Sie sind auf Seite 1von 34

HVAC DESIGN SOLUTIONS

ENGINEERING SOFTWARE

Quick and Easy Ventilation Rate Procedure Compliance Calculations


Copyright 2008 HVAC Design Solutions 1

62.1-2007 Comply from HVAC Design Solutions is a package of software programs for establishing compliance with the ASHRAE Standard 62.1-2007 Ventilation Rate Procedure. Includes Proprietary Auto-Optimize and VAV Scheduler which provide significant improvements over current ASHRAE 62.1 Users Manual Spreadsheet and over the ventilation calculations in current Equipment Manufacturers Load Calc software.
Copyright 2008 HVAC Design Solutions 2

Portions of the included information, descriptions, procedures, and forms are excerpts from ANSI/ASHRAE Standard 62.12007 ( 2007 American Society of Heating, Refrigeration and Air-Conditioning Engineers, Inc. (www.ashrae.org) Used by permission.)

Copyright 2007 HVAC Design Solutions

ANSI/ASHRAE Standard 62.1-2007 has made significant advancements in calculations and directives to help improve ventilation air delivery to the occupants. These changes and additional calculations, especially for multiple zone systems, have made it more difficult for engineers to determine the required outdoor air quantities.

Copyright 2008 HVAC Design Solutions

Exhaust Air

Relief Air

Outdoor Air Intake

Fan or AHU (Vps )

(Vps - Vot ) Fully Mixed Fraction of Secondary Recirculation (Where Applicable) (Er)(1-Ep)(Vdz)

(Vpz) = (Ep)(Vdz) VAV Box (Where Applicable) (1-Ep)(Vdz) Secondary Recirculation (Where Applicable) Secondary Recirculation Directly from Zone (Where Applicable) (1-Er)(1-Ep)(Vdz) Breathing Zone (Ez)(Vdz) (Vbz) = (RpPz + RaA z)

(Vdz)

Zone (1-Ez)(Vdz)

Ventilation calculations can become quite complex.

Figure 2: Ventilation System Schematic

Copyright 2008 HVAC Design Solutions

A few necessary formulas:


Evz = 1 + Xs - Zd

Keeping track of all the required formulas and calculations can be difficult.

Ev = minimum (Evz) Vot = Vou/Ev T = 3v/Vbz Evz = (Fa + Xs*Fb Zd*Fc)/Fa

Vbz = RpPz + RaAz Vot = 7all zonesVoz Voz = Vbz/Ez Vot = Voz D = Ps/7all zonesPz Zp = Voz/Vpz

Vou = D 7all zonesRpPz + 7all zonesRaAz

Copyright 2007 HVAC Design Solutions

Our software programs Minimize your Time and Efforts, and give you the Required OA Quantities, Min. VAV Settings, and Compliance Documents

Input Occupancy Category Number Input Zone Square Footage Input Number of Occupants, or use defaults Input Air Distribution Config. Number Input Design and Minimum Air Quantities Perform Quick Optimization Procedure Print out Compliance Documents Quick and Easy
Copyright 2007 HVAC Design Solutions 7

The following example of a typical multiple zone system calculation will show the Quick and Easy input for 62.1-2007 Comply, and the Ventilation Rate Procedure compliance calculations. Optimization procedures will show the actual reduction from an original 5,423 CFM outdoor air requirement to a final Optimized quantity of 2,824 CFM. This can result in a significant reduction in Owner energy and operating costs, while still complying with ASHRAE 62.1-2007.

Copyright 2008 HVAC Design Solutions

"Your Company Name"

HELP

Your company name will BASIC appear on all output sheets PROJECT INFORMATION and compliance documents PROJECT NAME : Berkley Plaza
PROJECT NUMBER : DATE : TYPE OF BUILDING : DESIGN WINTER OA TEMP. (F) : PROJECT MANAGER : PROJECT ENGINEER : CLIENT : CLIENT CONTACT NAME:
125-07 5/3/2007 This project information Office will automatically 30 transfer to all relative Bob Findley Curt Billings project calculations. Aztec Architects Phil Longley, AIA

2007 hvacdesignsolutions.com

Copyright 2007 HVAC Design Solutions

"Your Co mpa ny Na me" ASHR AE STD. 62.1-20 07 COMPLIANCE

VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY CALCULATIONS TAKE-OFF FORM RESET/CLEAR PRINT
P ROJECT NAME: Berkley Plaza 125-07 5/3/2007 30

HELP

AIR H ANDLIN G UNIT TAG NUMB ER (AHU-1, ETC.) ZONE NUMBER (EG: 1-1, 1-2) OCC UPANCY CATEGORY N UMBER (SEE TABLE 6-1) ZONE FLOOR AREA (SQ. FT.) (Az) NOR MAL OCCUPANCY - IF KNOWN (EG. ONE PER OFFICE) (NUMBER OF PEOPLE) PEAK OCC UPANCY - IF KNOWN (EG. MEETING IN AN OFFICE) (NUMBER OF PEOPLE) IF SPACE IS IN TERMITTEN T USAGE (EG. CONFERENCE ROOM) (SPACE HEIGHT - FT.) AIR DIST RIB. CONFIG. NUMBER (SEE TAB LE 6-2) DESIGN PRIMARY AIRFLOW TO ZONE (INCL. PRIMARY OA & RA) (CFM) (Vpz) MINIMU M PRIMARY AIRFLOW TO ZONE (MIN. VAV PRIMARY OA & RA) (CFM) (Vpzm)

P ROJECT NUMBER: DATE: DESIGN OA TEMP.:

You can print out blank forms for easy project take-off. Makes calculation input Quick and Easy.

