Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Summary of Rate Analysis


Code No Descriptions Unit DMR

Districts of Nagaland
KMA / MKG / PRN WKA PHEK ZBTO TSG / LLG KPE MON

CHAPTER-1 CARRIAGE OF MATERIALS


1.1 1.2 1.3 1.4 (i) (ii) (iii) Loading and unloading of stone boulder / stone aggregates / sand / kanker / moorum. (Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip) of Boulders by Manual Means Loading and Unloading Loading and Unloading of Cement or Steel by Manual Means and stacking. Cost of Haulage Excluding Loading and Unloading Surfaced Road Unsurfaced Gravelled Road Katcha Track and Track in river bed / nallah bed and choe bed. Hand Broken Stone Aggregates 63 mm nominal size (Supply of quarried stone, hand breaking into coarse aggregate 63 mm nominal size (passing 80 mm and retained on 50 mm sieve) and stacking as directed) Crushing of stone aggregates 13.2 mm nominal size. (Crushing of stone boulders of 150 mm size in an integrated stone crushing unit of 200 tonnes per hour capacity comprising of primary and secondary crushing units, belt conveyor and vibrating screens to obtain stone aggregates of 13 mm nominal size.) Crushing of stone aggregates 20 mm nominal size (Crushing of stone boulders of 150 mm size in an integrated stone crushing unit of 200 tonnes per hour capacity comprising of primary and secondary crushing units, belt conveyor and vibrating screens to obtain stone aggregates of 20 mm nominal size.) Crushing of stone aggregates 40 mm nominal size (Crushing of stone boulders of 150 mm size in an integrated stone crushing unit of 200 tonnes per hour capacity comprising of primary and secondary crushing units, belt conveyor and vibrating screens to obtain stone aggregates of 40 mm nominal size.) tonne.km tonne.km tonne.km 9.50 11.50 23.10 11.70 14.10 28.40 11.70 14.10 28.40 11.70 14.10 28.40 11.70 14.10 28.40 11.70 14.10 28.40 11.70 14.10 28.40 11.20 13.50 27.20 cum cum tonne 133.00 230.00 271.00 158.00 279.00 322.00 161.00 279.00 322.00 167.00 279.00 322.00 167.00 279.00 322.00 169.00 279.00 322.00 172.00 279.00 322.00 154.00 267.00 308.00

1.5

cum

1671.00 1644.00 1644.00 1644.00 1845.00 1845.00 1845.00 1845.00

1.6

cum

1846.00 1802.00 1802.00 1802.00 2046.00 2046.00 2046.00 2046.00

1.7

cum

1624.00 1667.00 1667.00 1667.00 1814.00 1814.00 1814.00 1814.00

1.8

cum

1653.00 1696.00 1696.00 1696.00 1768.00 1768.00 1768.00 1768.00

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

CHAPTER-2 SITE CLEARANCE


2.1 (i) (iii) (iv) 2.2 Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.) Girth from 300 mm to 600 mm (ii) Girth from 600 mm to 900 mm Girth from 900 mm to 1800 mm Girth above 1800 mm Clearing Grass and Removal of Rubbish Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.) each each each each 197.00 356.00 688.00 218.00 395.00 761.00 220.00 401.00 769.00 224.00 413.00 785.00 224.00 413.00 785.00 226.00 420.00 794.00 228.00 426.00 803.00 211.00 384.00 736.00

1300.00 1437.00 1450.00 1474.00 1474.00 1487.00 1500.00 1387.00

hectare 13409.00 14801.00 14801.00 14801.00 14801.00 14801.00 14801.00 14157.00

2.3

(i)

By Manual Means:-

A In area of light jungle B In area of thorny jungle (ii)

hectare 40605.00 44823.00 44844.00 44885.00 44885.00 44906.00 44928.00 42895.00 hectare 54392.00 60044.00 60088.00 60168.00 60168.00 60211.00 60254.00 57475.00 hectare 40261.00 44729.00 46901.00 51268.00 51268.00 53453.00 55625.00 44862.00 hectare 48749.00 54157.00 56769.00 62022.00 62022.00 64650.00 67263.00 54301.00

By Mechanical Means
A In area of light jungle B In area of thorny jungle Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres) Lime /Cement Concrete

2.4

(i) I

By Manual Means

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

Lime Concrete, cement concrete grade M-10 and below

cum cum cum

296.00 350.00

328.00 387.00

332.00 392.00

341.00 400.00

341.00 400.00

346.00 405.00

350.00 410.00

318.00 375.00 972.00

B Cement Concrete Grade M-15 & M-20 Prestressed / Reinforced cement concrete grade M-20 & C above II

912.00 1012.00 1017.00 1025.00 1025.00 1030.00 1035.00

By Mechanical Means for items No. 202( b)


A Cement Concrete Grade M-15 & M-20

& ( c)
cum cum 382.00 652.00 425.00 731.00 439.00 749.00 470.00 791.00 470.00 791.00 485.00 811.00 497.00 827.00 420.00 717.00

Prestressed / Reinforced cement concrete grade M-20 & B above (ii) Dismantling Brick / Tile work A In lime mortar B In cement mortar C In mud mortar D Dry brick pitching or brick soling (iii) Dismantling Stone Masonry A Rubble stone masonry in lime mortar B Rubble stone masonry in cement mortar. C Rubble Stone Masonry in mud mortar. D Dry rubble masonry E Dismantling stone pitching/ dry stone spalls. F (iv) (v) Dismantling boulders laid in wire crates including opening of crates and stacking dismantled materials. Wood work wrought framed and fixed in frames of trusses upto a height of 5 m above plinth level Steel work in all types of sections upto a height of 5 m above plinth level excluding cutting of rivet. A Including dismembering B Excluding dismembering. C Extra over item No( V ) A and( V ) B for cutting rivets. (vi) Scraping of bricks dismantled from brick work including stacking.

cum cum cum cum cum cum cum cum cum cum cum

189.00 243.00 168.00 157.00 210.00 243.00 189.00 178.00 168.00 189.00 454.00

209.00 269.00 186.00 174.00 233.00 269.00 209.00 198.00 186.00 209.00 512.00

214.00 273.00 190.00 179.00 238.00 273.00 214.00 202.00 190.00 214.00 517.00

223.00 282.00 199.00 187.00 246.00 282.00 223.00 211.00 199.00 223.00 525.00

223.00 282.00 199.00 187.00 246.00 282.00 223.00 211.00 199.00 223.00 525.00

227.00 287.00 204.00 192.00 251.00 287.00 227.00 216.00 204.00 227.00 530.00

232.00 291.00 208.00 197.00 256.00 291.00 232.00 220.00 208.00 232.00 535.00

205.00 261.00 182.00 171.00 227.00 261.00 205.00 193.00 182.00 205.00 494.00

tonne tonne tonne

1156.00 1302.00 1306.00 1313.00 1313.00 1316.00 1320.00 1249.00 863.00 9.00 969.00 10.00 973.00 10.00 979.00 10.00 979.00 10.00 983.00 10.00 987.00 10.00 930.00 9.00

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

A In lime/Cement mortar B In mud mortar (vii) Scraping of Stone from dismantled stone masonry A In cement and lime mortar B In Mud mortar (viii) (ix) Scarping plaster in lime or cement mortar from brick/ stone masonry Removing all type of hume pipes and stacking within a lead of 1000 metres including earthwork and dismantling of masonry works. A Up to 600 mm dia B Above 600 mm to 900 mm dia C Above 900 mm 2.5 I Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately) By Manual Means A Bituminous courses B Granular courses II By Mechanical Means A Bituminous course Dismantling of Cement Concrete Pavement (Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately) Dismantling Guard Rails (Dismantling guard rails by manual means and disposal of dismantled material with all lifts and up to a lead of 1000 metres, stacking serviceable materials and unserviceable materials separately.) Dismantling Kerb Stone (Dismantling kerb stone by manual means and disposal of dismantled material with all lifts and up to a lead of 1000 metre)

1000 nos 1000 nos cum cum sqm

939.00 1036.00 1036.00 1036.00 1036.00 1036.00 1036.00 335.00 377.00 80.00 12.00 370.00 416.00 88.00 13.00 370.00 416.00 88.00 13.00 370.00 416.00 88.00 13.00 370.00 416.00 88.00 13.00 370.00 416.00 88.00 13.00 370.00 416.00 88.00 14.00

991.00 354.00 398.00 84.00 13.00

metre metre metre

139.00 188.00 323.00

154.00 208.00 356.00

154.00 208.00 356.00

154.00 208.00 356.00

154.00 208.00 356.00

154.00 208.00 356.00

154.00 208.00 356.00

147.00 199.00 341.00

cum cum cum

546.00 393.00 230.00

604.00 435.00 256.00

612.00 442.00 264.00

628.00 455.00 280.00

628.00 455.00 280.00

636.00 463.00 289.00

644.00 470.00 298.00

586.00 423.00 253.00

2.6

cum

1113.00 1242.00 1287.00 1382.00 1382.00 1428.00 1471.00 1231.00

2.7

metre

59.00

65.00

67.00

69.00

69.00

70.00

71.00

64.00

2.8

metre

12.00

13.00

13.00

14.00

14.00

15.00

15.00

13.00

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

2.9

Dismantling Kerb Stone channel (Dismantling kerb stone channel by manual means and disposal of dismantled material with all lifts and up to a lead of 1000 metre) Dismantling Kilometre Stone (Dismantling of kilometre stone including cutting of earth, foundation and disposal of dismantled material with all lifts and lead upto 1000 m and back filling of pit.) A 5th KM stone B Ordinary KM Stone C Hectometre Stone Dismantling of Fencing (Dismantling of barbed wire fencing/ wire mesh fencing including posts, foundation concrete, back filling of pit by manual means including disposal of dismantled material with all lifts and up to a lead of 1000 metres, stacking serviceable material and unserviceable material separately. ) Dismantling of CI Water Pipe Line (Dismantling of CI water pipe line 600 mm dia including disposal with all lifts and lead upto 1000 metres and stacking of serviceable material and unserviceable material separately under supervision of concerned department) Removal of Cement Concrete Pipe of Sewer Gutter (Removal of cement concrete pipe of sewer gutter 1500 mm dia under the supervision of concerned department including disposal with all lifts and up to a lead of 1000 metres and stacking of serviceable and unserviceable material separately but excluding earth excavation and dismantling of masonry works.) Removal of Telephone / Electric Poles and Lines (Removal of telephone / Electric poles including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and up to a lead of 1000 metres and stacking the serviceable and unserviceable material separately)

metre

18.00

20.00

20.00

21.00

21.00

22.00

23.00

19.00

2.10

each each each

296.00 172.00 34.00

329.00 190.00 38.00

333.00 192.00 38.00

339.00 196.00 39.00

339.00 196.00 39.00

342.00 198.00 40.00

345.00 201.00 40.00

318.00 184.00 37.00

2.11

metre

39.00

43.00

43.00

44.00

44.00

44.00

44.00

41.00

2.12

metre

121.00

137.00

139.00

142.00

142.00

144.00

146.00

133.00

2.13

metre

186.00

216.00

218.00

219.00

219.00

220.00

221.00

208.00

2.14

each

135.00

150.00

152.00

154.00

154.00

155.00

156.00

145.00

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

CHAPTER-3 EARTH WORK, EROSION CONTROL AND DRAINAGE


3.1 Excavation in Soil by Manual Means. (Excavation for roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto1000 metres.) Excavation in ordinary rock by manual means (Excavation in ordinary rock using manual means including loading in a truck and carrying of excavated material to embankment site with in all lifts and leads upto 1000 metres ) Excavation in Soil with Dozer with lead upto 100 metres (Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.) Excavation in Ordinary Rock with Dozer with lead upto 100 metres (Excavation for roadway in ordinary rock by deploying a dozer, 80 HP including cutting and pushing the cut earth to site of embankment upto a distance of 100 metres ( average lead 50 metres ), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross sections.) Excavation in Hard Rock (requiring blasting) with disposal upto 1000 metres (Excavation for roadway in hard rock (requiring blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres ) cum 191.00 221.00 221.00 221.00 221.00 221.00 221.00 211.00

3.2

cum

247.00

282.00

282.00

282.00

282.00

282.00

282.00

270.00

3.3

cum

132.00

147.00

154.00

169.00

169.00

176.00

183.00

147.00

3.4

cum

223.00

248.00

260.00

284.00

284.00

296.00

308.00

248.00

3.5

cum

322.00

383.00

397.00

420.00

420.00

430.00

441.00

380.00

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

3.6

Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m) Excavation in Ordinary Rockusing Hydraulic ExcavatorCK-90 and Tippers with disposal upto 1000 metres. (Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site within all lifts and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.) Excavation in Hard Rock (blasting prohibited) (Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.) A Mechanised B Manual Method Excavation in Hard Rock (controlled blasting) with disposal upto 1000 metres (Excavation for roadway in hard rock with controlled blasting by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres ) Excavation in Marshy Soil (Excavation for roadway in marshy soil with hydraulic excavator 0.9 cum bucket capacity including cutting and loading in tippers and disposal with in all lifts and lead upto 1000 metres, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections.) Removal of Unserviceable Soil with Disposal upto 1000 metres (Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305.)

cum

86.00

102.00

104.00

106.00

106.00

107.00

109.00

99.00

3.7

cum

100.00

118.00

120.00

124.00

124.00

126.00

128.00

115.00

3.8

cum cum

463.00

571.00

584.00

609.00

609.00

622.00

634.00

558.00

953.00 1112.00 1112.00 1112.00 1112.00 1112.00 1112.00 1063.00

3.9

cum

373.00

440.00

468.00

501.00

501.00

514.00

529.00

452.00

3.10

cum

92.00

109.00

111.00

114.00

114.00

116.00

117.00

106.00

3.11

cum

87.00

104.00

105.00

108.00

108.00

109.00

110.00

101.00

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

3.12

3.13

Pre-splitting of Rock Excavation Slopes (Carrying out excavation in hard rock to achieve a specified slope of the rock face by controlled use of explosives and blasting accessories in properly aligned and spaced drill holes, collection of the excavated rock by a 80 HP dozer, loading in tipper by a front end loader and disposing of the material with all lifts and lead upto 1000 m, all as specified in clause No. 303) Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.) Ordinary soil A Manual Means (Depth upto 3 m) B Mechanical Means (Depth upto 3 m)

sqm

145.00

159.00

168.00

180.00

180.00

185.00

191.00

162.00

(i)

cum cum cum cum cum cum cum cum

215.00 34.00 268.00 45.00 533.00 482.00 442.00 212.00

237.00 38.00 296.00 50.00 579.00 536.00 503.00 256.00

237.00 40.00 296.00 52.00 585.00 554.00 519.00 267.00

237.00 43.00 296.00 56.00 592.00 595.00 529.00 270.00

237.00 43.00 296.00 56.00 592.00 595.00 529.00 270.00

237.00 44.00 296.00 59.00 593.00 615.00 535.00 271.00

237.00 46.00 296.00 61.00 597.00 629.00 541.00 272.00

227.00 38.00 283.00 50.00 560.00 530.00 496.00 255.00

(ii)

Ordinary rock (not requiring blasting) A Manual Means (Depth upto 3 m) B Mechanical Means

(iii) (iv) (v)

Hard rock ( requiring blasting ) A Manual Means Hard rock ( blasting prohibited ) A Mechanical Means Marshy soil A Manual means ( upto 3 m depth) B Mechanical Means Scarifying Existing Granular Surface to a Depth of 50 mm by Manual Means (Scarifying the existing granular road surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres. ) Scarifying existing bituminous surface to a depth of 50 mm by mechanical means (Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres.)

3.14

sqm

20.00

22.00

22.00

23.00

23.00

23.00

24.00

21.00

3.15

sqm

6.00

7.00

7.00

7.00

7.00

7.00

7.00

7.00

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

3.16

Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2) Construction of Embankment with Material Deposited from Roadway Cutting (Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2) Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2) Compacting Original Ground

cum

443.00

536.00

542.00

553.00

553.00

555.00

564.00

518.00

3.17

cum

143.00

195.00

199.00

208.00

208.00

209.00

216.00

191.00

3.18

cum

491.00

593.00

600.00

614.00

614.00

619.00

629.00

574.00

3.19

Compacting original ground supporting subgrade (Loosening of the ground upto a level of500 mm below the subgrade level, Case-I watered, graded and compacted in layers to meet requirement of table 300-2 for subgrade construction.) Case-II :Compacting original ground supporting embankment 3.20 Stripping and Storing Top Soil (Stripping, storing of top soil by road side at 15 m internal and re-application on embankment slopes, cut slopes and other areas in localities where the available embankment material is not conducive to plant growth) Stripping, storing and re-laying top soil from borrow areas in agriculture fields. (Stripping of top soil from borrow areas located in agriculture fields, storing at a suitable place, spreading and re-laying after taking the borrow earth to maintain fertility of the agricultural field, finishing it to the required levels and satisfaction of the farmer.) Turfing with Sods (Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the engineer including preparation of ground, fetching of rods and watering) Seeding and Mulching (Preparation of seed bed on previously laid top soil, furnishing and placing of seeds, fertilizer, mulching material, applying bituminous emulsion at the rate of0.23 litres per sqm and laying and fixing jute netting, including watering for 3 months all as per clause 308)

cum cum cum

69.00 41.00 173.00

84.00 53.00 191.00

88.00 56.00 193.00

96.00 61.00 198.00

96.00 61.00 198.00

99.00 62.00 200.00

103.00 65.00 202.00

84.00 53.00 185.00

3.21

cum

79.00

88.00

93.00

101.00

101.00

106.00

110.00

88.00

3.22

sqm

51.00

75.00

75.00

75.00

75.00

74.00

76.00

72.00

3.23

sqm

178.00

248.00

250.00

254.00

254.00

251.00

260.00

239.00

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

3.24

Surface Drains in Soil (Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of50 metres (average lead 25 metres)) A Mechanical means B Manual Means Surface Drains in Ordinary Rock (Construction of unlined surface drain of average cross sectional area 0.4 sqm in ordinary rock to specified lines, grades, levels and dimensions as per approved design and to the requirement of clause 301 to 309. Excavated material to be used in embankment at site.) A Mechanical Means B Manual Means Surface Drains in Hard Rock (Rate per metre may be worked out based on quantity of hard rock as per design.) Sub Surface Drains with Perforated Pipe (Construction of subsurface drain with perforated pipe of 100 mm internal diameter of metal/ asbestos cement/ cement concrete/PVC, closely jointed, perforations ranging from 3 mm to 6 mm depending upon size of material surrounding the pipe, with 150 mm bedding below the pipe and 300 mm cushion above the pipe, cross section of excavation 450 x 550 mm. Excavated material to be utilised in roadway at site ) Aggregate Sub- Surface Drains (Construction of aggregate sub surface drain 300 mm x 450 mm with aggregates conforming to table 300-4, excavated material to be utilised in roadway ) Underground Drain at Edge of Pavement (Construction of an underground drain 1 m x 1 m (inside dimensions) lined with RCC-20 cm thick and covered with RCC slab10 cm in thickness on urban roads) Preparation and Surface Treatment of formation. (Preparation and surface treatment of formation by removing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with 8-10 tonne smooth wheeled roller, complete as per clause 310.) metre metre metre 104.00 80.00 116.00 89.00 121.00 89.00 131.00 89.00 131.00 89.00 136.00 89.00 141.00 89.00 116.00 85.00 metre metre 52.00 54.00 57.00 59.00 60.00 59.00 65.00 59.00 65.00 59.00 67.00 59.00 70.00 59.00 57.00 57.00

3.25

3.26

3.27

metre

789.00

833.00

856.00 3087.00

917.00

905.00

983.00

815.00

3.28

metre

297.00

315.00

327.00 1575.00

354.00

346.00

387.00

311.00

3.29

metre

3457.00 4075.00 4350.00 4049.00 6462.00 6051.00 8662.00 4469.00

3.30

sqm

2.60

3.70

3.70

3.80

3.80

3.70

3.80

3.60

10

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

3.31

3.32

Construction of Rock fill Embankment (Construction of rock fill embankment with broken hard rock fragments of size not exceeding 300 mm laid in layers not exceeding 500 mm thick including filling of surface voids with stone spalls, blinding top layer with granular material, rolled with vibratory road roller, all complete as per clause 313) Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres) Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres ) Excavation in Hilly Areas in Hard Rock Requiring Blasting (Excavation in hilly areas in hard rock requiring blasting, by mechanical means including trimming of slopes and disposal of cut material with all lifts and lead upto 1000 metres.) Work in Urban Roads (The cost of earth work in urban roads inhabited area will be comparatively higher due to following reasons:) Embankment Construction with Fly ash/Pond ash available from coal or lignite burning Thermal Plants as waste material. (Construction of embankment with fly ash conforming to table 1 of IRC: SP: 58 - 2001 obtained from coal or lignite burning thermal power stations as waste material, spread and compacted in layer of 200mm thickness each at OMC, all as specified in IRC: SP: 58-2001 and as per approved plans.)

cum

81.00

109.00

112.00

118.00

118.00

119.00

123.00

107.00

cum

179.00

206.00

212.00

225.00

225.00

231.00

237.00

203.00

3.33

cum

241.00

275.00

284.00

303.00

303.00

313.00

322.00

272.00

3.34

cum

344.00

382.00

395.00

418.00

418.00

428.00

439.00

378.00

3.35

3.36

cum

440.00 1907.00 3382.00 4660.00 4660.00 6815.00 8436.00 4693.00

11

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

CHAPTER-4 SUB-BASES, BASES ( NON- BITUMINOUS) AND SHOULDERS


4.1 Granular Sub-base with Close Graded Material (Table:- 4001) Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 (i) for grading- I )Material (ii) for grading- II Material (iii) for grading-III Material By Mix in Place Method (Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401) (i) for grading- I Material (ii) for grading- II Material (iii) for grading-III Material Granular Sub-Base with Coarse Graded Material ( Table:- 4002) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401) for grading- I Material

cum cum cum

2057.00 2432.00 2445.00 2471.00 2667.00 2679.00 2847.00 2526.00 2261.00 2646.00 2659.00 2686.00 2882.00 2894.00 3062.00 2731.00 2471.00 2866.00 2879.00 2906.00 3102.00 3113.00 3281.00 2941.00

cum cum cum

1543.00 1814.00 1821.00 1835.00 2013.00 2020.00 2028.00 1912.00 1728.00 2009.00 2016.00 2030.00 2209.00 2215.00 2223.00 2099.00 1919.00 2209.00 2216.00 2230.00 2408.00 2415.00 2423.00 2290.00

