Sie sind auf Seite 1von 6

NAME: Felipe P. Dela Cruz (Bec. Ref. No.

103118)

DATE: August 2010

POSITION TITLE ORGANIZATION

Field Engineer, Piping Engineering Department

LOCATION CITIZENSHIP CONTINUOUS SERVICE SPOUSE'S NAME CHILDREN'S DETAILS

Wood River North Project Filipino August 09, 2010 to Present Liwayway P. Dela Cruz Edsel P. Dela Cruz Date of Birth:Jan.8,1978 Lalaine P.Dela Cruz Date of Birth:June 13,1979 Carinez P. Dela Cruz Date of Birth: Feb.1,1980

PROFESSIONAL LICENSES AND SOCIETIES Board of Mechanical Engineering, Register No.: 08594 Republic of the Philippines Professional Regulation Commission, 1975 Philippine Society Of Mechanical Engineers EDUCATION AND PERSONAL DEVELOPMENT PROGRAMS Degree, Certificate, etc. Secondary Bachelor of Science In Mechanical Engineering School Holy Angel University Holy Angel University Major (or Subject) Date 1968 1974

OTHER SIGNIFICANT INFORMATION PERSONAL: LANGUAGES: CAPABILITY: MEMBERSHIPS: OTHER: Very Cooperative to my Co - Employees English & Tagalog Sr. Construction Engineer;Field Engineer, Piping Project Management ; Project execution / Construction Project Execution / Construction/ Inspection Philippine General Motors Association Philippine Society Of Mechanical Engineers n/a

NAME: Felipe P. Dela Cruz (Bec. Ref. No. 103118) DATES FROM TO COMPANY, DIVISION, DEPARTMENT LOCATION AND SUPERIOR BECHTEL CORPORATION Engineering Department Woodriver, Illinois Refinery Expansion North Project Supervisor: Mr. Randy Adams BETS B.V. OPF Sakhalin- 2 Project Nogliki District Sakhalin Region, Russia Supervisor: Mr. Gordon Scott IMAD COMPANY FOR TRADING& CONSTRUCTION, KSA Supervisor: Mr. Efren Reyes WORK HISTORY

DATE: August 2010

POSITION HELD, SUMMARY OF RESPONSIBILITIES AND SIGNIFICANT ACCOMPLISHMENTS FIELD ENGINEERING, PIPING Prepare non-conformance report for any changes as per approved contract drawings. Conduct walk through for all hydrotest packages 90% completion. Prepare punch list for the remaining works to be done. JOB PACK PIPING ENGINEER Prepare job packages per issued service authorization including scope of works and safety requirements.

08/09/10

present

05/2007

07/2007

02/2008

04/2009

10/2005

12/2006

RESOURCE SCIENCES ARABIA LTD (RSAL), KSA Early Works, In-Kingdom Projects Division Rabigh Project Execution Dept. (RPED) Petro Rabigh, KSA Supervisor: Mr. Khaled Hussein

SENIOR MECHANICAL ENGINEER SITE SUPERINTENDENT Upgrade of Shedgum & Uthmaniyah Sulfur Recovery Unit Phase II (By Pass Shutdown & Bypass Mode),Monitor construction activities ensuring compliance, with Aramco Standards, Codes, Specification and design,Supervise and coordinate,all mechanical, piping, structural, civil, electrical works undertaken by the company; Coordinate and render technical report to engineering works such as engineering design,construction drawings,bill of materials/ take-off, change orders, project monitoring/ scheduling and all other mechanical construction works; Monitor the contractor for all the installation of mechanical, piping & electrical per required procedures recommended by manufacturers CONSTRUCTION SPECIALIST II QUANTITY SURVEYOR (Mechanical, Piping, Electrical and Civil Works) Monitor construction activities ensuring compliance with ARAMCO standards, codes, specifications & design, Monitor construction percentage completionfor each issued service authorization to the contractor on a daily & weekly basis, Verify & witness all changes occurred during construction activities,as per Aramco Standards, codes, specification and design; Monitor the contractor for all the installation of mechanical, piping, electrical

NAME: Felipe P. Dela Cruz (Bec. Ref. No. 103118) DATES FROM TO COMPANY, DIVISION, DEPARTMENT LOCATION AND SUPERIOR WORK HISTORY