Copyright 2007 HVAC Design Solutions

10

"Your Company Name" ASHRAE STD. 62.1-2007 COMPLIANCE

VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY MULTIPLE ZONE SYSTEMS (WITHOUT ZONE LEVEL RECIRCULATION)
RESET/CLEAR AIR HANDLING UNIT TAG NUMBER (AHU-1, ETC.) RECORD NUMBER > > > > PRINT
PROJECT NAME: PROJECT NUMBER: DATE: DESIGN OA TEMP.: Berkley P laza 125-07

HELP

Input Form for OA 5/3/2007 30 ventilation compliance calculations - 7Multiple 5 6 8 Zone systems

ZONE NUMBER (EG: 1-1, 1-2) OCCUPANCY CATEGORY NUMBER (SEE TABLE 6-1) OCCUPANCY CATEGORY PEOPLE OUTDOOR AIR RATE (CFM/PERSON) (Rp) AREA OUTDOOR AIR RATE (CFM/SQ. FT.) (Ra) 0 0 0 0 0 0 0 0

0.0 0.00

0.0 0.00

0.0 0.00

0.0 0.00

0.0 0.00

0.0 0.00

0.0 0.00

0.0 0.00

Copyright 2007 HVAC Design Solutions

11

"Your Company Name" ASHRAE STD. 62.1-2007 COMPLIANCE

VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY MULTIPLE ZONE SYSTEMS (WITHOUT ZONE LEVEL RECIRCULATION)
RESET/CLEAR AIR HANDLING UNIT TAG NUMBER (AHU-1, ETC.) RECORD NUMBER > > > > PRINT
PROJECT NAME: PROJECT NUMBER: DATE: DESIGN OA TEMP.: Berkley Plaza 125-07

HELP

AHU-1 1 1-1 2 1-2 3 1-3

4 1-4

5/3/2007 Quick input of AHU 30 and associated zone numbers. 7 5 6 8

ZONE NUMBER (EG: 1-1, 1-2) OCCUPANCY CATEGORY NUMBER (SEE TABLE 6-1) OCCUPANCY CATEGORY PEOPLE OUTDOOR AIR RATE (CFM/PERSON) (Rp) AREA OUTDOOR AIR RATE (CFM/SQ. FT.) (Ra)

1-5

0.0 0.00

0.0 0.00

0.0 0.00

0.0 0.00

0.0 0.00

0.0 0.00

0.0 0.00

0.0 0.00

Copyright 2007 HVAC Design Solutions

12

TABLE 6-1 MINIMUM VENTILATION RATES IN BREATHING ZONE

ANSI/ASHRAE STANDARD 62.1-2007 COMPLIANCE HELP (This table is not valid in isolation; it must be used in conjunction with the accompanying notes.) Default Values

Occ. Category Number

Occupancy Category

People Outdoor Air Rate Rp cfm/person L/sperson

Area Outdoor Air Rate Ra cfm/sq. ft. L/sm


2

Notes

Occupant Density (see Note 4) 2 #/1000 ft or #/100m


2

Combined Outdoor Air Rate (see Note 5) cfm/person L/sperson 49 4 44

Air Class

d st ti s i g w iti g

9 9

20

Conference/meeting

17 18 19

Restaurant dining rooms Cafeteria/fast food dining Bars, coc t ail lounges

7.5 7.5 7.5 5

3.8 3.8 3.8 2.5

70 100 100 50

Copyright 2007 HVAC Design Solutions

10 7.5 7.5 10 10 10 10 10 10 7.5

5 5 3.8 3.8 5 5 5 5 5 5 3.8

Category Numbers assigned to ASHRAE Table 1 categories. Appropriate rates automatically A transfer to program calculations.
10 9 9 6

25 5 65 150 20 25 20 25 25 35 100

15 13 8 8 19 17 19 15 15 12 8

5.1 4.7 4.7 3.1

 

5 6 7 8 9 10 11 12 13 14 15 16

c e (th gh age 4) Class s (ages 5-8) s (age 9 pl s ) Class Lect e class Lect e hall (fixed seats) Art classroom Universit c i. laboratories Wood metal shop Computer lab Media center Music theater/dance Multi-use assembl

86 7.4 6.7 4.3 4.0 9.5 8.6 9.5 7.4 7.4 5.9 4.1

1 1 1 1 2 --2 1 1 1 1 2 2 2 1

  

           

1 2 3 4

Cell

Correctional Facilities 6 6 6 6 Educational Facilities 8 9 0.12 0.6 0.12 0.6 0.06 0.3 0.06 0.3 0.18 0.9 0.18 0.9 0.18 0.9 0.12 0.6 0.12 0.6 0.06 0.3 0.06 0.3 Food and Beverage Service 0.18 0.9 0.18 0.9 0.18 0.9 General 0.06 0.3

13

"Your Company Name" ASHRAE STD. 62.1-2007 COMPLIANCE

VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY MULTIPLE ZONE SYSTEMS (WITHOUT ZONE LEVEL RECIRCULATION)
RESET/CLEAR AIR HANDLING UNIT TAG NUMBER (AHU-1, ETC.) RECORD NUMBER > > > > PRINT
PROJECT NAME: PROJECT NUMBER: DATE: DESIGN OA TEMP.: Berkley Plaza 125-07

