Sie sind auf Seite 1von 15
Kilowatt/Hour Meter Single, Polyphase, Demand, and Non Demand Installation Procedure DO NOT DISCARD! WARRANTY ENCLOSED. LEAVE WITH END USER. A AMPROBE INSTRUMENT® sPx |G —-— 3270 Executive Way Miramar, FL 33025 PAGE 1 Table Of Contents Mounting Meter and Flexible Conduit Electrical Connections . . 4 120/240v 1 Phase 3 Wire Wiring Diagram and Table I oS 480v 3 Wire Delta Wiring Diagram and Table I] .............--...--+++ 6 120/208v, 277/480v 4 Wire Y and 120/240v 4 Wire Delta Wiring Diagram and Table III..................+0+2200+ 7 Resetting Demand Meter’s Sweep Hand Pointer..............0.++++00+ 8 Totalization ........ 0... csc ce cece cece cece ence een eee eeeeneeeens 8-10 Reading Your Meter ............ 0. sce e cece eee e tener e eee eee eee 11-12 WAITAMY . 20... ee cence een cnet e ence ese e cent estes eeesacenenses 13 Pace? Preliminary i. Installation must be in accordance with all NEC and local electric codes by qualified personnel. i. Phase sequence must be identified for proper installation of 3 PHASE METERS. If phase sequence is unknown, obtain an Amprobe model # PSA-1 to identify phase sequence. ili. Installation must be done with all power off. Contact your local utility to shut off power before installation. Amprobe and its representatives shall not be responsible or liable with regard to safety, where personal injury, death, or property loss is concerned or any other consequential damages. Buyer assumes responsi- bility to apply this product with due regard to safety. . Verify that all power is off. Fuses are required for installation and are not provided with meter. Mounting Meter and Flexible Conduit - Install a screw, flush to the wall, at the approximate height you want the top of the meter to be, no more than 18” from the panel box. Note: If meter must be installed more than 18” from panel, flex into a6” junction box and run conduit to panel. Be sure to follow color code. Refer to Page 14. “Recommended meter to transducer length wiA.W.G.” . Back the screw out enough so the meter’s hanging bracket can slide in securely. Hang the meter on the screw and install lower mounting screws (min 2%" x 10p) in the pre-drilled holes. (see Fig. 1.) sz en HANGING BRACKET wees. TTT & On O MOUNTING SCREW HOLES ° Figure 1 PAGES 4, Remove plastic nut from threaded end of flexible conduit. (see Figure 2.) 5. Insert threaded end of flexible tubing into a ¥2” conduit knock out (34” hole) in the panel box and reinstall nut on tubing on the inside of the box. (see Figure 3.) PANEL BOX PAGES Electrical Connections 1. Hard wire the end of the GREEN wire (piece without slide connect), labeled (4), to earth ground. 2. Loosen phase A's terminal block bolt and remove phase A wire from terminal block. 3. Slip current transformer, labeled “PHASE A”, on line with marking “HI" and phase A label faced toward the source. (see Figure 4.) TERMINAL BLOCK TERMINAL BOLT Figure 4 “HI”? MUST FACE SOURCE, VOLTAGE LEAD CONNECTION. 4. Reinsert phase A wire into its terminal block and tighten to specified torque. Connect the current transformer leads to their corresponding meter leads by sliding the interconnects together. The color of the label, on the current transformer leads, corresponds to the wire on the meter harness. Connect harness wire labeled ‘“‘L1”, via fused jumper (not included), to phase A’s terminal block. Check your local code for correct fuse amp rating and lead termination. We recommend 3A fast blow at rated voltage. Repeat steps 2 through 6 for each additional phase to be metered. Refer to tables I-Ill and Figures 5-8, for electrical wiring applicable to your meter. . Double check all wiring before re-energizing. ca > N 2 Hi PHASE A/ ea] [ec NEUTRAL Figure 5 120/240V | PHASE 3 WIRE. PHASE AT WME wORAY NOICATORpoae GRAY [ : [BLack’ (WHITE wORANGE INDICATOR [goes toj ORANGE [BLACK wGREEN INDICATOR goes tol GREE! PHASE "BLACK WIGREEN INDICATOR ‘goes GREEN) INDICATOR (MEIERBUSLEADS [YELLOW wild INDIGATOR|goes tol PHASE C VOLTAGE(FUSED) [PANEL TEBMINATIONS goes 1o EARTH GROUND goes fo PHASE A VOLTAGE(FUSED) | — oes WIEARTH GROUND) Paces HI PHASE C Figure 6 480v 3 WIRE DELTA TABLE § (600V 3 WIRE DELTA WIRING) Ad WGRAY INDICATOR iawy [BLACK WGREEN NDCATOR —fpoes i (GREEN(S) __ S0|EARTH GROUND) [BLACK w.1 INDICATOR |gnes tl PHASE A VOLTAGEFUSED) C;| WHTE wORANGE NOCATOA ORME |__| = [BLACK wGREEN INDICATOR [onEENG) EARTH GROUNDS) —— [YELLOW wi INDICATOR|goes il PHASE C VOLTA PAGE? SOURCE f GA [2B | OC [NEUTRAL sitet HI PHASE A = [——_ HI PHASE G = © = F2 rs PEE ie a nutll = | 10 5) EINE ORANGE BLUE > es & Figure 8 TOTALIZATION (120/208v 277/480v 4 WIRE Y AND 120/2A0v 4 WIRE DELTA). PANEL B GA [ OB | oC \ NEUTRAL Ee TOTALIZATION = HARNESS. ee ORANGE loRG| or & eo — 0) Fa . SREEH LA - =D a4 a 1] BLK BLUE ANS S F BLUE EE 7 Zz Sa TO EARTH GRAY SOURCE { Figure 8 (CONTINUED) PAGE 10 To METER PAGE: READING YOUR METER Kilowatt/Hours (Non Demand and Demand Meters) To determine the amount of Kilowatt/Hours used, use the following formula: Kilowatt/Hours = Meter Reading Change x Multiplier. For example, Today the meter reads: eels i He S| Last month the meter read: — 10l2.01.1/0, Meter Change = 0011.75 If your Multiplier number is 40: _x 40 Note: Your Multiplier ; number is stamped on Kilowatt/Hours used = 470.00 the label at the bottom of the meter. See Figure 9. Kilowatt Peak Demand (Demand Meters only) To determine the Kilowatt Peak Demand, use the following formula: Kilowatt Peak Demand = Pointer Reading x Multiplier For example: The Sweep Hand Pointers pointing to: 2.43 If your Multiplier number is 40: 40. Note: Your Multiplier number is stamped on Kilowatt Peak Demand = 97.2. the label at the bottom of the meter. See Figure 10. PAGE 12 METER READOUT MULTIPLIER, Figure 9 ‘SWEEP HAND POINTER: Figure 10 PAGE 13 AMPROBE kW/hr SUBMETERS kkk ek -25 YEAR WARRANTY 3k OK dE ORR ORR bE bb bbb bt ttt bb tt ttt ‘Amprobe Instrument, division of Core Industries, 630 Merrick Road, Lynbrook, NY 11563, warrants its kWihr submeters to the original purchaser to be free from manufacturer's defects in materials and workmanship for a period of 25 years, provided the following criteria has been met: The product has been stored, handled, installed by qualifi personnel, with ail power off, and used under proper conditions in an environment conducive to this product. All installations must be in accordance with all national and local electrical codes. Meters installed outdoors must be equipped with a NEMA 3R, or equivalent, enclosure. This warranty is void if seals are not intact. Warranty does not cover damage due to abuse, neglect, lightning, or any acts of God. Pulse outputs and electronic portions of demand meters are warranteed for one year. If this product should fail during the specified period, after Amprobe’s inspection and at Amprobe’s discretion, we will repair or replace this product free of charge. Buyer is responsible for obtaining a returned goods authorization (RGA) number, from Amprobe’s repair depart- ment, prior to shipment. No returns wil! be accepted without RGA numbers. All returns must include a copy of the bill of sale and a brief description of the malfunction. Buyer is responsible for returning the unit(s) undamaged, prepaid, and insured for full value. OOO ok ok tok kok koe sPx|a—-— 9270 Executive Way Miramar, FL 33025 Made In U.S.A. SER Rb bb bE bb >t bt tt bbb bot bot ttt Amprobe kW/Hr Submeter Specifications Electrical Specs ‘Mechanical Space HOSE CONFIGURATIONS: Dela and TE WATT TPR) Tames PHASES OFFERED: Single and vouphase 3 pase) 1354738 5 SELF CONTAINED Vian) IW) 00 1 Phase) 1535 io} 575 WEGHTTRS cH it DELETING VOLTAGE SURGE 75tbr tor Tam PREWIRED. ns [ACCURACY OVERLOAD RANGE 1 (1a008FU) DISPLAY TYPE TB dg meen register IMEMORY BACKUP SOURCE —(W) wanecesary 0) 6 oi og wiawesp hans goiter oO TISPUAY RESOLUTION ™) ‘0 Tine V AESULATION ALLOWED m 003 [ReDUENCY hy CTP, yes PERATIMG TEMP METER MOVEMENT PRINCIPLE. — (hy agra Sang OPERATING TEMP F 10) MagoaticBaving FreawsoUcen OFFERED” (Wy “SOL10 OR SPLIT XFMRS | READOUT OTGIT SIZEGny Ww O15 (0) *S0UD OR SPLIT xFaRS. rt ass “inpustay stp isa sec) [WOU T x cover ™ Potyearbonate [RECOMMENDED METER TO Tan (14 AWG) 0) sakes [TRANSDUCER LENGTH WA. an (12 AWG) 25-1000.10.AWG) _} ease ” alte MEETS UL 1244 on Baia [aks cia. OPERATION NOTCATOR: i) Mamie sa o umn dee FESET BUTTON w "0 us) TUTOOOR USE ves wr % “with NEMA SR enclosure (}_25¢exc.uoes ELecTnontos) [WER ENCCOSURE SIE ———————“erawretien | [SOMPANY ESTABLISHED 1848 "NG INSTALL TIME (min) 20 Amprobe kW/Hr Submeter Part Numbers a |e a sap swee neta | game yaa wee | [1m W-2AEDW ze co Wa veAIPaW ‘0 wavaNWo WH RTP ca [Devenir 8 WERT PaW. 760 WE IVTOAAWT WaT WOOO EAVTOATPSN B60 WAY We aviseor Twi 00 WTO WaatHaWY WHEAVAASWO 3000 Wana Wer aoMW WAOARWO “i Twa wien WOW — fom ‘tmane 6 we 105 WEAETViWT “a Wwe vaeaw [waar We reRSWO | WHITTON a Wi vanawy ——[ WHER AAAS WO [WHERE TVARAW ‘ TW veAaWY — [WHEE Wi APATEASWD. ‘a Wa vane Wan WAVEHO “0 WT ViOMWY | Wr-vTOMWT ——[ Waa TTORS 30 wacu-ivissawy——{ wneczrisaawry ——[ wicaavisaswo | 00 Wi avaouw? ——T wraraveonswo S00 Wick Vaonewy | wra-vaanenY ——T WiraraYOAsW 000 Wc Tvaguewy | worarvannwY | WiraVORIWO

Das könnte Ihnen auch gefallen