DATE: August 2010

POSITION HELD, SUMMARY OF RESPONSIBILITIES AND SIGNIFICANT ACCOMPLISHMENTS utilities and civil works

DATES FROM TO COMPANY, DIVISION, DEPARTMENT LOCATION AND SUPERIOR JAL INTERNATIONAL, KSA Al-Jubail Fertilizer Company (Samad Berth Plant), Al Jubail, KSA Supervisor: Mr. Khaled Hussein AL-HUGAYET CONTRACTING EST., KSA Supervisor: Mr. Mohammed Mulhem

WORK HISTORY POSITION HELD, SUMMARY OF RESPONSIBILITIES AND SIGNIFICANT ACCOMPLISHMENTS MECHANICAL MAINTENANCE ENGINEER Supervise the preventive maintenance of Ship Loader No. 1 & 2, Slinger Conveyors, Bag head Conveyors for Ship Loader No. 1 & 2, Portal Scraper, Bucket Elevator, Sewing Machines, Bagging Machines, Alligator Conveyors, Curved Conveyors and Belt Conveyors & other Mechanical Rotating & Stationary equipments in the Plant MECHANICAL SITE SUPERINTENDENT SAUDI ARAMCO, M.P.P.D. Monitor construction activities ensuring compliance with ARAMCO standards, codes, specifications and design; Monitor the construction of Oil flow line, Trunk line and Test line, Hot-Tap and Cold Cut tie-in to existing pipe,construction of Oil and Water Wellhead and Flow line, replacement of corroded section of Hawtah Trunk line w/ the introduction of using Corrosion control Barrier (CCB), Steel strap laminated pipe (SSL) and reinforced thermoplastic pipe (RTP); Ensure safe and professional field activities safety of work environment MECHANICAL SITE SUPERINTENDENT SAUDI ARAMCO, M.P.P.D. Monitor construction activities ensuring compliance with ARAMCO standards, codes, specification and design; Monitor construction of Oil flow line, trunk line and test line,; Hot Tap and Cold cut tie-in to existing pipe line, construction of water injection internal and external FBE coated pipe, construction of oil and water well head and flow line; Prepare punch list upon eighty percent (80%)completion of the project

11/2002

09/2003

08/1999

01/2001

11/1997

08/1999

KING WILKINSON (SAUDI ARABIA), LTD., KSA Supervisor: Mr. Adel Marshoud

NAME: Felipe P. Dela Cruz (Bec. Ref. No. 103118)

DATE: August 2010

DATES 04/1995 05/1996

06/1994

11/1994

05/1993

01/1994

11/1991

12/1992

WORK HISTORY ABDULLAH H. ALMECHANICAL SUPERINTENDENT SHUWAYER COMPANY, KSA SENIOR MECHANICAL ENGINEER SAUDI ARAMCO, M.P.P.D. Supervisor: Supervise and coordinate all mechanical aspects Mr. Ernesto Bartolay of works undertaken by the company; Responsible for the inspection & quality control for the contractor; Coordinate, render technical support to engineering works such as engineering design, construction drawings, bill of materials/take-off, change orders, miscellaneous submittals, project; monitoring/scheduling, contract close-out requirements, and all other mechanical construction works P. T. NISCONI (PERTAMINA PIPING ENGINEER LEVEL III (CAPC Olefins JOINT VENTURE) Project) Indonesia Responsible for design, piping installation/ modifications in the field; Prepare isometric Supervisor: drawings for piping of issued engineering Tsu Saito revision instruction drawings by Toyo; Engineering Corporation prior to fabrication of pipe spools; Perform detail isometric drawings for piping of issued as-built drawings by Toyo Engineering Corporation for submission to Client (Chandra Astri Petroleum Corporation); Monitor construction activities for safe working practices in compliance with codes, specifications and adherence to good engineering practices HYUNDAI ENGINEERING & SENIOR MECHANICAL ENGINEER CONSTRUCTION CO., LTD, Petronas Second Refinery Project, Marine Malaysia Facilities EPC Melaka, Malaysia Supervisor: Responsible for the installation of all mechanical Jae S. Khan equipment, marine loading arms with control panel and driven with hydraulic power units, diesel and electric firewater pumps; Monitor subcontractors for all installation of mechanical equipment as per required standard procedures recommended by the manufacturers; Responsible for the inspection and quality control for the contractor; Assigned for testing & commissioning of all mechanical equipment INTERNATIONAL BECHTEL, SENIOR CONSTRUCTION ENGINEER