HELP

AHU-1 1 1-1 28
Receptio n areas

2 1-2 27
Office space

3 1-3 29

Quick input of Occupancy 5/3/2007 Category30 numbers - brings the People and Area OA 8 4 5 6 7 rates into the calculations
1-5 29 1-6 27
Office space

ZONE NUMBER (EG: 1-1, 1-2) OCCUPANCY CATEGORY NUMBER (SEE TABLE 6-1) OCCUPANCY CATEGORY PEOPLE OUTDOOR AIR RATE (CFM/PERSON) (Rp) AREA OUTDOOR AIR RATE (CFM/SQ. FT.) (Ra)

1-4 20

1-7 8
Lecture classroom

1-8

Telephon Conferen Telephon e/data ce/meetin e/data entry g entry

5.0 0.06

5.0 0.06

5.0 0.06

5.0 0.06

5.0 0.06

5.0 0.06

7.5 0.06

0.0 0.00

Copyright 2007 HVAC Design Solutions

14

OCCUPANCY CATEGORY PEOPLE OUTDOOR AIR RATE (CFM/PERSON) (Rp) AREA OUTDOOR AIR RATE (CFM/SQ. FT.) (Ra) ZONE FLOOR AREA (SQ. FT.) (Az) NORMAL OCCUPANCY - IF KNOWN (EG. ONE PER OFFICE) (NUMBER OF PEOPLE) PEAK OCCUPANCY - IF KNOWN (EG. MEETING IN AN OFFICE) (NUMBER OF PEOPLE) IF SPACE IS INTERMITTENT USAGE (EG. CONFERENCE ROOM) (SPACE HEIGHT - FT.) CORRECTED OCCUPANCY FOR INTERMITTENT USAGE SPACES (NUMBER OF PEOPLE) CALCULATED OCCUPANCY (NUMBER OF PEOPLE) (Pz) DEFAULT OCCUPANCY (NUMBER OF PEOPLE) (Pz)

Receptio n areas

Office space

Telepho Conferen Telepho ne/data ce/meeti ne/data entry ng entry

5.0 0.06 400

5.0 0.06 600

5.0 0.06 3000

5.0 0.06 500

Quick input of 5.0 5.0 7.5 each zones Floor Area. 0.06 0.06 0.06
400 700

Office space

Lecture Lobbies/ classroo prefuncti m on

7.5 0.06

0 0.0 12.0

0 0.0 3.0

0 0.0 180.0

0 0.0 25.0

0 0.0 24.0

0 0.0 3.5

0 0.0 0.0

0 0.0 0.0

Copyright 2007 HVAC Design Solutions

15

OCCUPANCY CATEGORY PEOPLE OUTDOOR AIR RATE (CFM/PERSON) (Rp) AREA OUTDOOR AIR RATE (CFM/SQ. FT.) (Ra) ZONE FLOOR AREA (SQ. FT.) (Az) NORMAL OCCUPANCY - IF KNOWN (EG. ONE PER OFFICE) (NUMBER OF PEOPLE) PEAK OCCUPANCY - IF KNOWN (EG. MEETING IN AN OFFICE) (NUMBER OF PEOPLE) IF SPACE IS INTERMITTENT USAGE (EG. CONFERENCE ROOM) (SPACE HEIGHT - FT.) CORRECTED OCCUPANCY FOR INTERMITTENT USAGE SPACES (NUMBER OF PEOPLE) CALCULATED OCCUPANCY (NUMBER OF PEOPLE) (Pz) DEFAULT OCCUPANCY (NUMBER OF PEOPLE) (Pz)

Receptio n areas

Easy input of normal and peak 5.0occupancy, if known. 5.0 left 5.0 5.0 5.0 5.0 If blank, the0.06 0.06 default0.06 ASHRAE 0.06 0.06 0.06 occupancy numbers will be used.
400 4 12 8 12 12.0 12.0 600 2 6 8 3 3.0 3.0 3000 140 180 8 180 180.0 180.0 500 0 20 8 20 20.0 25.0 400 12 24 8 24 24.0 24.0 0 5.0 3.5 700 5

Office space

Telepho Conferen Telepho ne/data ce/meeti ne/data entry ng entry

Office space

Lecture Lobbies/ classroo prefuncti m on

7.5 0.06 950

7.5 0.06 400

0 0.0 61.8

0 0.0 12.0

Copyright 2007 HVAC Design Solutions

16

ANSI/ASHRAE STANDARD 62.1-2007 COMPLIANC E

TABLE 6-2 Zone Air Distribution Effectiveness


C onfiguration Number 1 2 3 4 Air D istribution Configuration Ceiling supply of cool air Ceiling supply of warm air and floor return Ceiling supply of warm air 15F (8C) or more above space temperature and ceiling return. Ceiling supply of warm air less than 15F (8C) above space temperature and ceiling return, provided that the 150 fpm (0.8 m/s) supply air jet reaches to within 4.5 ft (1.4 m) of floor level. Ceiling supply of warm air less than 15F (8C) above space temperature and ceiling return, with the supply air jet reaching to within 4.5 ft (1.4 m) of floor level of less than 150 fpm (0.8 m/s) velocity. Floor supply of cool air and ceiling return provided that the 150 fpm (0.8 m/s) supply jet reaches 4.5 ft (1.4 m) or more above the floor. Note: Most underfloor air distribution systems comply with this proviso. Floor supply of cool air and ceiling return, provided low velocity displacement ventilation achieves unidirectional flow and thermal stratification. Effectiveness Ez 1.0 1.0 0.8 1.0

HELP

0.8

6 7 8 9 10 11

1.0 1.2 1.0 0.7 0.8 0.5

Configuration Numbers Floor supply of warm air and floor return 1.0 assigned to ASHRAE Floor supply of warm air and ceiling return 0.7 Table 2 Air Distribution Makeup supply drawn in on the opposite side of the room from the exhaust and/or return. Configuration descriptions. Makeup supply drawn in near to the exhaust and/or return location
GEN ERAL NOTES FOR TABLE 6-2 1. C ool air is air cooler than space temperature.