4.2

(i)

cum cum cum

1549.00 1836.00 1843.00 1855.00 2051.00 2056.00 2063.00 1950.00 1687.00 1981.00 1987.00 2000.00 2196.00 2201.00 2208.00 2088.00 1806.00 2106.00 2113.00 2125.00 2321.00 2327.00 2334.00 2208.00

(ii) for grading- II Material (iii) for grading-III Material

12

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

4.3

Lime Stabilisation for Improving Subgrade (Laying and spreading available soil in the subgrade on a prepared surface, pulverising, mixing the spread soil in place with rotavator with 3 % slaked lime having minimum content of 70% of CaO, grading with motor grader and compacting with the road roller at OMC to the desired density to form a layer of improved sub grade) A By Mechanical Means B By Manual Means Lime Treated Soil for Sub- Base (Providing, laying and spreading soil on a prepared sub grade, pulverising, mixing the spread soil in place with rotavator with 3 % slaked lime with minimum content of 70% of CaO, grading with motor grader and compacting with the road roller at OMC to achieve at least 98%of the max dry density to form a layer of sub base.) Cement Treated Soil Sub Base/ Base (Providing, laying and spreading soil on a prepared sub grade, pulverising, adding the designed quantity of cement to the spread soil, mixing in place with rotavator, grading with the motor grader and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base.) Cement Treated Crushed Rock or combination as per clause 403.2 and table 400.4in Sub base/ Base (Providing, laying and spreading Material on a prepared sub grade, adding the designed quantity of cement to the spread Material, mixing in place with rotavator, grading with the motor grader and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a For Sub-Base course layer of sub-base/base.) For Base course Making 50 mm x 50 mm Furrows (Making 50 mm x 50 mm furrows, 25mm deep, 450 to the center line of the road and at one metre interval in the existing thin bituminous wearing coarse including sweeping and disposal of excavated material within 1000 Inverted Choke (Construction of inverted choke by providing, metres lead) laying, spreading and compacting screening B type/ coarse sand of specified grade in uniform layer on a prepared surface with motor grader and compacting with power roller etc) Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.)

cum cum

409.00 410.00

566.00 568.00

598.00 598.00

882.00 880.00

882.00 880.00

819.00 1027.00 813.00 1021.00

579.00 578.00

4.4

cum

671.00

882.00

917.00 1207.00 1207.00 1146.00 1357.00

884.00

4.5

cum

1120.00 1286.00 1317.00 1534.00 1534.00 1490.00 1655.00 1261.00

4.6

(i) (ii) 4.7

cum cum sqm

2309.00 2667.00 2699.00 2942.00 3120.00 3068.00 3253.00 2754.00 2242.00 5993.00 6025.00 6268.00 3050.00 2998.00 3182.00 2687.00 2.90 3.20 3.20 3.30 3.30 3.30 3.30 3.10

4.8

cum

2827.00 5055.00 5926.00 13812.00 13812.00 11852.00 17891.00 5740.00

4.9

13

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

A (i)

By Manual Means Grading- I (Using Screening Crushable type such as Moorum or Gravel) (a) Using Screening Crushable type such as Moorum or Gravel

cum cum

1859.00 2090.00 2120.00 2162.00 2546.00 2526.00 2625.00 2369.00 1874.00 2120.00 2130.00 2146.00 2513.00 2506.00 2538.00 2381.00

(b) Using Screening Type-A (13.2mm Agg.) Grading- II (Using Screening Crushable type such as (ii) Moorum or Gravel) (a) Using Screening Crushable type such as Moorum or Gravel (b) Using Screening Type-A (13.2mm Agg.) (c) Using Screening Type-B (11.2mm Agg.) (iii) Grading- III (Using Screening Crushable type such as Moorum or Gravel) (a) Using Screening Crushable type such as Moorum or Gravel (b) Using Screening Type-B (11.2mm Agg.) B (i) By Mechanical Means: Grading- I (Using Screening Crushable type such as Moorum or Gravel) (a) Using Screening Crushable type such as Moorum or Gravel (b) Using Screening Type-A (13.2mm Agg.) (ii) Grading- II (Using Screening Crushable type such as Moorum or Gravel) (a) Using Screening Crushable type such as Moorum or Gravel (b) Using Screening Type-A (13.2mm Agg.) (c) Using Screening Type-B (11.2mm Agg.) (iii) Grading- III (Using Screening Crushable type such as Moorum or Gravel) (a) Using Screening Crushable type such as Moorum or Gravel (b) Using Screening Type-B (11.2mm Agg.) Crushed Cement Concrete Sub-base / Base (Breaking and crushing of material obtained by breaking damaged cement concrete slabs to size range not exceeding 75 mm as specified in table 400.7 transporting the aggregates obtained from breaking of cement concrete slabs at a lead of L km., laying and compacting the same as sub base/ base course, constructed as WBM to clause 404 except the use of screening or binding Material.)

cum cum cum

1975.00 2217.00 2247.00 2288.00 2658.00 2638.00 2735.00 2477.00 1855.00 2099.00 2109.00 2125.00 2456.00 2449.00 2481.00 2327.00 1963.00 2218.00 2228.00 2244.00 2591.00 2584.00 2616.00 2456.00

cum cum

2010.00 2256.00 2285.00 2327.00 2700.00 2680.00 2777.00 2517.00 1998.00 2257.00 2267.00 2283.00 2633.00 2626.00 2658.00 2496.00

cum cum

1734.00 1952.00 1985.00 2033.00 2417.00 2399.00 2501.00 2240.00 1749.00 1982.00 1995.00 2016.00 2383.00 2379.00 2414.00 2252.00

cum cum cum

1850.00 2079.00 2112.00 2159.00 2528.00 2511.00 2611.00 2348.00 1730.00 1961.00 1974.00 1995.00 2327.00 2322.00 2357.00 2198.00 1838.00 2080.00 2093.00 2114.00 2461.00 2457.00 2492.00 2327.00

cum cum

1885.00 2118.00 2151.00 2198.00 2570.00 2553.00 2653.00 2388.00 1873.00 2119.00 2132.00 2153.00 2503.00 2499.00 2534.00 2367.00

4.10

cum

480.00

592.00

598.00

610.00

610.00

614.00

776.00

572.00

14

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

4.11

4.12

Penetration Coat Over Top Layer of Crushed Cement Concrete Base (Spraying of bitumen over cleaned dry surface of crushed cement concrete base at the rate of 25 kg per 10 sqm by a bitumen pressure distributor, spreading of key aggregates at the rate of 0.13 cum per 10 sqm by a mechanical gritter and rolling the surface as per clause 506.3.8) Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.) Construction of Median and Island with Soil Taken from Roadway Cutting (Construction of Median and Island above road level with approved material deposited at site from roadway cutting and excavation for drain and foundation of other structures, spread, graded and compacted as per clause 407) Construction of Median and Island with Soil Taken from Borrow Areas (Construction of median and Island above road level with approved material brought from borrow pits, spread, sloped and compacted as per clause 407) Construction of Shoulders (A. Earthen Shoulders) A. Earthen Shoulders The rate as applicable for sub-grade construction may be adopted. B. Hard Shoulders Rate as applicable for sub-base and or base may be adopted as per approved design. C. Paved shoulders The rate may be adopted as applicable for different layers of pavement depending upon approved design of paved shoulders. Footpaths and Separators (Construction of footpath/separator by providing a 150 mm compacted granular sub base as per clause 401 and 25 mm thick cement concrete grade M15, over laid with precast concrete tiles in cement mortar 1:3 including provision of all drainage arrangements but excluding kerb channel..) Crusher Run Macadam Base (Providing crushed stone aggregate, depositing on a prepared surface by hauling vehicles, spreading and mixing with a motor grader, watering and compacting with a vibratory roller to clause 410 to form a layer of sub-base/Base) A By Mix in Place Method For 53 mm maximum size For 45 mm maximum size

sqm

28.00

30.00

31.00

32.00

35.00

35.00

35.00

32.00

cum

2269.00 2618.00 2627.00 2646.00 2883.00 2892.00 3071.00 2740.00

4.13

cum

228.00

294.00

298.00

304.00

304.00

304.00

311.00

285.00

4.14 4.15

cum

548.00

685.00

690.00

700.00

700.00

701.00

710.00

660.00

4.16

sqm

1526.00 1723.00 1779.00 2049.00 2112.00 2088.00 2335.00 1734.00

4.17

(i) (ii)

cum cum

1578.00 1823.00 1829.00 1841.00 2061.00 2066.00 2073.00 1960.00 1657.00 1939.00 1945.00 1956.00 2146.00 2150.00 2158.00 2041.00

15

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

(i) (ii)

4.18

CHAPTER-5 BASES AND SURFACE COURSES (BITUMINOUS)


5.1 5.2

B By Mixing Plant : For 53 mm maximum size For 45 mm maximum size Lime, Fly ash stabalised soil sub-base (Construction of Subbase using lime - fly ash admixture with granular soil, free from organic matter/ deleterious material or clayey silts and low plasticity clays having PI between 5 and 20 and liquid limit less than 25 and commercial dry lime, slaked at site or pre-slaked with CaO content not less than 50%, fly ash to conform to gradation as per clause 4.3 of IRC: 88-1984, lime + fly ash content ranging between 10 to 30%, the minimum un-confined compressive strength and CBR value after 28 days curing and 4 days soaking to be 7.5kg/sq, cm and 25% respectively, all as specified in IRC: 88-1984. )

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

cum cum

1929.00 2229.00 2242.00 2268.00 2489.00 2502.00 2668.00 2355.00 1262.00 1479.00 1488.00 1504.00 1623.00 1630.00 1735.00 1536.00

cum

654.00 1078.00 1381.00 1937.00 1937.00 2257.00 2786.00 1593.00

Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.) Tack coat Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. Bituminous Macadam (Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction) (i) for Grading I ( 40 mm nominal size ) (ii) for GradingII(19 mm nominal size) Bituminous Penetration Macadam (Construction of penetration macadam over prepared Base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a smooth wheeled steel roller 8-10 tonne capacity to achieve the desired degree of compaction) A 50 mm thick B 75 mm thick

sqm

38.40

40.00

41.00

44.70

44.70

44.00

47.00

38.70

sqm

13.50

14.20

14.50

15.80

15.80

15.60

16.50

13.60

5.3

cum cum

7757.00 8339.00 8480.00 9030.00 9322.00 9265.00 9808.00 8312.00 7854.00 8467.00 8608.00 9157.00 9423.00 9367.00 9910.00 8409.00

5.4

sqm sqm

416.00 570.00

445.00 602.00

451.00 611.00

482.00 651.00

492.00 673.00

486.00 665.00

509.00 696.00

436.00 598.00

16

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

5.5

5.6

Built-Up-Spray Grout (Providing, laying and rolling of built-upspray grout layer over prepared base consisting of a two layer composite construction of compacted crushed coarse aggregates using motor grader for aggregates. key stone chips spreader may be used with application of bituminous binder after each layer, and with key aggregates placed on top of the second layer to serve as a Base conforming to the line, grades and cross-section specified, the compacted layer thickness being 75 mm) Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.) (i) for Grading I ( 40 mm nominal size ) (ii) for GradingII(19 mm nominal size) Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects) (i) for Grading I ( 13 mm nominal size ) (ii) for GradingII(10 mm nominal size) Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects) (i) for Grading-I ( 13 mm nominal size ) (ii) for Grading-II(10 mm nominal size)

sqm

335.00

359.00

363.00

382.00

406.00

403.00

417.00

367.00

cum cum

9489.00 10239.00 10424.00 11336.00 11603.00 11448.00 12273.00 10125.00 9573.00 10336.00 10521.00 11433.00 11692.00 11538.00 12362.00 10210.00

5.7

cum cum

10039.00 10837.00 11028.00 11973.00 12221.00 12059.00 12909.00 10677.00 10790.00 11638.00 11842.00 12855.00 13074.00 12898.00 13799.00 11417.00

5.8

cum cum

10885.00 11701.00 11909.00 12943.00 13212.00 13031.00 13951.00 11526.00 10976.00 11807.00 12015.00 13049.00 13314.00 13134.00 14053.00 11623.00

17

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

Surface Dressing (Providing and laying surface dressing as wearing course in single coat using crushed stone aggregates of 5.9 specified size on a layer of bituminous binder laid on prepared surface and rolling with 8-10 tonne smooth wheeled steel roller) Case -1 :-19 mm nominal chipping size Case II 13 mm nominal size chipping Open - Graded Premix Surfacing (Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades.) Case - I: Mechanical method using Penetration grade (i) Bitumen and HMP of appropriate capacity not less than 75 tonnes/hour . Case - II: Open-Graded Premix Surfacing using cationic (ii) Bitumen Emulsion Close Graded Premix Surfacing/Mixed Seal Surfacing (Mechanical means using HMP of appropriate capacity not less than 75 tonnes/hour. Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-a) or 13.2 mm to 0.09 mm (Type-b) aggregates using penetration grade bitumen to the required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a Smooth wheeled roller 8-10 tonne capacity, and finishing to required level Seal Coat )(Providing and laying seal coat sealing the voids in a and grade. bituminous surface laid to the specified levels, grade and cross fall using Type A and B seal coats) (i) Case - I : Type A Case - II : Type B (Providing and laying of premix sand seal coat with HMP of appropriate capacity not less than 75 (ii) tonnes/ hours using crushed stone chipping 6.7 mm size and penetration bitumen of suitable grade.)

sqm sqm

100.00 84.00

105.00 89.00

107.00 90.00

114.00 96.00

117.00 99.00

116.00 98.00

122.00 102.00

104.00 87.00

5.10

sqm sqm

159.00 197.00

170.00 208.00

173.00 211.00

184.00 225.00

190.00 231.00

189.00 229.00

200.00 239.00

170.00 205.00

5.11

sqm

209.00

222.00

226.00

241.00

246.00

244.00

258.00

219.00

5.12

sqm sqm

79.00 60.00

83.00 64.00

85.00 65.00

91.00 70.00

93.00 71.00

92.00 71.00

96.00 75.00

82.00 63.00

18

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

5.13

5.14

5.15 (i)

Supply of Stone Aggregates for Pavement Courses (Supply of stone aggregates from approved sources confirming to the physical requirement, specified in the respective specified clauses, including royalties, fees rents, collection, transportation, stacking and testing and measured in cum as per clause 514.5 Competitive market rates to be ascertained. Alternatively, rates for stone crushing given in chapter 1may be adopted, if found economical. In case for supply of aggregates at site are not available, nearest crusher site may be ascertained. Loading and un-loading charges and cost of carriage may be added to these rates to arrive at the cost at site.) Mastic Asphalt (Providing and laying 25 mm thick mastic asphalt wearing course with paving grade bitumen meeting the requirements given in table 500-29, prepared by using mastic cooker and laid to required level and slope after cleaning the surface, including providing antiskid surface with bitumen precoated fine-grained hard stone chipping of 13.2 mm nominal size at the rate of 0.005cum per 10 sqm and at an approximate spacing of 10 cm center to center in both directions, pressed into surface when the temperature of surfaces not less than 1000C, protruding 1 mm to 4 mm over mastic surface, all complete as per clause 515.) Slurry Seal (Providing and laying slurry seal consisting of a mixture of fine aggregates, portland cement filler, bituminous emulsion and water on a road surface including cleaning of surface, mixing of slurry seal in a suitable mobile plant, laying and compacting to provide thickness surface) 5 mm even riding

cum

Please refer items No. 1.5 to 1.8

sqm

676.00

743.00

777.00

881.00

886.00

874.00

948.00

743.00

sqm sqm sqm

84.00 60.00 36.00

90.00 63.00 38.00

91.00 64.00 39.00

100.00 70.00 42.00

100.00 71.00 43.00

99.00 69.00 42.00

105.00 74.00 45.00

87.00 61.00 37.00

(ii) 3 mm thickness (iii) 1.5 mm thickness Recycling of Bituminous Pavement with Central Recycling Plant (Recycling pavement by cold milling of exiting bituminous layers, planning the surface after cold milling, reclaiming excavated material to the extent of 30 % of the required quantity, hauling and stock piling the reclaimed material near the central recycling plant after carrying out necessary checks and evaluation, adding fresh material including rejuvenators as required, mixing in a hot mix plant, transporting and laying at site and compacting to the required grade, level and thickness, all as specified in clause 517.) Fog Spray 1.In case it is decided by the engineer to blind the fog spray, the following may be added

5.16

cum

8068.00 8637.00 8797.00 9516.00 9706.00 9604.00 10113.00 8510.00

5.17

sqm sqm

47.00 5.70

49.00 6.20

50.00 6.30

54.00 6.60

54.00 6.90

53.00 6.80

57.00 7.10

47.00 6.50

19

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

Bituminous Cold Mix ( Including Gravel Emulsion) (Providing, laying and rolling of bituminous cold mix on prepared base consisting of a mixture of unheated mineral aggregate and 5.18 emulsified or cutback bitumen, including mixing in a plant of suitable type and capacity, transporting, laying, compacting and finishing to specified grades and levels.) Using bitumen emulsion and 9.5 mm or 13.2 mm nominal (i) size aggregate Using bitumen emulsion and 19 mm or 26.5 mm nominal size (ii) aggregate (iii) Using cutback bitumen and 9.5 mm or 13.2 mm nominal size aggregate Using cutback bitumen and 19 mm or 26.5 mm nominal size (iv) aggregate Sand Asphalt Base Course (Providing, laying and rolling sandasphalt base course composed of sand, mineral filler and bituminous binder on a prepared sub-grade or sub-base to the lines, levels, grades and cross sections as per the drawings including mixing in a plant of suitable type and capacity, transporting, laying, compacting and finishing.) Modified Binder (Supply of modified binder produced by mixing bitumen with modifier such as natural rubber or crumb rubber or any other polymer found compatible with bitumen and which allows properties given in clause 521.3 and IRC: SP: 53 blending of modifier with bitumen to be done either at the refinery or at the site plant capable of producing the modified binder to be delivered in drums which shall be agitated in melted condition using suitable device before use to ensure uniform dispersion.) Crack Prevention Courses Stress Absorbing Membrane (SAM) crack width less than 6 mm (Providing and laying of a stress absorbing membrane over a cracked road surface, with crack width below 6 mm after cleaning (i) with a mechanical broom, using modified binder complying with clause 521, sprayed at the rate of 9 kg per 10 sqm and spreading 5.6 mm crushed stone aggregates @ 0.11 cum per 10 sqm with hydraulic chip spreader, sweeping the surface for uniform spread of aggregates and surface finished to conform to clause 902.)

cum cum cum cum

13175.00 14047.00 14281.00 15555.00 15788.00 15522.00 16646.00 13697.00 13010.00 13833.00 14068.00 15341.00 15615.00 15350.00 16474.00 13532.00 9767.00 10481.00 10640.00 11531.00 11772.00 11589.00 12422.00 10294.00 9596.00 10263.00 10422.00 11312.00 11593.00 11411.00 12243.00 10123.00

5.19

cum

11384.00 14448.00 15656.00 25862.00 25862.00 23385.00 31323.00 14945.00

5.20

tonne

5.21

sqm

74.00

78.00

80.00

85.00

87.00

86.00

90.00

77.00

20

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

Stress Absorbing Membrane (SAM) with crack width 6 mm to 9 mm (Providing and laying of a stress absorbing membrane over a cracked road surface, with crack width 6 to 9 mm after cleaning (ii) with a mechanical broom, using modified binder complying with clause 521, sprayed at the rate of 11 kg per 10 sqm and spreading 11.2 mm crushed stone aggregates @ 0.12 cum per 10 sqm, sweeping the surface for uniform spread of aggregates and surface finished to conform to clause 902.) Stress Absorbing Membrane (SAM) crack width above 9 mm and cracked area above 50 % (Providing and laying a single coat of a stress absorbing membrane over a cracked road surface, with crack width above 9 mm and cracked area above 50 % after (iii) cleaning with a mechanical broom, using modified binder complying with clause 521, sprayed at the rate of 15 kg per 10 sqm and spreading 11.2 mm crushed stone aggregates @ 0.12 cum per 10 sqm, sweeping the surface for uniform spread of aggregates and surface finished to conform to clause 902.) Case - IV : Bitumen Impregnated Geotextile (Providing and laying a bitumen impregnated geotextile layer after cleaning the (iv) road surface, geotextile conforming to requirements of clause 704.3, laid over a tack coat with 1.05 kg per sqm of paving grade bitumen 80 - 100 penetration and constructed to the requirement of clause 704.4.5) Recipe Cold Mix (Providing and laying of premix of crushed stone aggregates and emulsion binder, mixed in a batch type cold mixing 5.22 plant, laid over prepared surface, by paver finisher, rolled with a pneumatic tyred roller initially and finished with a smooth steel wheel roller, all as per clause 519.3) (i) 75 mm thickness (ii) 40 mm thickness (iii) 25 mm thickness

sqm

87.00

92.00

93.00

100.00

102.00

101.00

106.00

90.00

sqm

116.00

121.00

123.00

132.00

135.00

133.00

140.00

119.00

sqm

100.00

105.00

108.00

116.00

116.00

116.00

124.00

102.00

cum cum cum

8335.00 8859.00 8987.00 9593.00 9946.00 9836.00 10457.00 8826.00 11948.00 12640.00 12830.00 13756.00 14088.00 13909.00 14773.00 12423.00 13865.00 14632.00 14860.00 15976.00 16279.00 16058.00 17068.00 14300.00

