TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

TOTAL 24 PAGE (Including Cover)

Purpose
PROJECT CODE : A70003EA For Review PROJECT NAME : ANGAMOS THMOELECTRIC POWER PLANT DOCUMENT No. : WD010-MZ731-00004 TITLE : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE OWNER: EMPRESA ELECTRICA ANGAMOS S.A.

For Information

For Construction For ( )

2008/06/23

For Information
J. Park
S.H. Park Y.H. Jeong

2008/03/10

For Information
J. Park
K.M.Jeon
REVIEW

Y.H. Jeong
APPR

Rev. No.

PREP

REVIEW

APPR

REVIEW

DATE

DESCRIPTION POSCO E&C

Owner

Contractor:

ANGAMOS THERMOELECTRIC POWER PLANT TITLE: TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004 REV. : B PAGE : 1 OF 23

1. GENERAL All documents prepared by the Contractor or its sub-contractors shall be in English and shall bear a prominent reference to the Project and a full title block containing a unique identification number, revision number, source and type of document and descriptive title. Documents shall be on ISO standard A-size sheets, except that separately submitted computer printouts may be on fan-fold paper suitably bound into an appropriate binder. The Contractor shall submit to the Owners Engineer four (4) hard (printed) copies and soft copies of documentation, unless otherwise specified in the contract. All printed documentation provided shall be of good quality, clear, legible and able to be used by the Owners Engineer to produce further copies by photocopying. All soft copies shall be in a format to be agreed mutually. As a minimum, text documents shall be in Microsoft Word Version 2000, spreadsheets shall be in Microsoft Excel Version 2000, data bases shall be in Microsoft Access Version 2000, drawings shall be in AutoCAD Version 2006 and schedules shall be in Primavera 3.0. Where the Contractor is required to specify the performance requirements for plant including, but not limited to, valves, control valves, instrumentation, motors, pumps and blowers the data and requirements shall be set out on in the format generally attached to the relevant specification or standard. Should the relevant standard not include specimen data sheets, the requirements shall be set out on a data sheet in a form generally recognized as appropriate in the industry.

2.

SUBMISSION The Contractor will submit all documents with the purpose stamped: For Information For Approval of the Chilean Seismic Expert For Owners Review For Construction As Built All documents shall be listed in Master Drawings and Document List (refer to Attachment #1). Documents submitted For Owners Review shall have been processed in accordance with the overall Approval Procedure of the Contractor and will be certified by the Contractor as having been fully examined by him and in compliance with the Contract.

ANGAMOS THERMOELECTRIC POWER PLANT TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004 REV. : B PAGE : 3 OF 26

The documents that need the approval of the Seismic Expert will be submitted both of them for Owners Review and Approval of the Seismic Expert simultaneously.(refer to the attachment #6) The Contractor shall allow a period of 14 days for the Owners Representative to review and comment on each submittal of documents, unless otherwise specified in the Contract. The Owners Representative will advise the Contractor of the status of all documents submitted for review as one of the following: Reviewed, without comments: The work may proceed on the basis of the document, to under exclusively responsibility of the Contractor

Reviewed, with comments: The contractor must take care of the commentaries by modifying the document or justifying it. The document shall be submitted for construction as soon as possible with the noted amendments. Work may, however, proceed pending formal release, based on the noted amendments always to under exclusively responsibility of the Contractor.

Disapproved Non-compliance with the Contract. The Owners representative will identify the non-compliance. Work shall not proceed based on the disapproved document. The document shall be resubmitted.

Revision of the Chilean Seismic Expert: All the drawings and documents that must be submitted for approval of the Chilean Seismic Expert (Scope of Works of Seismic Expert) will be emitted by the Contractor with a stamp in that sense. Once reviewed the drawing or document the Expert will put a clearly visible stamp on it with some of the following categories: Rejected: The document will have to be corrected by the Contractor and to be put under the process of revision of the Seismic Expert again.

ANGAMOS THERMOELECTRIC POWER PLANT TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004 REV. : B PAGE : 4 OF 26

Approved with commentaries The contractor must take care of the commentaries by modifying the document. The document shall be submitted for construction as soon as possible with the noted amendments. Work may, however, proceed pending formal release, based on the noted amendments always to under exclusively responsibility of the contractor.

Approved for shipping It indicates that the structures and/or the equipment can be shipped towards Angamos but that the Contractor must again be made position of commentaries modifying the document and putting under it the revision of the Seismic Expert to be approved for Construction.

Approved for construction

The stamps of the Seismic Expert will be in the document next to the title block, and that part of the document will be scanned for emission. The use of a Visible Stamp in the documents provided by the Seismic Expert can be implemented. And Seismic Expert will stamp a hard copy document (title page 0r title block area) and after taking a scan image provide a pdf version of it to the appropriate project document distribution list to expedite distribution of the information. Documents may have both stamps together Approved with commentaries and Approved for shipping simultaneously.

3. 3.1

DRAWINGS AND DOCUMENTS Codes and Standards Drawings shall be to the latest edition of the following: ISO 128-1982 Technical Drawings - General Principal of Presentation Engineering Drawings - Dimensions

ISO/R129-1959 3.2 General Requirements

ANGAMOS THERMOELECTRIC POWER PLANT TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004 REV. : B PAGE : 5 OF 26

Standard size shall be metric A0, A1, A2, A3 and A4. Drawings shall be prepared in such a way that photo-reduction to size A3 shall result in a legible and useable drawing. Particular attention shall be paid in this respect to selection of fonts. Each drawing submitted shall clearly indicate the applicable status, e.g. Preliminary, for Information, for Approval, for Construction, As Built.

3.3

Drawing and Document Identification A title block shall be provided at the bottom right hand corner of each drawing with a window each for the following minimum information: (refer to Attachment #3.) Name of Contractor Drawing Title and a brief description of the content Drawing No. Revision No. Before Approval : A, B, C, D. Drawing Scale Drawing Date Drawn By Designed By Checked By Approved By After Approval : 0, 1, 2, 3, ...

3.4

Drawing and Document Number

ANGAMOS THERMOELECTRIC POWER PLANT TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004 REV. : B PAGE : 6 OF 26

3.4.1 Definition of Code


Format N - WD NNN - AANNN - NNNNN

Uniit of No Code of Plant Complex PBS Code FBS Code Serial No.

Unit No. - AGM #1 - 1 - AGM #2 2 - Commom Facilities - 0

Code of Plant Complex It is defined to classify the property of equipment for the Project. WD is used as fixed code for this.

Physical Breakdown Structure (PBS) It is code structure to Classified the Property of equipment & System for Project. Refer to Attachment#4.

ANGAMOS THERMOELECTRIC POWER PLANT TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004 REV. : B PAGE : 7 OF 26

Functional Breakdown Structure (FBS)


A First Letter (Stage) Second Letter (Working Filed) Third Letter (Working Classification) - First Letter (Stage) 1) M : Project Management 2) E : Engineering 3) P : Procurement 4) C : Construction 5) Z : Common - Second Letter (Working Field) 1) R : Process 2) C : Civil 3) A : Architecture 4) M : Mechanical 5) P : Piping 6) E : Electrical 7) J : I & C 8) L : Landscape 9) Z : Common - Third Letter (Working Classification) : Refer to Attachment #4 A NNN

ANGAMOS THERMOELECTRIC POWER PLANT TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004 REV. : B PAGE : 8 OF 26

3.4.1.2 Coding & numbering system for Drawing & Document Drawings
Example Unit No. Code of Plant Complex PBS Code FBS Code Serial No. N - WD NNN AANNN - NNNNN

Specification
Example Unit No. Code of Plant Complex PBS Code FBS Code Serial No. N - WD NNN AANNN - NNNNN

Calculation
Example Unit No. Code of Plant Complex PBS Code FBS Code Serial No. N - WD NNN AANNN - NNNNN

ANGAMOS THERMOELECTRIC POWER PLANT TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004 REV. : B PAGE : 9 OF 26

Reports / Manual/List
Example Unit No. Code of Plant Complex PBS Code FBS Code Serial No. N - WD NNN AANNN NNNNN

3.4.2 3.4.3

CAD File Numbering system : same as the numbering system for Drawing Manufacturers Document Numbers Manufacturer documents are to be numbered as per section 3.4.1.

3.5Drafting Standards 3.5.1 Scales The following scales shall be applied. No others will be used unless specified by the Owner and the Contractor. 1:5 1:10 1:20 1:25 1:50 1:100 1:200 1:250 1:500

ANGAMOS THERMOELECTRIC POWER PLANT TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004 REV. : B PAGE : 10 OF 26

3.5.2 Dimensioning All dimensions will be shown in millimetres unless specified otherwise by the Owner. Leader lines shall start 2mm from the dimensioned element (unless that element is embedded within another) and end not less than 15mm away from the outer most element. Dimension lines shall be a minimum of 10mm apart. Dimension lines will take preference over leader lines with the leader line being broken around the dimension line. 3.5.3 Text Manual

Text shall have a minimum height of 3.5mm vertical upper case. CAD

Text shall have a minimum height by 2.5mm vertical upper case and conform to ISO 3098B style. 3.5.4 Line work Sufficient variety of line thickness will be shown so as to provide a clear definition between components and dimensions.

4. EQUIPMENT TYPE AND NUMBER 4.1 Purpose and area of application The power plant identification system is applied to clearly identify plants, systems, parts and components to their purpose, type and location. The contents are in accordance with KKS identification systems for Power Stations issued by VGB Kraftwerkstechnik GmbH Essen. (refer to attachment #5) 4.2 Requirements to be met by the KKS identification system

ANGAMOS THERMOELECTRIC POWER PLANT TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004 REV. : B PAGE : 11 OF 26

In order to perform the set tasks the identification system must be capable of satisfying the following requirements: All installations and sub-systems have to be included, An adequate number of reserve codes must be available for future developments in power plant engineering, The classification of installations and sub-systems must be generally applicable to all types of power plant; all individual circuits and arrangements must, however, be clearly identifiable, Clear identification of all sub-systems, An identification used in a power plant must be non-recurring, Sub-division with graded details and a fixed in relevance to the data characters, Variable identification length depending upon the detailed requirements of the various areas of application, Independent identification of various systems must be possible, Ease of recognition ensured by clarity and an acceptable length for the identification, Plausibility check facility, especially for data processing,

4.3 Structure and application of the identification system KKS KKS shall be applied for the process-related identification which identifies installations and equipment according to their assigned task in the power plant process. A uniform identification structure was created with a maximum of four breakdown levels, except application to spare parts. And the Project shall utilize upto three breakdown levels with a maximum; the units referred to becoming smaller from left to right. Table 1 summarizes the identification and type of data characters of the breakdown levels appearing in the KKS. In the process-related identification the entire system is subdivided according to the function or process, since, whether for mechanical, electrical, control of civil

ANGAMOS THERMOELECTRIC POWER PLANT TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004 REV. : B PAGE : 12 OF 26

engineering, the equipment units and components must be identifiable in relation to the process. The process-related identification is for many applications the most important identification, since it permits, for example, locations of electrical and control equipment, rooms, signals, and the identification in circuit diagrams related to particular functions. In the electrical and instrumentation control engineering sectors, the equipment for auxiliary services, power supply, open-loop-control, instrumentation, etc,. is treated as a process engineering function. The same applies to structures in civil engineering work. The process-related identification corresponds to the identification block Plant in DIN 40719, part2. This block has the prefix sign =. According to the standard, the prefix sign can be omitted provided that the identification remains unambiguous.

