financial period requirement. They not focus as much on customer needs. The expectation of house builder related to material innovations are very high, this may account for slow diffusion. They wait and watch for this change to happen so that they can learn from experience of others. This waiting is the main retarding factor in the innovation process. The UK construction industry is focusing towards the technological advancement but advancement in technique in is generally characterized by limited information. For Example, A material producer knows about pricing strategy with respect to the new product but do not want that its competitors and customers know about that. Imperfect information may limit the variety and subsequent competitive selection of new technologies. Such issues in Construction Business act as Barriers to the chosen Leagile Strategy. Further research is needed in construction sector so that the related Barriers can be eliminated. Food processing industry: The food industry is becoming an interconnected system with a large variety of complex relationships, reflected in the market place by the formation of (virtual) Food Supply Chain Networks (FSCN) via alliances, horizontal and vertical co-operation, forward and backward integration in the supply chain. The increase in complexity on FSCN developed various barriers to the Leagile Strategy. Most of the product in food processing industry carries certain inherent characteristics and complexity. Perish ability and seasonal fluctuation of demand and supply are the main inherent characteristics on food products. Food can only be held for a certain time

period before they become non-consumable and obsolete. Such food requires special and specific investment on storage and transportation equipments which increase the overall cost. Such inherent and other related properties effect the leagile operations. Sometime the FSCN is heavily affected by seasons and whether and instability of nature which also creates problem in leagile operations. The FSCN network is getting more complex day by day as mentioned earlier. This complexity involves number of tasks which has to be preformed and completed in a short span of time. Due to this numerous cost/service tradeoffs arise in operation which directly or indirectly affects leagile strategy. The food industry involves large range of products. Handling of large number of food product varieties (measured by stock keeping unit) requires higher management cost of inventory control and higher inventory cost for each item. This increase in cost acts as barrier for leagile strategy because leagile strategy highly focuses on cost reduction. (Rao and Young 1994) Now a day consumers are highly focusing on food safety due to the recent outbreaks of animal diseases. Due to this the quality requirements in the food processing industry are of utmost importance. The retailers and consumers are ready to pay more for better quality of food. The increase in demand on quality places barriers on the flexibility of FSCN. In the poultry supply chain quality requirements limit flexibility. The demand of products in food processing industry is very unpredictable. This argues that food industries should start over- production and should be stored to fulfil the demand in peek time. Unfortunately, this is not possible due to the perish ability on fresh food product. The unpredictable demand affects the FSCN which ultimately affects leagility strategy. In Conclusion, the concept on leagility and decoupling point is very useful in the analysis and identification process of innovation in Supply Chain design but due to the specific characteristics of Food Supply Chain and other factors, its applicability is restricted to a certain extent.

References: Ball, Michael(1999) 'Chasing a Snail: Innovation and Housebuilding Firms' Strategies', Housing Studies, 14: 1, 9 22 Available At: http://dx.doi.org/10.1080/02673039982975 [Accessed: 17 June 2011] Barlow, J. and Gann, D. (1999). Searching for customer focus in UK housebuilding. CIB Conference on Customer Satisfaction: A Focus for Research, Cape Town, Sept. 1999. Barve, A., Kanda, A. and Shankar, R. (2007) Analysis of interaction among the barriers of Third Party Logistics, Int. J. Agile Systems and Management, Vol. 2, No. 1, pp.109129.Available at http://inderscience.metapress.com/media/mftaqpqtlmcud2rlfray/contributions/f/5/ n/2/f5n25tr7105h6t31.pdf [Accessed: 17 June 2011] Blocher, E. (2005). Cost Management. McGraw-Hill/Irwin. Booth, R.1996. Agile manufacturing. Engineering Management journal 6(2), pp. 105-112. Bullwhip effect in supply chain. Feb 2008. Bullwhip effect in supply chain. Available:http://knowscm.blogspot.com/2008/02/bullwhip-effect-insupply-chain.html. Last accessed 18th June 2011. Davies, T. (1993). Effective supply chain management. Sloan Management Review, Summer, 35-45. Evans, G., Naim, M., and Towill, D. (1997). Process costing - the route to construction reengineering. Proceedings of the Mouchel Centenary Conference Innovation in Civil Engineering and Construction Engineering, Cambridge, 153162. Folinas,D. et al . 2006. Traceability data management for food chains.British Food Journal. 108 (8), 622-633. Gann, D. (1996). Construction as a manufacturing process? Similarities and differences between industrialised housing and car production in Japan. Constr. Mgt. and Econ., 14, 437-450. Gattorna, J.L. and Walters, D. W. (1996). Managing the supply chain: a strategic erspective. MacMillan, London.