21

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

CHAPTER-6 CEMENT CONCRETE PAVEMENTS


Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and Cement curing.) Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing )

6.1

cum

4145.00 5306.00 5690.00 4398.00 9314.00 8477.00 11250.00 5679.00

6.2

cum

8153.00 9577.00 10052.00 9550.00 14508.00 13487.00 16898.00 9926.00

22

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

6.3

6.4

6.5

6.6

Rolled Cement Concrete Base (Construction of rolled cement concrete base course with coarse and fine aggregate conforming to IS:383, the size of coarse aggregate not exceeding 25 mm with minimum, aggregate cement ratio15:1 and minimum cement content of 200 kg/cum, aggregate gradation to be as per table 6004 after blending, mixing in batching plant at optimum moisture content, transporting to site, laying with a paver with electronic sensor, compacting with 8-10 tonnes smooth wheeled vibratory roller to achieve, the designed flexural strength, finishing and curing.) Transition section between rigid and flexible pavement (Due to change in the properties of materials and type of construction, a gradual changeover from rigid pavement to flexible pavement is desirable to avoid any damage at the butting joint. After provision of an expansion joint in the cement concrete slab, the thickness of slab should be tapered to 10 cm over a length of 3 m towards the flexible pavement. The deficiency of thickness caused due to tapering of the slab should be made up by the asphaltic layers.) Construction of Base/Sub-base of pavement with lean concrete - fly ash. (Construction of Base/sub-base using cement, sand, fly ash and coarse aggregates proportioned as per table 4 of IRC: 74/1979 and with water content ratio, slump and compressive strength as defined in the said table, mix prepared in a batching and mixing plant and compacted with a vibratory roller 8-10 tonnes capacity within the time limit laid down vide clause 7.6.3 of IRC: 741979, construction joints properly formed at the end of day's work, cured for 14 days, all as specified in IRC: 74-1979 and as per Cement Fly ash concrete pavement. (Construction reinforcedapproved-plans.) reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, replacing cement by fly ash to the extent of 15% and sand by 10%, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing )

cum

4633.00 5833.00 6233.00 5084.00 9999.00 9128.00 12010.00 6200.00

cum

3910.00 5069.00 5538.00 4455.00 9137.00 8299.00 11157.00 5517.00

cum

8426.00 9863.00 10503.00 15248.00 15271.00 14319.00 18592.00 10346.00

23

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

CHAPTER-7 GEOSYNTHETICS AND REINFORCED EARTH


7.1 Sub- Surface Drain with Geotextiles (Construction of sub surface drain 200 mm dia using geotextiles treated with carbon black with physical properties as given in clause 702.2.3 formed in to a stable network and a planar geocomposite structure, joints wrapped with geotextile to prevent ingress of soil, all as per clause 702 and approved drawings including excavation and backfilling) Narrow Filter Sub- Surface Drain (Construction of a narrow filter sub- surface drain consisting of porous or perforated pipe laid in narrow trench surrounded by a geotextile filter fabric, with a minimum of 450 mm overlap of fabric and installed as per clause 702.3 and 309.3.5 including excavation and backfilling) Laying Paving Fabric Beneath a Pavement Overlay (Providing and laying paving fabric with physical requirements as per table 704-2 over a tack coat of paving grade Bitumen 80-100 penetration, laid at the rate of 1 kg per sqm over thoroughly cleaned and repaired surface to provide a water resistant membrane and crack retarding layer. Paving fabric to be free of wrinkling and folding and to be laid before cooling of tack coat, brooming and rolling of surface with pneumatic roller to maximise paving fabric contact with pavement surface) metre 347.00 383.00 387.00 394.00 394.00 399.00 406.00 370.00

7.2

metre

669.00

713.00

732.00

740.00

740.00

750.00

758.00

700.00

7.3

sqm

251.00

254.00

255.00

268.00

268.00

269.00

275.00

243.00

24

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

7.4

7.5

Laying Boulder Apron in Crates of Synthetic Geogrids (Providing, preparing and laying of geogrid crated apron 1 m x 5 m, 600 mm thick including excavation and backfilling with baffles at 1 metre interval, made with geogrids having characteristics as per clause 704.2, joining sides with connectors/ring staples, top corners to be tie tensioned, placing of suitable cross interval ties in layers of 300 mm connecting opposite side with lateral braces and tied with polymer braids to avoid bulging, constructed as per clause 704.3. filled with stone with minimum size of 200 mm and specific gravity not less than 2.65, packed with stone spalls, keyed to the foundation recess in case of sloping ground and laid over a layer of geotextile to prevent migration of fines, all as per clause 704 and laid as per clause 2503.3 and approved design.) Reinforced Earth Retaining Wall (Reinforced earth retaining walls have four main components as under: a) Excavation for foundation, foundation concrete and cement concrete grooved seating in the foundation for facing elements (facia material). b) Facia material and its placement. c) Assembling, joining with facing elements and laying of the reinforcing elements. d) Earthfill with granular material which is to be retained by the wall.) (i) Facing elements of RCC (ii) Assembling, joining and laying of reinforcing elements. With reinforcing element of steel / Aluminium strips / polymeric strips.

cum

746.00

850.00

864.00

802.00

961.00

968.00

977.00

861.00

sqm

1547.00 1760.00 1863.00 1888.00 2621.00 2523.00 3223.00 2075.00

Type 1 1.Galvanised carbon steel strips Type 2 2.Copper Strips Type 3 3.Aluminium Strips Type 4 4.Stainless steel strips 5.Glass reinforced Type 5 polymer/polymeric strips polymer/fibre reinforced

metre metre metre metre metre sqm

29.00 54.00 44.00 36.00 69.00 57.00

30.00 61.00 46.00 46.00 75.00 62.00

31.00 64.00 49.00 49.00 78.00 65.00

34.00 67.00 52.00 52.00 82.00 67.00

34.00 67.00 52.00 52.00 82.00 67.00

34.00 68.00 53.00 53.00 83.00 68.00

35.00 70.00 54.00 54.00 85.00 71.00

30.00 61.00 47.00 38.00 75.00 62.00

B With reinforcing elements of synthetic geogrids

25

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

CHAPTER-8 TRAFFIC SIGNS, MARKINGS & OTHER ROAD APPURTENANCES


8.1 Cast in Situ Cement Concrete M20 kerb (Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408) A Using Concrete Mixer B Using Concrete Batching and Mixing Plant Cast in Situ Cement Concrete M 20 Kerb with Channel (Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCC M20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408) A Using Concrete Mixer B Using Concrete Batching and Mixing Plant

metre metre

359.00 366.00

459.00 463.00

493.00 492.00

725.00 422.00

776.00 752.00

711.00 692.00

918.00 880.00

487.00 487.00

8.2

metre metre

668.00 677.00

857.00 859.00

922.00 1382.00 1486.00 1355.00 1766.00 915.00 769.00 1434.00 1313.00 1688.00

913.00 908.00

26

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

8.3

Printing new letter and figures of any shade (Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade) cm cm height height per per letter letter Hindi ( Matras commas and the like not to be measured and (i) paid for Half letter shall be counted as half ) (ii) English and Roman 0.80 0.50 0.90 0.60 0.90 0.60 0.90 0.60 0.90 0.60 0.90 0.60 0.90 0.60 0.90 0.50

Retro- reflectorised Traffic signs (Providing and fixing of retroreflectorised cautionary, mandatory and informatory sign as per IRC :67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick 8.4 supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing) ( i ) 90 cm equilateral triangle ( ii ) 60 cm equilateral triangle ( iii ) 60 cm circular ( iv ) 80 mm x 60 mm rectangular ( v ) 60 cm x 45 cm rectangular (vi ) 60 cm x 60 cm square ( vii ) 90 cm high octagon Direction and Place Identification signs upto 0.9 sqm size board. (Providing and erecting direction and place identification retro-reflectorised sign asper IRC:67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing)

each each each each each each each

5662.00 5976.00 6184.00 6781.00 6873.00 6763.00 7459.00 6007.00 3611.00 3866.00 3997.00 4568.00 4659.00 4522.00 5165.00 3903.00 4954.00 5248.00 5429.00 6017.00 6108.00 5989.00 6667.00 5280.00 7037.00 7391.00 7649.00 8265.00 8356.00 8264.00 8997.00 7417.00 4816.00 5106.00 5282.00 5868.00 5960.00 5839.00 6513.00 5139.00 5768.00 6085.00 6296.00 6895.00 6987.00 6878.00 7578.00 6115.00 9068.00 9479.00 9813.00 10455.00 10547.00 10482.00 11268.00 9500.00

8.5

sqm

12745.00 13278.00 13748.00 14470.00 14571.00 14563.00 15506.00 13293.00

27

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

8.6

8.7

Direction and Place Identification signs with size more than 0.9 sqm size board. (Providing and erecting direction and place identification retro- reflectorised sign asper IRC :67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing) Overhead Signs (Providing and erecting overhead signs with a corrosion resistant aluminium alloy sheet reflectorised with high intensity retro-reflective sheeting of encapsulated lense type with vertical and lateral clearance given in clause 802.2 and 802.3 and installed as per clause 802.7 over a designed support system of aluminium alloy or galvanised steel trestles and trusses of sections and type as per structural design requirements and approved plans) A Truss and Vertical Support B Aluminium alloy plate for over head sign Painting Two Coats on New Concrete Surfaces (Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces) Painting on Steel Surfaces (Providing and applying two coats of ready mix paint of approved brand on steel surface after through cleaning of surface to give an even shade) Painting on Wood Surfaces (Providing and applying two coats of ready mix paint of approved brand on wood surface after through cleaning of surface to give an even shade)

sqm

21911.00 22871.00 23680.00 25076.00 25279.00 25215.00 27010.00 22918.00

tonne sqm sqm

84413.00 86314.00 86924.00 88514.00 88514.00 89230.00 90566.00 83883.00 891.00 133.00 938.00 1002.00 1000.00 1000.00 1014.00 1042.00 138.00 138.00 139.00 139.00 139.00 139.00 963.00 132.00

8.8

8.9

sqm

73.00

77.00

77.00

78.00

78.00

77.00

78.00

74.00

8.10

sqm

83.00

87.00

87.00

88.00

88.00

88.00

88.00

83.00

Painting Lines, Dashes, Arrows etc on Roads in Two Coats on New Work (Painting lines, dashes, arrows etc on roads in two coats on new work with ready mixed road marking paint conforming 8.11 to IS:164 on bituminous surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control ) (i) Over 10 cm in width (ii) Up to 10 cm in width Painting Lines, Dashes, Arrows etc on Roads in Two Coats on Old Work (Painting lines, dashes, arrows etc on roads in two coats on old work with ready mixed road marking paint confirming to IS: 164 on bituminous surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control )

sqm sqm

162.00 148.00

170.00 155.00

170.00 155.00

171.00 156.00

171.00 156.00

171.00 155.00

171.00 156.00

163.00 148.00

8.12

28

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

(i) Over 10 cm in width (ii) Up to 10 cm in width Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.) Kilo Metre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) (i) 5th kilometre stone (precast) (ii) Ordinary Kilometer stone (Precast) (iii) Hectometer stone (Precast) Road Delineators (Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide stripes, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and confirming toIRC-79 and the drawings.) Boundary pillar (Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25-1967, fixed in position including finishing and lettering but excluding painting) G.I Barbed wire Fencing 1.2 metre high (Providing and fixing 1.2 metres high GI barbed wire fencing with 1.8 m angle iron posts 40 mm x 40 mm x 6 mm placed every 3 metres center to center founded in M15 grade cement concrete, 0.6 metre below ground level, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with 9 horizontal lines and 2 diagonals interwoven with horizontal wires, fixed with GI staples, turn buckles etc complete as G.I Barbed wire Fencing 1.8 metre high (Providing and fixing per clause 807 ) 1.8 metres high GI barbed wire fencing with 2.4 m angle iron posts 50 mm x 50 mm x 6 mm placed every 3 metres center to center founded in M15 grade cement concrete, 0.6 metre below ground level, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with 12 horizontal lines and 2 diagonals interwoven with horizontal wires, fixed with GI staples, turn buckles etc complete as per clause 807 )

sqm sqm

105.00 110.00

111.00 116.00

111.00 116.00

111.00 117.00

111.00 117.00

111.00 117.00

111.00 117.00

106.00 111.00

8.13

sqm

2167.00 2175.00 2181.00 2199.00 2199.00 2197.00 2208.00 2088.00

8.14

each each each

3469.00 4112.00 4340.00 5823.00 6121.00 5809.00 7619.00 4482.00 2119.00 2534.00 2683.00 3682.00 3887.00 3663.00 4890.00 2776.00 559.00 646.00 679.00 861.00 897.00 895.00 1147.00 749.00

8.15

each

1122.00 1158.00 1165.00 1193.00 1193.00 1179.00 1227.00 1114.00

8.16

each

1065.00 1641.00 1658.00 1741.00 2055.00 2066.00 2191.00 1748.00

8.17

metre

638.00

673.00

737.00

785.00

785.00

785.00

802.00

705.00

8.18

metre

920.00

969.00 1051.00 1123.00 1123.00 1119.00 1148.00 1006.00

29

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

8.19

8.20

Fencing with welded steel wire Fabric 75 mm x 50 mm (Suggestive) (Providing 1.20 metre high fencing with angle iron posts 50 mm x 50 mm x 6 mm at 3 metre center to center with 0.40 metre embedded in M15 grade cement concrete, corner, end and every 10th post to be strutted, provided with welded steel wire fabric of 75 mm x 50 mm mesh or 75 mm x 25 mm mesh and fixed to iron posts by flat iron 50 x 5 mm and bolts etc. complete in all respects.) Tubular Steel Railing on Medium Weight steel channel ( ISMC series) 100 mm x 50 mm (Providing, fixing and erecting 50 mm dia steel pipe railing in 3 rows duly painted on medium weight steel channels (ISMC series) 100 mm x 50 mm, 1.2 metres high above ground, 2 m centre to centre, complete as per approved drawings)

metre

611.00

663.00

671.00

723.00

723.00

708.00

744.00

643.00

metre

1694.00 1852.00 1906.00 2311.00 2373.00 2239.00 2641.00 1838.00

Tubular Steel Railing on Precast RCC posts, 1.2 m high above ground level (Providing, fencing and erecting 50 mm dia painted steel pipe railing in 3 rows on precast M20 grade RCC 8.21 vertical posts1.8 metres high (1.2 m above GL) with 3 holes 50 mm dia for pipe, fixed 2 metres centre to, complete as per approved drawing) Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M20 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled 8.22 with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified) (i) M 20 grade concrete 8.23 Metal Beam Crash Barrier Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced A 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810)

metre

1212.00 1372.00 1433.00 1742.00 1969.00 1795.00 2348.00 1430.00

metre

3917.00 4403.00 4661.00 4868.00 6555.00 6445.00 9200.00 5588.00

metre

2940.00 3042.00 3066.00 3306.00 3306.00 3248.00 3423.00 2938.00

30

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

8.24

8.25

8.26 A

Type - B, "THRIE" : Metal Beam Crash Barrier (Providing and erecting a "Thrie" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 85 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm B spaced 2 m centre to centre, 2 m high with 1.15 m below ground level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a space of channel section 150 x 75 x 5 mm, 546 mm long complete as per clause 810) Road Traffic Signals electrically operated (Since it is a ready made item commercially produced and erected by specialised firm in the electrical and electronic field, rate may be taken based on market enquiry from firms specialised in this field and ISI certified for the approved design and drawing.) Flexible Crash Barrier, Wire Rope Safety Barrier (Providing and erecting a wire rope safety barrier with vertical posts of medium weight RS Joist (ISMB series) 100 mm x 75 mm (11.50 kg/m), 1.50 m long 0.85 m above ground and 0.65 m below ground level, split at the bottom for better grip, embedded in M 15 grade cement concrete 450 x 450 x 450 mm, 1.50 m center to center and with 4 horizontal steel wire rope 40 mm dia and anchored at terminal posts 15 m apart. Terminal post to be embedded in M 15 gradecementconcretefoundation2400 x 450 x 900 mm (depth), strengthened by a strut of RS joist 100 x 75 mm, 2 m long at 450 inclination and a tie 100 x 8 mm, 1.50 m long at the bottom, all embedded in foundation concrete as per approved design and drawing, rate excluding excavation and cement concrete.) Anti - Glare Devices in Median Plantation (Plantation of shrubs and plants of approved species in the median. apart from cutting off glare from vehicle coming from opposite direction, these plants provide a pleasant envoirenment and are eco-friendly. The rate for this item is available in the chapter 11 on horticulture. ) Anti - Glare Screen with 25 mm steel pipe framework fixed with circular and rectangular vans (Providing and erecting an anti - glare screen with 25 mm dia vertical pipes fabricated and framed in the form of panels of one metre length and 1.75 mtr B height fixed with circular vane 250 mm dia at top and rectangular vane 600 x 300 mm at the middle, made out of steel sheet of 3 mm thickness, end vertical pipes of the panel made larger for embedding in foundation concrete, applying 2 coats of paint on all exposed surfaces, all as per approved design and drawings.)

metre

3975.00 4241.00 4309.00 4999.00 4999.00 4831.00 5336.00 4138.00

metre

3675.00 3753.00 3780.00 4068.00 4068.00 3996.00 4155.00 3768.00

metre

2457.00 2548.00 2574.00 2796.00 2795.00 2805.00 2864.00 2566.00

31

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

8.27

Anti - Glare Screen with Rectangular Vane of MS sheet (Providing and erecting anti - glare screen with rectangular vanes of size 750 x 500 mm made from MS sheet, 3 mm thick and fixed on C MS angle 50 x 50 x 6 mm at an angle of 450 to the direction of flow of traffic, 1.5 m center to center, top edge of the screen 1.75 m above ground level, vertical post firmly embedded in cement concrete foundation 0.60 m below ground level, applying 2 coats of paint on exposed faces, all complete as per approved design and Street Lighting (Providing and erecting street light mounted on a drawings) steel circular hollow pole of standard specifications for street lighting, 9 m high spaced 40 m apart, 1.8 m overhang on both sides if fixed in the median and on one side if fixed on the footpath, fitted with sodium vapour lamp and fixed firmly in concrete foundation.) (i) For Fixing in Median (ii) For fixing in Footpath Lighting on Bridges (Providing and fixing lighting on bridges, mounted on steel hollow circular poles of standard specifications, 5 m high fixed on parapets with cement concrete, 20 m apart and fitted with sodium vapour lamp) Cable Duct Across the Road (Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings.) (i) Single Row for one utility service (ii) Double Row for two utility services (iii) Triple Row for three utility services Highway Patrolling and Traffic Aid Post (It is proposed to locate one Traffic Aid Post every 50-60 km of the highway. )

metre

915.00

948.00

956.00 1063.00 1063.00 1047.00 1101.00

948.00

each each each

27794.00 28298.00 28484.00 29514.00 29513.00 29397.00 30056.00 27246.00 27716.00 28216.00 28402.00 29366.00 29365.00 29314.00 29973.00 27168.00 19477.00 19754.00 20023.00 20671.00 20670.00 20650.00 20932.00 19152.00

8.28

8.29

metre metre metre

7029.00 8156.00 8266.00 9859.00 10061.00 10452.00 11725.00 8477.00 13810.00 15999.00 16198.00 19216.00 19589.00 20426.00 22767.00 16617.00 20605.00 23857.00 24145.00 28588.00 29133.00 30416.00 33824.00 24771.00