ANGAMOS THERMOELECTRIC POWER PLANT TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004 REV. : B PAGE : 13 OF 26

Serial Number Of Breakdown level Name of Breakdown level Example

0 Overall Unit

1 Function System

2 Equipment Pump unit

3 Component Pump

<Breakdown levels >

Note : Six (6) digit numbering system shall be used for spare parts.

ANGAMOS THERMOELECTRIC POWER PLANT TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004 REV. : B PAGE : 14 OF 26

Usage of Breakdown Level Structure


Serial number of 0 1 breakdown level Name of breakdown Overall Function level plant Designation of data G F0 F1 F2 F3 FN character Type of data (A) or (N) (N)AAA NN character A = Alphabetical symbols (letters, special symbols) N = Numerical symbols (digits) () = The data characters may be omitted Breakdown levels 0 total plant Total plant Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit 1 function System code System Structure, floor Structure, floor System Structure, floor System Unit coordinate level Switchgear Transformer Transformer Transformer
Elec. equipment cab

2 Equipment Unit A1 A2 AN AANNN (A)

3 Component B1 B2 BN AANN

2 Equipment unit Equipment unit code Pump unit Rolling door Fan unit Measuring circuit Measuring circuit Open-loop control Closed-loop control Switchgear assembly Fan unit Measuring circuit Terminal box Measuring circuit Junction box

3 component Component code (pump) (motor) (fan) Transducer Temp.sensor Push-button Controller Fuse Motor Indicator Terminal block Smoke detector Telephone jack

Mechanical engineering Civil engineering Control and instrumentation (for mechanical and civil engineering)

Electrical and control and instrumentation engineering

Structure, floor

ANGAMOS THERMOELECTRIC POWER PLANT TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004 REV. : B PAGE : 15 OF 26

Breakdowns, contents of KKS data character


0 Overall plant G A or N 1 Function F0 N F1F2F3 AAA FN N N A1A2 AA 2 Equipment unit AN NN N A
3

serial no. of breakdown level name of breakdown level identification of data character type of data character
prefix sign of process related identification Identification of power station units and unit independent plants

3 component B1B2 AA BN N N

Prefix No. of the function code counting of similar systems and plants System-classifying classifying sub-division of systems and plants into unit System-counting Counting sub-division of systems and plants into system sections and sub-systems Equipment-classifying classifying sub-division of mechanical equipment, open loop-control equipment-counting counting of similar mechanical equipment, open and closed loop-control Additional identification of breakdown level2 identification of pilot valves, multiple drives/el.loads, measuring points with multiple output/operating points Component-classifying Classifying sub-division of components signals or signal-applications Component counting Counting of components or signals or signal-applications

ANGAMOS THERMOELECTRIC POWER PLANT TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004 REV. : B PAGE : 16 OF 26

Function key (function identification)


1 Function F0 N F1F2F3 A A A FN N N

Serial No. of breakdown level Name of the breakdown level Identification data character Type of character

Main groups F1 groups F1F2 sub-groups F1F2F3

Function Key, main groups F1 Code A B C D Identification Grid and distribution systems Power transmission and auxiliary power supply Instrumentation and control equipment instrumentation and control equipment (when the function codes CM to CT are insufficient for the identification) conventional fuel supply and residues disposal handling of nuclear equipment water supply and disposal conventional heat generation nuclear heat generation reactor auxiliary systems steam, water, gas cycles main machine sets process energy supply for external users Cooling water systems Auxiliary systems Gas generation and treatment Ancillary systems -blockedstructures -blockedRenewable energy plants Heavy machinery (not main machine sets) -blockedworkshop and office equipment

E H G H J K L M N P Q R S T U V W X Y Z

ANGAMOS THERMOELECTRIC POWER PLANT TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004 REV. : B PAGE : 17 OF 26

For complete function code list including system limits of function groups F1F2 and function sub-groups F1F2F3 see function code key (Refer to Attachment #5)
Equipment unit key Equipment unit identification Serial No. of breakdown level Name of the breakdown level Identification of data character Type of data character

2 Equipment unit A1A2 A A N AN N N A3 N N

Main groups Sub-groups

A1 A1A2

Equipment Unit Key, groups A1:


Code A B C D E F G H J Identification Mechanical equipments Mechanical equipments Direct measuring circuits Closed-loop control circuits Analog and binary signal conditioning Indirect measuring circuits Electrical equipment Sub-assemblies of main and heavy machinery Nuclear assemblies

For complete equipment units of the sub-groups A1A2 see equipment unit code key

ANGAMOS THERMOELECTRIC POWER PLANT TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004 REV. : B PAGE : 18 OF 26

Component identification
Serial No. of breakdown level Name of breakdown level Identification of data character Type of data character B1B2 A A 2 Component BN N N N B3 N N

Main groups Sub-groups

B1 B1B2

Component code main groups B1: Code K M Q X Y Z Identification Mechanical components Mechanical components Instrumentation and control components (not electrical) Electrical components Signal origin Gated signals Signal application

For complete components of the sub-groups B1B2 see component code key In P & I diagrams breakdown level 3 is NOT used. In other document it may be used according to separate agreements. The specification of subgroups of Signal or use of signals shall be discussed with participants at work.

ANGAMOS THERMOELECTRIC POWER PLANT TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004 REV. : B PAGE : 19 OF 26

4.4

Automation Systems Identification


Functional groups identification The automation system is divided into functional groups/subgroups according to functionally associated process sections. The structure of the automation functional groups is showed in the following figure 4.1 and is made by: Level 0 - Entire Plant Level 1 - Function ; F1F2Y NN identify the code of the automation functional group; Two numeric digits that identify the automation functional sub-groups.
Figure 4.1 Function G F0 F1 F2 Y NN Subgroups XX

In the following figure is represented a typical situation for automation system functional groups and sub-groups identification.
AUTOMATION SYSTEMS

LAYNN
0n

LBYNN
0n

MAYNN
0n

CJYNN
0n

CAYNN
0n

03 02 01

03 02 01

03 02 01

03 02 01

03 02 01

e.g.

LAYNN is the automation functional group related to process system LA Feedwater System LAYNN01 is the first functional sub-group of Feedwater System.

ANGAMOS THERMOELECTRIC POWER PLANT TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004 REV. : B PAGE : 20 OF 26

4.5

Pipeline identification
Identification code The code for the pipelines identification is made up by the Plant and the Function codes (level 0 and 1) as defined in Clause 3.2 and a third level code that identifies the line number.

Function G F0 F1 F2 F3 NN

Line Number A1 A2 NNN

Line number The code is made up by two alphabetical characters (A1A2) that identify the equipment, and three numeric digits (NNN) for the line counting.

Line attributes Additional information, that, are not part of the line identification code, but are useful to give the complete characterization of the line, follow the line identification code.

Line diameter This shall be indicated following line number, by up to four numeric digits that represent the nominal diameter in millimetres.

Piping design specification One alphabetic digit and one numerical digit refer to the piping class used

Example An example of line identification is the following:

Line Identification Code Function G 6 F0 1 F1 F2 F3 GDK NN 10 Line Number A1 A2 BR NNN 010

Attributes Nominal Diameter NNNN 1600 Piping Class. A1N D2

The sample is related to a ND 1600 mm pipe, pertaining to the desalination block section 1 System (i.e. distiller 61), which piping class is D2.

ANGAMOS THERMOELECTRIC POWER PLANT TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004 REV. : B PAGE : 21 OF 26

The numbering logic subdivision for pipelines, valves and measuring circuits is given in the Attachment #5.

ANGAMOS THERMOELECTRIC POWER PLANT TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004 REV. : B PAGE : 22 OF 26

4.6

Cables, Cable Raceways And Cable Raceway Parts Identification Cables The structure of the cables identification code is showed in figure 4.2 and is made by: Level 0 - Entire; Level 1 - Function; Level 1 will be identified with the code of the switchgear panel. Two alpha or numeric characters for vertical subdivision( optional); The numbering element of the cable number comprises four numeric data characters. The first digit of the four numeric data characters serves to identify the application area as follows: Application Area Description: 0 1 2 3 4 5 6 7 8 9 Power Cable > 1 KV POWER CABLE 1 KV C&I > 60 V - DC Commands And Interlocks C&I > 60 V - AC Commands And Interlocks C&I 60 V - Digital Instrumentation For Control C&I 60 V - Digital Instrumentation For Protection C&I 60 V - Analog Instrumentation For Control C&I 60 V - Analog Instrumentation For Protection C&I 60 V - Special (Bus etc.) C&I 60 V - Communication Cables
Figure 4.2 Cables identification Function G F0 F1 F2 F3 NN AA or NN Numbering N N N [A(or N) where needed]

Vertical subdivision (where necessary) Application area

ANGAMOS THERMOELECTRIC POWER PLANT TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004 REV. : B PAGE : 23 OF 26

Cable Raceways The structure of the cable raceways identification code is showed in figure 4.3 and is made by: Level 0 - Entire Plant; Level 1 Function; as defined in this paragraph for the cable raceways the last two numeric digits are identifies the floors level (F3 NN is optional and relevant characters may be omitted); two alphabetic digits for raceways assembly and two numeric digits for counting in each raceway assembly.
Figure 4.3 Cables raceways identification Structure code G F0 F1 F2 F3 Cable Way Type AA Numbering NNN A

Cable Way Types The cable way types are the following DT Cable Trays or Ladders UG Underground Pipe

ECExposed Cable Ways (Tray or Conduit)

ANGAMOS THERMOELECTRIC POWER PLANT TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004 REV. : B PAGE : 24 OF 26

4.7

Project related rules, agreements and procedures General rules on process-related identification Piping & Instrument Diagrams (P&ID) are the basic documents (origins) for a Project related KKS coding. Single line diagrams are the basic documents (origins) for a Project related KKS coding in electrical engineering. However, KKS codes for electrical consumers, measuring loops and items of I&C represented in Function Diagrams are originated in P & IDs. For other engineering activities (e.g. layout planning, component engineering), KKS code must always be taken from the above mentioned basic documents. In basic KKS documents (P&IDs and single line diagrams) the breakdown level 3 (component code) is never used. Note: Special rules on point of installation identification and location identification have to be established within the relevant engineering disciplines (electrical, I&C and civil engineering). The basis are the KKSApplication Commentaries, Part B2, B3, and B4 by VGB. Rules on modifications and cancellations of KKS numbers. It is not allowed to change allocated KKS numbers for a Project, if these numbers have been released for the Project. The original KKS number is still kept, even when another kind of equipment is used providing that the function according to the KKS equipment unit code is not changed (e.g. substitution of a gate valve by a globe valve). If in a Project a hardware component is no longer used, it is not allowed to re-allocate its KKS number for another component in the same Project. Agreement on breakdown level 0 and the prefix number F0. Total Plant G System Code prefix No. F0 Contents AES Comments is required General rules on other numbering code elements (FN, AN, BN).