Goldratt, Eliyahu M. 1990. What is this thing called Theory of Constraints a how should it be implemented. [Croton-on-Hudson, NY]: North River Press. pp. 161. Harland, C.M. 1996. Supply Chain Management, Purchasing and Supply Management, Logistics, Vertical Integration, Materials Management and Supply Chain Dynamics. In: Slack, N (ed.) Blackwell Encyclopedic Dictionary of Operations Management. UK: Blackwell.

Harrison, A. et al. 1999. Creating the agile supply chain. School of management working paper, Cranfield University. Hsiao Hsin-I, Vorst, van der, J.G.A.J., Omta S.W.F. (2010) A decision framework for logistics outsourcing in food chain networks Mansholtlaan 10-12, 6708PG, Wageningen. Available At:.univie.ac.at/fileadmin/user_upload/.../HsiaVorstOmta.doc

Husti, I. (2006). The main elements of sustainable food chain management. Cereal Research Communications. 34 (1) p.793-796. J. Gosling, M. M. Naim, N. Fowler, and A. Feamne."Defining the lean and agile characteristics of engineer-to-order construction projects", CME25:Construction Management and Economics: Past,Present and Future, Reading, UK, (2007). Lacreda,D P. et al. 2010 Service process analysis using process engineering and the theory of constraints thinking process. Business Process Management Journal. 16 (2), pp. 264-281. Manson-Jones, R. et al. 2000. Engineering the Leagile supply chain. International Journal of Agile Manufacturing Systems, spring Naim, M., Naylor,J. & Barlow, J. (1999). Developing Lean and Agile Supply Chains in the UK Housebuilding Industry. Proccedings IGLC-7. p.159-170. Naylor, J.B. et al. 1999. Leagilibilty: integrating the lean and agile manufacturing paradigm in total supply chain. International Journal of Production Economics. 62. (1999), pp. 107-118 Office for National Statistic. 2010. constructional growth likely to have boosted Q2 GDP [online]Available at: http://www.guardian.co.uk/business/2010/aug/13/construction-growth-boost-toq2-gdp[Accessed at: 21st June 21, 2011]

OMarah, K. 2001. A reality check on the collaboration dreams. Supply Chain Management review may /june(2001), pp. 23-26 Paim, R. (2002), Engenharia de Processosanalise do referencial teoricoconceitual,instrumentos, aplicacoesecasos, MSc dissertation, Mestrado em Engenharia de Produc ao COPPE-UFRJ, Porto Alegre

Rao and Young (1994). "Global supply chains: factors influencing outsourcing of logistics functions." International Journal of Physical Distribution & Logistics Management 24(6): 11-19.

Rother,M and Shook,J 2003. Learning to See: Value Stream Mapping to Add Value and Eliminate MUDA. USA: Lean enterprise institute. Vorst, van der, J.G.A.J., Dijk, S.J. van, Beulens, A.J.M. (2001) Leagile supply chain design in food industry; an inflexible poultry supply chain with high demand uncertainty, the International Journal on Logistics Management, Vol. 12, No. 2., pp. 73-85.

Wikipedia. 2010. food industry [online] Available at: http://en.wikipedia.org/wiki/Food_industry [Accessed at: 21st June 21, 2011] Wowzio. December 2009. Supply Chain Forecast for the new year Lots of ground to make up!! [Prediction]. Available: http://www.scmblog.com/2009/12/supply-chain-forecast-for-new-year-lots.html. [Last accessed 18th June 2011].

Yu, Haitao et al. Aug 2009. construction engineering & anagement.Development of Lean Model for House Construction Using Value Stream Mapping. 135 (8), pp. 782-790.

Das könnte Ihnen auch gefallen