8.30

32

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

Items related to under pass/ subway/ overhead bridge/ overhead foot bridge (The items involved for underpass/ subway/ overhead bridge/ overhead foot bridge are earthwork, plain cement 8.31 concrete, plastering, painting, information sign etc. The rates for these items are available in respective chapters which can be adopted for the quantities derived from the approved designs and drawings) Traffic Control System and Communication system (Providing a traffic control centre and communication system including telecommunication facilities and related accessories, CCTV, radar, vehicle detection camera, central computer system These are 8.32 specialised item of telecommunication system and are the commercial products. The designer is required to contact the manufacturers to ascertain market prices. In case of civil works required to be executed for these installations, pricing may be done as per rates in relevant chapters for quantities derived approved design and drawing.) Gantry Mounted Variable Message Sign board (Providing and erecting gantry mounted variable message sign board electronically operated capable of flashing the desired message over a designed 8.33 support system of aluminium alloy or galvanised steel, erected as per approved design and drawings and with lateral clearance as per clause 802.3) (i) Gantry Support System Message Display (Message display board 6 sqm (ii) electronically operated with complete electronic fitments for flashing the pre-determined messages.) 8.34 Traffic Impact Attenuators at Abutments and Piers With Scrap Tyres (Provision and installation of traffic attenuators at abutment/pier of flyovers bridges using scrap tyres of size 100 x A 20 retrieved from trucks laid in 2 rows and 4 tiers, one above the other and tied with 20 mm wire rope as per approved design and drawings.) Using Plastic/Steel Barrel, Filled with Sand (Provision and installation of traffic impact attenuator at abutment/pier of flyovers B bridges using plastic/steel barrels 0.60 m dia and 1.0 m in height, filled with sand in three rows and tied with20 mm steel wire rope as per approved design and drawings) With HI - DRO cell Sandwich (Patented) ((In this patented HI C DRO cell system, water gets discharged from plastic tubes on impact over a pre-determined time, thus absorbing the energy))

tonne

82100.00 83836.00 84299.00 85685.00 85685.00 86302.00 87534.00 81370.00

sqm

3436.00 3576.00 3623.00 3754.00 3754.00 3815.00 3926.00 3732.00

sqm

1540.00 2343.00 2668.00 1238.00 5405.00 4790.00 6843.00 2691.00

sqm

3214.00 3504.00 3573.00 3750.00 3750.00 3808.00 3935.00 3748.00

33

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

8.35

8.36 8.37

Road Markers/Road Stud with Lense Reflector (Providing and fixing of road stud 100x 100 mm, die cast in aluminium, resistant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface by drilling hole 30 mm upto a depth of 60 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS 873 part 4:1973) Traffic Cone (Provision of red fluorescent with white reflective sleeve traffic cone made of low density polyethylene (LDPE) material with a square base of 390 x 390 x 35 mm and a height of 770 mm, 4 kg in weight, placed at 1.5 m interval, all as per BS 873) Roadside Amenities Rest Areas (Providing plainly furnished accommodation for rest rooms, dormitories, restaurants, stalls, shops, petrol pump, telephone booth, first aid room, traffic aid post, police assistance booth, including electricity, toilet and sewerage system Pricing may be done based on current plinth area rates approved by PWD/CPWD/MES for a particular zone. Area is required to be assessed for specific location as per actual site conditions) Parking areas and Bus Laybyes for Trucks, Buses and Light vehicles (Pricing of parking areas may be done for the quantities of various items based on the approved dimensions and pavement design for a particular terrain and soil. Rates for items may be from respective chapters.) Lawn (Providing a lawn planted with grass and its maintenance ) Rumble Strips (Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint.) Policeman Umbrella (Provision of a 2 m high (floor to roof) umbrella for traffic policeman at road crossings, where necessary, installed on a raised platform, built on a central support of a steel pipe 100 mm dia, roof made of 25 mm dia steel pipe to provide covered area of 3 sqm, roofed with CGI sheets, all steel parts to be given 2 coats of paint)

each

1188.00 1258.00 1286.00 1314.00 1314.00 1300.00 1356.00 1230.00

each

1166.00 1240.00 1249.00 1255.00 1255.00 1263.00 1277.00 1195.00

B C 8.38

sqm

8.39

each

34

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

8.40

8.41

High Mast Pole Lighting at Interchanges and Flyovers (Providing and erecting a high mast pole lighting with 30 m high hot dip galvanised mast designed to withstand forces exerted with wind speeds of 180 km per hour with 3 seconds gust, as per IS:875 (Part 3) - 1978, fitted with a base flange, door at the base of mast with heavy duty internal lock, lantern carriage, suitable winching arrangement for safe working load of 750 kg and high powered electrically driven power tools for raising and lowering of lantern carriage, flexible 8 core electric cable, lightening conductor, earthing terminal, and fixing 2 nos aviation obstruction lights on top of the mast, all complete as per approved design and drawings This is a specialised work and is generally done by firms who specialise in such jobs. The detailed designs and estimates are submitted by the firms alongwith their tender for checks by the Department. The cost of this work is required to be worked out based on approved design, drawings and estimate of the lowest tender. A separate Toll Plaza this construction, operation contractors for road Toll contract for (The work is concluded as the and maintenance of and Plaza can be generally donot undertake such works) under based on bridge works broken into separate items of work as the approved design and drawings:-) Safety Devices and signs in Construction Zones (Provision and fixing of traffic signs for limited period at suitable locations in construction zone comprising of warning zone, approach transition zone, working zone and terminal transition zone with a minimum distance of 60 cm from the edge of the kerb in case of kerbed roads and 2 to 3 m from the edge of the carriageway in case of un-kerbed roads, the bottom edge of the lowest sign plate to be not less than 2 m above the road level, fixed on 60 mm x 60 mm x 6 mm angle iron post, founded and installed as per approved design and drawings, removed and disposed of after completion of Portable Barricade as per IRC:SP:55-2001) construction work, allin Construction Zone (Installation of a steel portable barricade with horizontal rail 300 mm wide, 2.5 m in length fitted on a 'A' frame made with 45 x 45 x 5 mm angle iron section, 1.5 m in height, horizontal rail painted (2 coats) with yellow and white stripes, 150 mm in width at an angle of 450, 'A' frame painted with 2 coats of yellow paint, complete as per IRC:SP:55-2001 ) Barricade in Construction Zone Permanent Type With Steel Components (Construction of a permanent type barricade made of steel components, 1.5 m high from road level, A fitted with 3 horizontal rails 200 mm wide and 4 m long on 50 x 50 x 5 mm angle iron vertical support, painted with yellow and white strips, 150 mm in width at an angle of450, complete as per IRC:SP:55-2001 )

8.42

8.43

each

3010.00 3143.00 3164.00 3378.00 3378.00 3326.00 3483.00 3032.00

8.44

each

4816.00 5012.00 5046.00 5395.00 5395.00 5310.00 5565.00 4835.00

35

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions With Wooden Components (Construction of a permanent type barricade made of wooden components, 1.5 m high from road level, fitted with 3 horizontal planks 200 mm wide and 3.66 m long on 100 x 100mm wooden B vertical post, painted with yellow and white striups, 150 mm in width at an angle of450, complete as per IRC:SP:55-2001 )

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

each

5046.00 5133.00 4937.00 4937.00 4937.00 4937.00 4937.00 4723.00

8.45

With Bricks (Construction of a permanent type barricade made with brick work in mud mortar, 1.5 m high, 4 m long, 600 mm C thick, plastered with cement mortar 1:6, painted with yellow and white strips) Drum Delineator in Construction Zone (Provision of metal drum/empty bitumen drum delineator, 300 mm in diameter, 800 mm high, filled with earth for stability, painted in circumferential strips of alternate black and white 100 mm wide fitted with reflectors 3 Nos of 7.5 cm dia, all as per IRC:SP:55-2001) Flagman (Positioning of a smart flagman with a yellow vest and a yellow cap and a red flag 600 x 600 mm securely fastened to a staff 1 m in length for guiding the traffic)

each

15856.00 22044.00 24386.00 45557.00 45671.00 40375.00 56669.00 23521.00

each

495.00

544.00

557.00

598.00

598.00

610.00

624.00

569.00

8.46

each

349.00

395.00

393.00

393.00

393.00

393.00

393.00

376.00

36

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

CHAPTER-9 PIPE CULVERTS


9.1 PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) Laying Reinforced Cement Concrete Pipe NP4/prestrssed concrete pipe on first class bedding in single row . (Laying Reinforced cement concrete pipe NP4/prestrssed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . ) A 1000 mm dia B 1200 mm dia Laying Reinforced Cement Concrete Pipe NP 4 /prestrssed concrete pipe on first class bedding in double row . (Laying Reinforced cement concrete pipe NP4 /prestrssed concrete pipe for culverts on first class bedding of granular material in double row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . ) 1000 mm dia 1200 mm dia metre metre 23772.00 26332.00 26592.00 29333.00 29743.00 30663.00 32638.00 26057.00 24913.00 30535.00 31004.00 33751.00 34202.00 35106.00 37142.00 30852.00 cum 5464.00 6989.00 7484.00 10959.00 11744.00 10774.00 13875.00 7389.00

9.2

metre metre

11626.00 12891.00 13005.00 16345.00 14503.00 14973.00 15909.00 12710.00 12178.00 14972.00 15191.00 16542.00 16706.00 17169.00 18133.00 15085.00

9.3

A B

37

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

CHAPTER-10 MAINTENANCE OF ROADS


10.1 Restoration of Rain Cuts (Restoration of rain cuts with soil, moorum, gravel or a mixture of these, clearing the loose soil, benching for 300 mm width, laying fresh material in layers not exceeding 250 mm and compacting with plate compactor or power rammers to restore the original alignment, levels and slopes) Maintenance of Earthen Shoulder (filling with fresh soil) (Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.) Maintenance of Earth Shoulder (stripping excess soil) (Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor) Filling Pot- holes and Patch Repairs with open - graded Premix surfacing, 20mm. (Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 511, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2) Filling Pot- holes and Patch Repairs with - Bituminous concrete, 40mm. (Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2) (i) for grading I Material (ii) for grading II Material 10.6 10.7 Crack Filling (Filling of crack using slow - curing bitumen emulsion and applying crusher dust in case crack are wider than 3mm.) Dusting (Applying crusher dust to areas of road where bleeding of excess bitumen has occurred.) cum 232.00 274.00 275.00 278.00 278.00 280.00 281.00 263.00

10.2

sqm

70.00

81.00

82.00

85.00

85.00

87.00

89.00

79.00

10.3

sqm

14.80

16.40

16.90

17.70

17.70

18.00

18.70

16.10

10.4

sqm

171.00

183.00

185.00

197.00

203.00

202.00

210.00

181.00

10.5

sqm sqm metre sqm

434.00 445.00 4.60 1.70

465.00 480.00 4.80 2.03

472.00 488.00 4.90 2.03

503.00 529.00 5.30 2.03

515.00 541.00 5.30 2.30

510.00 534.00 5.20 2.28

533.00 564.00 5.50 2.28

458.00 473.00 4.60 2.18

38

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

10.8 A B

Fog Seal (ref item 5.17) Crack Prevention courses. (ref item 5.21)

sqm

53.00

55.00

56.00

61.00

61.00

60.00

64.00

54.00

(i) Stress Absorbing Membrane (SAM) crack width less than 6 mm Stress Absorbing Membrane (SAM) with crack width 6 mm to (ii) 9 mm Stress Absorbing Membrane (SAM) crack width above 9 mm (iii) and cracked area above 50 % (iv) Bitumen Impregnated Geotextile C Slurry Seal (ref item 5.15) (i) 5 mm thickness (ii) 3 mm thickness (iii) 1.5 mm thickness D Surface Dressing for maintance works. (ref item 5.9) (i) 19 mm nominal chipping size (ii) 13 mm nominal size chipping 10.9 Repair of joint Grooves with Epoxy Mortar (Repair of spalled joint grooves of contraction joints, longitudinal joints and expansion joints in concrete pavements using epoxy mortar or epoxy concrete) Repair of old Joints Sealant (Removal of existing sealant and re sealing of contraction, longitudinal or expansion joints in concrete pavement with fresh sealant material) Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually) Land Slide Clearance in soil (Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side) Land slide Clearance in Hard Rock Requiring Blasting (Clearing of land slide in hard rock requiring blasting for 50% of the boulders and disposal of the same on the valley side.) Snow Clearance on Roads with Dozer (Snow clearance from road surface by a bull- dozer 165 Hp and disposing it on the valley side) Snow Clearance on Roads with Snow Blowers (Snow clearance from road surface by a snow blower and disposing on the valley side.)

sqm sqm sqm sqm sqm sqm sqm sqm sqm metre

87.00 116.00 100.00 93.00 93.00 64.00 36.00 100.00 84.00 787.00

92.00 121.00 105.50 110.00 110.00 74.00 38.00 105.00 89.00 792.00

93.00 123.00 108.20 116.00 116.00 78.00 39.00 107.00 90.00 793.00

100.00 132.00 115.90 163.00 163.00 106.00 42.00 114.00 96.00 800.00

102.00 135.00 116.00 171.00 171.00 111.00 43.00 117.00 99.00 800.00

101.00 133.00 116.00 158.00 158.00 103.00 42.00 116.00 98.00 798.00

106.00 140.00 124.00 200.00 200.00 128.00 45.00 122.00 102.00 803.00

90.00 119.00 102.00 110.00 110.00 74.00 37.00 104.00 87.00 759.00

10.10 10.11 10.12

metre metre cum

78.00 28.00 67.00

80.00 31.00 75.00

81.00 31.00 79.00

83.00 31.00 86.00

83.00 31.00 61.00

84.00 31.00 89.00

85.00 31.00 93.00

80.00 30.00 75.00

10.13 10.14 10.15

cum cum cum

153.00 4.70 1.50

163.00 5.20 1.70

170.00 5.40 1.70

180.00 6.00 1.90

180.00 6.00 1.90

185.00 6.20 2.00

190.00 6.50 2.00

163.00 5.20 1.70

39

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

CHAPTER-11 HORTICULTURE
11.1 Spreading of Sludge Farm Yard Manure or/and good Earth (Spreading of sludge farm yard manure or/ and good earth in required thickness (cost of sludge, farm- yard manure or/and good earth to be paid for separately)) Grassing with ' Doobs' Grass (Grassing with 'Doobs' grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn free from weeds and fit for moving including supplying good earth if needed) (i) In rows 15 cm apart in either direction (ii) In rows 7.5 cm apart in either direction Making Lawns including Ploughing and Dragging with 'Swagha' Breaking of Clod (Making lawns including ploughing and breaking of clod, removal of rubbish, dressing and supplying doobs grass roots and planting at 15 cm apart, including supplying and spreading of farm yard manure at rate of 0.18 cum per 100 sqm) Maintenance of Lawns or Turfing of Slopes (Maintenance of lawns or Turfing of slopes (rough grassing) for a period of one year including watering etc) Turfing Lawns with Fine Grassing including Ploughing, Dressing (Turfing lawns with fine grassing including ploughing, dressing including breaking of clods, removal of rubbish, dressing and supplying doobs grass roots at 10 cm apart, including supplying and spreading of farm yard manure at rate of0.6 cum per 100 sqm) Maintenance of Lawns with Fine Grassing for the First Year a) Planting Permanent Hedges including Digging of Trenches (Planting permanent hedges including digging of trenches, 60 cm wide and 45 cm deep, refilling the excavated earth mixed with farmyard manure, supplied at the rate of 4.65 cum per 100 metres and supplying and planting hedge plants at 30 cm apart) Maintenance of Hedge for one year cum 18.00 20.00 20.00 20.00 20.00 20.00 20.00 19.00

11.2

sqm sqm

84.00 161.00

99.00 192.00

101.00 194.00

101.00 194.00

101.00 194.00

101.00 194.00

101.00 194.00

96.00 186.00

11.3

sqm

106.00

121.00

124.00

124.00

124.00

124.00

124.00

118.00

11.4

sqm

326.00

494.00

494.00

494.00

494.00

483.00

494.00

473.00

11.5

sqm

109.00

126.00

128.00

128.00

128.00

128.00

128.00

123.00

11.6

sqm

336.00

472.00

472.00

472.00

472.00

465.00

472.00

452.00

11.7

metre

136.00

165.00

165.00

165.00

165.00

165.00

165.00

158.00

(b)

metre

199.00

266.00

266.00

266.00

266.00

262.00

266.00

254.00

40

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

11.8 [a] (b)

Planting Flowering Plants and Shrubs in Central Verge Maintenance of Flowering Plants and Shrubs in Central Verge for one Year Planting of Trees and their Maintenance for one Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trench, watering, fixing the tree guard and maintaining the plants for one year) Renovation Lawns including, Weeding, Forking the Ground, Top Dressing with Forked Soil (Renovation lawns including, weeding, forking the ground, top dressing with forked soil, watering and maintenance the lawns, for 30 days or more, till the grass forms a thick lawn, free from weeds, and fit for moving and disposal of rubbish as directed, including supplying good earth, if needed but excluding the cost of well decayed farm yard manure) Supply at Site Well Decayed Farm Yard Manure (Supply at site of work well decayed farm yard manure, from any available source, approved by the engineer in charge including screening and stacking) Site of Work/ Store - Deoiled Neem Cake (Supply at Supply at

km km

36810.00 49066.00 49228.00 49235.00 49235.00 49183.00 49641.00 47087.00 233595.0 292436.0 292464.0 292484.0 292484.0 290274.0 292559.0 279748.0 0 0 0 0 0 0 0 0

11.9

each

935.00 1212.00 1213.00 1213.00 1213.00 1199.00 1214.00 1160.00

11.10

sqm

18.00

24.00

24.00

24.00

24.00

24.00

24.00

23.00

11.11 11.12 11.13

cum

site of work/ store- deoiled neem cake duly packed in used gunny quintal bags) Supplying Sludge (Supplying sludge duly stacked at site/ store) cum Half Brick Circular Tree Guard, in 2nd class Brick, internal diametre 1.25 metres, and height 1.2 metres, above ground and 0.20 metre below ground (Half brick circular tree guard, in 2nd class brick, internal diametre 1.25 metres, and height 1.2 metres, above ground and 0.20 metre below ground, bottom two courses laid dry, and top three courses in cement mortar 1:6 ( 1 cement 6 sand) and the intermediate courses being in dry honey comb masonry, as per design complete) Edging with 2nd class Bricks, laid dry lengthwise (Edging with 2nd class bricks, laid dry lengthwise, including excavation, refilling, consolidation, with a hand packing and spreading nearly surplus earth within a lead of 50 metres) Making Tree Guard 53 cm dia and 1.3 m high as per design from empty bitumen drum (Making tree guard 53 cm dia and 1.3 m high as per design from empty bitumen drum, slit suitably to permit sun and air, (supplied by the department at stock issue rate) including providing and fixing 2 nos MS sheet rings 50 x 0.5 mm with rivets, complete in all respect)

11.14

each

1988.00 2809.00 3125.00 5953.00 5991.00 5278.00 7472.00 3015.00

11.15

metre

39.00

56.00

62.00

119.00

119.00

105.00

149.00

60.00

11.16

each

7314.00 7437.00 7533.00 7603.00 7603.00 7726.00 7908.00 7269.00

41

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

11.17

11.18

Making Tree Guard 53 cm dia and 2 metres high as per design from empty bitumen drums (Making tree guard 53 cm dia and 2 metres high as per design from empty bitumen drums, slit suitably to permit sun and air, ( supplied by the department at each stock issue rate) including providing and fixing four legs 40 cm long of 30 x 3 mm MS riveted to tree guard and providing and fixing 2 nos MS sheet rings 50 x 0.5 mm with rivets complete in all Wrought respects) Iron and Mild Steel Welded Work (Wrought iron and mild steel welded work) (using angles, square bars, tees and channel grills, grating frames, gates and tree guards of any size and design etc. including cost of screens and welding rods or bolts quintal and nuts complete fixed in position but without the cost of excavation and concrete for fixing which will be paid separately)

16490.00 16742.00 16951.00 17082.00 17082.00 17351.00 17757.00 16330.00

8150.00 8574.00 8629.00 9192.00 9192.00 9055.00 9467.00 8267.00

11.19

11.20

11.21

Tree Guard with MS Iron (Providing and fixing MS iron tree guard 60 cm dia and 2 metre high above ground level formed of 4 Nos (25 x 6 mm) and 8 Nos (25 x 3 mm) vertical MS riveted to 3 Nos (25 x 6 each tree 2064.00 2152.00 2168.00 2423.00 2423.00 2284.00 2395.00 2077.00 mm) iron rings in two halves, bolted together with 8 mm dia and 30 guard mm long bolts including painting two coats with paint of approved brand over a coat of priming, complete in all respects.) Tree Guard with MS Angle Iron and Steel Wire (Providing and fixing tree guard 0.60 metre square, 2.00 metre high fabricated each tree 2814.00 2973.00 3007.00 3276.00 3276.00 3163.00 3314.00 2888.00 with MS angle iron 30 x 30 x 3 mm, MS iron 25 x 3 mm and steel guard wire3 mm dia welded and fabricated as per design in two halves bolted together) Compensatory Afforestation (Planting trees as compensatory afforestation at the rate of 290 trees per hectare at a spacing of 6 m by grubbing and leveling the ground upto a depth of 150 mm, hectare 90254.00 106089.0 107521.0 110116.0 110116.0 111595.0 113110.0 102846.0 0 0 0 0 0 0 0 digging holes 0.9 m dia, 1 m deep, mixing farm yard/sludge manure with soil, planting of sapling 2 m high with 25 cm dia stem, backfilling the hole and watering)

42

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

CHAPTER-12 FOUNDATIONS
12.1 I A Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) Ordinary soil Manual Means (i) upto 3 m depth (ii) 3 m to 6 m depth (iii) Above 6 m depth B Mechanical Means (i) Depth upto 3 m (ii) Depth 3 m to 6 m (iii) Depth above 6m II A B III IV V (i) Ordinary rock (not requiring blasting) Manual Means (i) Depth upto 3 m Mechanical Means Hard rock ( requiring blasting ) A Manual Means Hard rock ( blasting prohibited ) A Mechanical Means Marshy soil upto 3 m depth cum 328.00 364.00 375.00 398.00 398.00 409.00 455.00 0.00 cum 402.00 434.00 440.00 448.00 448.00 451.00 496.00 441.00 cum cum 128.00 52.00 142.00 58.00 142.00 60.00 142.00 65.00 142.00 65.00 142.00 67.00 154.00 76.00 142.00 60.00 cum cum cum 41.00 47.00 58.00 46.00 52.00 64.00 47.00 54.00 66.00 51.00 58.00 71.00 51.00 58.00 71.00 53.00 60.00 73.00 60.00 68.00 83.00 47.00 54.00 66.00 cum cum cum 90.00 115.00 154.00 99.00 127.00 170.00 99.00 127.00 170.00 99.00 127.00 170.00 99.00 127.00 170.00 99.00 127.00 170.00 108.00 139.00 185.00 99.00 127.00 170.00

