/Qc Manager, Oil and Gas

<HR< td> Year of birth 1967

Permanent/Home Location/Address City or Town desuq Country EGYPT Current Location/Address Country KAZAKHSTAN Languages Primary Language Arabic Nationalities Main Nationality

Fluency

Read, write and sp

EGYPT

Experience Classification Job Function Years Experience QA/QC Engineer 16 QA/QC Manager 10 Quality/Inspection 16 QC 16 Industry Years Experience Oil and Gas 16 Qualifications Highest Qualifications

Degree

Qualification Subject Establis Degree B.Sc. of EGYPT Mechanical Engineering

Other Qualifications, Memberships,

Ultrasonic test Level II . Radiographic test Level II. Magnetic particle inspection Level II Dye penetrant test Level II. Heat treatment course. Visual Level II.

CWI Certified welding inspector (200 Intensive English course. Cambridge f Offshore Survival (HUET/Sea surviva

H2S Breathing apparatus course

Computer Skills and Software Used I) Operating System (Windows) II) Microsoft office (Excel, Word, and III) Net work system (Internet) Work Locations Are you willing to move or relocate? Yes - I will travel domestically

Availability Earliest Start Date Given 4 weeks not Ideal Next Job QC MANAGER/QC ENGINEER

Required Salary & Conditions Minimum Salary USD 10,000$ PER M ACCOMODATION&BOUNES&FRE TICKETS&FREE TRANSPORTATIO

Employment History Total Years of 18 Work Experience: Commenced Full 1993 Time Work: Name CCC Consolidated (KAZAKHISTAN Job Title: Qa/Qc Manager

Duration

From : 2008 To: 2

Summary CURRENT EMPLOYMENT:( Octobe My Responsibility : QA/QC Manager Company : CCC Consolidated Contrac (KAZAKHISTAN) Project : KAZAKHAN SULPHER and Client : AGIP Main Contractor : CCC Consolidated (KAZAKHISTAN) September 2006-May 2008) My Responsibility : QA / QC Manage Company : CCC Consolidated Contrac Project : Utilities Mechanical 2 Projec Client : The EQUATE Petrochemical Main Contractor : CCC Consolidated (KUWAIT) May 2005-August 2006

My Responsibility : QA / QC Manage Company : LEAD Contracting &Trad Project : Gathering System Project Client : BP (ALGERIA) Main Contractor : LEAD

June 2004-May 2005 My Responsibility : QA / QC Manage Company : LEAD Contracting &Trad Project : ASAB Facilities Upgrading P Client : ADCO(UAE) : TECHNIP Main Contractor May 2004-June 2004:

My Responsibility : TECHNIP Weldin Client : BURULLUS Gas Company Main contractor : TECHNIP Location March 2004-May2004:

My Responsibility : RINA Surveyor Client : PETROBEL (Balaim Petroleu RINA : Third Party Location : EGYPT Fields).

November.2003-March 2004: My Responsibility : QA / QC Manage Company : LEAD Syria . Project : OZ2(SP4& SP6) PROJECT Owner : SONATRACH - Algeria. Main Contractor : Joint Venture betwe and Saipem GEIE.

September2003-Novamber2003:

Elshaheen Field (12 Pipe Line Off Sh

Occupation : Germanischer Lloyd Sur Client : MAERSK OIL QATAR Co. Contractor : NPCC. Location : QATAR Elshaheen Field. Job Description : Surveyor responsible 12 risers and hydrotest activities for 1 Dec. 2001- September2003 :

QA / QC Manager. For CTU (Companies Temporary Unio & ETTERKIB Algeria). Assignment on OHANET gas develop Our Scope of work: 1) Mechanical works for ISBL includi [Piping Installation, Piping supports F Alignment for Stationary and Rotating Towers, Exchangers, Air Coolers, Gas Flares, And Filters), Light Steel Erecti Proofing, Blasting / Painting, Pre-Com Commissioning / start-up assistances]. 2) Mechanical works for OSBL includ [Piping fabrication and installation ins fence, hook-up lines connected to the line up-to the burn pit. Manifold skid a erection, piping supports and light stee Commissioning works, and Commissi My responsibility include the followin QA/QC manager for all mechanical w scope of work. Pre-commissioning assistant .

Turn over system coordinator . Familiarity with different codes ASM Inspection of materials Carbon, Allo Duplex . Preparing welding procedures qualifi Supervision the application of the ap specification. Welding inspector for piping during Welding inspector for steel structure Supervision of pipe lines constructio QC engineer and welding inspector f Mechanical punch list for hydrostatic Interpretation and supervision of N.D DP, and H.T. Oct. 2000 - Dec. 2001: El-Max Damanhour 12 Pipe line: Occupation : QA / QC Manager. Client : P.P.C. Petroleum Pipe lines C Contractor : PETROJET. Location : EGYPT-ALEXANDRIA. Job Description : QA/QC MGR. respo all construction activities for the pipe l Kilometer Mar. 1999 - Oct. 2000: Polyethylene Project: Occupation : QA / QC Manager & Hy Owner : SIDPEC Sidi Kerir petroleum Client : SAMSUNG Contractor : PETROJET. Location : EGYPT-ALEXANDRIA. PROJECT DESCRIPTION : fabricatio 350000 D.I /erection of very heavy eq (reactors ,towers , vessels , ECT..)

July 1998 - Mar. 1999: Abou El-gharadeek gas pipe line: Occupation : QA / QC Manager. Client : Khalda petroleum co. Contractor : PETROJET. Location : EGYPT-Western Desert. Job Description : Execution of 220 Ki its valve stations . Oct 1997 - July. 1998: Tarek gas plant Occupation : QA / QC Manager. Client : Khalda petroleum co.

Contractor : PETROJET. Location : EGYPT-Western Desert. Mar, 1997 - Oct. 1997: El-Obiyed pipe line: Occupation : QA / QC Engineer and A Client : BAPETCO Contractor : PETROJET. Location : EGYPT-Western Desert. Job Description : Execution of 430 Ki 34/32/22/16/12 pipe line with its

Dec, 1996 - Mar. 1997: Slug Catcher 36 Occupation : QA / QC Engineer. Client : PETROBEL (Balaim Petroleu Contractor : PETROJET. Location : EGYPT-Abou Madi (Midd Aug, 1996 - Dec. 1996: 5 Pipe lines F/L and G/L at BED #1 7 F/L and G/L at BED #2 600 meter: F/L and G/L at BED #3 2600 meter: Occupation : QA / QC Engineer. Client : BAPETCO Badr El-Din Co. Contractor : PETROJET. Location : EGYPT-Western Desert. Dec, 1995 - Aug. 1996: Spent oil re-refining plant: Occupation : QA / QC Engineer. Client : A.P.C. Alexandria Petroleum Contractor : PETROJET. Location : EGYPT- Alexandria-El-Ma Oct, 1995 - Dec. 1995: Storage Tank BADER 1 Occupation : QA / QC Engineer. Responsibilities : Visual inspection , N Fabrication ,installation ,Punch list & Client : BAPETCO BADER El-Din C Contractor : PETROJET. Location : EGYPT-Western Desert.

Dec, 1993 - Oct. 1995: M.P.C. lube oil blending plant: Occupation : Technical Office Engine Owner : M.P.C. Misr Petroleum Co. Client : ENPPI

Contractor : PETROJET. Location : EGYPT-Alexandria - Amer PROJECT DESCRIPTION : his Proje together to produce lubricating oil 1-Storage Tanks : Engineering , Fabric 2500 Ton of steel and plates . 2-Industrial BLDGS : Construction o of steel structure & 3000m2 Cladding .