Copyright 2007 HVAC Design Solutions

17

CORRECTED OCCUPANCY OR INTERMITTENT USAGE SPACES (NUMBER OF PEOPLE) CALCULATED OCCUPANCY (NUMBER OF PEOPLE) (Pz) DEFAULT OCCUPANCY (NUMBER OF PEOPLE) (Pz) DESIGN OCCUPANCY (CALCULATED, IF KNOWN OR DEFAULT) (NUMBER OF PEOPLE) (Pz) PEOPLE OUTDOOR AIR (CFM) (Rp x Pz) AREA OUTDOOR AIR (CFM) (Ra x Az) BREAT ING ONE OUTDOOR AIRFLOW (CFM) (V z) AIR DISTRIB. CONFIG. NUMBER (SEE TABLE 6-2) ZONE AIR DISTRIBUTION EFFECTIVENESS (Ez) ZONE OUTDOOR AIRFLOW (CFM) (V z)

12 12.0 12.0 12 60 24 84 1 1.0 84

3 3.0 3.0 3 15 36 51 1 1.0 51

180 180.0 180.0 180 900 180 1080 3 0.8 1350

20 20.0 25.0 20 100 30 130 1 1.0 130

24 24.0

0 5.0

40 40.0

16 16.0

24.0 3.5 Quick input of 61.8 12.0 Air Distribution Config. 16 24 5 40 Number - brings Zone 120 25 300 120 Air Distribution Effectiveness (Ez) into 24 42 57 24 the calculations. 144 3 0.8 180 67 1 1.0 67 0.0 0.0 357 144

Copyright 2007 HVAC Design Solutions

18

ZONE OUTDOOR AIRFLOW (CFM) (Voz) DESIGN PRIMARY AIRFLOW TO ZONE (INCL. PRIMARY OA & RA) (CFM) (Vpz) MINIMUM VAV AIRFLOW TO ZONE (INCL. PRIMARY OA & RA) (CFM) (Vdz) ZONE PRIMARY OUTDOOR AIR FRACTION (Zp) NORMAL ZONE OCCUPANCY (EITHER KNOWN OR DEFAULT) (NUMBER OF PEOPLE)

84 500 250 0.34 4

51 800 250 0.20 2

1350 5000 1800 0.75 140

130 600 300 0.43 25

180 650 300 0.60 12

Easy input of each zones 91 357 144 310 31 Design Airflow and Minimum 850 1400 600 1200 400 1000 Airflow. Alert colors 300 700 300 600 150 300 automatically indicate which 0.22zones are least efficient at 0.30 0.51 0.48 0.52 0.21 delivering OA to occupants.
67 5 62 12 16 2 7
CALC. ORIGINAL CHANGE 1 CHANGE 2 CHANGE 3

SYSTEM POPULATION (SUM OF NORMAL OCCUPANCIES) (Ps) ZONE POPULATION (LARGEST TYPICAL OCCUPANCY) (SUM (Pz)) OCCUPANT DIVERSITY (SYSTEM POPULATION / SUM OF DESIGN POPULATION) (D)

Yellow highlight in row for 291 Zone Primary Outdoor Air 330 Fraction (Zp) indicates the ventilation-critical zone.
0.88 2255 0.750

FOR OPTIMIZATION, ADD TO KEY "MINIMUM VAV AIRFLOW TO ZONE" (CFM): OA QUANTITY IS OPTIMIZED WHEN REQ'D. OA INTAKE CHANGE IS LESS THAN:

630

630

114.5

UNCORRECTED OUTDOOR AIR INTAKE (CFM) (Vou) MAXIMUM ZONE PRIMARY OUTDOOR AIR FRACTION (Zp)

REQUIRED OA INTAKE FLOW (CFM) (Vot)

5423

AUTO-OPTIMIZE

Preliminary Required OA Intake Flow is calculated during zone CFM input.


114.5 5423

Copyright 2008 HVAC Design Solutions

19

ZONE OUTDOOR AIRFLOW (CFM) (Voz) DESIGN PRIMARY AIRFLOW TO ZONE (INCL. PRIMARY OA & RA) (CFM) (Vpz) MINIMUM VAV AIRFLOW TO ZONE (INCL. PRIMARY OA & RA) (CFM) (Vdz) ZONE PRIMARY OUTDOOR AIR FRACTION (Zp)

84 500

51 800

1350 5000 1800 0.75 140

130 600 300 0.43 25

180 67 357 Critical Zone 144 before850 1400 600 Optimization 650 300 0.60 12 300 0.22 5 700 0.51 62
CALC.