43

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

A Manual means B Mechanical Means VI Back Filling in Marshy Foundation Pits 12.2 12.3 Filling Annular Space Around Footing in Rock (Lean cement concrete 1:3:6 nominal mix. Rate may be taken as per items 13.4.) Sand Filling in Foundation Trenches as per Drawing & Technical Specification PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) Brick masonry (Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per drawing and technical specifications Cement mortar1:3 (1cement :3 sand) Cement mortar1:2 (1cement :2 sand) Cement mortar1:4 (1cement :4 sand) Cement mortar1:6 (1cement :6 sand) Stone masonry (Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification Square Rubble Coursed rubble masonry( first sort ) Random Rubble Masonry Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications PCC Grade M15 PCC Grade M20 RCC Grade M20

cum cum cum

353.00 133.00 249.00

391.00 154.00 276.00

396.00 156.00 283.00

407.00 158.00 296.00

407.00 158.00 296.00

412.00 159.00 303.00

455.00 175.00 337.00

396.00 156.00 283.00

cum

1719.00 4052.00 4973.00 13349.00 13349.00 11265.00 19284.00 5053.00

12.4

cum

5205.00 6636.00 7104.00 10398.00 11132.00 10215.00 14344.00 7330.00

12.5 12.6 A B C D 12.7 (a) (b) 12.8 A B C

cum cum cum cum cum

5963.00 8159.00 8990.00 16445.00 16716.00 14666.00 22309.00 9062.00 6200.00 8221.00 9014.00 15173.00 16222.00 14428.00 19946.00 9083.00 7208.00 9137.00 9894.00 15847.00 16776.00 15064.00 20332.00 9960.00 5518.00 7584.00 8395.00 14646.00 15765.00 13932.00 19574.00 8465.00 5064.00 7405.00 8325.00 15352.00 16688.00 14607.00 21010.00 8405.00

cum cum

5436.00 6312.00 6600.00 9280.00 9618.00 8712.00 11735.00 6814.00 4128.00 5037.00 5334.00 8024.00 8373.00 7365.00 10338.00 5402.00

cum cum cum cum cum cum

5503.00 6818.00 7320.00 10857.00 11619.00 10707.00 15094.00 7555.00 6359.00 7750.00 8273.00 12022.00 12783.00 11763.00 16415.00 8508.00 6441.00 7840.00 8364.00 12122.00 12880.00 11858.00 16527.00 8596.00 6880.00 8117.00 8666.00 8050.00 12925.00 12090.00 17360.00 8914.00 6878.00 8309.00 8848.00 12745.00 13504.00 12447.00 17284.00 9084.00 7314.00 8585.00 9148.00 8683.00 13549.00 12678.00 18116.00 9400.00

Case I Using concrete mixer Case II With Batching Plant, Transit Mixer and Concrete Pump D PCC Grade M25 Case I Using concrete Mixer Case II With Batching Plant, Transit Mixer and Concrete Pump E RCC Grade M25

44

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

Case I Using concrete Mixer Case II With Batching Plant, Transit Mixer and Concrete Pump F PCC Grade M30 Case I Using Concrete Mixer Case II Using Batching Plant, Transit Mixer and Concrete Pump G Case II H RCC Grade M30 Case I Using Concrete Mixer Using Batching Plant, Transit Mixer and Concrete Pump RCC Grade M35

cum cum cum cum cum cum cum cum

6967.00 8406.00 8945.00 12854.00 13610.00 12551.00 17407.00 9179.00 7404.00 8682.00 9247.00 8792.00 13655.00 12782.00 18237.00 9496.00 6919.00 8351.00 8891.00 12795.00 13552.00 12494.00 17341.00 9127.00 7349.00 8620.00 9184.00 8735.00 13590.00 12717.00 18161.00 9436.00 6982.00 8420.00 8960.00 12868.00 13623.00 12564.00 17419.00 9193.00 7420.00 8698.00 9262.00 8818.00 13670.00 12796.00 18251.00 9511.00 7095.00 8538.00 9080.00 13013.00 13764.00 12699.00 17585.00 9313.00 7531.00 8815.00 9381.00 8982.00 13810.00 12930.00 18412.00 9629.00

Case I Using Concrete Mixer Case II Using Batching Plant, Transit Mixer and Concrete Pump 12.9 Providing and constructing temporary island 16 m diameter for construction of well foundation for 8m dia. Well. A Assuming depth of water 1.0 m and height of island to be 1.25m. B Assuming depth of water 4.0 m and height of island 4.5 m. C 12.10 12.11 A (i) Providing and constructing one span service road to reach island location from one pier location to another pier location and laying cutting edge of mild steel weighing 40 kg per Providing metre for well foundation complete as per drawing and technical specification. Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification Well curb RCC M20 Grade

each each metre tonne

123742.0 126525.0 143004.0 143004.0 153954.0 174973.0 126525.0 96598.00 0 0 0 0 0 0 0 645084.0 863999.0 879886.0 1003849. 1003849. 1088124. 1238459. 879886.0 0 0 0 00 00 00 00 0 3860.00 4490.00 4555.00 4830.00 4830.00 5003.00 5580.00 4555.00 78928.00 82542.00 83112.00 88951.00 88951.00 87527.00 100144.0 83254.00 0

Case I Using concrete mixer Case II With Batching Plant, Transit Mixer and Concrete Pump (ii) RCC M25 Grade Case I Using concrete mixer Case II With Batching Plant, Transit Mixer and Concrete Pump (iii) RCC M35 Grade Case I Using concrete mixer Case II With Batching Plant, Transit Mixer and Concrete Pump

cum cum cum cum cum cum

7433.00 9046.00 9651.00 13872.00 14749.00 13684.00 19070.00 9920.00 7940.00 9367.00 10000.00 9290.00 14915.00 13951.00 20031.00 9920.00 8059.00 9723.00 10347.00 14868.00 15743.00 14517.00 20134.00 10617.00 8892.00 10380.00 11035.00 10518.00 16143.00 15139.00 21489.00 11324.00 8266.00 9948.00 10579.00 15162.00 16036.00 14796.00 20489.00 10851.00 9117.00 10623.00 11286.00 10830.00 16456.00 15435.00 20768.00 11575.00

45

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

B (I) (ii) (iii)

Well steining PCC M15 Grade PCC M20 Grade RCC M20 Grade cum cum cum cum cum cum cum cum cum cum cum cum cum 6813.00 8292.00 8847.00 12823.00 13624.00 12543.00 17481.00 9093.00 7278.00 8586.00 9167.00 8516.00 13672.00 12788.00 18362.00 9429.00 7293.00 8810.00 9381.00 13514.00 14318.00 13198.00 18326.00 9632.00 7756.00 9103.00 9700.00 9207.00 14365.00 13443.00 19209.00 9968.00 7387.00 8912.00 9485.00 13629.00 14431.00 13307.00 18456.00 9732.00 8151.00 9515.00 10116.00 9642.00 14798.00 13877.00 19698.00 10380.00 7354.00 8876.00 9450.00 13600.00 14404.00 13279.00 18430.00 9700.00 7810.00 9163.00 9762.00 9284.00 14444.00 13516.00 19301.00 10029.00 7422.00 8950.00 9523.00 13677.00 14700.00 13563.00 18782.00 9947.00 7886.00 9245.00 9844.00 9373.00 14529.00 13600.00 19397.00 10109.00 7577.00 9119.00 9698.00 13898.00 14700.00 13563.00 18782.00 9947.00 8357.00 9738.00 10346.00 9928.00 15084.00 14149.00 20042.00 10611.00 8444.00 9832.00 10441.00 10048.00 15205.00 14263.00 20187.00 10707.00 cum cum 5820.00 7211.00 7744.00 11484.00 12290.00 11325.00 15965.00 7991.00 6727.00 8198.00 8750.00 12716.00 13520.00 12442.00 17363.00 8999.00

Case I Using concrete mixer Case II With Batching Plant, Transit Mixer and Concrete Pump (iv) PCC M25 Grade Case I Using concrete mixer Case II With Batching Plant, Transit Mixer and Concrete Pump (v) RCC M25 Grade Case I Using concrete mixer Case II With Batching Plant, Transit Mixer and Concrete Pump (vi) PCC M30 Grade Case I Using concrete mixer Case II With Batching Plant, Transit Mixer and Concrete Pump (vii) RCC M30 Grade Case I Using concrete mixer Case II With Batching Plant, Transit Mixer and Concrete Pump (viii) RCC M35 Grade Case I Using concrete mixer Case II With Batching Plant, Transit Mixer and Concrete Pump (ix) C (i) RCC M40 Grade Bottom Plug PCC Grade M20

Case I Using Concrete Mixer Case II Using Batching Plant, pump PCC Grade M25 (ii) Case I Using Concrete Mixer Case II Using Batching Plant, pump Transit Mixer and Crane/concrete Transit Mixer and Crane/concrete

cum cum cum cum

7106.00 8553.00 9107.00 12996.00 13764.00 12730.00 17584.00 9346.00 7329.00 8602.00 9159.00 8603.00 13525.00 12662.00 18041.00 9410.00 7428.00 8900.00 9463.00 13437.00 14205.00 13150.00 18114.00 9702.00 7648.00 8945.00 9511.00 9040.00 13962.00 13078.00 18565.00 9764.00

46

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

(iii)

PCC Grade M30 cum Transit Mixer and Crane/concrete cum cum Transit Mixer and Crane/concrete cum 7486.00 8963.00 9528.00 13519.00 14287.00 13229.00 18214.00 9768.00 7710.00 9012.00 9580.00 9127.00 14049.00 13161.00 18670.00 9833.00 7623.00 9111.00 9681.00 13712.00 14480.00 13411.00 18446.00 9921.00 7843.00 9156.00 9729.00 9315.00 14237.00 13339.00 18898.00 9982.00

Case I Using Concrete Mixer Case II Using Batching Plant, pump PCC Grade M35 (iv) Case I Using Concrete Mixer Case II Using Batching Plant, pump Intermediate plug D (I) Grade M20 PCC Case I Using Concrete Mixer Case II Using Batching Plant, pump Grade M25 PCC (ii) Case I Using Concrete Mixer Case II Using Batching Plant, pump Grade M30 PCC (iii) Case I Using Concrete Mixer Case II Using Batching Plant, pump Top plug E (i) (ii) (iii) Grade M15 PCC Case I Using Concrete Mixer Grade M20 PCC Case I Using Concrete Mixer Grade M25 PCC Case I Using Concrete Mixer Case II Using Batching Plant, pump Grade M30 PCC (iv) Case I Using Concrete Mixer Case II Using Batching Plant, pump Well cap F (i) RCC Grade M20 Transit Mixer and Crane/concrete Transit Mixer and Crane/concrete Transit Mixer and Crane/concrete Transit Mixer and Crane/concrete Transit Mixer and Crane/concrete

cum cum cum cum cum cum

6800.00 8183.00 8714.00 12422.00 13154.00 12171.00 16801.00 8941.00 7039.00 8252.00 8787.00 8264.00 12952.00 12135.00 17307.00 9027.00 7108.00 8514.00 9053.00 12842.00 13574.00 12572.00 17305.00 9281.00 7342.00 8579.00 9123.00 8679.00 13367.00 12532.00 17805.00 9363.00 7163.00 8574.00 9115.00 12920.00 13652.00 12646.00 17400.00 9344.00 7402.00 8642.00 9189.00 8763.00 13450.00 12611.00 17906.00 9430.00

cum cum cum cum cum cum

5291.00 6556.00 7040.00 10440.00 11173.00 10296.00 14513.00 7265.00 6115.00 7452.00 7955.00 11560.00 12291.00 11311.00 15785.00 8181.00 6630.00 8009.00 8528.00 12285.00 13016.00 11998.00 16660.00 8757.00 7051.00 8275.00 8818.00 8370.00 13060.00 12221.00 17462.00 9062.00 6685.00 8069.00 8591.00 12364.00 17653.00 12072.00 16755.00 8818.00 7100.00 8330.00 8874.00 8440.00 13131.00 12288.00 17547.00 9117.00

47

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

Case I Using concrete Mixer Case II Using Batching Plant, Transit Mixer and Concrete Pump (ii) RCC Grade M25 Case I Using concrete Mixer Case II Using Batching Plant, Transit Mixer and Concrete Pump (iii) RCC Grade M30 Case I Using Concrete Mixer Case II Using Batching Plant, Transit Mixer and Concrete Pump (iv) RCC Grade M35 Case I Using Concrete Mixer Case II Using Batching Plant, Transit Mixer and Concrete Pump (v) 12.12 A (i) (ii) (iii) a (iv) a RCC M40 Grade Sinking of 6 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is reckoned from bed level. Sandy soil Depth below bed level upto 3.0 M Beyond 3m upto 10m depth Beyond 10m upto 20m Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter Beyond 20m upto 30 m Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter Add 20% of cost for Kentledge including supports, loading b arrangement and Labour . Beyond 30m upto 40 m Add 10% for every additional meter depth of sinking over a the rate of sinking for the previous meter b Add 20% of cost for Kentledge including supports, loading arrangement and Labour .

cum cum cum cum cum cum cum cum cum

6383.00 7777.00 8299.00 12041.00 12799.00 11781.00 16428.00 8531.00 6820.00 8053.00 8599.00 7966.00 12841.00 12010.00 17258.00 8848.00 6967.00 8406.00 8945.00 12854.00 13610.00 12551.00 17407.00 9179.00 7405.00 8684.00 9249.00 8794.00 13657.00 12784.00 18240.00 9498.00 6982.00 8420.00 8960.00 12868.00 13623.00 12564.00 17419.00 9193.00 7419.00 8697.00 9261.00 8817.00 13669.00 12795.00 18249.00 9510.00 7095.00 8538.00 9080.00 13013.00 13764.00 12699.00 17585.00 9313.00 7531.00 8815.00 9381.00 8982.00 13810.00 12930.00 18412.00 9629.00 7955.00 9258.00 9830.00 9476.00 14305.00 13420.00 18984.00 10079.00

metre metre

1930.00 2093.00 2249.00 2487.00 2487.00 2632.00 2969.00 2249.00 2673.00 2892.00 3127.00 3483.00 3483.00 3701.00 4184.00 3127.00

metre

3530.00 3820.00 4129.00 4600.00 4600.00 4887.00 5526.00 4129.00

metre metre

6620.00 7165.00 7748.00 8628.00 8628.00 9166.00 10365.00 7748.00 7944.00 8598.00 9298.00 10353.00 10353.00 11000.00 12437.00 9298.00

(v)

metre metre

15730.00 17022.00 18412.00 20498.00 20498.00 21780.00 24627.00 18412.00 18876.00 20426.00 22094.00 24598.00 24598.00 26136.00 29552.00 22094.00

48

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

B (i) (ii) (iii)

Clayey soil ( 6m dia. Well ) Depth below bed level upto 3.0 M Beyond 3m upto 10m depth Beyond 10 m upto 20 m Add 5% for every additional meter depth of sinking over the a rate of sinking for the previous meter b Add for dewatering @ 5% of cost, if required. Beyond 20m upto 30 m Add 7.5% for every additional meter depth of sinking over a the rate of sinking for the previous meter b Add 5% of cost for dewatering of the cost, if required c Add 25% of cost for Kentledge including supports, loading arrangement and Labour ). Beyond 30m upto 40 m Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter b Add 5% of cost for dewatering, if required a Add 20% of cost for Kentledge including supports, loading c arrangement and Labour). metre metre metre 14902.00 16159.00 17418.00 19364.00 19364.00 20533.00 23226.00 17418.00 19559.00 21209.00 22861.00 25415.00 25415.00 26950.00 30484.00 22861.00 18628.00 20199.00 21772.00 24205.00 24205.00 25667.00 29032.00 21772.00 metre metre 7945.00 8615.00 9286.00 10323.00 10323.00 10947.00 12382.00 9286.00 8342.00 9045.00 9751.00 10839.00 10839.00 11494.00 13001.00 9751.00 metre metre 2680.00 2899.00 3134.00 3491.00 3491.00 3709.00 4192.00 3134.00 6015.00 6523.00 7031.00 7817.00 7817.00 8289.00 9375.00 7031.00

(iv)

(v)

metre metre metre

35406.00 38392.00 41384.00 46005.00 46005.00 48785.00 55182.00 41384.00 44612.00 48375.00 52143.00 57967.00 57967.00 61469.00 69530.00 52143.00 42488.00 46071.00 49660.00 55206.00 55206.00 58542.00 66219.00 49660.00

C (i) D (i) 12.13 A (i) (ii) (iii) a

Soft rock (6m dia well ) Depth of soft rock strata upto 3m Hard rock (6m dia well ) Depth of soft rock strata upto 3m Sinking of 7 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is reckoned from bed level. Sandy soil Depth below bed level upto 3.0 M Beyond 3m upto 10m depth Beyond 10m upto 20m Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 4855.00 5239.00 5705.00 6411.00 6411.00 6843.00 7755.00 5705.00 metre metre 5559.00 6010.00 6514.00 7280.00 7280.00 7748.00 8706.00 6514.00 3675.00 3967.00 4319.00 4854.00 4854.00 5181.00 5871.00 4319.00 metre 11197.00 12127.00 12715.00 13586.00 13586.00 14087.00 15744.00 12726.00 metre 10597.00 11681.00 12081.00 12714.00 12714.00 13086.00 14553.00 12081.00

49

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

(iv) a b (v)

Beyond 20m upto 30 m Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter Add 20% of cost for Kentledge including supports, loading arrangement and Labour) . Beyond 30m upto 40 m Add 10% for every additional meter depth of sinking over a the rate of sinking for the previous meter b Add 20% of cost for Kentledge including supports, loading arrangement, and Labour etc. Clayey soil ( 7m dia. Well ) Depth below bed level upto 3.0 M Beyond 3m upto 10m depth Beyond 10 m upto 20 m a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter Beyond 20m upto 30 m Add 7.5% for every additional meter depth of sinking over a the rate of sinking for the previous meter b Add 5% of cost for dewatering on the cost, if required c Add 25% of cost for Kentledge including supports, loading arrangement and Labour ). Beyond 30m upto 40 m Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter b Add 5% of cost for dewatering, if required a Add 20% of cost for Kentledge including supports, loading c arrangement and Labour). metre metre metre 30727.00 33129.00 36179.00 40788.00 40788.00 43605.00 49467.00 36179.00 38716.00 41742.00 45585.00 51393.00 51393.00 54942.00 62328.00 45585.00 36872.00 39755.00 43414.00 48946.00 48946.00 52326.00 59360.00 43414.00 metre metre metre 12932.00 13944.00 15227.00 17168.00 17168.00 18353.00 20820.00 15227.00 16974.00 18302.00 19985.00 22532.00 22532.00 24088.00 27327.00 19985.00 16166.00 17430.00 19034.00 21460.00 21460.00 22941.00 26025.00 19034.00 metre metre 6894.00 7434.00 8117.00 9152.00 9152.00 9785.00 11099.00 8117.00 7239.00 7806.00 8523.00 9609.00 9609.00 10274.00 11654.00 8523.00 metre metre 3675.00 3967.00 4319.00 4854.00 4854.00 5181.00 5871.00 4319.00 5220.00 5629.00 6146.00 6930.00 6930.00 7409.00 8405.00 6146.00 metre metre 21637.00 23350.00 25426.00 28572.00 28572.00 30502.00 34556.00 25426.00 25965.00 28019.00 30511.00 34287.00 34287.00 36603.00 41467.00 30511.00 metre metre 9107.00 9828.00 10702.00 12026.00 12026.00 12839.00 14545.00 10702.00 10928.00 11793.00 12842.00 14432.00 14432.00 15406.00 17453.00 12842.00

B (I) (ii) (iii)

b Add for dewatering @ 5% of cost, if required. (iv)

(v)

C (i) D (i)

Soft rock ( 7m dia well ) Depth of soft rock strata upto 3m Hard rock ( 7m dia well ) Depth upto 3 m metre 14167.00 15319.00 15947.00 16857.00 16857.00 17365.00 19342.00 15966.00 metre 8364.00 9181.00 9626.00 10328.00 10328.00 10741.00 12024.00 9626.00

50

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

12.14 A (i) (ii) (iii)

Sinking of 8 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is reckoned from bed level. Sandy soil Depth below bed level upto 3.0 M Beyond 3m upto 10m depth Beyond 10m upto 20m Add 5% for every additional meter depth of sinking over the a rate of sinking for the previous meter metre 5511.00 5952.00 6470.00 7254.00 7254.00 7734.00 8759.00 6470.00 metre metre 3415.00 3691.00 4004.00 4479.00 4479.00 4770.00 5399.00 4004.00 4172.00 4507.00 4898.00 5492.00 5492.00 5856.00 6632.00 4898.00

(iv) a b (v) a b B (i) (ii) (iii) a

Beyond 20m upto 30 m Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter Add 20% of cost for Kentledge including supports, loading arrangement and Labour . Beyond 30m upto 40 m Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter Add 20% of cost for Kentledge including supports, loading arrangement, and Labour etc. Clayey soil ( 8m dia. Well ) Depth upto 3.0 M Beyond 3m upto 10m depth Beyond 10 m upto 20 m Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter b Add for dewatering @ 5% of cost, if required. metre metre 8402.00 9124.00 9834.00 10944.00 10944.00 11603.00 13135.00 9834.00 8823.00 9580.00 10325.00 11491.00 11491.00 12184.00 13792.00 10325.00 metre metre 4497.00 4854.00 5284.00 5937.00 5937.00 6337.00 7182.00 5284.00 6361.00 6908.00 7446.00 8286.00 8286.00 8785.00 9946.00 7446.00 metre metre 3634.00 3925.00 4266.00 4783.00 4783.00 5099.00 5775.00 4266.00 4360.00 4710.00 5119.00 5739.00 5739.00 6119.00 6930.00 5119.00 metre metre 10338.00 11166.00 12137.00 13606.00 13606.00 14507.00 16429.00 12137.00 12406.00 13399.00 14564.00 16328.00 16328.00 17408.00 19715.00 14564.00

(iv) a

Beyond 20m upto 30 m Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre metre metre 15762.00 17113.00 18446.00 20527.00 20527.00 21764.00 24637.00 18446.00 20688.00 22461.00 24211.00 26942.00 26942.00 28566.00 32336.00 24211.00 19703.00 21391.00 23058.00 25659.00 25659.00 27206.00 30796.00 23058.00

b Add 5% of cost for dewatering on the cost, if required Add 25% of cost for Kentledge including supports, loading c arrangement and Labour ).

