Other Prepking products A) Offline Testing engine Use the offline Testing engine product to practice the questions in an exam environment. B) Study Guide (not available for all exams) Build a foundation of knowledge which will be useful also after passing the exam. Latest Version We are constantly reviewing our products. New material is added and old material is updated. Free updates are available for 90 days after the purchase. You should check your member zone at Prepking and update 3-4 days before the scheduled exam date. Here is the procedure to get the latest version: 1.Go towww.Prepking.com 2.Click on Member zone/Log in (right side) 3. Then click My Account 4.The latest versions of all purchased products are downloadable from here. Just click the links. For most updates,it is enough just to print the new questions at the end of the new version, not the whole document. Feedback If you spot a possible improvement then please let us know. We always interested in improving product quality. Feedback should be send to feedback@Prepking.com. You should include the following: Exam number, version, page number, question number, and your login ID. Our experts will answer your mail promptly. Copyright Each PDF file contains a unique serial number associated with your particular name and contact information for security purposes. So if we find out that a particular PDF file is being distributed by you, Prepking reserves the right to take legal action against you according to the International Copyright Laws. Explanations This product does not include explanations at the moment. If you are interested in providing explanations for this exam, please contact feedback@Prepking.com.
.

www.prepking.com

1. You have determined how each of the customer traffic types map to Multiservice Switch services. You have also calculated the amount of traffic within the network. What is your next step? A. Choose FP types. B. Engineer the backbone. C. Check CP requirements. D. Verify your performance metrics. Answer: B

2. Path load balancing is used to increase PNNI network reliability. Which three statements are correct? (Choose three.) A. Multiservice Switch supports two load balancing techniques. B. Path load balancing increases network stability in case of link or node failure. C. Load balancing is intended to produce a balanced utilization of network resources. D. Requirements include finding multiple diverse acceptable paths and selecting one of those paths. Answer: BCD

3. You are in the process of designing a new network. You need to determine the backbone bandwidth requirements of the network. One application has network traffic of 2000 Kbps, the network packet consists of a 512 byte payload and 6 bytes of overhead. What are the bandwidth requirements for the backbone for this application? A. 2023 Kbps B. 2340 Kbps C. 2347 Kbps D. 2006 Kbps Answer: A

4. The level of service for a customer can be measured in many ways. Which three items are measurements for level of service? (Choose three.) A. availability
www.prepking.com

B. throughput C. link utilization D. response time E. rate enforcement Answer: ABD

5. The design and implementation of any networking product imposes constraints on the ability of the network to support the required level of service. Which statement is true? A. Nodal engineering involves configuring enough bandwidth in the path between each pair of sites to support the traffic. B. Backbone engineering has enough ports to support the required number of access lines, that is, hardware engineering. C. Backbone engineering involves verifying that the backbone has sufficient processor and memory resources to accept the user traffic and switch it to its destination, that is, service engineering. D. Backbone engineering involves calculating the amount of traffic that will flow between each pair of nodes (based on the application information and COI from the internal inputs/requirements step of the engineering process). Answer: D

6. A topology that consists of a full mesh core of relatively few nodes with larger numbers of edge nodes that are dual-homed to the core nodes. Why is this a good compromise? A. low trunk cost B. support for parallel clusters C. full redundancy with a maximum of three hops per connection D. a worldwide carrier network consisting of a number of clusters connected by continental links Answer: C

7. You are in the process of designing a new network. You are gathering information on the communities of interest profiles and the application requirements. In which stage in the engineering cycle are you currently involved?
www.prepking.com

A. feedback B. internal inputs C. external inputs D. network design Answer: B

8. Reliability in a network can be accomplished through network level controls and nodal level controls. Which statement is correct? A. Network level controls operate in real-time (in cell-times at the frame/cell level). B. Node level controls operate in near real time, that is, in propagation times across the network and call duration times. C. Network level controls are implemented with admission controls for new connections, network routing systems and flow control rate adaptation schemes. D. Network level controls are implemented with queues supporting different priority levels, sophisticated queue management capabilities and rate controls to provide policing of user traffic. Answer: C

9. During the process of designing a new network you need to estimate the backbone requirements for the network. In which part of the engineering cycle would you be involved if you are estimating the backbone requirements? A. feedback B. internal inputs C. external inputs D. network design Answer: D

10. Engineering is a continuous process and requires management of the network topology. Which three reasons are important to gather feedback from the network, applications and users? (Choose three.) A. To ensure the desired level of service is being met and the assumptions about transactions were valid. B. This enables the network operator to determine trends in the network and to quantify it's cost over time.
www.prepking.com

C. All gathered data has to be fed back into the requirements step of the engineering cycle to enable fine-tuning of network performance by repeating the network design step -- completing the engineering cycle. D. Because of the difficulty that can be encountered in gathering information in the requirements phase (before network design), the design may be incorrect due to the inaccuracy of the assumptions that were made. Answer: ACD

11. Network reliability requirements are considered during the engineering cycle. The network design considers nodal and backbone engineering. What are two external inputs to this process? (Choose two.) A. level of service B. tariffs and costs C. community of interest D. capabilities of chosen switch Answer: BD