ANGAMOS THERMOELECTRIC POWER PLANT TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004 REV. : B PAGE : 25 OF 26

Numbering starts anew when one of the preceding code elements changes. Numbering may be consecutive or grouping. Numbering need not be continuous. Numbering conventions, once established, may not be altered, not even in the event of changes made in the progress of planning. Redundant zeros must be written. An application-specific scheme of numbering may be established. However, such schemes may not have the effect of reserving numbers in other applications, not even within the same engineering discipline. Management systems (e.g. computer checking programs, allocation sheets) have to assure, that no double KKS numbers occur in the Project. If necessary, subdivisions of number ranges in Fn and An according to the division of work could be made. They have to be written down directly in the Function key code and must be respected by the Members. General rules regarding direction of numbering Standard designations have priority in all cases. Numbers are increased in media or process flow direction. Project counting directives refereed to local layouts are related to breakdown level 0, and prefix number for system code F1 and structures (F1=U) only. The counting is not related to any geographical direction (e.g. not from west to east, not from north to south). Writing modus of KKS code Following structures of the KKS code are allowed:

in one line with space between Function Level, Equipment Unit Level (and Component Level). e.g. 19PAB10 AP001 (-M01) in two (three) lines

ANGAMOS THERMOELECTRIC POWER PLANT TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004 REV. : B PAGE : 26 OF 26

e.g. 19PAB10 AP001


(-M01)

5.

ATTACHMENTS
Attachment #1 Attachment #2 Attachment #3 Attachment #4 Attachment #5 Master Drawing & Document List Title Block Design Document Cover PBS and FBS Code Summary of KKS Key Rev.B

Attachment #6

Approval Procedure of Drawing and Document Rev.B

ATTACHEMENT # 1

MASTER DRAWING & DOCUMENT LIST


( PROJECT: Angamos Thermoelectric Power Plant )
DISCIPLINE/WBS: AR (547 EA) DRAWING & DOCUMENT NUMBER 0-WD090-EA124-00101 Cate gory (Class) 10% R A A1 Standards - Abbreviation, Legend & Symbols-1 (SCH) (ACT) 0-WD090-EA124-00102 R A A1 Standards - Abbreviation, Legend & Symbols-2 (SCH) (ACT) 0-WD090-EA124-00103 R A A1 Standards - Floor and Wall Junction Details (SCH) (ACT) 0-WD090-EA124-00104 R A A1 Standards - Ceiling and Wall Junction Details (SCH) (ACT) 0-WD090-EA124-00105 R A A1 Standards - Roof Details-1 (SCH) (ACT) 0-WD090-EA124-00106 R A A1 Standards - Roof Details-2 (SCH) (ACT) 0-WD090-EA124-00107 R A A1 Standards - Wall and Roof Penetration Details (SCH) (ACT) 0-WD090-EA124-00108 R A A1 Standards - Block Wall Details (SCH) (ACT) 0-WD090-EA124-00109 R A A1 Standards - Stair & Handrail Details (SCH) (ACT) 0-WD090-EA124-00110 R A A1 Standards - Door Head Details (SCH) (ACT) 0-WD090-EA124-00111 R A A1 Standards - Door Jamb Details (SCH) (ACT) 2008-04-01 2008-04-01 2008-04-01 2008-04-01 2008-04-01 2008-04-01 2008-04-01 2008-04-01 2008-04-01 2008-04-01 2008-04-01 2008-04-01 2008-04-01 2008-04-01 2008-04-01 2008-04-01 2008-04-01 2008-04-01 2008-04-01 2008-04-01 2008-04-01 2008-04-01 50% 2008-06-03 2008-05-30 2008-06-03 2008-05-30 2008-06-03 2008-05-30 2008-06-03 2008-05-30 2008-06-03 2008-05-30 2008-06-03 2008-05-30 2008-06-03 2008-05-30 2008-06-03 2008-05-30 2008-06-03 2008-05-30 2008-06-03 2008-05-30 2008-06-03 2008-05-30 70% 2008-06-15 2008-06-13 2008-06-15 2008-06-13 2008-06-15 2008-06-13 2008-06-15 2008-06-13 2008-06-15 2008-06-13 2008-06-15 2008-06-13 2008-06-15 2008-06-13 2008-06-15 2008-06-13 2008-06-15 2008-06-13 2008-06-15 2008-06-13 2008-06-15 2008-06-13 2008-06-30 2008-08-30 2008-06-30 2008-08-30 2008-06-30 2008-08-30 2008-06-30 2008-08-30 2008-06-30 2008-08-30 2008-06-30 2008-08-30 2008-06-30 2008-08-30 2008-06-30 2008-08-30 2008-06-30 2008-08-30 2008-06-30 2008-08-30 90% 2008-06-30 100% 2008-08-30 REV NO. SH'T NO. SI ZE DESCRIPTION Draft Start Draft Completion Issue for IFR/Info. Comment Received IFC As of 2008-06-13 Remarks

ATTACHEMENT #2

ATTACHMENT #3

PURCHASE SPECIFICATION

TOTAL

PAGE

(Including Cover)

PROJECT CODE : A70003EA

Purpose

PROJECT NAME : ANGAMOS THERMOELECTRIC POWER PLANT DOCUMENT No. : AGM-M-RFQ-001

For Review

For Information

TITLE : PURCHASE SPECIFICATION FOR STEAM TURBINE AND GENERATOR WITH AUXILIARIES

For Construction For ( )

OWNER: EMPRESA ELECTRICA ANGAMOS S.A.

2008/06/23

For Information
J. Park
S.H. Park Y.H.Jeong

2008/02/29 J.N.Park M.S.Han


REVIEW

For Comment
C.H.Choi
APPR

M.H.Han H.S.Woo Y.H.Jeong


REVIEW REVIEW APPR

Rev. No.

PREP

DATE

DESCRIPTION POSCO E&C

Owner

Contractor

Subcontractor

REV. No.

ATTACHEMENT A. PBS Code List (Level 1 & 2)


Level 1 Code 000 General Description Code 010 070 080 090 100 Boiler & HRSG 110 120 130 140 150 160 170 180 190 200 Turbine 210 220 230 240 250 260 270 280 290 300 Auxiliary System 310 320 330 340 350 360 370 380 390 400 Generator 410 420 430 440 450 480 490 500 Attendant Facilities 510 Project Management Structure Civil Architecture Boiler proper Draft System Combustion Equipment Soot Blowing & Blow Down System Casing & Structure Steel Chemical Injection & Sampling System HRSG proper Steam Drum Miscellaneous Item for Boiler & HRSG Steam Turbine Lub Oil System Protective Device Control Device Sealing Device Turning Gear System Gas Turbine & Aux. Wind Turbine & Hydro Turbine Miscellaneous Item for Turbine Steam System Condensate System Feed Water System DH System Make-up Water System Closed Cooling Water System Tank & Vessel Piping & Valves Miscellaneous Item Generator H2 & CO2 System Level 2 Description

#4

Generator Seal System Excitation System Generator Stator Cooling System Solar System Miscellaneous Item for Generator Sea Water Treatment System

Level 1 Code Description Code 520 530 540 550 560 570 580 590 600 Other Facilities (Organic Rankine Cycle , etc) 610 620 630 690 700 EIC 710 720 730 740 750 ` 760 770 780 790 900 Utility & Common 910 920 930 940 950 960 990

Level 2 Description Fuel Gas Treatment System Coal Supply System Ash Handling System Lime Handling System Aux. Boiler Fire Fighting System Emergency Diesel Generator Miscellaneous Item for Attendant Facilities TGU for ORC WHOH System WHOR System Miscellaneous Item Power Receiving & Distribution Equipment Motor & Control System Panel & Box Instrumentation Equipment Auxiliaries Equipment Process Control System Package Control System Special Instruments Equipment Construction Material & Others Water & Waste Water Treatment/service System Gas Service System Oil Service System Air Treatment System Lifting & Transportation Auxiliaries Facilities (HVAC, Elevator etc.) Miscellaneous

PBS Code List (Level 2 & 3)


Level 2 Code 080 Civil Description Code 081 082 083 084 089 090 Architecture 091 092 093 099 120 Draft System 121 122 123 124 125 126 127 128 130 140 Combustion Equipment 131 Shoot Blowing & Blow Down 141 System 142 Casing & Structure Steel Chemical Injection & Sampling System Gas Turbine & Aux. 151 152 160 161 162 270 271 272 273 274 275 280 Wind Turbine & Hydro Turbine 281 282 285 289 310 Steam System 311 312 313 314 316 Level 3 Description Main Equipment Foundation Auxiliary Equipment Foundation Building Foundation Underground Equipment Civil Others Main Building Auxiliary Building Equipment For Building Architecture Others Forced Draft Fan Induced Draft Fan Other Fan Steam Coil Air Heater Gas Air Preheater Gas Gas Heater Duct, Wind Box & OAP Stack Burner Soot Blowing System Blow Down System Casing Structure Steel Chemical Injection System Sampling System Gas Turbine Air Intake System Compressor Combustor Water/Steam Injection System Wind turbine generator system Tower Hydro Turbine Miscellaneous Main & Reheat Steam System Steam Bypass System F.W Heater Extraction Steam System F.W Heater Drain & Misc. System Steam Blowing Out System

150

Level 2 Code Description Code 318 320 Condensate System 321 322 323 324 325 326 327 330 Feed Water system 331 332 333 340 DH System 341 342 343 350 Make-up Water System Closed Cooling Water System Tank & Vessel 351 352 360 361 362 370 371 372 373 380 Piping & Valves 381 382 383 384 385 480 Solar System 481 489 510 Sea Water Treatment Sys. & 511 Circulating Water Sys. 512 513 514 515 516 517 520 Fuel Gas Treatment System 521 522 523 524 Aux. Steam System Condenser