51

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

(v) a

Beyond 30m upto 40 m Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter Add 20% of cost for Kentledge including supports, loading arrangement and Labour). Soft rock ( 8m dia well ) Depth in soft rock strata upto 3m Hard rock ( 8m dia well ) Depth in hard rock strata upto 3 m Sinking of 9 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is reckoned from bed level. Sandy soil Depth below bed level upto 3.0 M Beyond 3m upto 10m depth Beyond 10m upto 20m a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter Beyond 20m upto 30 m a Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre metre 11337.00 12244.00 13313.00 14929.00 14929.00 15921.00 18032.00 13313.00 13605.00 14693.00 15975.00 17915.00 17915.00 19105.00 21638.00 15975.00 metre 6043.00 6528.00 7097.00 7959.00 7959.00 8487.00 9612.00 7097.00 metre metre 3487.00 3771.00 4084.00 4559.00 4559.00 4850.00 5486.00 4084.00 4576.00 4943.00 5373.00 6027.00 6027.00 6426.00 7279.00 5373.00 metre 14981.00 16171.00 16758.00 17601.00 17601.00 18064.00 20078.00 16778.00 metre metre metre 37449.00 40656.00 43825.00 48769.00 48769.00 51710.00 58533.00 43825.00 47186.00 51227.00 55220.00 61449.00 61449.00 65154.00 73752.00 55220.00 44939.00 48787.00 52591.00 58522.00 58522.00 62052.00 70240.00 52591.00

b Add 5% of cost for dewatering, if required c C (i) D (i) 12.15 A (i) (ii) (iii)

metre

9358.00 10280.00 10767.00 11534.00 11534.00 11987.00 13411.00 10767.00

(iv)

Add 20% of cost for Kentledge including supports, loading b arrangement and Labour . (v) a b B (i) (ii) Beyond 30m upto 40 m Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter Add 20% of cost for Kentledge including supports, loading arrangement, and Labour etc. Clayey soil ( 9m dia. Well ) Depth below bed level upto 3.0 M Beyond 3m upto 10m depth

metre metre

26937.00 29093.00 31630.00 35469.00 35469.00 37826.00 42842.00 31630.00 32325.00 34911.00 37956.00 42563.00 42563.00 45391.00 51410.00 37956.00

metre metre

4778.00 5159.00 5609.00 6292.00 6292.00 6710.00 7600.00 5609.00 6847.00 7434.00 8016.00 8924.00 8924.00 9465.00 10717.00 8016.00

52

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

(iii)

Beyond 10 m upto 20 m Add 5% for every additional meter depth of sinking over the a rate of sinking for the previous meter b Add for dewatering @ 5% of cost, if required. Beyond 20m upto 30 m Add 7.5% for every additional meter depth of sinking over a the rate of sinking for the previous meter b Add 5% of cost for dewatering on the cost, if required c Add 25% of cost for Kentledge including supports, loading arrangement and Labour ). Beyond 30m upto 40 m a Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter Add 20% of cost for Kentledge including supports, loading arrangement and Labour). Soft rock ( 9m dia well ) Depth upto 3m Hard rock ( 9m dia well ) Depth of hard rock strata upto 3 m Sinking of 10 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is reckoned from bed level. Sandy soil Depth below bed level upto 3.0 M Beyond 3m upto 10m depth Beyond 10m upto 20m a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter Beyond 20m upto 30 m a Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 12049.00 13019.00 14139.00 15830.00 15830.00 16863.00 19091.00 14139.00 metre 6423.00 6941.00 7537.00 8438.00 8438.00 8990.00 10178.00 7537.00 metre metre 4079.00 4403.00 4794.00 5388.00 5388.00 5751.00 6518.00 4794.00 4864.00 5257.00 5707.00 6390.00 6390.00 6808.00 7707.00 5707.00 metre 17432.00 18821.00 19517.00 20515.00 20515.00 21058.00 23414.00 19542.00 metre 11462.00 12575.00 13221.00 14230.00 14230.00 14830.00 16614.00 13221.00 metre metre metre 16960.00 18415.00 19859.00 22107.00 22107.00 23445.00 26548.00 19859.00 22261.00 24170.00 26065.00 29016.00 29016.00 30772.00 34844.00 26065.00 21201.00 23019.00 24824.00 27634.00 27634.00 29307.00 33185.00 24824.00 metre metre 9042.00 9818.00 10587.00 11786.00 11786.00 12500.00 14154.00 10587.00 9494.00 10309.00 11117.00 12376.00 12376.00 13125.00 14862.00 11117.00

(iv)

(v)

metre metre metre

40299.00 43753.00 47184.00 52525.00 52525.00 55702.00 63074.00 47184.00 50777.00 55128.00 59452.00 66181.00 66181.00 70185.00 79474.00 59452.00 48359.00 52503.00 56621.00 63029.00 63029.00 66843.00 75689.00 56621.00

b Add 5% of cost for dewatering, if required c C (i) D (i) 12.16 A (i) (ii) (iii)

(iv)

53

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

b (v) a b B (i) (ii) (iii) a

Add 20% of cost for Kentledge including supports, loading arrangement and Labour . Beyond 30m upto 40 m Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter Add 20% of cost for Kentledge including supports, loading arrangement, and Labour etc. Clayey soil (10m dia. Well ) Depth below bed level upto 3.0 M Beyond 3m upto 10m depth Beyond 10 m upto 20 m Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter Beyond 20m upto 30 m

metre

14458.00 15624.00 16967.00 18996.00 18996.00 20236.00 22909.00 16967.00

metre metre

28627.00 30932.00 33594.00 37610.00 37610.00 40065.00 45358.00 33594.00 34352.00 37118.00 40313.00 45132.00 45132.00 48078.00 54429.00 40313.00

metre metre

5464.00 5914.00 6383.00 7096.00 7096.00 7532.00 8510.00 6383.00 6978.00 7591.00 8139.00 8997.00 8997.00 9506.00 10742.00 8139.00

metre metre

9215.00 10026.00 10749.00 11882.00 11882.00 12554.00 14187.00 10749.00 9675.00 10527.00 11286.00 12477.00 12477.00 13182.00 14897.00 11286.00

b Add for dewatering @ 5% of cost, if required. (iv) a Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter

metre metre metre metre metre metre

17283.00 18806.00 20161.00 22289.00 22289.00 23548.00 26612.00 20161.00 22684.00 24683.00 26461.00 29255.00 29255.00 30906.00 34929.00 26461.00 21604.00 23508.00 25201.00 27862.00 27862.00 29435.00 33265.00 25201.00 41060.00 44682.00 47896.00 52957.00 52957.00 55944.00 63226.00 47896.00 51736.00 56299.00 60349.00 66725.00 66725.00 70489.00 79665.00 60349.00 49272.00 53618.00 57475.00 63548.00 63548.00 67133.00 75872.00 57475.00

'b Add 5% of cost for dewatering on the cost, if required (v) c Add 25% of cost for Kentledge including supports, loading arrangement and Labour ). Beyond 30m upto 40 m a Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter b Add 5% of cost for dewatering, if required Add 20% of cost for Kentledge including supports, loading c arrangement and Labour). C (i) D (i) 12.17 A Soft rock (10m dia well ) Depth of soft rock strata upto 3m Hard rock (10m dia well ) Depth of hard rock strata upto 3 m Sinking of 11 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is reckoned from bed level. Sandy soil

metre metre

11667.00 12801.00 13463.00 14499.00 14499.00 15114.00 16935.00 13463.00 19016.00 20465.00 21363.00 22667.00 22667.00 23389.00 26088.00 21391.00

54

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

(i) (ii) (iii)

Depth from bed level upto 3.0 M Beyond 3m upto 10m depth Beyond 10m upto 20m Add 5% for every additional meter depth of sinking over the a rate of sinking for the previous meter

metre metre

9095.00 9797.00 10736.00 12162.00 12162.00 13034.00 14804.00 10736.00 8052.00 8741.00 9367.00 10317.00 10317.00 10899.00 12280.00 9367.00

metre

10634.00 11544.00 12370.00 13626.00 13626.00 14394.00 16219.00 12370.00

(iv)

Beyond 20m upto 30 m Add 7.5% for every additional meter depth of sinking over a the rate of sinking for the previous meter b Add 20% of cost for Kentledge including supports, loading arrangement and Labour . Beyond 30m upto 40 m metre metre 19949.00 21655.00 23204.00 25557.00 25557.00 26998.00 30423.00 23204.00 23939.00 25986.00 27844.00 30669.00 30669.00 32398.00 36507.00 27844.00

(v)

Add 10% for every additional meter depth of sinking over a the rate of sinking for the previous meter Add 20% of cost for Kentledge including supports, loading b arrangement, and Labour etc. B (i) (ii) (iii) a Clayey soil (11 m dia. Well ) Depth from bed level upto 3.0 M Beyond 3m upto 10m depth Beyond 10 m upto 20 m Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter Beyond 20m upto 30 m Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter b Add 5% of cost for dewatering on the cost, if required a Add 25% of cost for Kentledge including supports, loading c arrangement and Labour ). (v) a Beyond 30m upto 40 m Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter

metre metre

47395.00 51450.00 55130.00 60721.00 60721.00 64145.00 72280.00 55130.00 56874.00 61740.00 66156.00 72865.00 72865.00 76974.00 86735.00 66156.00

metre metre

9078.00 9824.00 10607.00 11795.00 11795.00 12522.00 14148.00 10607.00 14579.00 15873.00 16979.00 18713.00 18713.00 19740.00 22288.00 16979.00

metre metre

19254.00 20964.00 22424.00 24714.00 24714.00 26071.00 29435.00 22424.00 20217.00 22012.00 23545.00 25950.00 25950.00 27374.00 30907.00 23545.00

b Add for dewatering @ 5% of cost, if required. (iv)

metre metre metre

36117.00 39324.00 42062.00 46357.00 46357.00 48903.00 55212.00 42062.00 47404.00 51612.00 55206.00 60844.00 60844.00 64185.00 72466.00 55206.00 45146.00 49155.00 52577.00 57947.00 57947.00 61129.00 69015.00 52577.00

metre metre

b Add 5% of cost for dewatering, if required

110138.0 110138.0 116185.0 131176.0 99931.00 0 0 0 0 108121.0 117717.0 125912.0 138774.0 138774.0 146393.0 165281.0 125912.0 0 0 0 0 0 0 0 0 85810.00 93426.00 99931.00

55

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

c C (i) D (i) 12.18 A (i) (ii) (iii)

Add 20% of cost for Kentledge including supports, loading arrangement and Labour). Soft rock (11m dia well ) Depth of soft rock strata upto 3m Hard rock (11m dia well ) Depth of hard rock upto 3 m Sinking of 12 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is reckoned from bed level. Sandy soil I) Depth below bed level upto 3.0 M Beyond 3m upto 10m depth Beyond 10m upto 20m

metre

102972.0 112112.0 119917.0 132166.0 132166.0 139422.0 157411.0 119917.0 0 0 0 0 0 0 0 0 25975.00 28488.00 29988.00 32327.00 32327.00 33720.00 37792.00 29988.00 41876.00 45044.00 47126.00 50157.00 50157.00 51844.00 57887.00 47187.00

metre metre

metre metre

19270.00 20791.00 22669.00 25520.00 25520.00 27264.00 30914.00 22669.00 22252.00 24055.00 26089.00 29178.00 29178.00 31068.00 35160.00 26089.00

Add 5% for every additional meter depth of sinking over the a rate of sinking for the previous meter (iv) a b (v) a Beyond 20m upto 30 m Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter Add 20% of cost for Kentledge including supports, loading arrangement and Labour . Beyond 30m upto 40 m

metre

29388.00 31769.00 34455.00 38535.00 38535.00 41030.00 46435.00 34455.00

metre metre

55124.00 59591.00 64628.00 72281.00 72281.00 76962.00 87100.00 64628.00 66148.00 71509.00 77553.00 86737.00 86737.00 92354.00 104520.0 77553.00 0

Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter Add 20% of cost for Kentledge including supports, loading b arrangement, and Labour etc. B (i) (ii) (iii) a Clayey soil (12 m dia. Well ) Depth below bed level upto 3.0 M Beyond 3m upto 10m depth Beyond 10 m upto 20 m Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter b Add for dewatering @ 5% of cost, if required.

metre metre

130963.0 141579.0 153547.0 171728.0 171728.0 182851.0 206936.0 153547.0 0 0 0 0 0 0 0 0 157156.0 169894.0 184257.0 206074.0 206074.0 219422.0 248323.0 184257.0 0 0 0 0 0 0 0 0 21963.00 23747.00 25704.00 28673.00 28673.00 30490.00 34482.00 25704.00 34978.00 37973.00 40933.00 45546.00 45546.00 48294.00 54667.00 40933.00

metre metre

metre metre

46195.00 50151.00 54060.00 60151.00 60151.00 63781.00 72197.00 54060.00 48505.00 52658.00 56763.00 63159.00 63159.00 66970.00 75807.00 56763.00

56

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

(iv)

Beyond 20m upto 30 m Add 7.5% for every additional meter depth of sinking over a the rate of sinking for the previous meter b Add 5% of cost for dewatering on the cost, if required c Add 25% of cost for Kentledge including supports, loading arrangement and Labour ). Beyond 30m upto 40 m a Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter metre metre metre 86651.00 94068.00 113729.0 123464.0 0 0 108313.0 117585.0 0 0 101402.0 112826.0 112826.0 119635.0 135422.0 101402.0 0 0 0 0 0 0 133090.0 148085.0 148085.0 157021.0 177742.0 133090.0 0 0 0 0 0 0 126753.0 141033.0 141033.0 149544.0 169278.0 126753.0 0 0 0 0 0 0

(v)

metre metre metre

b Add 5% of cost for dewatering, if required Add 20% of cost for Kentledge including supports, loading c arrangement and Labour). C (i) D (i) 12.19 A (i) (ii) (iii) a (iv) a Soft rock (12m dia well ) Depth of soft rock strata upto 3m Hard rock (12m dia well ) Depth of hard rock strata upto 3 m Sinking of Twin D Type well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is reckoned from bed level. Sandy soil Depth from bed level upto 3.0 M Beyond 3m upto 10m depth Beyond 10m upto 20m Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter Beyond 20m upto 30 m Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter

205870.0 223491.0 240916.0 268057.0 268057.0 284233.0 321745.0 240916.0 0 0 0 0 0 0 0 0 259396.0 281598.0 303555.0 337752.0 337752.0 358134.0 405399.0 303555.0 0 0 0 0 0 0 0 0 247044.0 268189.0 289100.0 321669.0 321669.0 341080.0 386094.0 289100.0 0 0 0 0 0 0 0 0 59665.00 65356.00 69034.00 74748.00 74748.00 78162.00 87713.00 69034.00 92377.00 99125.00 104267.0 111771.0 111771.0 115973.0 129795.0 104409.0 0 0 0 0 0 0

metre metre

metre metre

4331.00 4671.00 5102.00 5755.00 5755.00 6155.00 6983.00 5102.00 4709.00 5082.00 5542.00 6241.00 6241.00 6668.00 7561.00 5542.00

metre

6219.00 6712.00 7320.00 8242.00 8242.00 8807.00 9987.00 7320.00

metre metre

11665.00 12588.00 13729.00 15459.00 15459.00 16521.00 18735.00 13729.00 13999.00 15106.00 16475.00 18551.00 18551.00 19826.00 22482.00 16475.00

(v)

b Add 20% of cost for Kentledge including supports, loading arrangement and Labour . Beyond 30m upto 40 m Add 10% for every additional meter depth of sinking over a the rate of sinking for the previous meter

metre

27716.00 29908.00 32620.00 36731.00 36731.00 39252.00 44511.00 32620.00

57

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

b B (i) (ii) (iii)

Add 20% of cost for Kentledge including supports, loading arrangement, and Labour etc. Clayey soil (Twin D Type Well ) Depth below bed level upto 3.0 M Beyond 3m upto 10m depth Beyond 10 m upto 20 m

metre

33259.00 35890.00 39144.00 44077.00 44077.00 47103.00 53414.00 39144.00

metre metre

5189.00 5602.00 6091.00 6834.00 6834.00 7288.00 8255.00 6091.00 7719.00 8398.00 9008.00 9964.00 9964.00 10530.00 11902.00 9008.00

Add 5% for every additional meter depth of sinking over the a rate of sinking for the previous meter b Add for dewatering @ 5% of cost, if required. (iv) Beyond 20m upto 30 m Add 7.5% for every additional meter depth of sinking over a the rate of sinking for the previous meter b Add 5% of cost for dewatering on the cost, if required c (v) a Add 25% of cost for Kentledge including supports, loading arrangement and Labour ). Beyond 30m upto 40 m Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter

metre metre

10195.00 11091.00 11896.00 13159.00 13159.00 13909.00 15719.00 11896.00 10705.00 11646.00 12491.00 13818.00 13818.00 14604.00 16505.00 12491.00

metre metre metre

19123.00 20804.00 22315.00 24685.00 24685.00 26090.00 29483.00 22315.00 25099.00 27305.00 29288.00 32399.00 32399.00 34243.00 38697.00 29288.00 23904.00 26005.00 27894.00 30856.00 30856.00 32612.00 36854.00 27894.00

metre metre metre

45436.00 49427.00 53018.00 58649.00 58649.00 61986.00 70048.00 53018.00 57249.00 62278.00 66803.00 73898.00 73898.00 78103.00 88261.00 66803.00 54523.00 59312.00 63622.00 70379.00 70379.00 74383.00 84058.00 63622.00

b Add 5% of cost for dewatering, if required Add 20% of cost for Kentledge including supports, loading c arrangement and Labour). C (i) D (i) Soft rock (Twin D Type well ) Depth of soft rock strata upto 3m Hard rock (Twin D Type well ) Depth of hard rock strata upto 3 m

metre metre

12909.00 14143.00 14951.00 16219.00 16219.00 16969.00 19063.00 14951.00 19433.00 20922.00 21931.00 23410.00 23410.00 24245.00 27092.00 21956.00

58

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

12.20

12.21 12.22 12.23

12.24

Pneumatic sinking of wells with equipment of approved design, drawing and specifications worked by competent and trained personnel and comprising of compression and decompression chambers, reducers, two air locks separately for men and plant & materials, arrangement for supply of fresh air to working chambers, check valves, exhaust valves, shafts made from steel plates of riveted construction not less than 6 mm thick to withstand an air pressure of 0.50 MPa, controlled blasting of hard rock where required, staircases and 1 m wide landing plate forms with railing, arrangement for compression and decompression, electric lighting of 50 V maximum, proper rooms for rest and medical examinations and compliance with safety precautions as per IS:4138, all as per clause1207.6 in MoRTH Specifications. per drawing and technical Sand filling of wells complete as specifications Providing steel liner 10 mm thick for curbs and 6mm thick for steining of wells including fabricating and setting out as per detailed drawing Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter750 mm) Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter1000 mm) Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter1200 mm) Driven cast-in-place vertical M35 grade R.C.C. pile excluding reinforcement complete as per drawing and & Technical Specification (Pile diameter - 750 mm) Driven cast-in-place vertical M35 grade R.C.C. piles excluding reinforcement complete as per drawing and & Technical Specification (Pile diameter - 1000 mm) Driven cast-in-place vertical M35 grade R.C.C. piles excluding reinforcement complete as per drawing and & Technical Specification (Pile diameter - 1200 mm) Driven precast vertical M35 grade R.C.C. piles reinforcement complete as per drawing and & Specification (Pile Diameter=500 mm) Driven precast vertical M35 grade R.C.C. piles reinforcement complete as per drawing and & Specification (Pile Diameter=750 mm) Driven precast vertical M35 grade R.C.C. piles reinforcement complete as per drawing Specification (Pile Diameter=1000 mm) and & excluding Technical excluding Technical excluding Technical

cum tonne metre

1719.00 4052.00 4973.00 14591.00 13349.00 11265.00 19284.00 5053.00 72409.00 75544.00 76077.00 81547.00 81547.00 80213.00 91871.00 76211.00 9758.00 11006.00 11117.00 11970.00 12236.00 13346.00 16450.00 11253.00

metre

16634.00 18776.00 18946.00 20392.00 20866.00 22802.00 28199.00 19187.00

12.25 12.26 12.27

metre metre metre

21318.00 24122.00 24408.00 24611.00 30173.00 29676.00 37074.00 24746.00 3939.00 4573.00 4845.00 4686.00 6859.00 6484.00 8799.00 4963.00 6811.00 7915.00 8391.00 8098.00 11962.00 11287.00 15372.00 8598.00

12.28 12.29 12.30 12.31

metre metre metre metre

9839.00 11434.00 12119.00 11698.00 17262.00 16291.00 22178.00 12418.00 2048.00 2360.00 2506.00 2464.00 3424.00 3276.00 4461.00 2558.00 3935.00 4567.00 4856.00 4733.00 6891.00 6532.00 9085.00 4971.00 6803.00 7914.00 8400.00 8142.00 11978.00 11318.00 15825.00 8604.00

59

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

12.32

12.33

Driven precast vertical reinforcement complete Specification (Size of pile Driven precast vertical reinforcement complete Specification (Size of pile -