3-Mechanical Works : Fabrication & I piping and Erection of 600 Ton of Equipment . 4- Pipe Lines : Construction of 3 pipe May, 1993 - Nov. 1993: Occupation : Maintenance and Operat Company : El-Jawhara Tee Co. Sector of Job : Private Sector. Location : EGYPT-Alexandria.

Work Experience My responsibilities during the last pro to the following tasks:

QA/QC manager for all mechanical w Mechanical, Civil, Electrical and Instr project scope of work. Preparing Project Quality Plan (PQP Preparing Project Management Proce Quality Management Procedures to co Requirements. Preparing Quality Control procedure Specifications. Preparing All Method Of Statements conditions and Owner Specifications. Preparing Welding Procedures Speci Supervising Welder Qualification Te Qualification Certificates and Identific Preparing welding map for all Isome Preparing Audit Plan Programme. Lead Auditor for all internal and sub conducted by CCC Auditee for all Audit conducted by b

Familiarity with different codes (ASM I&ASME 31.1) / (API 1104&API 650 DAW Specifications. Inspection for all Material (Receiving and CCC supplied material. Turn Over System Co-coordinator. Preparing and reviewing Hydrostatic Issuing Mechanical punch list for hy Interpretation and supervision of N.D Heat treatment. Welding Engineer for all welding iss Assist in solving Engineering and Co Attending all quality and constructio all Owner Requirements. Preparing Monthly report for both O Covering the unavailabilitys of the Q Working part time as painting inspec piping engineer to cover the shortage o Preparing welding map and related W Distributing the work to all QC staff Training classes for all employers be
QA/QC manager for all mechanical works (including Mechanical, Civil, Electrical and Instruments) as described in project scope of work. Preparing Project Quality Plan (PQP). Preparing Project Management Procedures (PP) instead of Quality Management Procedures to comply with Owner Requirements. Preparing Quality Control procedures (QCP s) as per Owner Specifications. Preparing All Method Of Statements (MS s) as per Site conditions and Owner Specifications. Preparing Welding Procedures Specifications (WPS s). Supervising Welder Qualification Test and Preparing Welder Qualification Certificates and Identification Cards. Preparing welding map for all Isometric drawings. Preparing Audit Plan Programme. Lead Auditor for all internal and sub-contractor Audit which conducted by CCC Auditee for all Audit conducted by both Owner and MOA. Familiarity with different codes (ASME B31.3, IX, ASME I&ASME 31.1) / (API 1104&API 650) / ASTM/AWS D1.1 and DAW Specifications. Inspection for all Material (Receiving stage) Free issue material and CCC supplied material. Turn Over System Co-coordinator. Preparing and reviewing Hydrostatic test Packages. Issuing Mechanical punch list for hydrostatic test loops. Interpretation and supervision of N.D.T. methods RT, DPT and Heat treatment. Welding Engineer for all welding issues.

Assist in solving Engineering and Construction Issues. Attending all quality and construction meeting and fulfill with all Owner Requirements. Preparing Monthly report for both Owner and MOA. Covering the unavailability s of the QC Equipment engineer. Working part time as painting inspector, welding inspector, QC piping engineer to cover the shortage of staff at early beginning. Preparing welding map and related WPS s. Distributing the work to all QC staff and getting the feedback. Training classes for all employers before starting any activities.

Summary CAREER SUMMARY Senior B.S. Mechanical Engineer; responsible for overall control of supervision within the Construction group, Projects Control, Mechanical Completions (commissioning), QA/QC, Design & Process groups within the Process (petrochemical), Oil & Gas (downstream, midstream & upstream) and Power-FGD Industry, at the major EPC & Construction Contractor Company side and also the Client ((PMT) side for total 20 years (Power Plant = 10, Oil & Gas / Refinery = 7, Others =3) Brownfield / Greenfield experience. Key Competencies; - Self motivated, able to work unsupervised & flexible. Adaptability and problem solving capacity. - Able to make decisions at all level of organizations and Project Management Team, - Managing commissioning /construction/ QA-QC teams multidiscipline (civil/ structural, welding / piping, Rotating / Static equipment, coating/insulation, electrical / instrument) & multinational, - Conversant in large multi-discipline integrated construction projects with multinationalcompanies, - Primarily responsible for ensuring all aspects of Quality on the nominated project, - Capable to cover multidiscipline (civil, mechanical & electrical/I&C) engineering scope. - Fully conversant with ISO 9001 QMS as it relates to large project execution and Quality Audit, - Working experience with relevant industry codes, in particular API, ASTM, ASME, ANSI, NFPA, EN, ARAMCO, SABIC, - Ensuring compliance with HSE (SHE), HAZOP and PTW especially construction of Oil & Gas Refinery, Petrochemical Plant and Power Industry, - Project Management with respect to quality, scope of work and schedule. - Maintaining effective relationships with the Client, Vendors, EPC and Sub-contractors, - An effective PC user, advanced knowledge on the computer software & hardware.
Project: El Merk Pipe Line, Flow & Trunkline Project includes FGS & GDM units El Merk / ALGERIA Client: GROUPEMENT BERKINE. (Sonatrach Anadarko, ConocoPhillips, Eni Oil) ALGERIA Scope: Implementation of Project Quality Control Plan, Develop & update QA system and QC documents. - Analyses and review Quality Project Documentation (Drawings, Specification, Procedures, Codes ) - Identify any site organization deficiency, carry out site internal audits, analyze critical point and, in collaboration with Site Manager, to propose and implement corrective action. Also Periodic Reporting, - Reviewing & approval of materials submissions accordance with project requirement & standards,

- Ensure all construction works meet project specifications, procedures, codes and specific requirements, - Verifying the adequacy of the quality control procedures, methods and docs applied by subcontractors - Ensuring that inspection and tests are carried out & documented in accordance with the approved plans, - Attending periodically to inspection and tests, according to the approved QCP Quality control plan for site activities , verifying the inspector/Supervisor checks, reports & approves for the results, - Collecting the inspection records, maintaining and updating the inspection and tests status, - Using the computer monitoring system for to issue all Inspection summary reports which include all tests and certificates related to all items, maintain a traceability of the documents included in the dossiers, - Follow up N.C.R. Non Conformity Report issuing and resolution and punch listing certification. - Handing over of the mechanical completion systems (System Dossier) based on piping, instrumentation, electrical, equipments, pre-commissioning and commissioning systems & civil works, ===================================================== Apr.09 Jul.10 : Senior Mechanical Adviser (Installation & Commissioning) Company: GAMA Power Systems Engineering & Contracting Inc Project: SKOPJE 220 MW Combined Cycle Cogeneration Power Plant Project Skopje / MACEDONIA Client: TE-TO AD. Skopje / MACEDONIA Scope: Checking CCGT Power Plant mechanical installation daily and notify the sub-contractors about any discrepancies found according to contract, standards, drawings, ISO, P&ID. - Manage site mechanical departments (Equipment, Piping, Boiler, Turbine, and Utility) in budget and resources, project costs and schedules, and preparing periodic management reports. - Supervision for Equipments installation without vendor supervisor except ST-GT, which are installed advice of ALSTOM s Field Advisor. - Monitors & corrects hazardous situations to assure the workplace safety and to stop unsafe acts. - Reviewing & replying all mechanical RFI in coordination with HQ engineering department - Responsibility of all pre-commissioning activity including preparing of as-built P&ID during construction phase as well as commissioning of equipments, start-up & trial run. - Interface across plant functions providing technical support for plant construction improvements, to provide flowless commissioning, operations, maintenance, reliability, safety, and performance (+++) CCGT - Power Plant main equipment installation consist of GT (Alstom - GT13E2), ST (Alstom ST18 8CK76), Gas Compressor (Atlas Copco GT032 T2D1) and various LP/HP Pumps, Air Compressors / Diesel Gen, Fire Sys, HVAC equipment, Water Treatment & Waste Water Plants, Demi Water Plant. Also static equipment; HRSG-Boiler (ALSTOM), Gas Metering Station, Cooling Tower, Horizontal Vertical Drums, Condenser, Heath Exchanger, Vessels & Tanks including piping & various valves. Feb.08 Jan.09 Site QA/QC Manager Company: MMG (Mohammed Al MOJIL Group) Dammam / SAUDI ARABIA Project: PET Conversion & De-Bottleneck Plant Project. Client: SABIC Ibn Rushd Petrochemical Complex - Yanbu / SAUDI ARABIA