NAME: Felipe P. Dela Cruz (Bec. Ref. No. 103118) DATES

DATE: August 2010

01/1989

12/1990

09/1984

07/1986

06/1982

09/1983

WORK HISTORY INC., Kuwait GRADE 25 PIPING ENGINEER AL-Tameer Project & AL Awda Project Supervisor: Coordinate with design engineering to ensure if Mr. Steve K. Worrel drawings and technical information is available; Prepare work orders; Responsible for design piping installation/modifications in the field; Coordinate material sourcing and write; Field Material Requisition, test pack preparations & witnessing; Monitor construction activities for safe working practices,compliance with codes, specification and adherence to good engineering practices GUSTAV EPPLE ARABIA MECHANICAL ENGINEER LTD., KSA Ministry of Interior Project SA-PKT Villages, Dammam Supervisor: Responsible for the supervision of Mechanical & Zahid Khan HVAC installation works for a series of housing projects; Responsible for inspection & quality control for the contractor; Monitor construction activities for safe working practices, compliance with codes, specification and commissioning works on plumbing and HVAC system SAUDI ELECTRO-MECHL. MECHANICAL ENGINEER CONST. CO., LTD. Vestibule Maintenance Training Center, Housing (PETCON), KSA Project, Saudi Bahrain Causeway Border Station Responsible for the supervision of Mechanical & Supervisor: HVAC installation works; Responsible for the Mr. Fausto Zigarelli inspection and quality control for the contractor; Monitor construction activities for safe working; practices, compliance with codes, specification & adherence to good engineering practices; Perform testing & commissioning Perform testing and commissioning works on plumbing and HVAC system; Prepare operating and maintenance manual upon completion of the project for submission to ARAMCO BECHTEL INTERNATIONAL, SENIOR CONSTRUCTION ENGINEER INC., Indonesia GRADE 26 PIPING ENGINEER Balikpapan Refinery Expansion Project - As Supervisor: Agent for Pertamina Mr. Greg Wiley Coordinate with design engineering to ensure if drawings and technical information is available; Responsible for design piping installation/ modifications in the field;Coordinate material sourcing and write Field Material Requisition, test pack preparations and witnessing; Provide engineering disposition for incorrect design, field construction & operations problems Performance objective-Support of const'n group w/ tech'l data

NAME: Felipe P. Dela Cruz (Bec. Ref. No. 103118) DATES 11/1980 11/198

DATE: August 2010

04/1977

04/1978

09/1974

03/1977

WORK HISTORY ARABIAN INDUSTRIAL & SITE CONSTRUCTION ENGINEER PETROLEUM Royal Saudi Air Force Domestic Facilities Construction Accommodation Project 4:2 Company Responsible for the design mechanical/piping subsidiary of Santa Fe Int., KSA installation/modification in the field;Coordinate material sourcing and write ; Field Material Supervisor: Requisitions test pack preparations & witnessing Mr. Francisco G. Cruz Monitor construction activities for safe working practices, compliance with codes, specification and adherence to good engineering practices; executed to keep construction activities moving efficiently possible;Perform testing & commissioning works for plumbing and HVAC system ARABIAN SUNDT LTD., KSA OFFICE ENGINEER Project BI-1501 (Town Houses) Supervisor: Coordinate with design engineering to ensure if Mr. Aldo Penso drawings and technical information is available;Responsible for supervision of mechanical, plumbing and HVAC installation works of a series of housing projects; Performance objective-Support of construction group w/ technical data Republic of the Philippines ASSISTANT CONSTRUCTION ENGINEER National Irrigation Supervise the drilling and grouting operation in Administration the construction of Aurora Transbasin diversion Upper Pampanga River Project & Diayo Dam as well as for the Project,Dam maintenance of construction equipment; & Town Facilities Division Engineer-In-Charge on inspection and Pantabangan supervision in the fabrication, installation Nueva Ecija and testing of the following: Penstock and its Wye Branches Supervisor: Bulkhead Assembly used in testing turbines & Mr. Abelardo Cortez other instrument; Conduct shop & field inspection report data; Supervise the installation and testing procedures of two units 50megawatts each(vertical type Francis turbines)of Pantabangan Hydro-Electric power plants & its appurtenant structures