M35 grade R.C.C. piles as per drawing and & 300 mm x 300 mm) M35 grade R.C.C. piles as per drawing and & 500 mm x 500 mm)

excluding Technical excluding Technical excluding Technical

metre

1218.00 1390.00 1467.00 1466.00 1906.00 1849.00 2439.00 1493.00

metre

2440.00 2820.00 2999.00 2938.00 4160.00 3967.00 5450.00 3065.00

12.34

Driven precast vertical M35 grade R.C.C. piles reinforcement complete as per drawing and & Specification (Size of pile - 750 mm x 750 mm)

metre

4959.00 5759.00 6126.00 5949.00 8698.00 8234.00 11481.00 6271.00

12.35

12.36 12.37 12.38 A

Driven vertical steel piles complete as per drawing and & Technical Specification (Section of the pile - H Section steel column 400 x 250 mm (ISHB Series) ) Driven vertical steel piles complete as per drawing and & Technical Specification (Section of the pile - H Section steel column 450 x 250 mm (ISHB Series) ) Pile load test on single vertical pile in accordance with IS:2911(PartIV) Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical Specification RCC Grade M20 (i) Using Concrete Mixer

metre

5171.00 5342.00 5395.00 5841.00 5841.00 5746.00 6623.00 5405.00

metre

5831.00 6024.00 6084.00 6587.00 6587.00 6481.00 7469.00 6096.00

cum cum cum cum cum cum cum cum cum tonne

6395.00 7787.00 8309.00 12051.00 12809.00 11791.00 16440.00 8542.00 6846.00 8080.00 8627.00 7995.00 12870.00 12039.00 17290.00 8875.00 6956.00 8394.00 8934.00 12841.00 13599.00 12540.00 17394.00 9168.00 7392.00 8675.00 9232.00 8762.00 13638.00 12764.00 18218.00 9482.00 7027.00 8471.00 9013.00 12941.00 13699.00 12635.00 17515.00 9248.00 7478.00 8764.00 9331.00 8885.00 13760.00 12882.00 18365.00 9581.00 7175.00 8631.00 9178.00 13149.00 13907.00 12833.00 17767.00 9413.00 7612.00 8912.00 9476.00 9071.00 13946.00 13057.00 18591.00 9726.00 5446.00 6725.00 7207.00 10625.00 11358.00 10424.00 14660.00 7433.00 56670.00 58902.00 61338.00 76584.00 76584.00 82958.00 101612.0 95634.00 0

(ii) Using Batching Plant, Transit Mixer and Concrete Pump B RCC Grade M25 (i) Using concrete mixer. (ii) Using Batching Plant, Transit Mixer and Concrete Pump C RCC Grade M30 (i) Using concrete mixer. (ii) Using Batching Plant, Transit Mixer and Concrete Pump D RCC Grade M35 (i) Using concrete mixer. (ii) Using Batching Plant, Transit Mixer and Concrete Pump 12.39 12.40 Levelling course for Pile cap Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications

60

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

12.41

Supplying, fitting and placing un-coated Mild steel reinforcement complete in foundation as per drawing and technical specification

tonne

54237.00 56499.00 57029.00 62238.00 62238.00 60989.00 70715.00 57148.00

CHAPTER-13
61
Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

SUB-STRUCTURE
13.1 13.2 13.3 13.4 Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and technical specifications Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical specifications Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications A Random Rubble Masonry B Coursed rubble masonry (first sort ) C Ashlar masonry ( first sort ) 13.5 A B C (p) Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications PCC Grade M15 (p) Height upto 5m PCC Grade M20 (p) Height upto 5m PCC Grade M25 Height upto 5m cum cum cum cum cum cum 7293.00 8810.00 9381.00 13514.00 14318.00 13198.00 19209.00 9632.00 7756.00 9103.00 9700.00 9207.00 14365.00 13443.00 19698.00 9968.00 7558.00 9130.00 9722.00 14005.00 14838.00 13678.00 19907.00 9983.00 8038.00 9434.00 10053.00 9541.00 14888.00 13932.00 20414.00 10330.00 7889.00 9531.00 10148.00 14619.00 15489.00 14278.00 20780.00 10421.00 8390.00 9847.00 10494.00 9960.00 15541.00 14543.00 21309.00 10783.00 cum 6727.00 8198.00 8750.00 12716.00 13520.00 12442.00 17363.00 8999.00 cum 5820.00 7211.00 7744.00 11484.00 12290.00 11325.00 15965.00 7991.00 cum cum cum 4270.00 5256.00 5588.00 8580.00 8971.00 7858.00 11145.00 5662.00 4292.00 5232.00 5534.00 8271.00 8626.00 7597.00 10631.00 5605.00 6547.00 7630.00 7962.00 11039.00 11430.00 10387.00 13904.00 8191.00 cum sqm sqm 6044.00 8327.00 9200.00 17028.00 17312.00 15159.00 23163.00 9276.00 54.20 139.70 66.00 179.40 68.90 193.00 93.80 300.60 97.20 329.10 89.00 288.00 118.00 419.00 69.20 194.00

Case I Using concrete Mixer Case II With Batching Plant, Transit Mixer and Concrete Pump (q) Height 5m to 10m Case I Using concrete Mixer Case II With Batching Plant, Transit Mixer and Concrete Pump (r) Height above 10m Case I Using concrete Mixer Case II With Batching Plant, Transit Mixer and Concrete Pump D (p) PCC Grade M30 Height upto 5m

Case I Using concrete Mixer

cum

7354.00 8876.00 9450.00 13600.00 14404.00 13279.00 18514.00 9700.00

62

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

Case II With Batching Plant, Transit Mixer and Concrete Pump (q) Height 5m to 10m Case I Using concrete Mixer Case II With Batching Plant, Transit Mixer and Concrete Pump (r) Height above 10m Case I Using concrete Mixer Case II With Batching Plant, Transit Mixer and Concrete Pump E (p) RCC Grade M20 Height upto 5m

cum cum cum cum cum

7810.00 9163.00 9762.00 9284.00 14444.00 13516.00 19397.00 10029.00 7621.00 9199.00 9794.00 14095.00 14928.00 13762.00 19100.00 10053.00 8094.00 9496.00 10117.00 9621.00 14969.00 14008.00 20003.00 10394.00 7955.00 9603.00 10223.00 14713.00 15583.00 14366.00 19938.00 10494.00 8449.00 9912.00 10560.00 10043.00 15626.00 14622.00 20881.00 10850.00

Case I Using concrete Mixer Case II With Batching Plant, Transit Mixer and Concrete Pump (q) Height 5m to 10m Case I Using concrete Mixer Case II With Batching Plant, Transit Mixer and Concrete Pump (r) Height above 10m Case I Using concrete Mixer Case II With Batching Plant, Transit Mixer and Concrete Pump F (p) RCC Grade M25 Height upto 5m

cum cum cum cum cum cum

6813.00 8292.00 8847.00 12823.00 13624.00 12543.00 17481.00 9093.00 7278.00 8586.00 9167.00 8516.00 13672.00 12788.00 18362.00 9429.00 7061.00 8594.00 9169.00 13289.00 14120.00 12999.00 18116.00 9424.00 7543.00 8899.00 9500.00 8825.00 14169.00 13253.00 19030.00 9772.00 7371.00 8971.00 9571.00 13872.00 14739.00 13570.00 18911.00 9837.00 7873.00 9289.00 9917.00 9212.00 14791.00 13835.00 19864.00 10200.00

Case I Using concrete Mixer Case II With Batching Plant, Transit Mixer and Concrete Pump (q) Height 5m to 10m Case I Using concrete Mixer Case II With Batching Plant, Transit Mixer and Concrete Pump (r) Height above 10m Case I Using concrete Mixer Case II With Batching Plant, Transit Mixer and Concrete Pump G (p) RCC Grade M30 Height upto 5m

cum cum cum cum cum cum

7387.00 8912.00 9485.00 13629.00 14431.00 13307.00 18456.00 9732.00 8151.00 9515.00 10116.00 9642.00 14798.00 13877.00 19698.00 10380.00 7629.00 9204.00 9795.00 14075.00 14903.00 13743.00 19060.00 10051.00 8418.00 9827.00 10447.00 9957.00 15282.00 14331.00 20342.00 10720.00 7991.00 9642.00 10261.00 14745.00 15611.00 14396.00 19966.00 10529.00 8818.00 10294.00 10943.00 10431.00 16009.00 15012.00 21309.00 11230.00

63

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

Case I Using concrete Mixer Case II With Batching Plant, Transit Mixer and Concrete Pump (q) Height 5m to 10m Case I Using concrete Mixer Case II With Batching Plant, Transit Mixer and Concrete Pump (r) Height above 10m Case I Using concrete Mixer Case II With Batching Plant, Transit Mixer and Concrete Pump H (p) RCC Grade M35 Height upto 5m

cum cum cum cum cum cum

7422.00 8950.00 9523.00 13677.00 14479.00 13354.00 18514.00 9771.00 7886.00 9245.00 9844.00 9373.00 14529.00 13600.00 19397.00 10109.00 7631.00 9202.00 9792.00 14063.00 14887.00 13730.00 19036.00 10046.00 8108.00 9506.00 10121.00 9637.00 14939.00 13983.00 19944.00 10394.00 7928.00 9560.00 10173.00 14610.00 15466.00 14264.00 19777.00 10437.00 8424.00 9875.00 10515.00 10012.00 15520.00 14527.00 20720.00 10798.00

Case I Using concrete Mixer Case II With Batching Plant, Transit Mixer and Concrete Pump (q) Height 5m to 10m Case I Using concrete Mixer Case II With Batching Plant, Transit Mixer and Concrete Pump (r) Height above 10m Case I Using concrete Mixer Case II With Batching Plant, Transit Mixer and Concrete Pump 13.6 13.7 Supplying, fitting and placing HYSD bar reinforcement in substructure complete as per drawing and technical specifications Supplying, fitting and placing Mild steel reinforcement complete in sub-structure as per drawing and technical specification

cum cum cum cum cum cum tonne tonne

7577.00 9119.00 9698.00 13898.00 14700.00 13563.00 18782.00 9947.00 8357.00 9738.00 10346.00 9928.00 15084.00 14149.00 20042.00 10611.00 7743.00 9318.00 9909.00 14202.00 15020.00 13859.00 19191.00 10164.00 8540.00 9950.00 10572.00 10145.00 15413.00 14457.00 20479.00 10842.00 7991.00 9616.00 10227.00 14656.00 15501.00 14303.00 19806.00 10489.00 8813.00 10269.00 10910.00 10469.00 15907.00 14920.00 21135.00 11189.00 56769.00 59010.00 61446.00 76692.00 76692.00 83066.00 101729.0 95742.00 0

53668.00 55851.00 56381.00 61590.00 61590.00 60341.00 70009.00 56501.00

13.8

13.9

Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V : R.metre 20H towards drawing foce. Complete as per drawing and Technical specifications Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A Granular material B Sandy material cum cum

407.00

465.00

477.00

506.00

508.00

526.00

605.00

484.00

2366.00 2516.00 2645.00 2817.00 3287.00 3207.00 3957.00 2990.00 1877.00 4227.00 5151.00 13532.00 13532.00 11451.00 19490.00 5232.00

64

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

13.10

13.11

Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than cum 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification. Supplying, fitting and fixing in position true to line and level cast steel rocker bearing conforming to IRC: 83(Pt.-1) section IX and tonne clause 2003 of MoRTH specifications complete including all capacity accessories as per drawing and Technical Specifications. Supplying, fitting and fixing in position true to line and level forged steel roller bearing conforming to IRC: 83(Pt.-1) section IX and tonne clause 2003 of MoRTH specifications complete including all capacity accessories as per drawing and Technical Specifications. Supplying, fitting and fixing in position true to line and level sliding plate bearing with PTFE surface sliding on stainless steel complete tonne including all accessories as per drawing and Technical Specifications capacity and BS: 5400, section 9.1 & 9.2 (for PTFE) and clause 2004 of MoRTH Specifications. Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and cubic clause 2005 of MoRTH specifications complete including all centimetr e accessories as per drawing and Technical Specifications. Supplying, fitting and fixing in position true to line and level sliding plate bearing with stainless steel plate sliding on stainless steel tonne plate with mild steel matrix complete including all accessories as capacity per drawing and Technical Specifications. Supplying, fitting and fixing in position true to line and level POTPTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, completre assembly to be of cast steel/fabricated tonne structural steel, metal and elastomer elements to be as per IRC: 83 capacity part-I & II respectively and other parts conforming to BS: 5400, section 9.1 & 9.2 and clause 2006 of MoRTH Specifications complete asper drawing and approved technical specifications.

2413.00 2558.00 2663.00 2802.00 2889.00 2819.00 3456.00 2645.00

266.00

271.00

272.00

274.00

274.00

275.00

303.00

272.00

13.12

249.00

254.00

255.00

257.00

257.00

259.00

284.00

255.00

13.13

2097.00 2125.00 2148.00 2154.00 2154.00 2159.00 2362.00 2132.00

13.14

5.00

5.00

5.10

5.10

5.10

5.10

5.50

5.10

13.15

2096.00 2124.00 2146.00 2152.00 2152.00 2158.00 2360.00 2130.00

13.16

250.00

255.00

256.00

257.00

257.00

259.00

285.00

256.00

65

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

CHAPTER-14 SUPER-STRUCTURE
14.1 A Case I (i) Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M20 Using Concrete Mixer For solid slab super-structure, 20-30% of (a+b+c) (p) Height upto 5m (q) Height 5m to 10m (r) Height above 10m (ii) For T-beam & slab, 25-35% of (a+b+c) (p) Height upto 5m (q) Height 5m to 10m (r) Height above 10m Case II (i) Using Batching Plant, Transit Mixer and Concrete Pump For solid slab super-structure, 20-30% of (a+b+c) (p) Height upto 5m (q) Height 5m to 10m (r) Height above 10m (ii) For T-beam & slab, 25-35% of (a+b+c) (p) Height upto 5m (q) Height 5m to 10m (r) Height above 10m B Case I (i) RCC Grade M25 Using Concrete Mixer For solid slab super-structure, 20-30% of (a+b+c) (p) Height upto 5m (q) Height 5m to 10m cum cum 8013.00 9674.00 10297.00 14805.00 15679.00 14457.00 20057.00 10567.00 8347.00 10077.00 10726.00 15421.00 16332.00 15060.00 20893.00 11007.00 cum cum cum 8197.00 9679.00 10336.00 9575.00 15434.00 14435.00 20743.00 10634.00 8525.00 10066.00 10749.00 9958.00 16052.00 15013.00 21573.00 11060.00 8853.00 10453.00 11163.00 10341.00 16669.00 15590.00 22402.00 11485.00 cum cum cum 7869.00 9292.00 9922.00 9192.00 14817.00 13858.00 19913.00 10209.00 8197.00 9679.00 10336.00 9575.00 15434.00 14435.00 20743.00 10634.00 8525.00 10066.00 10749.00 9958.00 16052.00 15013.00 21573.00 11060.00 cum cum cum 7672.00 9347.00 9975.00 14472.00 15383.00 14160.00 19746.00 10254.00 7979.00 9721.00 10374.00 15051.00 15998.00 14726.00 20535.00 10664.00 8286.00 10095.00 10773.00 15630.00 16614.00 15293.00 21325.00 11075.00 cum cum cum 7366.00 8973.00 9576.00 13893.00 14768.00 13593.00 18956.00 9844.00 7672.00 9347.00 9975.00 14472.00 15383.00 14160.00 19746.00 10254.00 7979.00 9721.00 10374.00 15051.00 15998.00 14726.00 20535.00 10664.00

66

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

(r) Height above 10m (ii) For T-beam & slab, 25-35% of (a+b+c) (p) Height upto 5m (q) Height 5m to 10m (r) Height above 10m Case II (i) Using Batching Plant, Transit Mixer and Concrete Pump For solid slab super-structure, 20-30% of (a+b+c) (p) Height upto 5m (q) Height 5m to 10m (r) Height above 10m (ii) For T-beam & slab, 25-35% of (a+b+c) (p) Height upto 5m (q) Height 5m to 10m (r) Height above 10m C Case I (i) RCC Grade M 30 Using Concrete Mixer For solid slab super-structure, 20-30% of (a+b+c) (p) Height upto 5m (q) Height 5m to 10m (r) Height above 10m (ii) For T-beam & slab, 25-35% of (a+b+c) (p) Height upto 5m (q) Height 5m to 10m (r) Height above 10m Case II (i) Using Batching Plant, Transit Mixer and Concrete Pump. For solid slab super-structure, 20-30% of (a+b+c) (p) Height upto 5m (q) Height 5m to 10m (r) Height above 10m

cum cum cum cum

8681.00 10480.00 11155.00 16038.00 16986.00 15662.00 21729.00 11448.00 8347.00 10077.00 10726.00 15421.00 16332.00 15060.00 20893.00 11007.00 8681.00 10480.00 11155.00 16038.00 16986.00 15662.00 21729.00 11448.00 9015.00 10883.00 11584.00 16655.00 17639.00 16265.00 22564.00 11888.00

cum cum cum cum cum cum

8528.00 10007.00 10660.00 10114.00 15759.00 14749.00 21056.00 10949.00 8883.00 10424.00 11104.00 10536.00 16416.00 15364.00 21934.00 11405.00 9238.00 10841.00 11548.00 10957.00 17073.00 15978.00 22811.00 11861.00 8883.00 10424.00 11104.00 10536.00 16416.00 15364.00 21934.00 11405.00 9238.00 10841.00 11548.00 10957.00 17073.00 15978.00 22811.00 11861.00 9594.00 11258.00 11993.00 11378.00 17729.00 16593.00 23689.00 12317.00

cum cum cum cum cum cum

8116.00 9785.00 10411.00 14942.00 15817.00 14589.00 20221.00 10681.00 8454.00 10193.00 10845.00 15565.00 16476.00 15197.00 21064.00 11126.00 8792.00 10600.00 11278.00 16188.00 17135.00 15805.00 21906.00 11571.00 8454.00 10193.00 10845.00 15565.00 16476.00 15197.00 21064.00 11126.00 8792.00 10600.00 11278.00 16188.00 17135.00 15805.00 21906.00 11571.00 9130.00 11008.00 11712.00 16810.00 17794.00 16413.00 22749.00 12016.00

cum cum cum

8617.00 10110.00 10768.00 10231.00 15916.00 14894.00 21254.00 11057.00 8976.00 10531.00 11217.00 10657.00 16579.00 15514.00 22140.00 11518.00 9335.00 10952.00 11666.00 11083.00 17242.00 16135.00 23025.00 11979.00

67

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

(ii)

For T-beam & slab, 25-35% of (a+b+c) (p) Height upto 5m (q) Height 5m to 10m (r) Height above 10m cum cum cum 8976.00 10531.00 11217.00 10657.00 16579.00 15514.00 22140.00 11518.00 9335.00 10952.00 11666.00 11083.00 17242.00 16135.00 23025.00 11979.00 9694.00 11374.00 12114.00 11509.00 17905.00 16755.00 23911.00 12439.00

D Case 1 (i)

RCC/PSC Grade M35 Using concrete mixer. For solid slab super-structure, 18-28% of (a+b+c) (p) Height upto 5m (q) Height 5m to 10m (r) Height above 10m cum cum cum cum cum cum cum cum cum 8149.00 9804.00 10425.00 14930.00 15790.00 14571.00 20171.00 10691.00 8494.00 10219.00 10866.00 15563.00 16459.00 15188.00 21025.00 11144.00 8839.00 10635.00 11308.00 16196.00 17128.00 15806.00 21880.00 11597.00 8494.00 10219.00 10866.00 15563.00 16459.00 15188.00 21025.00 11144.00 8839.00 10635.00 11308.00 16196.00 17128.00 15806.00 21880.00 11597.00 9184.00 11050.00 11750.00 16828.00 17798.00 16423.00 22735.00 12050.00 9530.00 11466.00 12192.00 17461.00 18467.00 17040.00 23589.00 12503.00 10220.00 12297.00 13075.00 18726.00 19805.00 18275.00 25299.00 13409.00 10911.00 13127.00 13959.00 19991.00 21143.00 19510.00 27008.00 14315.00

(ii)

For T-beam & slab, 23-33% of (a+b+c) (p) Height upto 5m (q) Height 5m to 10m (r) Height above 10m

(iii)

For box girder and balanced cantilever, 38-58% of cost of concrete. (p) Height upto 5m (q) Height 5m to 10m (r) Height above 10m

Case II (i)

Using Batching Plant, Transit Mixer and Concrete Pump For solid slab super-structure, 18-28% of (a+b+c)

(p) Height upto 5m (q) Height 5m to 10m (r) Height above 10m (ii) For T-beam & slab, 23-33% of (a+b+c) (p) Height upto 5m (q) Height 5m to 10m (r) Height above 10m For box girder and balanced cantilever, 38-58% of cost of (iii) concrete. (p) Height upto 5m

cum cum cum cum cum cum cum

8630.00 10101.00 10750.00 10293.00 15824.00 14816.00 21097.00 11034.00 8996.00 10529.00 11206.00 10729.00 16495.00 15444.00 21991.00 11502.00 9361.00 10957.00 11661.00 11165.00 17165.00 16072.00 22885.00 11970.00 8996.00 10529.00 11206.00 10729.00 16495.00 15444.00 21991.00 11502.00 9361.00 10957.00 11661.00 11165.00 17165.00 16072.00 22885.00 11970.00 9727.00 11385.00 12117.00 11601.00 17836.00 16700.00 23779.00 12437.00 10093.00 11813.00 12572.00 12038.00 18507.00 17328.00 24673.00 12905.00