Scope: Implement QA/QC System at site to carry out the project specific quality control and assurance activities as detailed in the Project Quality Plan. - Manage & coordinate QC team of 23 ( 21 Inspector Structural, Civil, Welding, Piping, Rotating / Static Equipment, Coating, Insulation, E&I, 1 NDT / PMI Technician and 1 Document controller) and ensure that QC personnel are fully aware of the Project Quality Plan. - Ensure the safety is adhered to at site - Control all nonconformance reports and undertake remedial action. - Compete site quality control instructions and action remedial responses. - Participate in the internal and external site audits - Ensure all quality control documentation is complied and competed for as-built hand over through the client. Sep.06 Jan.08 Senior Quality Assurance Engineer (Biding & Operation/Construction) Company: MMG (Mohammed Al MOJIL Group) Dammam / SAUDI ARABIA Project: Total 18 ongoing construction/ maintenance projects in the field of Oil & Gas (Oil Refinery, Petrochemical Plant, Fertilizer Plant, and Pipe Line, Oil Wells as offshore & onshore) also construction of Power Plant, Steel Factory and Desalination Plant. Client: ARAMCO, SABIC, SAFCO, FOSTER WHEELER, LINERCO, Saudi TOYO, FLOUR DANIEL Int. Scope: As a Senior QA Engineer of construction company at the HQ; - Reviewing (Black Spot Analyze) of biding & contract documents and report to the Engineering / Project Control departments to cost & planning including QA/QC man-power estimation for bids - Preparing of QA/QC Packages (includes P.Q.A.M, QCIP, QCR & Report Forms, WMS & Operating Instructions) for bids / awarded projects and implementation of Client comments - CV evaluation / interviewing of QA/QC candidates, recruitment, deployment (over 150) and planning of QA/QC personnel (over 290) for 18-projects. May.05 Sep.06: Senior Completions (Commissioning) Engineer (Rotary / Stationary Equipment & Piping) Company: BOTAS; is state authority for transportation of crude oil & gas by pipeline. ANKARA / TURKEY Project : BTC Crude Oil Pipe Line (Turkish section of Baku-Tbilisi-Ceyhan crude oil Pipe Line with capacities 50 MTA; 46 x1076 Km s, 4 Pumps St, 2 Terminal On/Offshore, 51 Block Valves St.) Client: British Petroleum (BP) Scope: As an EPC Completions Engineer; to install commission & hand over Pump Stations - 2, 3 & 4 Main duties were but not limited to; - Checking the sub-contractor s mechanical installation(***) daily and notify the sub-contractors about any discrepancies found according to contract, standards, drawings, ISO, P&IDs, ITPs and project specifications with an end result to ensure the contractor generated a finished installation that meets project specifications and quality. NCR if any non-conformity. - Acting as Completions Manager - Dealing with QA/QC problems and ensure the safe quality of installation. - Ensure all work is carried out in line with HSE standards and the Project practices - Managing the supervision in guiding and overseeing the completions work undertaken by the various

construction contractors preparing systems for hand-over and hence minimize the affects of interfaces that the commissioning contractor's/vendor s work the meets the commissioning objectives by ensuring the commissioning contractor's activities. - Checking vendors commissioning procedures, method statements (WMS), risk assessment (RA), write and/or add relevant points missed out by vendor also preparing procedures, WMS. - Final checking to preparing Punch Lists & As-Build P&ID, ISO and confirming all the rotating / stationery equipments was fit for purpose to gain Mechanical Completions, and then to progress PreCommissioning, Commissioning, and finally Start- up. - Data assembling to GOC (certification software of BP), checking and collating all various certification documents, drawings, certificates of conformity etc, to make sure the entire mechanical paper works were in place to ensure client satisfaction for completion & hand over - Completion of all cold tests of equipment and performing the line fill and commissioning test of all equipment for Pump Stations with the crude oil. - Finding solution to Engineering, Quality, Process and Operating problems together with the Engineering Management. - Participate in and assist with the co-ordination of the Project's Function & Performance Test(s). - To act as Senior Maintenance Engineer after commissioning works for all Pump (4) & Pigging (2) Stations including Block Valves (51) (***) Pump Station Mechanical Installation consist of Gas-Engines / horizontal & vertical HP - LP Pumps / Compressors / Diesel Generator as large scale rotary equipments, Scraper Receiver-Launcher / tanks & vessels / strainers as stationery equipments, piping including large diameter of Relief Valves / NRV / TCV / PCV / FCV / MOV / ESD & E/H actuating units. Also Metering Station, F&G / Fire Fighting Sys, Water Treatment Sys, Waste Water Treatment Plant, Compressed & Instrument Air Plant, Fuel-gas System and Cooling/Heat Recovery/Hot Water & HVAC System Equipments as well as the buildings steel-structure & sanitary systems.

Aug.2003 May.2005: QA/QC Supervisor (Piping/Welding Works) Company: SCL - Sakhalin Construction Ltd /ALSIM-ALARKO A.S. Sakhalin Island/RUSSIA Project: Sakhalin LNG Project- II (2x4.8 annual million tones LNG and Oil Export Terminal) RUSSIA Client: Sakhalin Energy Investment Co; (is a SHELL Investment) EPC: CTSD ; ( is CHIYOTEC Ltd & TOYO Eng Ltd Sakhalin Development) Scope: As a construction company QA/QC Supervisor to installation / test and hand over total 436 InchKm s CS, HDPE & GRE piping with dia 4 to 24 and the crude oil pipe line 30 x1 Km. - Preparing and implementation project quality plan for the piping related works - Preparing Method Statement (WMS) for CS, HDPE, GRE piping, Painting & Insulation, - Preparing WPS, and conducting PQR & WQR tests according to ASME-IX & GOST. - Preparing Procedures for NDT (RT, MPI, DPI & Welding Consumables). - Over all responsibility of all QA/QC site & office activity for piping/welding works such as;

- Managing of QC inspectors, Line checkers, NDT Technician and third party NDT sub-contractor. - Coordinating inspection (RFI) & test together with EPC & the Client after performing internal inspection/test and arranging of test equipments/manpower for all pipe/valve/instrument installation works including welding, painting & tape wrapping, insulation & foam insulation. - Conducting NDT test, interpreting of PT/MT & RT results and preparation of reports. - Ensuring daily inspections and submit daily reports to the QA/QC Manager. Build and maintain all inspection reports, testing reports & the test packages and have appropriate turn-over documentation binders for each phase of the project, which are include all mechanical, welding and piping test results.