310 1200 600 0.52 16

31 400 150 0.21 2

91 1000 300 0.30 7

SYSTEM POPULATION (SUM OF NORMAL OCCUPANCIES) (Ps) ZONE POPULATION (LARGEST TYPICAL OCCUPANCY) (SUM (Pz)) OCCUPANT DIVERSITY (SYSTEM POPULATION / SUM OF DESIGN POPULATION) (D)

After completing the 250 250 zone Design and 0.34 0.20 Minimum air quantity input, the next step is 4 2 to Optimize the 291 system and required 330 OA quantity.
NORMAL ZONE OCCUPANCY (EITHER KNOWN OR DEFAULT) (NUMBER OF PEOPLE)

300 0.48 12

ORIGINAL CHANGE 1

CHANGE 2 CHANGE 3

FOR OPTIMIZATION, ADD TO KEY "MINIMUM VAV AIRFLOW TO ZONE" (CFM): OA QUANTITY IS OPTIMIZED WHEN REQ'D. OA INTAKE CHANGE IS LESS THAN: REQUIRED OA INTAKE FLOW (CFM) (Vot)

630

630

UNCORRECTED OUTDOOR AIR INTAKE (CFM) (Vou)

MAXIMUM ZONE PRIMARY OUTDOOR AIR FRACTION (Zp)

To Optimize, simply click the Auto-Optimize 2255 button.


0.750

0.88

Required OA 114.5 before Optimization


114.5

5423

5423

AUTO-OPTIMIZE

Copyright 2008 HVAC Design Solutions

20

ZONE OUTDOOR AIRFLOW (CFM) (Voz) DESIGN PRIMARY AIRFLOW TO ZONE (INCL. PRIMARY OA & RA) (CFM) (Vpz) MINIMUM VAV AIRFLOW TO ZONE (INCL. PRIMARY OA & RA) (CFM) (Vdz) ZONE PRIMARY OUTDOOR AIR FRACTION (Zp) NORMAL ZONE OCCUPANCY (EITHER KNOWN OR DEFAULT) (NUMBER OF PEOPLE) SYSTEM POPULATION (SUM OF NORMAL OCCUPANCIES) (Ps) ZONE POPULATION (LARGEST TYPICAL OCCUPANCY) (SUM (Pz)) OCCUPANT DIVERSITY (SYSTEM POPULATION / SUM OF DESIGN POPULATION) (D) UNCORRECTED OUTDOOR AIR INTAKE (CFM) (Vou) MAXIMUM ZONE PRIMARY OUTDOOR AIR FRACTION (Zp)

84 500 250 0.34 4 291 330

Program automatically adjusts critical zone Max.31 Zone 91 51VAV Minimums, which reduce the310 1350 130 180 67 357 144 OA Fraction650 850 1400 0.75 to 0.37. 400 from original 600 1200 800 5000 600 1000
250 0.20 2 3800 0.36 140 360 0.36 25 490 0.37 12 300 0.22 5 1050 0.34 62
CALC. FOR OPTIMIZATION, ADD TO KEY "MINIMUM VAV AIRFLOW TO ZONE" (CFM): OA QUANTITY IS OPTIMIZED WHEN REQ'D. OA INTAKE CHANGE IS LESS THAN:

450 0.32 12

900 0.34 16

150 0.21 2

300 0.30 7

ORIGINAL CHANGE 1

CHANGE 2 CHANGE 3

0.88

This results in a reduction of 98 Required OA from original 5423 CFM17.8 final 2824 CFM. to
630 114.5

2255 0.367

REQUIRED OA INTAKE FLOW (CFM) (Vot)

2824

5423

AUTO-OPTIMIZE

Copyright 2008 HVAC Design Solutions

21

"YOUR COMPANY NAME"

(MZ TYPE A)

VAV(1) - REHEAT COIL CALCULATIONS - 15 DEG. MAXIMUM


RESET/CLEAR PRINT
PROJECT ELEVATION = HEATING WATER DELTA-T = HEATING WATER SUPPLY TEMP = CALC. ZONE HEAT LOSS (MBH) HEAT LOSS DELTA-T (DEG. F) HEAT LOSS SAT (DEG. F)

HELP

OA DESIGN DB = COOLING SUPPLY DB = DESIGN ROOM TEMP. = VAV NUMBER COOLING AIR QUANTITY (CFM)

-4 55 70
MINIMUM VENT. OR HEATING AIR QUANT. (CFM)

670 30 200
COIL LOAD AT HEAT LOSS SAT (MBH)

PROJECT NAME: PROJECT NUMBER: DATE: GPM AT HW DELTA-T (GPM) REVISED MIN. VENT. (CFM)

TEST PROJECT #2 1456-08 05/21/08 REVISED SAT (DEG. F) REVISED COIL LOAD (MBH)

1-1 1-2 1-3 1-4 1-5 1-6 1-7 1-8 1-9 1-10 1-11 1-12 0 0 0 0 0 0 0 0

500 800 5000 600 650 850 1400 600 1200 400 1000 600 0 0 0 0 0 0 0 0

250 250 3800 360 490 300 1050 450 900 150 300 250 0 0 0 0 0 0 0 0

Program calculates required Reheat Coil capacities, based on minimum air quantities and zone heating loads.
Copyright 2008 HVAC Design Solutions

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

VAV Numbers and Optimized Air Quantities are automatically transferred to VAV-Reheat calculation program. (In VAV Version of software package)

80.0 80.0 80.0 80.0 80.0 80.0 80.0 80.0 80.0 80.0 80.0 80.0 80.0 80.0 80.0 80.0 80.0 80.0 80.0 80.0

6.7 6.7 101.2 9.6 13.1 8.0 28.0 12.0 24.0 4.0 8.0 6.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.4 0.4 6.7 0.6 0.9 0.5 1.9 0.8 1.6 0.3 0.5 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