12. There are several different controls within a network. One of these types of controls are called node level controls. Which three are node level controls? (Choose three.) A. queue controls B. propagation times C. operate in real time D. rate controls that provide policing to traffic Answer: ACD

13. It is possible to overbook bandwidth pools to help meet QoS goals. What are two reasons why a customer would want to do this? (Choose two.) A. When usage of network resources is maximized. B. When users are likely to send traffic simultaneously. C. When the user seldom contracts more bandwidth than is actually needed. D. When the customer wants to compensate for situations where CAC may overstate ECR.
www.prepking.com

Answer: AD 14. While engineering a Multiservice Switch network to be carrier grade for a customer, you determine that you need a dual slot MSA32 Function Processors. Which two must you have? (Choose two.) A. You must have a CP1 installed and active. B. You must have a CP2 installed and active. C. You must have at least two power supplies. D. You must have at least three power supplies. Answer: BC

15. You are working on buffer management for ATM queue manager (AQM) cell queue memory (CQM). What is the Nortel recommendation for the link pool percentage? A. SQRT(N) * 100% where N = number of ports per AQM B. 1/ SQRT(N) * 100% where N = number of ports per AQM C. 3/ SQRT(N) * 100% where N = number of ports per AQM D. N/ SQRT(B) * 100% where N = number of ports per AQM and B = Total Bandwidth Answer: B

16. You are in the process of engineering a Multiservice Switch system for a customer. There are different traffic sources being received throughout the network. Which three are traffic sources you should be aware? (Choose three.) A. quality bit rate (QBR) B. variable bit rate (VBR) C. obviated bit rate (OBR) D. constant bit rate (CBR) E. unspecified bit rate (UBR) Answer: BDE

17. You are in the process of engineering the emission priorities. You are concerned about the possibility of starvation. Which mechanism is intended to prevent starvation? A. minimum guaranteed path (MGP)
www.prepking.com

B. minimum bandwidth priority (MBP) C. minimum bandwidth guarantee (MBG) D. minimum guaranteed bandwidth (MGB) Answer: C

18. Due to discrete and rounding behaviors, it is possible to create situations that on the surface seem legitimate, yet result in significant cell losses. Where would these cell losses occur? (Choose two.) A. on the link B. in the buffer C. in the shaping point D. on an adjacent policer Answer: CD

19. You are currently in the process of engineering which Control Processor(s) to insert in a Multiservice Switch 15000 running release PCR 6.1. Which two versions of Control Processor are supported? (Choose two.) A. CP1 B. CP2 C. CP3 D. CP4 Answer: BC

20. You have engineered a Multiservice Switch network for a customer and have decided that you will need a 5 slot chassis and a 16 slot chassis. Which two models reflect these requirements? (Choose two.) A. 7400 B. 7420 C. 7440 D. 7480 Answer: BD

www.prepking.com

21. What is the default starting point for developing a bandwidth pool strategy? A. one pool B. two pools C. three pools D. four pools Answer: A

22. You are currently in the process of engineering which Control Processor(s) to insert in a Multiservice Switch 7480 running release PCR 6.1. Which version of Control Processor is supported? A. CP1 B. CP2 C. CP3 D. CP4 Answer: B

23. On Multiservice Switch (MSS) ATM Function Processors (FPs), queues exist at both the incoming and outgoing link sides and both to and from the MSS bus/fabric. MSS traffic scheduling policies are based on a system of emission and discard priorities. Which three statements are true? (Choose three.) A. GQM-based FPs have eight EPs, numbered 0 through 7. B. CQC-based FPs have three emission priorities: high, medium and low. C. AQM, QRD and AQS-based FPs have eight EPs, numbered 0 through 7. D. APC-based FPs have three EPs, numbered 0, 4, and 7. EP4 and EP7 have an optional MBG for starvation avoidance. Answer: ABC

24. While engineering traffic queuing, which two methods of transmit traffic queuing should you choose? A. per-VC queuing B. per-VPI queuing C. variable queuing D. common queuing
www.prepking.com

Answer: AD 25. During the engineering process you decide that you are going to use AQM-based Function Processor's (FPs). You are engineering Quality of Service (QoS). How many Emission Priorities (EPs) are available? A. 3 B. 5 C. 8 D. 9 Answer: C

26. You are currently in the process of engineering which Control Processor(s) to insert in a Multiservice Switch 15000 running release PCR 6.1 that requires the use of IP services. Which version of Control Processor do you use? A. CP1 B. CP2 C. CP3 D. CP4 Answer: C

27. On a Multiservice Switch, what happens to ensure that the switch does not discard traffic conforming to the traffic contract? A. Policer parameters are rounded up. B. Policer parameters are under-valued. C. Policer parameters are rounded down. D. Policer parameters are increased by three. Answer: A

28. Unshaped traffic uses Weighted Fair Queuing (WFQ). Why would WFQ be engineered into the network? A. When customer control of weight assignment is required. B. When customer control of weight assignment is not required.