Oct.1995 Mar.2003: Owner Project Engineer (& Owner Site Coordinator) Company: ELTEM-TEK Consulting & Engineering. Service A.S. Ankara / TURKEY Projects: FGD (Flue Gas Desulphurization) retrofit for; a) (1995-1999) EUAS 3x210 MW YATAGAN Thermal Power Plant Mugla / TURKEY b) (1999-2003) EUAS 1x210 MW ORHANELI Thermal Power Plant Bursa / TURKEY Client: EUAS; is client as an authority for the State Power Plants and Transmission/Distribution Lines Scope: As a Client(owner) representative with full responsibility of retrofitting four (4) FGD Plants; main duties were but not limited to; - Managing of Owner s Engineer site team (civil, linning, electrical, instrument & process engineer) as a Site Coordinator. - Provided coordination between the site organizations and the client HQ as well as coordinating and participating in all review meetings with the contractors - To act as Client representative to ensure that design works by contractors meets Company standards and relevant industry codes. Field Engineering / Construction Management & Supervision of mechanical works I&C installation and, their quality, provide coordination between civil and mechanical works as a client engineer. Checking the contractor s activity daily, inform the Client Site Manager and notify contractors abut the any discrepancies found according to the contract, drawings, P&IDs, the project specifications, standards and common engineering practice. As result, ensure contractors generate a finished installation that meets the project specifications, as well as planned budget & schedule. - Monitor the site for unsafe situations and maintain safety awareness with the contractors - Replying mechanical EDC (engineering & design change) requested by contractors as FCN (Field Change Notice), FQ (field query), CR (concession request) and preparing TQ (technical query), or NCR if any nonconformity - Participated in all aspects of Inspection & test of mechanical equipments (pumps / agitators / airblowers / compressors / generators / conveyors / bucket elevators / crushers / re-claimers / weigh-belts / wet-mills / gas-gas heaters regavos / personnel elevators / pack-mills also gypsum handling & water treatment plants; fire fighting system equipments as rotating and Tanks & vessels /cyclones / bunkers / silos / Scrubber towers as static, piping, steel structure, welding & brazing, rubber & flake-linning of tank / pipe / ducts, coating & insulation, NDT, pressure & leakage tests and cold & hot commissioning test of all equipment as well as acceptance test of FGD Plant). Reviewed & evaluated all Tests protocols & QA/QC documents according to the contract, TIP- test and inspection plan and standards, to sign

protocols. - Dealing/participating electrical/civil & process engineering issue - Prepared Punch Lists for I&C and mechanical installation including coating/insulation/linning. - Taking part at the commissioning, start-up and trial run activities of mechanical equipment (rotating, stationary equipments and DCS-Teleperm-ME & XP Sys and PLC Units). - Checking & approval of monthly progressing bill of contractors. - Observing overall commissioning, start-up and trial run activities of the plant and preparing punch list for process and over all operation problems. - Releasing of testing, mechanical completions, commissioning, start-up and trial run protocols - Member of official Temporary/Final Acceptance Committee for Orhaneli & Yatagan FGD. Jan.1994 Sep.1995 Position: QC Engineer / Commissioning Engineer. /// ENERTES Ltd. (TURKEY) Client//EPC: TUPRAS; Turkish Petroleum Refinery A.S // FOSTER WHEELER Job detail: IZMIR Refinery expansion ( Isomerization Plant ) project ( All responsibility of all QA/QC site & office activity of piping/welding works & mechanical equipments installation of Isomerization Plant as a QA/QC Engineer. To act as Commissioning Engineer during the commissioning phase after mechanical completion). Dec.1990 Nov.1993 Position: Installation / Commissioning Engineer. /// CROMWELL SECURITY Ltd. (U.K.) Client//EPC: Several medium& small size costumers Job detail: Planning, installation and maintenance of interlock & security systems. Nov.1989 Jul.1990 Position: Senior Mechanical Engineer/Supervisor. /// ISLEM Ltd- LIBYA Branch (LIBYA) Client//EPC: LEC (LIBYA Electricity Authority) // LTEC (Libya Turkish Engineering Consulting) Ltd. Job detail: Installing of CASCS (computer aided stock control system) for Power Plants. Dec.1987 Nov.1989 Position: Mechanical Site / Commissioning Engineer. /// IZOFER Ltd. (TURKEY) Client//EPC: TEK (Turkish Electricity Authority, former name of EUAS) // ELECTRIM (POLAND) Job detail: 3x210 Thermal Power Plant ( Kemerkoy/MUGLA-Turkey ): Installation and commissioning (cold & hot) of Coal Handling (crasher, conveyors, reclaimer) System. Apr.1985 Mar.1986 Position: Mechanical Site Engineer, /// IZOFER Ltd. (TURKEY) Job detail: > KIRIKKALE Refinery for TUPRAS: Painting & Insulation of miscellaneous tanks, pipes, equipment > URFA Cement Factory for CITOSAN A.S: Installation of rotating equipments (crushers , grinding mills, conveyors, re-claimer, compressors & packing system) and stationery (vessels, bunkers, silos, cyclones & filters) equipments in the Project: El Merk Pipe Line, Flow & Trunkline Project includes FGS & GDM units El Merk / ALGERIA Client: GROUPEMENT BERKINE. (Sonatrach Anadarko, ConocoPhillips, Eni Oil) ALGERIA Scope: Implementation of Project Quality Control Plan, Develop & update QA system and QC

documents. - Analyses and review Quality Project Documentation (Drawings, Specification, Procedures, Codes ) - Identify any site organization deficiency, carry out site internal audits, analyze critical point and, in collaboration with Site Manager, to propose and implement corrective action. Also Periodic Reporting, - Reviewing & approval of materials submissions accordance with project requirement & standards, - Ensure all construction works meet project specifications, procedures, codes and specific requirements, - Verifying the adequacy of the quality control procedures, methods and docs applied by subcontractors - Ensuring that inspection and tests are carried out & documented in accordance with the approved plans, - Attending periodically to inspection and tests, according to the approved QCP Quality control plan for site activities , verifying the inspector/Supervisor checks, reports & approves for the results, - Collecting the inspection records, maintaining and updating the inspection and tests status, - Using the computer monitoring system for to issue all Inspection summary reports which include all tests and certificates related to all items, maintain a traceability of the documents included in the dossiers, - Follow up N.C.R. Non Conformity Report issuing and resolution and punch listing certification. - Handing over of the mechanical completion systems (System Dossier) based on piping, instrumentation, electrical, equipments, pre-commissioning and commissioning systems & civil works, ===================================================== Apr.09 Jul.10 : Senior Mechanical Adviser (Installation & Commissioning) Company: GAMA Power Systems Engineering & Contracting Inc Project: SKOPJE 220 MW Combined Cycle Cogeneration Power Plant Project Skopje / MACEDONIA Client: TE-TO AD. Skopje / MACEDONIA Scope: Checking CCGT Power Plant mechanical installation daily and notify the sub-contractors about any discrepancies found according to contract, standards, drawings, ISO, P&ID. - Manage site mechanical departments (Equipment, Piping, Boiler, Turbine, and Utility) in budget and resources, project costs and schedules, and preparing periodic management reports. - Supervision for Equipments installation without vendor supervisor except ST-GT, which are installed advice of ALSTOM s Field Advisor. - Monitors & corrects hazardous situations to assure the workplace safety and to stop unsafe acts. - Reviewing & replying all mechanical RFI in coordination with HQ engineering department - Responsibility of all pre-commissioning activity including preparing of as-built P&ID during construction phase as well as commissioning of equipments, start-up & trial run. - Interface across plant functions providing technical support for plant construction improvements, to provide flowless commissioning, operations, maintenance, reliability, safety, and performance (+++) CCGT - Power Plant main equipment installation consist of GT (Alstom - GT13E2), ST (Alstom ST18 8CK76), Gas Compressor (Atlas Copco GT032 T2D1) and various LP/HP Pumps, Air Compressors / Diesel Gen, Fire Sys, HVAC equipment, Water Treatment & Waste Water Plants, Demi Water Plant. Also static equipment; HRSG-Boiler (ALSTOM), Gas Metering Station, Cooling Tower, Horizontal Vertical Drums, Condenser, Heath Exchanger, Vessels & Tanks including piping & various valves.