22

User Input of zone (MZ TYPE A) VAV(1) - REHEAT COIL CALCULATIONS - 15 DEG. MAXIMUM Heating Loads RESET/CLEAR (excluding PRINT Loads: OA 670 -4 55 30 Envelope Loads200 only). 70
"YOUR COMPANY NAME"
OA DESIGN DB = PROJECT ELEVATION = PROJECT NAME: DATE: COOLING SUPPLY DB = DESIGN ROOM TEMP. = COOLING AIR QUANTITY (CFM) HEATING WATER DELTA-T = PROJECT NUMBER: HEATING WATER SUPPLY TEMP = HEAT LOSS DELTA-T (DEG. F) HEAT LOSS SAT (DEG. F) VAV NUMBER MINIMUM VENT. OR HEATING AIR QUANT. (CFM) CALC. ZONE HEAT LOSS (MBH) COIL LOAD AT HEAT LOSS SAT (MBH) GPM AT HW DELTA-T (GPM) REVISED MIN. VENT. (CFM)

HELP

TEST PROJECT #2 1456-08 05/21/08 REVISED SAT (DEG. F) REVISED COIL LOAD (MBH)

1-1 1-2 1-3 1-4 1-5 1-6 1-7 1-8 1-9 1-10 1-11 1-12 0 0 0 0 0 0 0

500 800 5000 600 650 850 1400 600 1200 400 1000 600 0 0 0 0 0 0 0

Program calculates actual coil loads (including Reheat Penalty).

250 250 3800 360 490 300 1050 450 900 150 300 250 0 0 0 0 0 0 0

2.5 3.9 51.6 0 0 4.1 14.9 4.6 11.2 0.8 2.3 3.2

9.4 14.6 12.7 0.0 0.0 12.8 13.3 9.6 11.7 5.0 7.2 12.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

80.0 84.6 82.7 80.0 80.0 82.8 83.3 80.0 81.7 80.0 80.0 82.0 80.0 80.0 80.0 80.0 80.0 80.0 80.0

6.7 7.9 112.3 9.6 13.1 8.9 31.7 12.0 25.6 4.0 8.0 7.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Also calculates required Coil GPM.


23

0.4 0.5 7.5 0.6 0.9 0.6 2.1 0.8 1.7 0.3 0.5 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0

N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

Copyright 2008 HVAC Design Solutions

"YOUR COMPANY NAME"


OA DESIGN DB = COOLING SUPPLY DB = DESIGN ROOM TEMP. =

-4 55 70

PROJECT ELEVATION = HEATING WATER DELTA-T = HEATING WATER SUPPLY TEMP =

670 30 200

PROJECT NAME: PROJECT NUMBER: DATE:

TEST PROJECT #2 1456-08 5/21/2008

VARIABLE AIR VOLUME TERMINAL UNIT SCHEDULE (WITH REHEAT)


VAV NUMBER COOLING AIR QUANTITY (CFM) MINIMUM AIR QUANTITY (CFM) ZONE COIL LOAD (1) (MBH) ENTERING REHEAT COIL DATA BASED ON MINIMUM AIR QUANTITY (COLUMN 3) AIR TEMP. (DEG. F) LEAVING WATER TEMP. (DEG. F) ENTERING LEAVING COIL GPM (2) PIPE SIZE (3) (GPM) (IN.) NOTES

Automatic printout of VAV Schedule, for input to ACAD drawing schedule or for final selection by equipment manufacturers.

1-1 1-2 1-3 1-4 1-5 1-6 1-7 1-8 1-9 1-10 1-11 1-12

500 800 5000 600 650 850 1400 600 1200 400 1000 600

250 250 3800 360 490 300 1050 450 900 150 300 250

6.7 7.9 112.3 9.6 13.1 8.9 31.7 12.0 25.6 4.0 8.0 7.2

55.0 55.0 55.0 55.0 55.0 55.0 55.0 55.0 55.0 55.0 55.0 55.0 55.0 55.0 55.0 55.0

Also calculates most economical pipe sizing for coil supply pipes.

80.0 84.6 82.7 80.0 80.0 82.8 83.3 80.0 81.7 80.0 80.0 82.0 80.0 80.0 80.0 80.0

200 200 200 200 200 200 200 200 200 200 200 200

170 170 170 170 170 170 170 170 170 170 170 170

0.4 0.5 7.5 0.6 0.9 0.6 2.1 0.8 1.7 0.3 0.5 0.5 0.0 0.0 0.0 0.0

1/2 1/2 1 1/2 1/2 1/2 1/2 1/2 1/2 1/2 1/2 1/2

4-7 4-7 4-7 4-7 4-7 4-7 4-7 4-7 4-7 4-7 4-7 4-7

Copyright 2008 HVAC Design Solutions

24

"Your Company Name" ASHRAE STD. 62.1-2004 COM PLIANCE


PAGE 1

ASHRAE STD. 6 2.1-20 04 COMPLIANCE

PAGE 2

VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY MULTIPLE ZONE SYSTEMS (WITHOUT ZONE LEVEL RECIRCULATION)
PROJECT NAME: Berkley Plaza 125-07 4/3/2007

VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY MULTIPLE ZONE SYSTEMS ( WITHOUT ZONE LEVEL RECIRCULATION)
PROJECT NAME: Berkley P laza 125-07 4/3/2007

AIR HANDLING UN IT TAG NUMB ER (AHU-1, ETC.) ZONE NUMB ER (EG: 1-1, 1-2)

PROJECT NUMBER:

AHU-1 1-1
Receptio n areas

DATE:

AIR HANDLING UNIT TAG NUMBER (AHU-1, ETC.) ZONE NUMBER (EG: 1 -1 , 1-2) DESIGN PRIMARY AIRFLOW TO ZONE (INCL. PRIMARY OA & RA) (CFM) (Vpz) MINIMUM VAV AIRFLOW TO ZONE (INCL. PRIMARY OA & RA) (CFM) (Vdz) ZONE PRIMARY OUTDOOR AIR FRACTION (Zp) NORMAL ZONE OCCUPANCY (EITHER KNOWN OR DEFAULT) (NUMBER OF PEOPLE) SYSTEM POPULATION (SUM OF NORMAL OCCUPANCI ES) (Ps)

PROJECT NU MBER :

AHU-1 1-1 500 250 0.34 4 290.75 330 1-2 800 250 0.20 2 1-3 4000 3200 0.42 140

DATE:

1-2
Office space

1-3

1-4

1-5

1-6
Office space

1-7

1-8

1-4 600 300 0.43 25

1-5 500 390 0.46 12

1-6 850 300 0.22 5

1-7 1100 700 0.51 61.75

1-8 600 300 0.48 12

OC CUPANCY CATEGORY PEOPLE OUTDOOR AIR RATE (CFM /PERSON) (Rp) AREA OUTD OOR AIR R ATE (CFM/SQ. FT.) (Ra) ZONE FLOOR AREA (SQ. FT.) (Az) NORM AL OC CUPANCY - IF KNOWN (EG. ONE PER OFFICE) (NUMB ER OF PEOPLE) PEAK OCCU PANCY - IF KNOWN (EG. MEETIN G IN AN OFFICE) (NUMB ER OF PEOPLE) IF SPACE IS INTERM ITTENT USAGE (EG. CONFERENCE ROOM ) (SPACE HEIGH T - FT.) CORRECTED OCCUPANCY FOR INTER MITTENT USAGE SPACES (NUMB ER OF PEOPLE) CALCULATED OC CUPANCY (NUM BER OF PEOPLE) (Pz) DEFAULT OCCUPANCY (NUM BER OF PEOPLE) (Pz) DESIGN OCCUPANCY (CALCU LATED, IF KNOWN OR DEFAULT) (NUM BER OF PEOPLE) (Pz) PEOPLE OUTDOOR AIR (Rp x Pz) AREA OUTDOOR AIR (Ra x Az) (CFM)

Telephon Conferen Telephon e/data ce/meetin e/data entry g entry

Lecture Lobbies/pref classroom unction

5.0 0.06 400 4 12 8 12 12.0 12.0 12 60 24 84 1 1.0 84

5.0 0.06 600 2 6 8 3 3.0 3.0 3 15 36 51 1 1.0 51

5.0 0.06 3000 140 180 8 180 180.0 180.0 180 900 180 1080 3 0.8 1350

5.0 0.06 500

5.0 0.06 400 12

5.0 0.06 700 5

7.5 0.06 950

7.5 0.06 400

20 8 20 20.0 25.0 20 100 30 130 1 1.0 130

24 8 24 24.0 24.0 24 120 24 144 3 0.8 180 5.0 3.5 5 25 42 67 1 1.0 67

40 10 40 40.0 61.8 40 300 57 357 1 1.0 357

20 10 16 16.0 12.0 16 120 24 144 1 1.0 144

ZONE POPULATION (LARGEST TYPICAL OCCUPANCY) (SUM (Pz)) OCCUPANT DI VERSITY (SYSTEM POPULATION / SUM OF DESIGN POPULATION) (D)

UNCORRECTED OUTDOOR AIR INTAKE (CFM) (Vou)

MAXIMUM ZONE PRIMARY OUTDOOR AIR FRACTION (Zp) DEFAULT SYSTEM VENTILATION EFFICIENCY (Ev ) SYSTEM PRIMARY AIRFLOW (Vps)

(CFM )

AVERAGE OUT DOOR AIR FRACTION (Xs)

BR EATHING ZONE OUT DOOR AIRFLOW (CFM ) (Vbz) AIR DISTR IB. CONFIG. NUM BER (SEE TABLE 6-2) ZONE AIR DISTRIBU TION EFFECTIVENESS (Ez) ZONE OUTDOOR AIRFLOW (CFM ) (Voz)

DISCHARGE OUTDOOR AIR FRACTION (Zd) ZONE VENTILATION EFFICI ENCY (Evz) CALCULATED SYSTEM VENTILATION EFFICIENCY (APPENDIX A) (Ev) = MINIMUM (Ev z)

After completing input and optimization, compliance documents can be printed for submittal to building department officials and for LEED submittals.
0.88 2254.893939 0.510 0.65
(CFM)

11950 0.19

0.34 0.85

0.20 0.98

0.42 0.77

0.43 0.76

0.46 0.73

0.22 0.97

0.51 0.68

0.48 0.71

0.68 3322

MULTIPLE ZONE RECIRC. SYSTEM REQUIRED OA INTAKE FLOW (CFM) (Vot)

Copyright 2008 HVAC Design Solutions

25

For more information, see our article appearing in the November, 2006 ASHRAE Journal

Copyright 2007 HVAC Design Solutions

26

TAB
P JE I

C NTENTS
B A S IC PR O JE C T IN F O R M A TIO N F O R M

TABLE 6-1

MINIMUM VENTILATION RATES IN BREATHING ZONE ( FROM ASHRAE STANDARD 62.1-2007)