68

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

(q) Height 5m to 10m (r) Height above 10m E Case 1 (i) PSC Grade M-40 Using concrete mixer. For solid slab super-structure, 20-30% of (a+b+c) (p) Height upto 5m (q) Height 5m to 10m (r) Height above 10m (ii) For T-beam & slab, 25-35% of (a+b+c) (p) Height upto 5m (q) Height 5m to 10m (r) Height above 10m Case II (i) Using Batching Plant, Transit Mixer and Concrete Pump For solid slab super-structure, 18-28% of (a+b+c) (p) Height upto 5m (q) Height 5m to 10m (r) Height above 10m (ii) For T-beam & slab, 23-33% of (a+b+c) (p) Height upto 5m (q) Height 5m to 10m (r) Height above 10m (iii) For box girder and balanced cantilever, 38-58% of cost of concrete. (p) Height upto 5m (q) Height 5m to 10m (r) Height above 10m F (i) PSC Grade M-45 For solid slab/voided slab super-structure, 16-26% of cost of concrete (a+b+c) (p) Height upto 5m

cum cum

10824.00 12670.00 13483.00 12910.00 19848.00 18583.00 26460.00 13840.00 11555.00 13526.00 14394.00 13782.00 21189.00 19839.00 28248.00 14775.00

cum cum cum cum cum cum

8761.00 10467.00 11103.00 15721.00 16596.00 15354.00 21128.00 11374.00 9126.00 10903.00 11566.00 16377.00 17288.00 15994.00 22008.00 11848.00 9491.00 11339.00 12029.00 17032.00 17979.00 16634.00 22888.00 12322.00 9126.00 10903.00 11566.00 16377.00 17288.00 15994.00 22008.00 11848.00 9491.00 11339.00 12029.00 17032.00 17979.00 16634.00 22888.00 12322.00 9856.00 11775.00 12491.00 17687.00 18671.00 17274.00 23769.00 12796.00

cum cum cum cum cum cum

9066.00 10555.00 11209.00 10787.00 16319.00 15309.00 21664.00 11494.00 9450.00 11002.00 11684.00 11245.00 17010.00 15958.00 22582.00 11981.00 9834.00 11449.00 12159.00 11702.00 17702.00 16607.00 23500.00 12468.00 9450.00 11002.00 11684.00 11245.00 17010.00 15958.00 22582.00 11981.00 9834.00 11449.00 12159.00 11702.00 17702.00 16607.00 23500.00 12468.00 10218.00 11897.00 12634.00 12159.00 18393.00 17255.00 24418.00 12955.00

cum cum cum

10603.00 12344.00 13109.00 12616.00 19085.00 17904.00 25336.00 13442.00 11371.00 13238.00 14059.00 13530.00 20468.00 19201.00 27172.00 14416.00 12139.00 14133.00 15009.00 14444.00 21851.00 20499.00 29008.00 15390.00

cum

9318.00 10813.00 11468.00 11165.00 16603.00 15583.00 21972.00 11749.00

69

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

(q) Height 5m to 10m (r) Height above 10m (ii) For I-beam & slab including launching of precast girders by launching truss upto 40 m span, 21-31% of cost of concrete. (p) Height upto 5m (q) Height 5m to 10m (r) Height above 10m (iii) For cast-in-situ box girder, segmental construction and balanced cantilever, 36-56% of cost of concrete. (p) Height upto 5m (q) Height 5m to 10m (r) Height above 10m G (i) PSC Grade M-50 For cast-in-situ box girder, segmental construction and balanced cantilever, 35-55% of cost of concrete (p) Height upto 5m (q) Height 5m to 10m (r) Height above 10m H (i) PSC Grade M- 55 For cast-in-situ box girder, segmental construction and balanced cantilever, 35-55% of cost of concrete (p) Height upto 5m (q) Height 5m to 10m (r) Height above 10m 14.2 14.3 14.4 a) Supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications High tensile steel wires/strands including all accessories for stressing, stressing operations and grouting complete as per drawing and Technical Specifications Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications

cum cum

9719.00 11279.00 11963.00 11647.00 17319.00 16255.00 22920.00 12256.00 10121.00 11745.00 12457.00 12128.00 18035.00 16927.00 23867.00 12762.00

cum cum cum

9719.00 11279.00 11963.00 11647.00 17319.00 16255.00 22920.00 12256.00 10121.00 11745.00 12457.00 12128.00 18035.00 16927.00 23867.00 12762.00 10522.00 12211.00 12951.00 12609.00 18750.00 17599.00 24814.00 13268.00

cum cum cum

10924.00 12677.00 13446.00 13091.00 19466.00 18270.00 25761.00 13775.00 11727.00 13609.00 14434.00 14053.00 20897.00 19614.00 27655.00 14788.00 12531.00 14541.00 15423.00 15016.00 22328.00 20957.00 29549.00 15800.00

cum cum cum

11181.00 12947.00 13720.00 13461.00 19789.00 18580.00 26133.00 14048.00 12009.00 13906.00 14737.00 14458.00 21255.00 19956.00 28069.00 15088.00 12837.00 14865.00 15753.00 15455.00 22721.00 21332.00 30004.00 16129.00

cum cum cum tonne tonne cum

11708.00 13516.00 14305.00 14191.00 20519.00 19275.00 27013.00 14634.00 12576.00 14517.00 15365.00 15242.00 22039.00 20702.00 29014.00 15718.00 13443.00 15518.00 16425.00 16293.00 23559.00 22130.00 31015.00 16802.00 57652.00 60008.00 62451.00 77697.00 77697.00 84079.00 102842.0 96745.00 0

67664.00 71278.00 72257.00 78557.00 78557.00 77893.00 83889.00 72372.00 11542.00 12966.00 13697.00 14393.00 19130.00 18757.00 25469.00 16510.00

70

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

14.5

14.6

14.7

14.8 14.9 14.10 14.11 14.12 14.13 14.14

Mastic Asphalt (Providing and laying 12 mm thick mastic asphalt wearing course on top of deck slab excluding prime coat with paving grade bitumen meeting the requirements given in table 500-29, prepared by using mastic cooker and laid to required level and slope after cleaning the surface, including providing antiskid surface with bitumen precoated fine grained hard stone chipping of 9.5 mm nominal size at the rate of 0.005cum per 10 sqm and at an approximate spacing of 10 cm center to center in both directions, pressed into surface when the temperature of surfaces not less than 100 deg. C, protruding 1 mm to 4 mm over mastic surface, all complete as per precast515.) railing of M30 Grade, aggregate size Construction of clause RCC not exceeding 12 mm, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications. Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications. Providing, fitting and fixing mild steel railing complete as per drawing and Technical Specification Drainage Spouts complete as per drawing and Technical specification PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification Providing anti-corrosive treatment to HYSD reinforcement with Fusion Bonded Epoxy Coating (FBEC) (To be taken as per the prevailing market rates.) Precast - pretensioned Girders (Providing, precasting, transportation and placing in position precast pretensioned concrete girders as per drawing and technical specifications) Providing and fixing Helical pipes in voided concrete slabs Crash Barriers (The rate analysis for rigid crash barrier in reinforced cement concrete, semi-rigid crash barrier with metal beam and flexible crash barrier with wire ropes have been made and included in chapter-8 on Traffic and Transportation.)

sqm

317.00

349.00

365.00

413.00

415.00

410.00

484.00

364.00

metre

1766.00 1927.00 2025.00 2271.00 2717.00 2757.00 3611.00 2697.00

metre

1725.00 1886.00 1982.00 2214.00 2667.00 2700.00 3544.00 2623.00

metre each cum cum tonne cum metre

2870.00 2974.00 2996.00 3224.00 3224.00 3168.00 3638.00 3002.00 2732.00 3043.00 3117.00 3234.00 3234.00 3366.00 3791.00 3160.00 5291.00 6556.00 7040.00 10440.00 11173.00 10296.00 14513.00 7265.00 10195.00 11573.00 12251.00 12576.00 17357.00 16815.00 23129.00 14211.00

27583.00 30056.00 30865.00 32581.00 37552.00 37016.00 48062.00 34599.00 976.00 1009.00 1015.00 1019.00 1019.00 1028.00 1131.00 1015.00

14.15

71

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

14.16

14.17

Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ) Burried Joint (Providing and laying a burried expansion joint, expansion gap being 20 mm, covered with 12 mm thick, 200 mm wide galvanised wieldable structural steel plate as per IS: 2062, placed symmetrical to centre line of the joint, resting freely over the top surface of the deck concrete, welding of 8 mm dia. 100 mm long galvanised nails spaced 300 mm c/c along the centre line of the plate, all as specified in clause 2604.) Filler joint Providing & fixing 2 mm thick corrugated copper plate in (i) expansion joint complete as per drawing & Technical Specification.

metre

90.00

103.00

103.00

109.00

109.00

112.00

127.00

106.00

metre

1271.00 1294.00 1301.00 1323.00 1323.00 1333.00 1475.00 1313.00

14.18

metre

124251.0 130353.0 132572.0 155310.0 155310.0 149764.0 181529.0 133126.0 0 0 0 0 0 0 0 0 266.00 271.00 275.00 281.00 281.00 285.00 313.00 275.00

Providing & fixing 20 mm thick compressible fibre board in (ii) expansion joint complete as per drawing & Technical Specification. Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply (iii) supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered with sealant complete as per drawing and technical specifications. Providing and filling joint sealing compound as per drawings (iv) and technical specifications with coarse sand and 6% bitumen by weight Asphaltic Plug joint (Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of wieldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/backer rod, all as per approved drawings and specifications.)

metre

metre

143.00

154.00

157.00

167.00

167.00

171.00

189.00

157.00

metre

21.00

24.00

25.00

31.00

33.00

31.00

40.00

25.00

14.19

metre

1285.00 1337.00 1358.00 1448.00 1461.00 1444.00 1647.00 1365.00

72

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

14.20

14.21

14.22

14.23

14.24

Elastomeric Slab Steel Expansion Joint (Providing and laying of an elastomeric slab steel expansion joint, catering to right or skew (less than 20 deg., moderately curved with maximum horizontal movement upto 50 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation and clause 2606 of MoRTH specifications for road & bridge works.) Compression Seal Joint (Providing and laying of compression seal joint consisting of steel armoured nosing at two edges of the joint gap suitably anchored to the deck concrete and a preformed chloroprene elastomer or closed cell foam joint sealer compressed and fixed into the joint gap with special adhesive binder to cater for a horizontal movement upto 40 mm and vertical movement of 3 mm.) Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.) Modular Strip / Box Seal Joint (Providing and laying of a modular strip Box steel expansion joint including anchorage catering to a horizontal movement beyond 70 mm and upto 140mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.) Modular Strip / Box Seal Joint (Providing and laying of a modular strip box seal expansion joint catering to a horizontal movement beyond 140mm and upto 210mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.)

metre

13184.00 13378.00 14259.00 14538.00 14538.00 14573.00 15974.00 14259.00

metre

3531.00 3614.00 3640.00 3847.00 3847.00 3807.00 4314.00 3645.00

metre

56.00

60.00

62.00

63.00

63.00

64.00

71.00

62.00

metre

691.00

712.00

714.00

716.00

716.00

719.00

790.00

714.00

metre

897.00

910.00

937.00

952.00

952.00

960.00 1054.00

937.00

73

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

CHAPTER-15 RIVER TRAINING AND PROTECTION WORKS


15.1 Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. A Boulder laid dry without wire crates. Boulder apron laid in wire crates (Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10% extra for laps and joints laid with stone boulders weighing not less than 40 kg each.) Cement concrete blocks (size 0.5 x 0.5 x 0.5 m) (Providing and laying of apron with cement concrete blocks of size 0.5x0.5x0.5 m cast in-situ and made with nominal mix of M-15 grade cement concrete with a minimum cement content of 250 kg/cum as per IRC: 21-2000.) Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications A Stone/Boulder cum 1873.00 2393.00 2393.00 1797.00 2729.00 2729.00 2977.00 2555.00

15.2

cum

3568.00 4077.00 4079.00 4099.00 4436.00 4431.00 4850.00 4242.00

15.3

cum

5613.00 6954.00 7466.00 11074.00 11851.00 10921.00 15396.00 7706.00

15.4

cum

1873.00 2393.00 2393.00 2393.00 2729.00 2729.00 2977.00 2555.00

74

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

Cement Concrete blocks of size 0.3x0.3 x0.3 m cast in B cement concrete of Grade M15 15.5 Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification Geotextile Filter (Laying of a geotextile filter between pitching and embankment slopes on which pitching is laid to prevent escape of the embankment material through the voids of the stone pitching/cement concrete blocks as well as to allow free movement of water without creating any uplift head on the pitching.) Toe protection (A toe wall for toe protection can either be in dry rubble masonry in case of dry rubble pitching or pitching with stones in wire crates or it can be in PCC M15 nominal mix if cement concrete block have been used for pitching . Rates for toe wall can be adopted from respective clauses depending upon approved design. The rate for excavation for foundation, dry rubble masonry and PCC M15 have been analysed and given in respective chapters.) Providing and laying Flooring complete as per drawing and Technical specifications laid over cement concrete bedding. A Rubble stone laid in cement mortar 1:3 B Cement Concrete blocks Grade M15 15.9 15.10 Dry rubble Flooring Curtain wall complete as per drawing and Technical specification A Stone masonry in cement mortar (1:3) B Cement concrete Grade M15 15.11 Flexible Apron :Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. Gabian Structure for Retaining Earth (Providing and construction of a gabain structure for retaining earth with segments of wire crates of size 7 m x 3 m x 0.6 m each divided into 1.5 m compartments by cross netting, made from 4 mm galvanised steel wire @ 32 kg per 10 sqm having minimum tensile strength of 300 Mpa conforming to IS:280 and galvanizing coating conforming to IS:4826, woven into mesh with double twist, mesh size not exceeding 100 x 100 mm, filled with boulders with least dimension of 200 mm, all loose ends to be tied with 4 mm galvanised steel wire)

cum cum

5613.00 6954.00 7466.00 11074.00 11851.00 10921.00 15396.00 7706.00 2531.00 2688.00 2792.00 2932.00 3019.00 2949.00 3598.00 2775.00

15.6

sqm

58.00

63.00

65.00

67.00

67.00

68.00

77.00

65.00

15.7

15.8

cum cum cum cum cum cum

6077.00 7788.00 8241.00 12088.00 13649.00 11654.00 15702.00 8493.00 7392.00 9159.00 9833.00 14584.00 15608.00 14383.00 20276.00 10149.00 2137.00 2688.00 2688.00 2092.00 3024.00 3024.00 3299.00 2850.00 5436.00 6312.00 6600.00 9024.00 9405.00 8712.00 11735.00 6814.00 5503.00 6818.00 7320.00 10857.00 11619.00 10707.00 15094.00 7555.00 1920.00 2445.00 2445.00 1844.00 2785.00 2785.00 3038.00 2609.00

15.12

cum

3925.00 4428.00 4430.00 4454.00 4790.00 4785.00 5239.00 4593.00

75

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

15.13

Gabian Structure for Erosion Control, River Training Works and Protection works (Providing and constructing gabain structures for erosion control, river training works and protection works with wire crates of size 2 m x 1 m x 0.3 m each divided into 1m compartments by cross netting, made from 4 mm galvanised steel wire @ 32 kg per 10 sqm having minimum tensile strength of 300 Mpa conforming to IS:280 and galvanizing coating conforming to IS:4826, woven into mesh with double twist, mesh size not exceeding 100 mm x 100 mm, filled with boulders with least dimension of 200 mm, all loose ends to be securely tied with 4 mm galvanised steel wire.)

cum

6684.00 7198.00 7204.00 7257.00 7594.00 7581.00 8313.00 7367.00

CHAPTER-16 REPAIR AND REHABILITATION


16.1 Removal of existing cement concrete wearing coat including its disposal complete as per Technical specification without causing any detrimental effect to any part of the bridge structure and removal of dismantled material with all lifts and lead upto 1000m(Thickness 75 mm) Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12 mm thick mastic asphalt including disposal with all lift and lead upto 1000m. Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with epoxy complete as per Technical specification sqm 78.00 86.00 89.00 95.00 95.00 98.00 100.00 89.00

16.2

sqm

59.00

65.00

67.00

72.00

72.00

74.00

76.00

67.00

16.3

sqm

1088.00 1220.00 1269.00 1622.00 1622.00 1553.00 1824.00 1275.00

76

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

16.4

Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy Sealing of cracks/porous concrete by injection process through nipples/Grouting complete as per Technical specification. A Cement Grout B Cement mortar (1:1) Grouting Patching of damaged concrete surface with polymer concrete and curing compounds, initiator and promoter, available in present formulations, to be applied as per instructions of manufacturer and as approved by the Engineer. Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1. Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement complete as per Technical specification Removal of defective concrete, cleaning the surface thoroughly, applying the shotcrete mixture mechanically with compressed air under pressure, comprising of cement, sand, coarse aggregates, water and quick setting compound in the proportion as per clause 2807.1., sand and coarse aggregates conforming to IS: 383 and table 1 of IS: 9012 respectively, water cement ratio ranging from 0.35 to 0.50, density of gunite not less than 2000 kg/cum, strength not less than 25 Mpa and workmanship conforming to clause 2807.6. pre-packed cement based polymer mortar of strength 45 Applying Mpa at 28 days for replacement of spalled concrete Eproxy bonding of new concrete to old concrete Providing external prestressing with high tensile steel wires/strands including drilling for passage of prestessing steel, all accessories for stressing and stressing operation and grouting complete as per drawing and Technical specification Providing external prestressing with high tensile steel wires/strands including drilling for passage of prestessing steel, all accessories for stressing and stressing operation and grouting complete as per drawing and Technical specification

each

80.00

92.00

92.00

93.00

93.00

93.00

94.00

92.00

16.5

kg kg sqm kg sqm

37.00 111.00

40.00 123.00

40.00 124.00

42.00 129.00

42.00 129.00

43.00 130.00

44.00 134.00

40.00 124.00

16.6 16.7 16.8

2943.00 3062.00 3101.00 3256.00 3256.00 3335.00 3451.00 3101.00 788.00 312.00 804.00 316.00 821.00 317.00 831.00 320.00 831.00 320.00 832.00 319.00 839.00 322.00 821.00 317.00

16.9

sqm

372.00

437.00

462.00

600.00

621.00

596.00

710.00

465.00

16.10 16.11

sqm sqm

198.00 331.00

219.00 336.00

221.00 336.00

229.00 340.00

229.00 340.00

233.00 339.00

238.00 342.00

220.00 336.00

16.12

tonne

255168.0 263351.0 266048.0 287013.0 287013.0 282820.0 298296.0 266844.0 0 0 0 0 0 0 0 0

16.13

tonne

253789.0 262191.0 264549.0 286277.0 286277.0 281939.0 297522.0 265033.0 0 0 0 0 0 0 0 0

77

Schedule of Rate for NH , MORT work in Nagland (2010)

Schedule fo Rates for NH, MORT Works in Nagaland(2010)

Code No

Descriptions

Unit

DMR

KMA / MKG / PRN

WKA

PHEK

ZBTO

TSG / LLG

KPE

MON

16.14 16.15 16.16 16.17 16.18 16.19 16.20

Providing external prestressing with high tensile steel wires/strands including drilling for passage of prestessing steel, all accessories for stressing and stressing operation and grouting complete as per drawing and Technical specification Replacement of bearings complete as per Technical specification Rectification of bearings as per Technical specifications Replacement of Expansion Joints complete as per drawings Replacement of damaged concrete railing. Replacement of crash barrier. Replacement of damaged mild steel railing Repair of crash barrier (Repair of concrete crash barrier with cement concrete of M-30 grade by cutting and trimming the damaged portion to a regular shape, cleaning the area to be repaired thoroughly, applying cement concrete after erection of proper form work.) Repair of RCC Railing (Carrying out repair of RCC M30 railing to bring it to the original shape.) Repair of steel Railing (Repair of steel railing to bring it to the original shape)

tonne each each metre metre metre metre

231722.0 239430.0 241593.0 261550.0 261550.0 257578.0 271895.0 242037.0 0 0 0 0 0 0 0 0 67399.00 68827.00 68930.00 69411.00 69411.00 69680.00 70310.00 68930.00 63199.00 65140.00 65358.00 65587.00 65587.00 65795.00 66103.00 65358.00 3217.00 3680.00 3878.00 3721.00 5426.00 5119.00 6499.00 3965.00 164.00 293.00 139.00 182.00 323.00 154.00 184.00 325.00 156.00 188.00 329.00 159.00 188.00 329.00 159.00 190.00 331.00 162.00 192.00 333.00 164.00 184.00 325.00 156.00

16.21

metre

239.00

279.00

295.00

282.00

423.00

398.00

511.00

302.00

16.22 16.23

metre metre

139.00 256.00

154.00 265.00

162.00 267.00

174.00 288.00

221.00 288.00

219.00 283.00

268.00 298.00

201.00 267.00

78

Schedule of Rate for NH , MORT work in Nagland (2010)

I N D E X
Sl. No Chapter Ref
CHAPTER - 1 CHAPTER- 2

Description of Works
COMMON WORKS

Page

1 2

CARRIAGE OF MATERIALS SITE CLEARENCE

1 2-5

ROAD WORKS
1 2 3 4 5 6 7 8 9 CHAPTER-3 CHAPTER-4 CHAPTER-5 CHAPTER-6 CHAPTER-7 CHAPTER-8 CHAPTER-9 CHAPTER-10 CHAPTER-11 EARTH WORK, EROSION CONTROL AND DRAINAGE SUB-BASES, BASES (NON-BITUMINOUS) AND SHOULDERS BASES AND SURFACE COURSES (BITUMINOUS) CEMENT CONCRETE PAVEMENTS GERSYNTHETICS AND REINFORCED EARTH TRAFFIC SIGNS, MARKINGS & OTHER ROAD APPURTENANCES PIPE CULVERTS MAINTENANCE OF ROADS HORTICULTURE 6 - 11 12 - 15 16 - 21 22 - 23 24 - 25 26 - 35 36 37 - 38 39 - 41

BRIDGE WORKS
1 2 3 4 5 CHAPTER-12 CHAPTER-13 CHAPTER-14 CHAPTER-15 CHAPTER-16 FOUNDATIONS SUB-STRUCTURE SUPER-STRUCTURE RIVER TRAINING AND PROTECTION WORKS REPAIR AND REHABILITATION 42 - 59 60 - 63 64 - 71 72 - 73 74 - 75

Das könnte Ihnen auch gefallen