Feb.08 Jan.09 Site QA/QC Manager Company: MMG (Mohammed Al MOJIL Group) Dammam / SAUDI ARABIA Project: PET Conversion & De-Bottleneck Plant Project. Client: SABIC Ibn Rushd Petrochemical Complex - Yanbu / SAUDI ARABIA Scope: Implement QA/QC System at site to carry out the project specific quality control and assurance activities as detailed in the Project Quality Plan. - Manage & coordinate QC team of 23 ( 21 Inspector Structural, Civil, Welding, Piping, Rotating / Static Equipment, Coating, Insulation, E&I, 1 NDT / PMI Technician and 1 Document controller) and ensure that QC personnel are fully aware of the Project Quality Plan. - Ensure the safety is adhered to at site - Control all nonconformance reports and undertake remedial action. - Compete site quality control instructions and action remedial responses. - Participate in the internal and external site audits - Ensure all quality control documentation is complied and competed for as-built hand over through the client. Sep.06 Jan.08 Senior Quality Assurance Engineer (Biding & Operation/Construction) Company: MMG (Mohammed Al MOJIL Group) Dammam / SAUDI ARABIA Project: Total 18 ongoing construction/ maintenance projects in the field of Oil & Gas (Oil Refinery, Petrochemical Plant, Fertilizer Plant, and Pipe Line, Oil Wells as offshore & onshore) also construction of Power Plant, Steel Factory and Desalination Plant. Client: ARAMCO, SABIC, SAFCO, FOSTER WHEELER, LINERCO, Saudi TOYO, FLOUR DANIEL Int. Scope: As a Senior QA Engineer of construction company at the HQ; - Reviewing (Black Spot Analyze) of biding & contract documents and report to the Engineering / Project Control departments to cost & planning including QA/QC man-power estimation for bids - Preparing of QA/QC Packages (includes P.Q.A.M, QCIP, QCR & Report Forms, WMS & Operating Instructions) for bids / awarded projects and implementation of Client comments - CV evaluation / interviewing of QA/QC candidates, recruitment, deployment (over 150) and planning of QA/QC personnel (over 290) for 18-projects. May.05 Sep.06: Senior Completions (Commissioning) Engineer (Rotary / Stationary Equipment & Piping) Company: BOTAS; is state authority for transportation of crude oil & gas by pipeline. ANKARA / TURKEY Project : BTC Crude Oil Pipe Line (Turkish section of Baku-Tbilisi-Ceyhan crude oil Pipe Line with capacities 50 MTA; 46 x1076 Km s, 4 Pumps St, 2 Terminal On/Offshore, 51 Block Valves St.) Client: British Petroleum (BP) Scope: As an EPC Completions Engineer; to install commission & hand over Pump Stations - 2, 3 & 4 Main duties were but not limited to; - Checking the sub-contractor s mechanical installation(***) daily and notify the sub-contractors about any discrepancies found according to contract, standards, drawings, ISO, P&IDs, ITPs and project specifications with an end result to ensure the contractor generated a finished installation that meets

project specifications and quality. NCR if any non-conformity. - Acting as Completions Manager - Dealing with QA/QC problems and ensure the safe quality of installation. - Ensure all work is carried out in line with HSE standards and the Project practices - Managing the supervision in guiding and overseeing the completions work undertaken by the various construction contractors preparing systems for hand-over and hence minimize the affects of interfaces that the commissioning contractor's/vendor s work the meets the commissioning objectives by ensuring the commissioning contractor's activities. - Checking vendors commissioning procedures, method statements (WMS), risk assessment (RA), write and/or add relevant points missed out by vendor also preparing procedures, WMS. - Final checking to preparing Punch Lists & As-Build P&ID, ISO and confirming all the rotating / stationery equipments was fit for purpose to gain Mechanical Completions, and then to progress PreCommissioning, Commissioning, and finally Start- up. - Data assembling to GOC (certification software of BP), checking and collating all various certification documents, drawings, certificates of conformity etc, to make sure the entire mechanical paper works were in place to ensure client satisfaction for completion & hand over - Completion of all cold tests of equipment and performing the line fill and commissioning test of all equipment for Pump Stations with the crude oil. - Finding solution to Engineering, Quality, Process and Operating problems together with the Engineering Management. - Participate in and assist with the co-ordination of the Project's Function & Performance Test(s). - To act as Senior Maintenance Engineer after commissioning works for all Pump (4) & Pigging (2) Stations including Block Valves (51) (***) Pump Station Mechanical Installation consist of Gas-Engines / horizontal & vertical HP - LP Pumps / Compressors / Diesel Generator as large scale rotary equipments, Scraper Receiver-Launcher / tanks & vessels / strainers as stationery equipments, piping including large diameter of Relief Valves / NRV / TCV / PCV / FCV / MOV / ESD & E/H actuating units. Also Metering Station, F&G / Fire Fighting Sys, Water Treatment Sys, Waste Water Treatment Plant, Compressed & Instrument Air Plant, Fuel-gas System and Cooling/Heat Recovery/Hot Water & HVAC System Equipments as well as the buildings steel-structure & sanitary systems.

Aug.2003 May.2005: QA/QC Supervisor (Piping/Welding Works) Company: SCL - Sakhalin Construction Ltd /ALSIM-ALARKO A.S. Sakhalin Island/RUSSIA Project: Sakhalin LNG Project- II (2x4.8 annual million tones LNG and Oil Export Terminal) RUSSIA Client: Sakhalin Energy Investment Co; (is a SHELL Investment) EPC: CTSD ; ( is CHIYOTEC Ltd & TOYO Eng Ltd Sakhalin Development) Scope: As a construction company QA/QC Supervisor to installation / test and hand over total 436 InchKm s CS, HDPE & GRE piping with dia 4 to 24 and the crude oil pipe line 30 x1 Km.