Level 3 Description

Condenser Tube Cleaning System Condenser vacuum pump Debris filter system Condensate Pump Condensate Polishing System Condensate Booster Pump Feed Water Pump Feed Water Heaters Deaerator DH Heaters DH Water Circulation Pump Heat Accumulator Make-up Water Tank Make-up Water Pump Heat Exchanger Closed Cooling Water Pump Field Fabricated Tank Shop Fabricated Tank Vessel Pipe & Fittings Valves Insulation Specialty Supports Solar Module Miscellaneous Item for Solar Module Water Intake System Hypochlorination Equipment Desalination System Circulating Water Pump Sea Water Lift Pump Brine Pump Cooling Tower Gas Detecting System Gas Heater Gas Filter/Separator Gas Reducing Station

Level 2 Code Description Code 525 526 527 528 530 Coal Supply Sysem 531 532 533 534 535 536 540 Ash Handling System 541 542 543 544 545 546 547 548 550 Lime Handling System 551 555 570 Fire Fighting System 571 572 573 574 575 576 590 Miscellaneous Item Attendant Facilities TGU for ORC for 591 592 610 611 612 613 614 620 WHOH System 621 622 623 630 WHOR System 631 632 633 634

Level 3 Description Gas Metering System Gas Analyzer Gas Compressor Flare System Coal Unloading System Coal Storage System(Stacking Out & Reclaiming) Coal Handling System Coal Sampling System Pulverized Coal System Dust Control System Bottom Ash Collection System Bottom Ash Transport System Bottom Ash Disposal System Fly Ash Collection System Fly Ash Transport System Fly Ash Storage & Disposal System Ash Water Supply System Ash Disposal System Lime Handling System Not Used Hydrant System Foam System CO2 System Water Sprinkler System Fire Extinguisher Fire Detection & Alarm System Single Point Mooring System Unloading Arm Turbine Generator Gear Box Lub. Oil system Oil Heat Exchanger Oil Feed Pump Expansion Tank Isopentane Feed Pump Vaporizer Preheater Recuperator

Level 2 Code Description Code 635 636 710 Power Receiving & Distribution Equipment 711 712 713 714 715 716 717 719 720 Motor & Control System 721 722 723 724 729 730 Panel & Box 731 732 739 740 Instrumentation Equipment 741 742 743 744 745 746 747 749 750 Auxiliaries Equipment 751 752 753 754 759 760 Process Control System 761 762 763 769 770 780 Package Control System Special Instruments Equipment Construction Material & 779 781 789 790 791

Level 3 Description Air Cooled Condenser Hot Well Transformer High Tension Panel Low Tension Panel Supervisory Monitoring Panel Generator UPS & AVR Battery & Charger Power Receiving & Distribution Equipment Others Motor Control Center (MCC) Drive Control System Motor Brake Motor & Control System Others Operating Panel Local Box Panel & Box Others Flow Instrument Level Instrument Pressure Instrument Temperature Instrument Control, Shut off Valves Analysing System Gas Sampling/Warning System Instrumentation Equipment Others Sensor(Plant Devices), Switch Paging, Interphone System I-TV System Score Board Auxiliaries equipment others Level 1 System Level 2 System Monitoring System(CMS/EMM) Process Control System Others Package Control System Others Weighing System Special Instruments Equipment Others Construction Material

Level 2 Code Others 799 900 Utility & common 901 902 903 910 Water & Waste Treatment/Service System Water 911 912 913 914 915 916 917 918 919 920 Gas service system 921 922 923 924 925 926 927 928 929 930 Oil service system 931 932 933 934 939 940 Air Treatment System 941 945 946 947 949 950 Lifting & transportation system 951 952 953 959 960 Auxiliaries Facilities (HVAC, 961 Elevator etc.) EIC Others Piping Manual Valve Fittings Description Code

Level 3 Description

Final effluent treatment system Cooling water system Waste water system Demineralization system Potable water system Chemical dosing system Advanced treatment system Sewage water treatment system Utility water supply system Compressed air system Steam system Nitrogen system Hydrogen system Oxygen system Argon system Low pressure gas(BFG,COG,LDG,CFG) system Fuel gas(LNG & LPG) system Gas service system others Fuel oil system Lubrication oil system Grease system Hydraulic system Oil service system others De-Dusting System De-NOx system De-SOx system De-Odor system De-dusting system others Crane Hoist Chain Block Lifting & transportation system others Elevator

Level 2 Code Description Code 962 963 967 969 990 Miscellaneous 991 992 993 999 Air-conditioner Thermohygrostat Ventilation System

Level 3 Description

Auxiliaries facilities others Temporary Pump Others for Water Treatment System Others

B. FBS Sub-Code List


FBS CODE COMMON PIPING MECH MECH MECH CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL CIVIL ARCH ARCH ARCH ARCH ARCH ARCH ARCH ARCH MECH MECH MECH MECH MECH MECH MECH PIPING PIPING PIPING PIPING PIPING PIPING PIPING PIPING 100 101 102 103 106 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 130 131 132 133 134 135 136 140 141 142 143 144 145 146 147 Drawing General Layout (Plant Layout/Equipment Layout) PFD/UFD (Process Flow Diagram/Utility Flow Diagram) P&ID Process Flow Chart General Drawing for Civil Excavation Drawing Pile Arrangement Drawing Temporary Work Drawing Foundation Drawing for Architecture Plan Section Anchor List Embedded List Road, Drainage, Pavement Drawing (Plant Utilities) General Drawing for Architecture Structure Drawing of Building Finish Drawing of Building Finish & Structure Drawing of Building Misc. Drawing for Architecture HAVC & Plumbing for Building Fire Fighting for Building Misc. Drawing for Building Equipment General Arrangement for Mech. System Equipment Assembly Drawing Steel Structure Assembly Drawing Equipment Detail Drawing Steel Structure Detail Drawing Information Drawing for Mechanical Items Misc. Drawing for Mechanical Plot Plan Piping Route Plan Piping Arrangement Drawing Information Drawing of Piping Piping ISO Drawing Piping Spool/Shop Drawing Piping Support Drawing Structure Drawing for Piping Description

FBS CODE PIPING ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC I&C I&C I&C I&C I&C I&C I&C I&C ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON 148 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 170 171 172 173 174 175 176 177 178 190 191 192 193 194 195 196 200 210 220

Description Details of Piping Components Single Line Diagram Cable Tray Plan Embedded Conduit Plan Sequence Diagram Paging & Intercommunication System Lighting & Receptacle Plan Fire Detection & Alarm System Heat Tracing And Freeze Protection Details of Electric Components Cathodic Protection System Configuration Control & Instrument Diagram Functional Block Diagram Control Loop Diagram Control Logic Diagram Control Circuit Diagram CRT Graphic Display Instrument Air Piping Plan Equipment / Room Arrangement Equipment Location & Wiring Plan Grounding / Lightning Plan Cable Block Diagram Cable Schedule Installation Detail Interconnection Diagram Information Drawing Equipment Outline Drawing Drawing List Typical & Standard Drawing Information Drawing for Construction Detailed Drawing or Temporary Works Detailed Drawing for Insulation Computer Graphic View Miscellaneous Drawing in General Specification Spec. for Inquiry Spec. for Project Contract

FBS CODE COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON 230 240 241 242 243 244 250 251 260 261 290 300 400 410 420 421 422 430 431 432 440 441 442 443 444 445 446 450 451 452 460 500 510 511 512 519 520 530 540 550 Spec. for Purchase Spec. for Design Design Criteria Piping Material Spec. Insulation Spec. Painting Spec.

Description

Spec. For Inspection And Test In General(ITP) Spec. For Fabrication Spec. for Construction Welding Procedure Spec. Process Description/Functional Description Calculation Data Sheet & List Bill of Material Spare Parts & Tool List Spare Parts Tool List Utility Consumption List Consumables List Lubrication Oil List Equipment List Line List Valve & Piping Component List Load List Motor List Instrument List Sensor List Signal List I/O List Interface/Interlock List Data Sheet Engineering Report Feasibility Study Report Site Survey Report Basic Engineering & Design Plan Miscellaneous Technical Bid Evaluation(TBE) Interdisciplinary Document Review Request Design Review/Verification/Validation Design Change Notice(DCN)

FBS CODE COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON COMMON 600 610 620 630 631 632 640 650 651 652 660 670 700 710 711 712 713 714 715 719 720 730 731 740 741 750 751 760 761 762 763 765 766 767 768 769 770 771 772 773 774 775

Description Manual & REF. Information Operation/Maintenance Manual Erection/Installation Manual Manual for Commissioning/Start Up PAT Manual/Check Sheet FAT Manual/Check Sheet Documents of Client/Licensor Supply Items Rules & Regulations Data Book Industrial Standards and Codes Catalogs Reference Information Project Management Document Project General Quality/Safety/Environment Management Claim/Change Order Lessons Learned Invoice/Insurance Government/Authorities/Agent Miscellaneous Proposal/Contract Documents Project Execution Project Execution Plan/Procedures Schedule Control/Management Planning/Progress Control Cost Control / Financial Status Cost Estimation Procurement Management Procurement Plan Inquiry / RFP(Request for proposal) Purchase Order / Contract Customs Clearance / Transportation / Insurance Site Material Manufacturing Management Inspection/Test Report Non Conformity Report(NCR)/Punch List Installation & Commissioning Supervision Report Commissioning Plan Commissioning Report PAC (Preliminary Acceptance Certification) FAC (Final Acceptance Certification)

FBS CODE COMMON COMMON 780 790 MOM/MOU

Description POST-Contract Management

ATTACHEMENT Summary of KKS Key


Function Key A B C E G H L M N P Q S U V X Main Groups & Codes Grid And Distribution Systems Power Transmission And Auxiliary Power Supply Instrumentation And Control Equipment Conventional Fuel Supply And Residues Disposal Water Supply And Disposal Conventional Heat Generation Steam, Water, Gas Cycles Main Machine Sets Process Energy Supply For External Users Cooling Water Systems Auxiliary Systems Ancillary Systems Structures Plant And Disciplines General Documents Heavy Machinery (Not Main Machine Sets)