TABLE 6-2
TA KE -O F F F O R M
F O R M F O R L IS TIN G TH E N E C E S S A R Y IN PU T D A TA F O R R E QU IR E D V E N TIL A TIO N C A L C U L A TIO N S C A L C U L A TIO N PR O G R A M F O R S Y S TE M S WITH

ZONE AIR DISTRIBUTION EFFECTIVENESS ( FROM ASHRAE STANDARD 62.1-2007)

TABLE 6-3

SYSTEM VENTILATION EFFICIENCY ( FROM ASHRAE STANDARD 62.1-2007)

S IN G L E ZO N E S YS TE M O N E A IR H A N D L E R S U PPL Y IN G A IR TO O N L Y
O N E ZO N E C A L C U L A TIO N PR O G R A M F O R S Y S TE M S WITH O N E A IR H A N D L E R S U PPL Y IN G 1 0 0 % O U TD O O R A IR TO O N E O R M O R E ZO N E S C A L C U L A TIO N PR O G R A M F O R "S IN G L E S U PPL Y " S Y S TE M S WH E R E A L L V E N TIL A TIO N IS A M IXTU R E O F O A A N D R A F R O M A S IN G L E C A L C . PR O G R A M F O R S Y S TE M S TH A T PR O V ID E PA R T O F TH E V E N TIL A TIO N B Y R E C IR C U L A TIN G L O C A L A IR WITH O U T D IR E C TL Y M IXIN G WITH O A

TABLE 6-4

MINIMUM EXHAUST RATES ( FROM ASHRAE STANDARD 62.1-2007)

1 0 0 % O A S YS TE M

Also, with VAV Version


V A V (1 ) R E H E A T
C A L C U L A TIO N PR O G R A M F O R V A V TE R M IN A L A N D R E H E A T C O IL S IZIN G (M U L TIPL E ZO N E WITH O U T ZO N E L E V E L R E C IR C . ) (1 5 T M A X) C A L C U L A TIO N PR O G R A M F O R V A V TE R M IN A L A N D R E H E A T C O IL S IZIN G (M U L TIPL E ZO N E WITH O U T ZO N E L E V E L R E C IR C . ) (2 5 T M A X) C A L C U L A TIO N PR O G R A M F O R V A V TE R M IN A L A N D R E H E A T C O IL S IZIN G (M U L TIPL E ZO N E WITH ZO N E L E V E L R E C IR C . ) (1 5 T M A X) C A L C U L A TIO N PR O G R A M F O R V A V TE R M IN A L A N D R E H E A T C O IL S IZIN G (M U L TIPL E ZO N E WITH ZO N E L E V E L R E C IR C . ) (2 5 T M A X) H E L P F IL E IN F O R M A TIO N F O R V A V /R E H E A T C A L C U L A TIO N S

M U L T. ZO N E TYPE A

V A V (2 ) R E H E A T

M U L T. ZO N E TYPE B

V A V (3 ) R E H E A T (B )

V A V (4 ) R E H E A T (B )

H E L P1 (V A V )

A C A D 1 (V A V )

A C A D D R A WIN G O F S U G G E S TE D V A V TE R M IN A L U N IT S C H E D U L E (WITH R E H E A T)

Copyright 2008 HVAC Design Solutions

27

Straightforward takeoff and input allows easy analysis of ALL zones, to assure that the correct critical zones are analyzed. All procedures, formulas, charts, and tables as prescribed by the Ventilation Rate Procedure have been included and have been used to establish the Optimized outdoor intake flow rate requirements. Capacity of over 100 zones per air handling unit, using Appendix A calculations.
Copyright 2007 HVAC Design Solutions 28

Proprietary Optimization procedures to assure that the prescribed outdoor air requirements are being met while also assuring that the outdoor air quantities are not grossly excessive. Optimization can save significant energy and operating costs over the life of a facility. Output in the form of Compliance Documents for submittal to appropriate code enforcement officials or building departments.
Copyright 2007 HVAC Design Solutions 29

Separate calculation procedures for multiple zone systems with and without local recirculation systems, as well as single zone systems and 100% outdoor air systems. Time averaging algorithms for occupancy, where allowed. Extensive Help Files that are hyperlinked to each program, form, or table. Available in either I-P Units or SI Units
Copyright 2007 HVAC Design Solutions 30

Limited time Special Pricing available at our website www.hvacdesignsolutions.com 62.1-2007 Comply (Inch-Pound or SI Units) Original rice: $ , Special Price: $189 US 62.1-2007 Comply-VAV (I-P or SI Units) Original rice: $ , Special Price: $219 US

Copyright 2008 HVAC Design Solutions

31

Current Version: 2.38, with latest update (06/04/2008) Free updates as available. To purchase 62.1-2007 Comply, visit our website at www.hvacdesignsolutions.com and go to the Prices/Orders page Software can be downloaded for immediate installation (with password) after purchase is confirmed

Copyright 2008 HVAC Design Solutions

32

OS: Windows 98, 2000, XP, 2003, Vista Processor: Pentium or equivalent Ram: 512MB (recommended) Disk Space: 100 MB (recommended) Software: MS Word, MS Excel

Copyright 2008 HVAC Design Solutions

33

Thank you for taking your time to review our 62.1-2007 Comply software package If you have any questions or comments, you can e-mail to: steveathvacdesignsolutions.com , or supportathvacdesignsolutions.com We also have an interactive demo of our 62.1-2007 Comply software that can be delivered, on request, via e-mail.
Copyright 2008 HVAC Design Solutions 34

Das könnte Ihnen auch gefallen