Sie sind auf Seite 1von 4
1) Doe.no. en Rev.ind, Draft pate 2006-03-28 From Dept. TRAP Phone +46 (0)21 321523 Fox +46 (0)21 146918 Email hakan.b.karlsson@se.abb.com Ape. 1 Memo Exchange of Main Processing Module (MPM) in RExSxx Te Copy to Before starting the work with disassembling the terminal, please bear in mind the consequences of the ESD phenomenon. Most electronic components are sensitive to electrostatic discharge, and latent damage ‘may occur, unless measures are taken In order to prevent this, an ESD wrist strap must be used during the replacement of the module. 1. Switch off DC supply to the terminal. 2. Remove the green connectors on the rear of the terminal. 3. Remove all optical cables. 4. Remove the rear cover plate at the left side of the terminal, see the figure below. ABB Power Technologies AB 203) ABB -- - ° ae Date 2006-03-28 5. Remove (Draw out) the MPM module, which is placed in the slot $9. 6 7. Please note that the new MPM looks different ABB Power Technologies AB Doe.na, en Rev. nd Date 2006-03-28 Abi Mount the small optical interfaces for SPA/IEC and/or LON on new MPM (if equipped). 8 _ Insert the new MPM module in the same slot. 9. Mount rear cover plate and green connectors. 10. Switch on DC supply, 11. Download configuration and settings. Ifyou have any problems or questions, please contact SA-T Supportline Phone: +46 21 321680 E-mail: sa-tsupportline@se.abb.com ABB Power Technologies AB

Das könnte Ihnen auch gefallen