- Preparing and implementation project quality plan for the piping related works - Preparing Method Statement (WMS) for CS, HDPE, GRE piping, Painting & Insulation, - Preparing WPS, and conducting PQR & WQR tests according to ASME-IX & GOST. - Preparing Procedures for NDT (RT, MPI, DPI & Welding Consumables). - Over all responsibility of all QA/QC site & office activity for piping/welding works such as; - Managing of QC inspectors, Line checkers, NDT Technician and third party NDT sub-contractor. - Coordinating inspection (RFI) & test together with EPC & the Client after performing internal inspection/test and arranging of test equipments/manpower for all pipe/valve/instrument installation works including welding, painting & tape wrapping, insulation & foam insulation. - Conducting NDT test, interpreting of PT/MT & RT results and preparation of reports. - Ensuring daily inspections and submit daily reports to the QA/QC Manager. Build and maintain all inspection reports, testing reports & the test packages and have appropriate turn-over documentation binders for each phase of the project, which are include all mechanical, welding and piping test results.

Oct.1995 Mar.2003: Owner Project Engineer (& Owner Site Coordinator) Company: ELTEM-TEK Consulting & Engineering. Service A.S. Ankara / TURKEY Projects: FGD (Flue Gas Desulphurization) retrofit for; a) (1995-1999) EUAS 3x210 MW YATAGAN Thermal Power Plant Mugla / TURKEY b) (1999-2003) EUAS 1x210 MW ORHANELI Thermal Power Plant Bursa / TURKEY Client: EUAS; is client as an authority for the State Power Plants and Transmission/Distribution Lines Scope: As a Client(owner) representative with full responsibility of retrofitting four (4) FGD Plants; main duties were but not limited to; - Managing of Owner s Engineer site team (civil, linning, electrical, instrument & process engineer) as a Site Coordinator. - Provided coordination between the site organizations and the client HQ as well as coordinating and participating in all review meetings with the contractors - To act as Client representative to ensure that design works by contractors meets Company standards and relevant industry codes. Field Engineering / Construction Management & Supervision of mechanical works I&C installation and, their quality, provide coordination between civil and mechanical works as a client engineer. Checking the contractor s activity daily, inform the Client Site Manager and notify contractors abut the any discrepancies found according to the contract, drawings, P&IDs, the project specifications, standards and common engineering practice. As result, ensure contractors generate a finished installation that meets the project specifications, as well as planned budget & schedule. - Monitor the site for unsafe situations and maintain safety awareness with the contractors - Replying mechanical EDC (engineering & design change) requested by contractors as FCN (Field Change Notice), FQ (field query), CR (concession request) and preparing TQ (technical query), or NCR if any nonconformity - Participated in all aspects of Inspection & test of mechanical equipments (pumps / agitators / airblowers / compressors / generators / conveyors / bucket elevators / crushers / re-claimers / weigh-belts / wet-mills / gas-gas heaters regavos / personnel elevators / pack-mills also gypsum handling & water

treatment plants; fire fighting system equipments as rotating and Tanks & vessels /cyclones / bunkers / silos / Scrubber towers as static, piping, steel structure, welding & brazing, rubber & flake-linning of tank / pipe / ducts, coating & insulation, NDT, pressure & leakage tests and cold & hot commissioning test of all equipment as well as acceptance test of FGD Plant). Reviewed & evaluated all Tests protocols & QA/QC documents according to the contract, TIP- test and inspection plan and standards, to sign protocols. - Dealing/participating electrical/civil & process engineering issue - Prepared Punch Lists for I&C and mechanical installation including coating/insulation/linning. - Taking part at the commissioning, start-up and trial run activities of mechanical equipment (rotating, stationary equipments and DCS-Teleperm-ME & XP Sys and PLC Units). - Checking & approval of monthly progressing bill of contractors. - Observing overall commissioning, start-up and trial run activities of the plant and preparing punch list for process and over all operation problems. - Releasing of testing, mechanical completions, commissioning, start-up and trial run protocols - Member of official Temporary/Final Acceptance Committee for Orhaneli & Yatagan FGD. Jan.1994 Sep.1995 Position: QC Engineer / Commissioning Engineer. /// ENERTES Ltd. (TURKEY) Client//EPC: TUPRAS; Turkish Petroleum Refinery A.S // FOSTER WHEELER Job detail: IZMIR Refinery expansion ( Isomerization Plant ) project ( All responsibility of all QA/QC site & office activity of piping/welding works & mechanical equipments installation of Isomerization Plant as a QA/QC Engineer. To act as Commissioning Engineer during the commissioning phase after mechanical completion). Dec.1990 Nov.1993 Position: Installation / Commissioning Engineer. /// CROMWELL SECURITY Ltd. (U.K.) Client//EPC: Several medium& small size costumers Job detail: Planning, installation and maintenance of interlock & security systems. Nov.1989 Jul.1990 Position: Senior Mechanical Engineer/Supervisor. /// ISLEM Ltd- LIBYA Branch (LIBYA) Client//EPC: LEC (LIBYA Electricity Authority) // LTEC (Libya Turkish Engineering Consulting) Ltd. Job detail: Installing of CASCS (computer aided stock control system) for Power Plants. Dec.1987 Nov.1989 Position: Mechanical Site / Commissioning Engineer. /// IZOFER Ltd. (TURKEY) Client//EPC: TEK (Turkish Electricity Authority, former name of EUAS) // ELECTRIM (POLAND) Job detail: 3x210 Thermal Power Plant ( Kemerkoy/MUGLA-Turkey ): Installation and commissioning (cold & hot) of Coal Handling (crasher, conveyors, reclaimer) System. Apr.1985 Mar.1986 Position: Mechanical Site Engineer, /// IZOFER Ltd. (TURKEY) Job detail: > KIRIKKALE Refinery for TUPRAS: Painting & Insulation of miscellaneous tanks, pipes, equipment > URFA Cement Factory for CITOSAN A.S: Installation of rotating equipments (crushers , grinding mills,

conveyors, re-claimer, compressors & packing system) and stationery (vessels, bunkers, silos, cyclones & filters) equipments in the CAREER SUMMARY Senior B.S. Mechanical Engineer; responsible for overall control of supervision within the Construction group, Projects Control, Mechanical Completions (commissioning), QA/QC, Design & Process groups within the Process (petrochemical), Oil & Gas (downstream, midstream & upstream) and Power-FGD Industry, at the major EPC & Construction Contractor Company side and also the Client ((PMT) side for total 20 years (Power Plant = 10, Oil & Gas / Refinery = 7, Others =3) Brownfield / Greenfield experience. Key Competencies; - Self motivated, able to work unsupervised & flexible. Adaptability and problem solving capacity. - Able to make decisions at all level of organizations and Project Management Team, - Managing commissioning /construction/ QA-QC teams multidiscipline (civil/ structural, welding / piping, Rotating / Static equipment, coating/insulation, electrical / instrument) & multinational, - Conversant in large multi-discipline integrated construction projects with multinational-companies, - Primarily responsible for ensuring all aspects of Quality on the nominated project, - Capable to cover multidiscipline (civil, mechanical & electrical/I&C) engineering scope. - Fully conversant with ISO 9001 QMS as it relates to large project execution and Quality Audit, - Working experience with relevant industry codes, in particular API, ASTM, ASME, ANSI, NFPA, EN, ARAMCO, SABIC, - Ensuring compliance with HSE (SHE), HAZOP and PTW especially construction of Oil & Gas Refinery, Petrochemical Plant and Power Industry, - Project Management with respect to quality, scope of work and schedule. - Maintaining effective relationships with the Client, Vendors, EPC and Sub-contractors, - An effective PC user, advanced knowledge on the computer software & hardware. Scope: Implementation of Project Quality Control Plan, Develop & update QA system and QC documents. - Analyses and review Quality Project Documentation (Drawings, Specification, Procedures, Codes ) - Identify any site organization deficiency, carry out site internal audits, analyze critical point and, in collaboration with Site Manager, to propose and implement corrective action. Also Periodic Reporting, - Reviewing & approval of materials submissions accordance with project requirement & standards, - Ensure all construction works meet project specifications, procedures, codes and specific requirements, - Verifying the adequacy of the quality control procedures, methods and docs applied by subcontractors - Ensuring that inspection and tests are carried out & documented in accordance with the approved plans, - Attending periodically to inspection and tests, according to the approved QCP Quality control plan for site activities , verifying the inspector/Supervisor checks, reports & approves for the results, - Collecting the inspection records, maintaining and updating the inspection and tests status, - Using the computer monitoring system for to issue all Inspection summary reports which include all tests and certificates related to all items, maintain a traceability of the documents included in the