#5

Systems A** Grid And Distribution Systems


AC 380(420)kV systems ACA 380(420)kV systems (free for use) AE* 132 kV Systems AP Control consoles APA Control consoles (free for use) AQ Measuring and metering equipment AQA Measuring and metering equipment (free for use) AR Protection equipment ARA Protection equipment (free for use) AS Decentralized panel and cabinets ASA Circuit breaker appurtenance ASB Multiplication, conversion, decoupling ASC Transducer appurtenance ASD Compressed air, hydraulics ASJ Automated controls, closedloop control ASL Grid simulation, voltage group selection ASM Measuring equipment ASN Auxiliary power supply ASP Recording ASQ Metering ASR Protection ASS Synchronization AST Transformation ASU Panels and cabinets for auxiliary equipment ASV Group, intermediate and general terminal blocks ASW Indication, manual and general terminal blocks ASX Alarm annunciation AT Transformer equipment ATA Transformer equipment (free for use) AU Open-loop control, check back and auxiliary equipment AUA Open-loop control, check back and auxiliary equipment (free for use) AV Marshalling racks AVA Marshalling racks (free for use)

AW AX
AXA

Instrument panels Central equipment

AWA Instrument panels (free for use) Central equipment (free for use) AY Communication equipment AYA Telephone system (PABX) AYB Control console telephone system AYC Alarm system (acoustic) AYD Alarm system (optical) AYE Fire alarm system AYF Clock system AYG Remote control system AYH Telemetry system AYJ Remote metering system AYK HF carrier telephone system AYL Staff paging system, wireless AYM Staff paging system, inductive AYN Staff paging system, hardwired AYP Optical monitoring system AYQ Environmental monitoring system AYS Radiotelephone system

B** Power Transmission And Auxiliary Power Supply BA*


BAA

Power Transmission

Generator Bus Duct And Accessories BAB Static Starter Output Breaker BAC Generator Circuit Breaker BAT Step-Up Transformers, Including Cooling Sys BAU Transformers Oil Treatment Systems BAW Earthing and lighting protection systems BAX Fluid supply system for control and protection equipment BAY Control and protection equipment BB* MV Distribution Boards And Transformers - Normal System BBA 11 kV Switchboard BBB 11 kV Switchboard BBC 11 kV Switchboard BBD 11 kV Switchboard BBE 11 kV Switchboard BBF 11 kV Switchboard BBG MV Distribution Boards BBH MV Distribution Boards BBJ MV Distribution Boards BBK MV Distribution Boards BBL MV Distribution Boards BBM MV Distribution Boards BBN MV Distribution Boards BBO MV Distribution Boards BBP MV Distribution Boards BBQ MV Distribution Boards BBR MV Distribution Boards BBS MV Distribution Boards BBT MV Auxiliary Power Transformers BBX Fluid supply system for control and protection equipment BBY Control and protection equipment BC* MV Distribution Boards And Transformers General Purpose BCA MV Distribution Boards BCT Start-Up, Offsite, General Purpose Transformer BCX Fluid supply system for control and protection equipment BCY Control and protection equipment BF* LV Main Distribution Boards And Transformer Normal System BFA 0,4 KV Power Centre BFB 0,4 KV Power Centre BFC 0,4 KV Power Centre BFD 0,4 KV Power Centre BFE 0,4 KV Power Centre BFF 0,4 KV Power Centre BFG 0,4 KV Power Centre BFH 0,4 KV Power Centre BFJ 0,4 KV Power Centre BFK 0,4 KV Power Centre BFL LV Main Distribution Boards BFM LV Main Distribution Boards BFN LV Main Distribution Boards BFP LV Main Distribution Boards BFQ LV Main Distribution Boards BFR LV Main Distribution Boards BFS LV Main Distribution Boards BFT LV Auxiliary Power Transformers BFU LV Auxiliary Power Transformers

LV Main Distribution Boards And Transformer General Purpose BHA 0,4 KV Power Centre BHB 0,4 KV Power Centre BHC 0,4 KV Power Centre BHD 0,4 KV Power Centre BHE 0,4 KV Power Centre BHF 0,4 KV Power Centre BHG 0,4 KV Power Centre BHH 0,4 KV Power Centre BHJ 0,4 KV Power Centre BHK 0,4 KV Power Centre BHL LV Main Distribution Boards BHM LV Main Distribution Boards BHN LV Main Distribution Boards BHP LV Main Distribution Boards BHQ LV Main Distribution Boards BHR LV Main Distribution Boards BHS LV Main Distribution Boards BHT LV Auxiliary Power Transformers BHU LV Auxiliary Power Transformers BHX Fluid supply system for control and protection equipment BHY Control and protection equipment BJ* LV Sub distribution Boards And Transformers Normal System BJA 0,4 KV Motor Control Centre BJB 0,4 kV Motor Control Centre BJC 0,4 KV Motor Control Centre BJD 0,4 KV Motor Control Centre BJE LV Sub distribution Boards BJF LV Sub distribution Boards BJG LV Sub distribution Boards BJH LV Sub distribution Boards BJJ LV Sub distribution Boards BJK LV Sub distribution Boards BJL LV Sub distribution Boards BJM LV Sub distribution Boards BJN LV Sub distribution Boards BJP LV Sub distribution Boards BJQ LV Sub distribution Boards BJR LV Sub distribution Boards BJS LV Sub distribution Boards BJT LV Sub distribution Transformer BJX Fluid supply system for control and protection equipment BJY Control and protection equipment BL* LV Sub distribution Boards And Transformers General Purpose BLA 0,4 KV Motor Control Centre BLB 0,4 KV Motor Control Centre BLC 0,4 KV Motor Control Centre BLD 0,4 KV Motor Control Centre BLE 0,4 KV Motor Control Centre BLF 0,4 KV Motor Control Centre BLG 0,4 KV Motor Control Centre BLH 0,4 KV Motor Control Centre BLJ 0,4 KV Motor Control Centre BLK 0,4 KV Motor Control Centre BLL LV Sub distribution Boards BLM LV Sub distribution Boards BLN LV Sub distribution Boards BLP LV Sub distribution Boards BLQ LV Sub distribution Boards BLR LV Sub distribution Boards BLS LV Sub distribution Boards BLT LV Auxiliary Power Transformer

BH*

Fluid supply system for control and protection equipment BLY Control and protection equipment BM* LV Distribution Boards and Transformers, (Diesel) Emergency Power System 1 BMA 0,4 KV Power Centre BMB 0,4 KV Power Centre BMC LV Sub distribution Boards BMD LV Sub distribution Boards BME LV Sub distribution Boards BMF LV Sub distribution Boards BMG LV Sub distribution Boards BMH LV Sub distribution Boards BMJ LV Sub distribution Boards BMK LV Sub distribution Boards BML LV Sub distribution Boards BMM LV Sub distribution Boards BMN LV Sub distribution Boards BMP LV Sub distribution Boards BMQ LV Sub distribution Boards BMR LV Sub distribution Boards BMS LV Sub distribution Boards BMT LV Auxiliary Power Transformer BMX Fluid supply system for control and protection equipment BMY Control and protection equipment BP Power installation for large variablespeed drives (e.g. for feedwater pump, excitation equipment, not power adjusters in switch gear) BPA Power installations for large variable-speed drives (free for use) BPX Fluid supply system for control and protection equipment BPY Control and protection equipment BR* LV Distribution Boards (Converters), Emergency Power System 1 BRA 220 V UPS Emergency Light BRB 220 V UPS Emergency Light BRC 220 V UPS for I & C BRD 220 V UPS For I & C BRE 220 V UPS Emergency BRF 220 V UPS Emergency BRG 220 V UPS for I & C BRH 220 V UPS for I & C BRJ LV Distribution Boards BRK LV Distribution Boards BRL LV Distribution Boards BRM LV Distribution Boards BRN LV Distribution Boards BRP LV Distribution Boards BRQ LV Distribution Boards BRR LV Distribution Boards BRS LV Distribution Boards BRT Converter (rotary) BRU Converter (static), inverter

BLX

BRV BRX BRY

Emergency power generating equipment (if not under *X* = Heavy Machinery) Fluid supply system for control and protection equipment Control and protection equipment

BT*

Battery Systems

BTA Batteries 220 V BTB Batteries 220 V BTC Batteries 110 V BTD Batteries 110 V BTE Batteries 220 V BTF Batteries 220 V BTL Battery Chargers 220 V BTM Battery Chargers 220 V BTN Battery Chargers 110 V BTP Battery Chargers 110 V BTQ Battery Chargers 220 V BTR Battery Chargers 220 V BTS Battery Chargers 110 V BTT Battery Chargers 110 V BTW Common equipment (free for use) BTZ DC Distribution Board BU Direct voltage distribution boards, normal system BUA Direct voltage distribution boards, normal system (free for use) BUX Fluid supply system for control and protection equipment BV* DC Distribution Boards, Emergency System BVA 220 V DC Distribution Board BVB 220 V DC Distribution Board BVC 110 V DC Distribution Board BVD 110 V DC Distribution Board BVE 24 V DC Distribution Board BVF 24 V DC Distribution Board BVG 220 V DC Distribution Board BVH 220 V DC Distribution Board BVJ 110 V DC Distribution Board BVK 110 V DC Distribution Board BVL 24 V DC Distribution Board BVM 24 V DC Distribution Board BVN DC Distribution Boards BVP DC Distribution Boards BVQ DC Distribution Boards BVR DC Distribution Boards BVS DC Distribution Boards BVX Fluid supply system for control and protection equipment BVY Control and protection equipment BY Control and protection equipment BYA Control and protection equipment (free for use)

C** Instrumentation And Control Systems


CA* Protective Interlocking CAA BOP Protection System CAB Gas Turbine Protection System CAC Steam Turbine Protection System CAD HRSG Protection System CAE BMS Protection System CAY Aux Boiler Protection System CB* Functional Group Control, Sub loop Control CBA-CBN Cabinets For Functional Group Control CBP Cabinets For Synchronisation CBQ Cabinets For Auxiliary Power Change-Over CC* Binary Signal Conditioning CCA-CCQ Cabinets For Binary Signal Conditioning

CD*

Drive Control Interface

CDA-CDQ Cabinets For Drive Control Interface CE* Annunciation CEA-CEH Cabinets For Annunciation System CEJ Fault Recording (SER) CEK Fault Recording (OSCILLO) CF* Measurement Recording CFA-CFF Cabinets For Measurement CFQ Cabinets For Recording (Meters, Pen Recorders) CG Closed-loop control (excl. power section) CH* Protection (Excluding Reactor Protection) CHA Generator Transformer Protection CJ* Unit Coordination Level CJA Unit Control System (Including Cabinets) CJD Start-Up And Set-Point Control (Including Cabinets) CJF Boiler Control System (Incl. Cabinets) CJJ Instrumentation And Control Cabinets For Turbine Set CJP Instrument & Control Cabinets For Gas Turbine Set CJU-CJY Instrumentation And Control Cabinets For Other Main And Heavy Machinery CK* Process Computer System CKA-CKH Online Supervisory And Diagnostic Computer Distributed Process System

