Proposed Cadastral -Political Survey

in Region 10
Locations
Province
Bukidnon

Project No.

Municipality/City
Dangcagan
Kalilangan
Sumilao
Valencia City

PLS 112 Portion


Swo 42001 portion
Pls 749, Pls 987 Portion
Cad 791-D

Libona

Cad 1109

No. of
Barangays
14
11
10
15

No. of Monument
98
77
70
105

14

98

PLS 229/PLs13

Malaybalay City

Cad 864

36

252

Pangantucan

PLS 970-D Portion

18

126

Camiguin

Mahinog

PLs 1103

49

Lanao del Norte

Bacolod
Balo-i
Baroy
Kapatagan
Kauswagan
Lala
Linamon
Maigo
Mapapay
Matungao
Munai
Nunungan

Cad 685 portion


PLs 546
PLs 13 Portion
PLs 68, Pls-35 Portion

16
21
23
33
13
27
8
13
24
12
26
25

112
147
161
231
91
189
56
91
168
84
182
175

PLs 142, Pls 142, portion Cad 685

PLs 13 Portion
Cad 685 portion
Swo 41714

GSS and Swo


PLs 575
Gss
GSS, SWO-12-000069

Lanao del Norte

Pantao Ragat
Pantar
Pona Piagapo
Sapad
Salvador

PLs 576, PLs 141 & GSs


GSS 2 projects

Sultan Naga Dimaporo


Tangkal
Tubod
Misamis Oriental

Alubijid
Claveria
Cagayan de Oro City
El Salvador
Gitagum
Laguindingan
Opol
Tagoloan
Villanueva

Misamis Occidental

Baliangao
Bonifacio
Lopez Jaena
Pana-on
Plaridel
Sapang Dalaga
Sinacaban
Concepcion
Don Victoriano
Jimenez
TOTAL

20
21
18
17
25

140
147
126
119
175

PLs 748, PLs 326, 3 Gss


T-277
PLs and Gss
PLs 372, PLs 13 Portion
Gss
Cad 237 portion
Pls 563, Pls 805,
Cad 237 portion
Cad 237 portion
Cad 237 portion
Cad 237 portion
Cad 237 portion
Pls 799
Pls 923

37

259

18
24

126
168

16
25
37
15
11
10
14
10
8

112
175
259
105
77
70
98
70
56

Pls 637, Pls 99, Portion of Pls 75

15
28
28
21
33
28
17
18
11
5

105
196
196
147
231
196
119
126
77
35

896

6272

Gss and SWO, Pls 35 P


Cad 1174-D, Pls-13 P

Cad 1104-D, Pls-535


PLS 479 Portion, GSS
Cad 1194
PLS 646 Portion
PLs 479 Portion
PLs 99 Portion
Pls by DAR
Cad 1021-D

Cost Estimate

Remarks
7 monuments to be established /brgy.

1,324,000.00
1,051,000.00
1,010,000.00
1,415,000.00
5,569,087.84
1,374,000.00

Cad 1138 portion -withdrawn for correction


lot surveys for the rem brgys/contract cancelled

3,326,000.00

for lot surveys(22,076.35135 mills)(P250 survey rate)=cost

Control approved
Control approved .
other brgys (7 cases not approved)/no pol. bdry

1,688,000.00

687,000.00
1,506,000.00
1,961,000.00
2,093,000.00
3,053,000.00
1,233,000.00
2,507,000.00
778,000.00
1,233,000.00
Cad 1124-D Cancelled
2,234,000.00
1,142,000.00
2,416,000.00
2,325,000.00

1,870,000.00
1,961,000.00
1,688,000.00
1,597,000.00
2,325,000.00
9,248,333.00
3,417,000.00

Cad 1174-D Cancelled


for lot surveys (36793 mills)(250 survey rate)=cost

1,688,000.00
2,234,000.00
1,506,000.00
2,275,000.00
3,367,000.00
1,365,000.00
1,001,000.00
910,000.00
1,274,000.00
910,000.00
728,000.00
1,415,000.00
2,598,000.00
2,598,000.00
1,961,000.00
3,053,000.00
2,598,000.00
1,597,000.00
1,688,000.00
1,051,000.00
505,000.00
1,889,500.00
100,242,920.84

Approved Political Boundary Survey


Only primary control by FNSP

Timberland
Timberland
5 Cases pending/approved Pol. Bdry. Survey
for lot surveys(7358 mills)(250 survey rate)=cost

lot surveys for the remaining cases

ACTIVITIES
I- MOBILIZATION OF PERSONNEL & INSTRUMENTS,
ESTABLISHMENT OF OFFICE AND INAGURATION
PROCUREMENT OF SUPPLIES
II- POLITICAL BOUNDARY ESTABLISHMENT
a.Conduct Meeting to LGU Officials
b. Reconnaisance & identification of Political Boundaries/
PBM/MBM,CBM,BBM
c. Construction and establishment of Political Boundary Monuments
d. GPS Observation on established Political Boundary Monuments
e. Processing and validation of GPS Data
III-SUBMITTAL OF SURVEY RETURNS
a. Preparations of Maps and survey returns
b. Submittal of Survey returns
c. Approval of surveys