dossiers, - Follow up N.C.R. Non Conformity Report issuing and resolution and punch listing certification. - Handing over of the mechanical completion systems (System Dossier) based on piping, instrumentation, electrical, equipments, pre-commissioning and commissioning systems & civil works,

Project: SKOPJE 220 MW Combined Cycle Cogeneration Power Plant Project Skopje / MACEDONIA Client: TE-TO AD. Skopje / MACEDONIA Scope: Checking CCGT Power Plant mechanical installation daily and notify the sub-contractors about any discrepancies found according to contract, standards, drawings, ISO, P&ID. - Manage site mechanical departments (Equipment, Piping, Boiler, Turbine, and Utility) in budget and resources, project costs and schedules, and preparing periodic management reports. - Supervision for Equipments installation without vendor supervisor except ST-GT, which are installed advice of ALSTOMs Field Advisor. - Monitors & corrects hazardous situations to assure the workplace safety and to stop unsafe acts. - Reviewing & replying all mechanical RFI in coordination with HQ engineering department - Responsibility of all pre-commissioning activity including preparing of as-built P&ID during construction phase as well as commissioning of equipments, start-up & trial run. - Interface across plant functions providing technical support for plant construction improvements, to provide flowless commissioning, operations, maintenance, reliability, safety, and performance (+++) CCGT - Power Plant main equipment installation consist of GT (Alstom - GT13E2), ST (Alstom ST18 - 8CK76), Gas Compressor (Atlas Copco GT032 T2D1) and various LP/HP Pumps, Air Compressors / Diesel Gen, Fire Sys, HVAC equipment, Water Treatment & Waste Water Plants, Demi Water Plant. Also static equipment; HRSG-Boiler (ALSTOM), Gas Metering Station, Cooling Tower, Horizontal Vertical Drums, Condenser, Heath Exchanger, Vessels & Tanks including piping & various valves. Feb.08 Jan.09 Site QA/QC Manager Company: MMG (Mohammed Al MOJIL Group) Dammam / SAUDI ARABIA Project: PET Conversion & De-Bottleneck Plant Project. Client: SABIC Ibn Rushd Petrochemical Complex - Yanbu / SAUDI ARABIA Scope: Implement QA/QC System at site to carry out the project specific quality control and assurance activities as detailed in the Project Quality Plan. - Manage & coordinate QC team of 23 ( 21 Inspector Structural, Civil, Welding, Piping, Rotating / Static Equipment, Coating, Insulation, E&I, 1 NDT / PMI Technician and 1 Document controller) and ensure that QC personnel are fully aware of the Project Quality Plan. - Ensure the safety is adhered to at site - Control all nonconformance reports and undertake remedial action. - Compete site quality control instructions and action remedial responses. - Participate in the internal and external site audits - Ensure all quality control documentation is complied and competed for as-built hand over through the client. Sep.06 Jan.08 Senior Quality Assurance Engineer (Biding & Operation/Construction) Company: MMG (Mohammed Al MOJIL Group) Dammam / SAUDI ARABIA

Project: Total 18 ongoing construction/ maintenance projects in the field of Oil & Gas (Oil Refinery, Petrochemical Plant, Fertilizer Plant, and Pipe Line, Oil Wells as offshore & onshore) also construction of Power Plant, Steel Factory and Desalination Plant. Client: ARAMCO, SABIC, SAFCO, FOSTER WHEELER, LINERCO, Saudi TOYO, FLOUR DANIEL Int. Scope: As a Senior QA Engineer of construction company at the HQ; - Reviewing (Black Spot Analyze) of biding & contract documents and report to the Engineering / Project Control departments to cost & planning including QA/QC man-power estimation for bids - Preparing of QA/QC Packages (includes P.Q.A.M, QCIP, QCR & Report Forms, WMS & Operating Instructions) for bids / awarded projects and implementation of Client comments - CV evaluation / interviewing of QA/QC candidates, recruitment, deployment (over 150) and planning of QA/QC personnel (over 290) for 18-projects. May.05 Sep.06: Senior Completions (Commissioning) Engineer (Rotary / Stationary Equipment & Piping) Company: BOTAS; is state authority for transportation of crude oil & gas by pipeline. ANKARA / TURKEY Project : BTC Crude Oil Pipe Line (Turkish section of Baku-Tbilisi-Ceyhan crude oil Pipe Line with capacities 50 MTA; 46x1076 Kms, 4 Pumps St, 2 Terminal On/Offshore, 51 Block Valves St.) Client: British Petroleum (BP) Scope: As an EPC Completions Engineer; to install commission & hand over Pump Stations - 2, 3&4 Main duties were but not limited to; - Checking the sub-contractors mechanical installation(***) daily and notify the sub-contractors about any discrepancies found according to contract, standards, drawings, ISO, P&IDs, ITPs and project specifications with an end result to ensure the contractor generated a finished installation that meets project specifications and quality. NCR if any non-conformity. - Acting as Completions Manager - Dealing with QA/QC problems and ensure the safe quality of installation. - Ensure all work is carried out in line with HSE standards and the Project practices - Managing the supervision in guiding and overseeing the completions work undertaken by the various construction contractors preparing systems for hand-over and hence minimize the affects of interfaces that the commissioning contractor's/vendors work the meets the commissioning objectives by ensuring the commissioning contractor's activities. - Checking vendors commissioning procedures, method statements (WMS), risk assessment (RA), write and/or add relevant points missed out by vendor also preparing procedures, WMS. - Final checking to preparing Punch Lists & As-Build P&ID, ISO and confirming all the rotating / stationery equipments was fit for purpose to gain Mechanical Completions, and then to progress Pre-Commissioning, Commissioning, and finally Start- up. - Data assembling to GOC (certification software of BP), checking and collating all various certification documents, drawings, certificates of conformity etc, to make sure the entire mechanical paper works were in place to ensure client satisfaction for completion & hand over - Completion of all cold tests of equipment and performing the line fill and commissioning test of all equipment for Pump Stations with the crude oil.