Access control computer (free for use) CKN Process computer system (free for use) CU* Closed/Loop Control (Power Section) CV* Marshalling Racks CW* Control Room CWA BTG Control Desk CWB Process Computer Console CWC Operator Interface Station (OIS) CWF Main Contr. Pan.-Unit Elect.Vert.Board CWG Main Contr.Pan-Common ElectVert-Boards CWK Main Contr.Pan-BTG Vert.Boards CWQ Cabinets For Voltage Distribution CX* Local Control Stations CY* Communication Equipment CYA Telephone System (PABX) CYB Direct Wire Telephone System CYC Paging System (Acoustic) CYD Paging System (Optical) CYE Fire Alarm System CYF Clock System CYG Remote control system CYH Pocket Radio Paging System CYJ Loudspeaker Paging CYK Messenger Call System CYL Staff paging system, wireless CYM Prayer Room Sound System CYN Staff Paging System, Hardwired CYP Optical monitoring system CYQ Gas detection system CYR Pneumatic tube system CYS Radiotelephone system

CKJ

E** Conventional Fuel Supply And Residues Disposal


EG* Supply Of Liquid Fuels (Heavy Oil) EGA Receiving Equipment Incl. Pipeline EGB Tank Farm EGC Pump System EGD Piping System EGR Residues Removal System EGT Heating Medium System EGX Fluid Supply System For Control And Protection EGY Control And Protection Equipment EK* Supply Of Gaseous Fuel EKA Receiving Equipment Including Pipe Line EKB Moisture Separation System EKC Heating System EKD Main Reducing Station, Expansion Turbine EKE Mechanical Cleaning, Scrubbing Storage System Piping System Main Pressure Boosting System Fluid supply system for control and protection equipment EKR Residues Removal System EKT Heating Medium System EKV Lubricant supply system EKW Sealing fluid supply system EKX Fluid Supply System For Control And Protection EKY Control And Protection Equipment EN* SUPPLY OF OTHER FUELS (GASOIL) ENA Receiving Equipment ENB Tank Farm ENC Pump System END Piping System ENY Control And Protection Equipment EKF EKG EKH EKK

G** Water Supply And Disposal


GA Raw water supply GAA Extraction, mechanical cleaning GAC Piping and channel system GAD Storage system GAV Lubricant supply system GAX Fluid supply system for control and protection equipment GAY Control and protection equipment GB* Treatment System (Carbonate Hardness Removal) Included Cooling Tower-Make Up Water Treatment System GBB Filtering Mechanical Cleaning System GBC Aeration, Gas Injection System GBD Precipitation System (E.G. For Carbonate Hardness Removal)

GBE GBF GBG GBH GBJ GBK GBL GBN GBP GBQ GBR GBS GBT GBX GBY

Acid Proportioning System (e.g. For Carbonate Hardness Removal) Ion Exchange, Reverse Osmosis System (e.g. For Carbonate Hardness Removal) Evaporation System (e.g. For Carbonate Hardness Removal) Deaeration, Drying System Preheating, Cooling System Piping Storage, Pump Systems For Main Fluid Storage System Fluid Treatment System (If Not Part Of Another System) Chemicals Supply System Regeneration. Flushing Equipment Injection System For Main Fluid (For Hardness Stabilisation) Flushing Water And Residues Removal System Included Neutralization Sludge Thickening System Heating, Cooling And Flushing Fluid Distribution System Fluid Supply System For Control And Protection Control And Protection Equipment

GC* Treatment System (Demineralisation)


GCA Treatment System GCB Filtering. Mechanical Cleaning System GCC Aeration, Gas Injection System GCD Precipitation System (E.G. For Carbonate Hardness Removal) GCE Acid Proportioning System (E.G. For Carbonate Hardness Removal) GCF Ion Exchange, Reverse Osmosis System GCG Evaporation System (E.G. For Carbonate Hardness Removal) GCH Deaeration, Drying System GCJ Preheating, Cooling System GCK Piping System, Temporary Storage System, Pump System For Main Fluid GCL Storage System Outside Fluid Treatment System (If Not Part Of Another System) GCN Chemicals Supply System GCP Regeneration, Flushing Equipment GCQ Injection System For Main Fluid GCR Flushing Water And Residues Removal System Included Neutralization GCS Sludge Thickening System GCT Heating, Cooling And Flushing Fluid Distribution System GCV Lubricant supply system GCX Fluid Supply System For Control And Protection GCY Control And Protection Equipment GD* Treatment System Of Sea Water (Desalination) GDB Steam System GDC Condensate System GDD Precipitation System (E.G. For Carbonate Hardness Removal) GDE Acid Cleaning System

Ion Exchange, Reverse Osmosis System (E.G. For Carbonate Hardness Removal) GDG Multiflash System, Evaporation System (E.G. For Demineralisation) GDH Deaeration, Drying System GDJ Preheating, Cooling System GDK Brine System 10-70 Brine Recirculation 80 Brine Blow Down GDL Storage system outside fluid treatment system (if not part of another system) GDM Product Water System GDN Chemical Supply System 10-30 Antiscale 40-60 Antifoam 70-90 Sodium Sulphite GDP Sea Water System GDQ Injection System For Main Fluid GDR Flushing Water And Residues Removal System Included Neutralization GDS Sludge Thickening System GDT Service Water System GDU Gas Extraction System GDV Lubricant supply system GDW On Load Cleaning System GDX Fluid Supply System For Control And Protection GDY Control And Protection Equipment GE* Treatment System Of Desalinated Water (Blending) GEL Limestone Transfer System GEM Desalinated Water GEN Chemical Dosing System 20-30 Caustic Soda 40-60 Electro chlorination System 70 Polyelectrolyte Dosing (Wash water) 80 Potable Water Chlorine Dosing GEP Sea Water (For Treatment) GET Wash water System 10-69 Limestone Units 70-79 Recovery System 80-99 Sea Water Filters GEU Gas Extraction System GEW Service Water System

GDF

GH* Distribution System (Not Drinking Water)


GHB Distribution System FTER Treatment (Carbonate Hardness Removal) GHC Distribution System FTER Treatment (Demineralization) GHD Distribution System FTER Treatment (Others) GHE Service Water Dist. System GK* Drinking Water Supply GKA Receiving Point GKB Storage, Forwarding And Distribution System GKC Drinking water supply (free for use e.g. building-specific) GKX Fluid supply system for control and protection equipment GKY Control and protection equipment GM Plant Drainage System GMA Central Discharge System

GMB Gas Turbine Drainage Circuit GMC Oily Water Plant Drainage) GME Process drainage system in structures for conventional fuel supply and residue disposal GMG Process drainage system in structures for water supply and disposal GMH Process drainage system in structures for conventional heat generation GMJ Desalination Plant Drainage GMJ Blending Plant Drainage GML Process drainage system in structures for steam water cycle GMM Process drainage system in structures for main machine sets GMN Process drainage system in structures for process energies supply GMP Process drainage system in structures for circulating (cooling) water systems GMQ Process drainage system in structures for auxiliary systems GMX Fluid supply system for control and protection equipment GMY Control and protection equipment GN* Plant Drains Treatment System GNB Filtering, Mechanical Cleaning System GNC Aeration, Gas Injection System GND Precipitation System (E.G. For Carbonate Hardness Removal) GNE Acid Proportioning System (E.G. For Carbonate Hardness Removal) GNF Ion Exchange System (E.G. For Demineralisation) GNG Evaporation System (E.G. For Demineralisation) GNH Deaeration, Drying System GNJ Preheating, Cooling System GNK Piping System, Temporary Storage System, Pump System For Main Fluid GNL Storage System Outside Fluid Treatment System (If Not Part Of Another System) GNN Chemicals Supply System GNP Regeneration, Flushing Equipment GNQ Injection System For Main Fluid GNR Flushing Water And Residues Removal System Included Neutralization GNS Sludge Thickening System GNT Heating, Cooling And Flushing Fluid Distribution System GNV Lubricant supply system GNX Fluid Supply System For Control And Protection

GNY Control And Protection Equipment

GQ* Domestic Waste Water And Drainage System


GQA Central Discharge System GQB Storage GQX Fluid supply system for control and protection equipment 0 GQY Control and protection equipment

GR* Domestic Waste Water Treatment System


GRB Filtering. Mechanical Cleaning System GRC Aeration, Gas Injection System GRD Precipitation System (E.G. For Carbonate Hardness Removal) GRE Acid Proportioning System (E.G. For Carbonate Hardness Removal) GRF Ion Exchange System (E.G. For Demineralisation) GRG Evaporation System (E.G. For Demineralisation) GRH Deaeration, Drying System GRJ Preheating, Cooling System GRK Piping System, Temporary Storage System, Pump System For Main Fluid GRL Storage System Outside Fluid Treatment System (If Not Part Of Another System) GRN Chemicals Supply System GRP Regeneration, Flushing Equipment GRQ Injection System For Main Fluid GRR Flushing Water And Residues Removal System Included Neutralization GRS Sludge Thickening System GRT Heating, Cooling And Flushing Fluid Distribution System GRV Lubricant supply system GRX Fluid Supply System For Control And Protection GRY Control And Protection Equipment GU* Rainwater, Drainage System Including Treatment System GUA Rainwater collection and drainage systems (free for use e.g building-specific) GUB Rainwater collection and drainage systems (free for use e.g buildingspecific) GUX Fluid supply system for control and protection equipment GUY Control and protection equipment GY Control and protection equipment

H** Conventional Heat Generation


HA* Pressure System HAA LP Part-Flow Feed Heating System (Flue Gas Heated) HAB HP Part-Flow Feed Heating System (Flue Gas Heated) HAC Economiser System HAD Evaporator System HAG Circulating System (Not Used In Natural Circulation Boiler) HAH HP Superheater System HAJ Reheat System HAK Secondary Reheat System HAM Triflux System HAN Pressure System Drainage & Venting Systems

HAV Lubricant supply system HAW Sealing fluid supply system HAX Fluid Supply System For Control And Protection HAY Control And Protection Equipment HB* Support Structure And Steam Generator Interior HBA Frame Including Foundations HBB Enclosure, Insulation HBC Brick Lining Incl. Insulating Brickwork HBD Platforms And Stairways HBK Steam Generator Interior

HC*

Fireside Heat Transferring Surface Cleaning Equipments


Air Soot blowing System Steam Soot blowing System Water Soot blowing System Flushing Equipment Rapping Gear Shot Cleaning System Lubricant supply system Sealing Fluid Supply System Fluid supply system for control and protection equipment Control And Protection Equipment Main Firing System Main Burners Retarded Combustion Grate Grate Combustion System Others Burner Equipment (E.G. Vapour Burner, Flue Dust Burner) Pulverized Coal Bin, Forwarding And Distribution System Oil Temporary Storage Pump And Distribution System Gas Pressure Reduction, Distribution System Temporary Storage, Forwarding And Distribution System For Other Fuels, Fluid 1-3 Temporary Storage, Forwarding And Distribution System For Other Fuels, Fluid 1-3 Combustion Air Supply System Atomized Medium Supply System (Steam) Atomized Medium Supply System (Air) Coolant Supply System (Steam) Coolant Supply System (Air) Purging Medium Supply System (Steam) Purging Medium Supply System (Air) Heating Medium Supply System (Steam)

HCA HCB HCC HCD HCE HCF HCV HCW HCX HCY HH* HHA HHB HHC HHD HHE HHF HHG HHH HHK HHL HHM HHN HHP HHQ HHR HHS HHT

HHU Heating Medium Supply System (Hot Water) HHV Electric Heating System HHX Fluid Supply System For Control And Protection HHY Control And Protection Equipment HHZ Electric heating system HJ Ignition firing equipment (if separate) HJA Ignition burners HJG Gas pressure reduction, distribution system HJL Combustion air supply system HJM Atomizer medium supply system (steam) HJN Atomizer medium supply system (air) HJP Cooling supply system (steam) HJQ Cooling supply system (air) HJR Purging medium supply system (steam) HJS Purging medium supply system (air) HJT Heating medium supply system (steam) HJU Heating medium supply system (hot water) HJX Fluid supply system for control and protection equipment HJY Control and protection equipment HL* Combustion Air System HLA Ducting System HLB Fan System, Forced-Drought Fan System HLC External Air Heating System (Not Flue-Gas-Heated HLD Air Heating System (Flue-GasHeated HLU Air pressure relief system HLY Control And Protection Equipment HN* Flue Gas Exhaust HNA Ducting System HNC Induced-Drought Fan System HNC Smoke Stack System (Chimney) HNE Smoke stack system HNF Flue Gas Recirculation System HNW Sealing fluid supply system HNX Fluid supply system for control and protection equipment HNY Control And Protection Equipment HV Lubricant supply system HX Fluid supply system for control and protection equipment HY* Control And Protection Equipment HYA Field Instrumentation Control Valves HYC Instrumentation Erection Material (Cables) HYE Automation And Control System

L** Steam Water Gas Cycles


LA* Feed water System LAA Storage Deaeration (Incl. Feed water Tank) LAB Feed water Piping System (Excl. Feed water Pump And Feed water Heating System) LAC Feed water Pump System LAD HP Feed water Heating System LAE LAF LAH LAJ LAR HP Desuperheating Spray System IP Desuperheating Spray System Start-Up And Shutdown Piping System Start-Up And Shutdown Pump System Emergency Feed water Piping System Incl. Storage (Excl.

Emergency Feed water Pump System) LAS Emergency Feed water Pump System LAT Back-Up Emergency Feed water System LAV Lubricant supply system LAW Feed water Sealing Water System LAX Fluid Supply System For Control And Protection LAY Control And Protection Equipment LB* Steam System LBA Main Steam Piping System LBB Hot Reheat Piping System LBC Cold Reheat Piping System LBD Extraction Piping System LBE Back Pressure Piping System LBF HP Reducing Station LBG Auxiliary Steam Piping System LBH Start-Up/Shut-Down Steam System LBJ Moisture Separator/Reheater (MSR) LBK Main Steam Safety/Relief System Inside Reactor Containment For Single-Cycle Plants LBL IP Reducing Station LBQ Extract. Steam Piping Sys. (HP Feed water Heater) LBR Piping System For Branch Or Auxiliary Turbine LBS Extraction Steam Piping System For LP Feed water Heating (Main Condensate) LBT Emergency Condensing System LBU Common Dump Line LBV Lubricant supply system LBW Sealing Steam System LBX Fluid Supply System For Control And Protection LBY Control And Protection Equipment LC* Condensate System LCA Main Condensate Piping System (Excl. Main Condensate Pump System, LP Feed water Heating

System, Condensate Polishing Plant) LCB Main Condensate Pump System LCC LP Feed water Heating System LCE Condensate Desuperheating Spray System LCF Branch Turbine Condensate Piping System LCG Branch Turbine Condensate Pump System LCH HP Heater Drains System LCJ LP Heater Drains System LCL Steam Generator Drains System LCM Clean Drains System (Collecting And Return Systems) LCN Aux Steam Condensate System (Collecting And Return Systems) LCP Stand-By Condensate System Incl. Storage And Pump System LCQ Steam Generator Blow down System LCR Stand-By Condensate Distribution System LCS Reheater Drains (Moisture Separator/Reheater) LCT Moisture Separator Drains (Moisture Separator/Reheater) LCV Lubricant supply system LCW Sealing And Cooling Drains System LCX Fluid Supply System For Control And Protection LCY Control And Protection Equipment LF* Common Installation For Steam, Water, Gas Cycles LFC Common Drain And Vent System LFG Secondary-Side Steam Generator Tube sheet Lancing System LFJ Steam Generator Lay-Up System LFN Proportioning System For Feed water, Condensate System, Included Proportioning In Boiler And Turbine Area LY Control and protection equipment

M** Main Machine Sets


MA* Steam Turbine Plant MAA HP Turbine MAB IP Turbine MAC LP Turbine MAD Bearings MAG Condensing System MAH Motive Water System (If Separate From MAJ) MAJ Air Removal System MAK Transmission Gear Between Prime Mover & Driven Machine Included Turning Gear MAL Drain And Vent System MAM Leak Off Steam System MAN Turbine Bypass Station, Included Desuperheating Spray System MAP LP Turbine Bypass MAQ Venting System (If Separate From MAL) MAV Lubricant Supply System MAW Sealing, Heating And Cooling Steam System MAX Non Electric Control And Protection Equipment, Included Fluid Supply System MAY Electrical Control And Protection Equipments MB* Gas Turbine Plant MBA Turbine Compressor Rotor With Common Casing MBB Turbine Casing And Rotor MBC Compressor Casing And Rotor MBD Bearings MBE GT Vibration Monitoring System MBF GT Foundation Components MBG GT Enclosure Ventilation MBH Cooling And Sealing Gas System MBI GT Bleed Air System MBJ Start-Up Unit MBK Transmission Gear Between Prime Mover & Driven Machine Included Turning Gear MBL Intake Air, Cold Gas System (Open Cycle) MBM Combustion Chamber (Gas Heating Combustion)

MBN Fuel Supply System (Liquid) MBO GT & Reduction Gearbox Enclosure Axial Exhaust Type MBP Fuel Supply System (Gaseous) MBQ Ignition Fuel Supply System (If Separate) MBR Exhaust Gas System (Open Cycle) MBS Storage System MBT Motive Gas Generator Unit Including Combustion Chamber MBU Additive System MBV Lubricant Supply System MBW Sealing Oil Supply System MBX Non Electric Control. & Protection Equipments, Included Fluid Supply System MBY Electrical Control And Protection Equipments MBZ Lubricant And Control Medium Treatment MK* Generator Plant MKA Generator Complete, Included Stator, Rotor And All Integral Cooling Equipment MKB Exciter Set (Use Only if MKC Is Not Sufficient for Identification) MKC Exciter Set, Complete (10 Auxiliary Excitation, 20 Main Excitation Unit) MKD Bearings MKF Stator/Rotor Liquid Cooling System, Included Coolant Supply System MKG Stator/Rotor Gas Cooling System, Included Coolant Supply System

MKH Stator/Rotor Nitrogen Cooling System, Included Coolant Supply System MKP Secondary cooling water system MKQ Exhaust Gas System (If Separate From MKG and MKH) MKU Stator/Rotor Cooling Oil Cooling System, Included Coolant Supply System MKV Lubricant Supply System (If Separate System For Generator) MKW Sealing Oil System, Included Supply And Treatment MKX Fluid supply system for control and protection equipment MKY Control And Protection Equipment MM* Compressor Plant MMA Compressor Including Internal System MMC Air Intake Piping System MMD Bearings MME Inter-cooling System MMF After-cooling System MMG Final Cooling System MMH Discharge Piping System MMV Lubricant Supply System MMW Sealing Fluid Supply System MMX Fluid Supply System For Control And Protection MMY Control And Protection Equipment

P** Cooling Water System


PA* PAA PAB PAC PAD PAE PAH PAR PAS PAV PAX PAY PAZ PB* PBA PBB PBC PBD PBE PBF Circulating (Main Cooling) Water System Extraction, Cleaning For Direct Cooling Circulating Water Piping And Culvert System Circulating Water Pump System Recirculating cooling System, Outfall Cooling System Cooling Tower Pump System (If Separate) Condenser Cleaning System Included All Appurtenances. Make-Up Water Piping System Make-Up Water Pump System Lubricant Supply System Fluid Supply System For Control And Protection Control And Protection Equipment Cathodic Protection Circulating (Main Cooling) Water Treatment System Discharge From Fluid Treatment System Filtering, Mechanical Cleaning System Aeration, Gas Injection System Precipitation System (E.G. For Carbonate Hardness Removal) Acid Proportioning System (E.G. For Carbonate Hardness Removal) Ion Exchange System (E.G. For Demineralisation) Evaporation System (E.G. For Demineralisation) PBH Deaeration, Drying System PBJ Preheating, Cooling System PBK Piping System, Temporary Storage System, Pump System For Main Fluid PBL Storage System Outside Fluid Treatment System (If Not Part Of Another System) PBN Chemicals Supply System PBP Regeneration, Flushing Equipment PBQ Injection System For Main Fluid PBR Flushing Water And Residues Removal System Included Neutralization PBS Sludge Thickening System PBT Heating, Cooling And Flushing Fluid Distribution System PBX Fluid Supply System For Control And Protection PBY Control And Protection Equipment PC* Service (Secondary Cooling) Water System PCA Extraction, Mechanical Cleaning For Direct Cooling PCB Piping And Culvert System PCC Pump System PCD Recirculating Cooling System, Outfall Cooling System PCH Heat Exchanger Cleaning System PCM Service Water System For Generator, Motor Generator Cooling PCV Lubricant supply system PBG