- Finding solution to Engineering, Quality, Process and Operating problems together with the Engineering Management. - Participate in and assist with the co-ordination of the Project's Function & Performance Test(s). - To act as Senior Maintenance Engineer after commissioning works for all Pump (4) & Pigging (2) Stations including Block Valves (51) (***) Pump Station Mechanical Installation consist of Gas-Engines / horizontal & vertical HP LP Pumps / Compressors / Diesel Generator as large scale rotary equipments, Scraper ReceiverLauncher / tanks & vessels / strainers as stationery equipments, piping including large diameter of Relief Valves / NRV / TCV / PCV / FCV / MOV / ESD & E/H actuating units. Also Metering Station, F&G / Fire Fighting Sys, Water Treatment Sys, Waste Water Treatment Plant, Compressed & Instrument Air Plant, Fuel-gas System and Cooling/Heat Recovery/Hot Water & HVAC System Equipments as well as the buildings steel-structure & sanitary systems.

Aug.2003 May.2005: QA/QC Supervisor (Piping/Welding Works) Company: SCL - Sakhalin Construction Ltd /ALSIM-ALARKO A.S. Sakhalin Island/RUSSIA Project: Sakhalin LNG Project- II (2x4.8 annual million tones LNG and Oil Export Terminal) RUSSIA Client: Sakhalin Energy Investment Co; (is a SHELL Investment) EPC: CTSD ; ( is CHIYOTEC Ltd & TOYO Eng Ltd Sakhalin Development) Scope: As a construction company QA/QC Supervisor to installation / test and hand over total 436 Inch-Kms CS, HDPE & GRE piping with dia 4 to 24 and the crude oil pipe line 30x1 Km. - Preparing and implementation project quality plan for the piping related works - Preparing Method Statement (WMS) for CS, HDPE, GRE piping, Painting & Insulation, - Preparing WPS, and conducting PQR & WQR tests according to ASME-IX & GOST. - Preparing Procedures for NDT (RT, MPI, DPI & Welding Consumables). - Over all responsibility of all QA/QC site & office activity for piping/welding works such as; - Managing of QC inspectors, Line checkers, NDT Technician and third party NDT subcontractor. - Coordinating inspection (RFI) & test together with EPC & the Client after performing internal inspection/test and arranging of test equipments/manpower for all pipe/valve/instrument installation works including welding, painting & tape wrapping, insulation & foam insulation. - Conducting NDT test, interpreting of PT/MT & RT results and preparation of reports. - Ensuring daily inspections and submit daily reports to the QA/QC Manager. Build and maintain all inspection reports, testing reports & the test packages and have appropriate turn-over documentation binders for each phase of the project, which are include all mechanical, welding and piping test results.

Oct.1995 Mar.2003: Owner Project Engineer (& Owner Site Coordinator) Company: ELTEM-TEK Consulting & Engineering. Service A.S. Ankara / TURKEY

Projects: FGD (Flue Gas Desulphurization) retrofit for; a) (1995-1999) EUAS 3x210 MW YATAGAN Thermal Power Plant Mugla / TURKEY b) (1999-2003) EUAS 1x210 MW ORHANELI Thermal Power Plant Bursa / TURKEY Client: EUAS; is client as an authority for the State Power Plants and Transmission/Distribution Lines Scope: As a Client(owner) representative with full responsibility of retrofitting four (4) FGD Plants; main duties were but not limited to; - Managing of Owners Engineer site team (civil, linning, electrical, instrument & process engineer) as a Site Coordinator. - Provided coordination between the site organizations and the client HQ as well as coordinating and participating in all review meetings with the contractors - To act as Client representative to ensure that design works by contractors meets Company standards and relevant industry codes. Field Engineering / Construction Management & Supervision of mechanical works I&C installation and, their quality, provide coordination between civil and mechanical works as a client engineer. Checking the contractors activity daily, inform the Client Site Manager and notify contractors abut the any discrepancies found according to the contract, drawings, P&IDs, the project specifications, standards and common engineering practice. As result, ensure contractors generate a finished installation that meets the project specifications, as well as planned budget & schedule. - Monitor the site for unsafe situations and maintain safety awareness with the contractors - Replying mechanical EDC (engineering & design change) requested by contractors as FCN (Field Change Notice), FQ (field query), CR (concession request) and preparing TQ (technical query), or NCR if any non-conformity - Participated in all aspects of Inspection & test of mechanical equipments (pumps / agitators / air-blowers / compressors / generators / conveyors / bucket elevators / crushers / re-claimers / weigh-belts / wet-mills / gas-gas heaters regavos / personnel elevators / pack-mills also gypsum handling & water treatment plants; fire fighting system equipments as rotating and Tanks & vessels /cyclones / bunkers / silos / Scrubber towers as static, piping, steel structure, welding & brazing, rubber & flake-linning of tank / pipe / ducts, coating & insulation, NDT, pressure & leakage tests and cold & hot commissioning test of all equipment as well as acceptance test of FGD Plant). Reviewed & evaluated all Tests protocols & QA/QC documents according to the contract, TIP- test and inspection plan and standards, to sign protocols. - Dealing/participating electrical/civil & process engineering issue - Prepared Punch Lists for I&C and mechanical installation including coating/insulation/linning. - Taking part at the commissioning, start-up and trial run activities of mechanical equipment (rotating, stationary equipments and DCS-Teleperm-ME & XP Sys and PLC Units). - Checking & approval of monthly progressing bill of contractors. - Observing overall commissioning, start-up and trial run activities of the plant and preparing punch list for process and over all operation problems. - Releasing of testing, mechanical completions, commissioning, start-up and trial run protocols - Member of official Temporary/Final Acceptance Committee for Orhaneli & Yatagan FGD. Jan.1994 Sep.1995 Position: QC Engineer / Commissioning Engineer. /// ENERTES Ltd. (TURKEY) Client//EPC: TUPRAS; Turkish Petroleum Refinery A.S // FOSTER WHEELER Job detail: IZMIR Refinery expansion ( Isomerization Plant ) project ( All responsibility of all

QA/QC site & office activity of piping/welding works & mechanical equipments installation of Isomerization Plant as a QA/QC Engineer. To act as Commissioning Engineer during the commissioning phase after mechanical completion). Dec.1990 Nov.1993 Position: Installation / Commissioning Engineer. /// CROMWELL SECURITY Ltd. (U.K.) Client//EPC: Several medium& small size costumers Job detail: Planning, installation and maintenance of interlock & security systems. Nov.1989 Jul.1990 Position: Senior Mechanical Engineer/Supervisor. /// ISLEM Ltd- LIBYA Branch (LIBYA) Client//EPC: LEC (LIBYA Electricity Authority) // LTEC (Libya Turkish Engineering Consulting) Ltd. Job detail: Installing of CASCS (computer aided stock control system) for Power Plants. Dec.1987 Nov.1989 Position: Mechanical Site / Commissioning Engineer. /// IZOFER Ltd. (TURKEY) Client//EPC: TEK (Turkish Electricity Authority, former name of EUAS) // ELECTRIM (POLAND) Job detail: 3x210 Thermal Power Plant ( Kemerkoy/MUGLA-Turkey ): Installation and commissioning (cold & hot) of Coal Handling (crasher, conveyors, reclaimer) System. Apr.1985 Mar.1986 Position: Mechanical Site Engineer, /// IZOFER Ltd. (TURKEY) Job detail: > KIRIKKALE Refinery for TUPRAS: Painting & Insulation of miscellaneous tanks, pipes, equipment > URFA Cement Factory for CITOSAN A.S: Installation of rotating equipments (crushers , grinding mills, conveyors, re-claimer, compressors & packing system) and stationery (vessels, bunkers, silos, cyclones & filters) equipments in the Cement Factory.