Fluid Supply System For Control And Protection PCY Control And Protection Equipment PD* Service (Secondary Cooling) Water Treatment System PDA Discharge From Fluid Treatment System (If Not Part Of Another System) PDB Filtering, Mechanical Cleaning System PDC Aeration, Gas Injection System PDD Precipitation System (E.G. For Carbonate Hardness Removal) PDE Acid Proportioning System (E.G. For Carbonate Hardness Removal) PDF Ion Exchange System (E.G. For Demineralisation) PDG Evaporation System (E.G. For Demineralisation) PDH Deaeration, Drying System PDJ Preheating, Cooling System PDK Piping System, Temporary Storage System, Pump System For Main Fluid PDL Storage System Outside Fluid Treatment System (If Not Part Of Another System) PDN Chemicals Supply System PDP Regeneration, Flushing Equipment PDQ Injection System For Main Fluid PDR Flushing Water And Residues Removal System Included Neutralization PDS Sludge Thickening System PDT Heating, Cooling And Flushing Fluid Distribution System PDX Fluid Supply System For Control And Protection PDY Control And Protection Equipment PG* Closed Cooling Water System For Conventional Area PGA Closed cooling water unit PGB Closed Cooling Water Piping System PGC Closed Cooling Water Pump System PGD Closed Water Cooler PGF Pressure system PGH Closed cooling water system for main groups *E* and *H*

PCX

Closed cooling water system for main groups *G*, *L*, *N* and *P* PGM Closed cooling water system for main groups *B*, *M* and *X* PGX Fluid Supply System For Control And Protection PGY Control And Protection Equipment PH* Closed Cooling Water Treatment System PHA Discharge From Fluid Treatment System (If Not Part Of Another System) PHB Filtering, Mechanical Cleaning System PHC Aeration, Gas Injection System PHD Precipitation System (E.G. For Carbonate Hardness Removal) PHE Acid Proportioning System (E.G. For Carbonate Hardness Removal) PHF Ion Exchange System (E.G. For Demineralisation) PHG Evaporation System (E.G. For Demineralisation) PHH Deaeration, Drying System PHJ Preheating, Cooling System PHK Piping System, Temporary Storage System, Pump System For Main Fluid PHL Storage System Outside Fluid Treatment System (If Not Part Of Another System) PHN Chemicals Supply System PHP Regeneration, Flushing Equipment PHQ Injection System For Main Fluid PHR Flushing Water And Residues Removal System Included Neutralization PHS Sludge Thickening System PHT Heating, Cooling And Flushing Fluid Distribution System PHX Fluid Supply System For Control And Protection PHY Control And Protection Equipment PV Lubricant supply system PX Fluid supply system for control and protection equipment PY Control and protection equipment

PGL

Q** Auxiliary System


QC* Central Chemical Supply QCA Chemical Reagents System QCB Boiler Dosing System QCC Hydrazine supply and distribution QCD Chemical dosing unit QCE Ammonia supply and distribution QCF Iron-sulphate supply and distribution QCG Sodium-nitrite supply and distribution QCH Sulphuric acid supply and distribution QCV Lubricant supply system QCX Fluid supply system for control and protection equipment QCY Central Chemical Supply Functional Group QE* General Compressed Air And Carrier Air Supply QEA Central Compressed Air And Carrier Air Generation System QEB Central Compressed Air And Carrier Air Distribution QEC Air filter unit QEE Compressed air supply system for main groups *E* QEH Compressed air supply system for main groups *H* QEL Compressed air supply system for main groups *G*,*L*, *N* and *P* QEM Compressed air supply system for main groups *B*, *M* and *X*

QEQ Compressed air supply system for main groups *Q* QES Compressed air supply system for main groups *S* QEV Lubricant supply system QEW Sealing fluid supply system QEX Fluid supply system for control and protection equipment QEY Control And Protection Equipment QF* General Control Air Supply QFA Central Control Air Generation System QFB Central Control Air Distribution System QFC GT Instrument Air Circuit QFD Desalination Plant Instrument Air Distribution System QFE Blending Plant Instrument Air QFP Potable Water Pump Instrument Air Distribution System QFF Control air treatment system QFH Control air supply system for main group *H* QFL Control air supply system for main group *G*,*L*,*N* and *P* QFM Control air supply system for main group *B*,*M* and *X* QFQ Control air supply system for main group *Q* QFS Control air supply system for main group *S* QFV Lubricant supply system QFW Sealing fluid supply system QFX Fluid supply system for control and protection equipment QFY Control And Protection Equipment QH* Auxiliary Steam Generating System QHA Pressure System QHB Support Structure And Enclosure QHC Fireside Heat Transfer Surface Cleaning Equipment QHD Ash And Slag Removal QHE Blow down System Flash Drain System QHF Bunker, Feeder And Pulverizing System QHG Boiler Water Circulation System (Also for Electrode Steam Boiler) QHH Main Firing System (Also For Electric Heating) QHJ Ignition Firing Equipment (If Separate) QHL Combustion Air System QHM Gas Heating System (For Closed Cycle) QHN Fuel Gas Exhaust (Without Gas Treatment) QHP Mechanical Dust Handling System QHQ Electrostatic Precipitator QHR Chemical Flue Gas Treatment System, Included Residues Removal, Adsorptiv Process QHS Chemical Flue Gas Treatment System, Included Residues Removal, Catalytic Process QHT Chemical Flue Gas Treatment System, Included Residues Removal, Absorptiv Process

QHU Flue Gas Reheating System QHV Lubricant supply system QHX Fluid Supply System For Control And Protection QHY Control And Protection Equipment QJ* Central Gas Supply, Also Inert Gas QJA Gas supply and distribution system QJB Nitrogen Gas Supply System QJD Gas Supply And Distribution System N2 (Nitrogen) QJF Gas Supply And Distribution System H2 (Hydrogen) QJH Gas supply and distribution system CH4(methane) QJK Gas Supply And Distribution System CO2 (Carbon Dioxide) QJM Gas supply and distribution system C2H2(acetylene) QJP Gas supply and distribution system C3H8(propane gas) QJR Gas supply and distribution system N2O (laughing gas) QJV Lubricant supply system QJW Sealing fluid supply system QJX Fluid supply system for control and protection equipment QJY Control And Protection Equipment QK* Chilled Water System For Conventional Area QKA Central Chilled Water Plant QKY Control And Protection Equipment QL* Feed water Steam Condensate Cycle Of Auxiliary Steam Generating And Distribution QLA Feed water System QLB Steam System QLC Condensate System QLD Condensate Polishing Plant QLF Common Equipment For Auxiliary Steam Generation And Distribution Systems QLV Lubricant supply system QLX Fluid supply system for control and protection equipment QLY Control And Protection Equipment QM Air humidifying system QU* Sampling System For Conventional Area QUA Sampling System QUB I & C Laboratory QUE Sampling systems for main group *E* QUH Sampling systems for main group *H*(gas-side QUL Sampling systems for WHRB *N*,*M* and *N* QUP Sampling systems for main group *G* and *P* QUQ Sampling systems for main group *Q* QUS Sampling systems for main group *S* QUX Fluid supply system for control and protection equipment QUY Control And Protection Equipment

S** Ancillary System

SA*
SAA

Heating, Ventilation AirConditioning (HVAC) System

Refrigeration plant (if not part of *QK*) SAB HVAC System for S/S and 400kV GIS control building SAC For Control & Electrical Buildings/Subs. Building SAD For Aux. Boiler Building & Diesel Building SAE HVAC System for steam turbine SAF For Fuel Oil Pump Room & Hydrogen Building SAG For Water Treatment Building SAH Heating, ventilation, air-conditioning (HVAC) systems in structures for conventional heat generation SAL Heating, ventilation, air-conditioning (HVAC) systems in structures for steam-water cycle SAM For Turbine Building SAN Heating, ventilation, air-conditioning (HVAC) systems in structures for process energy supply systems SAP Heating, ventilation, air-conditioning (HVAC) systems in structures for circulating (cooling) water systems SAQ For Cooling Water Pump House SAS For Fire Fighting Building/Workshop SAU Heating, ventilation, air-conditioning (HVAC) systems in general services structures SAX Fluid supply system for control and protection equipment SAV For Administration Building SAY Control And Protection Equipment

SCA SCB SCE SCP SCY

Compressed Air Generation System Compressed Air Distribution System Blending Plant Compressed Air Potable Water Pump Compressed Air Distribution System Control And Protection Equipment

SD*
SDY

Stationary Cleaning Systems


Control And Protection Equipment

SG* Stationary Fire Protection Systems


Fire Water System Conventional Area SGB Fire Water System Nuclear Area 1 SGC Spray Deluge Systems Conventional Area SGD Spray Deluge Systems, Nuclear Area 1 SGE Sprinkler Systems SGF Foam Fire-Fighting Systems SGG Tank Roof, Tank Shell Cooling Systems SGJ CO2 Fire-Fighting Systems SGK Halon Fire-Fighting Systems SGL Powder Fire-Fighting Systems SGV Lubricant supply system SGX Fluid Supply System For Control & Protection Equipment SGY Control And Protection Equipment SGA

SM* Cranes, Stationary Hoists And Conveying Appliance


Overhead cranes Monorail hoist Other cranes Cranes, stationary hoist and conveying appliances in structures for flue gas chemical treatment SMG Cranes, stationary hoists and conveying appliances in structures for water supply and waste water disposal SMH Cranes, stationary hoists and conveying appliances in structures for conventional heat generation SML Cranes, stationary hoists and conveying appliances in structures for steam-water cycle. SMM In Turbine Building SMN Cranes, stationary hoist and conveying appliances in structures for process energy supply for external users SMP In Circulating Water Intake Structures SMQ Cranes, stationary hoists and conveying appliances in structures for auxiliary systems SMS In Ancillary System Building SMU Cranes, stationary hoists and conveying appliances in general service structures SMW In Workshop Building SMX Fluid supply system for control and protection equipment SMY Cranes Stationary Hoists & Conveying Appliance SN* Elevators SNA Elevators for plant SNC Switchgear Building SMA SMB SMC SMF

SB*
SBA SBC

Space Heating Systems

Central Heating Plant For Control & Elect. Building/Subs. Building SBD For Aux. Boiler Building & Diesel Building SBE Space heating systems in structures for conventional fuel supply and residue disposal SBF For District Heating Building SBG For Water Treatment Building SBH For Boiler House SBL Space heating systems in structures for steam-water cycle SBM For Turbine Building SBN Space heating systems in structures for process energy supply systems SBP Space heating systems in structures for circulating (cooling)water systems SBQ For Cooling Water Pump House SBS For Fire Fighting Building/Workshop SBU Space heating systems in general service structures SBV For Administration Building SBY Control And Protection Equipment

SC*

Stationary Compressed Air Supplies

SNE

Elevators in structures for conventional fuel supply and residue disposal SNG Elevators in structures for water supply and waste water disposal SNH Elevators in structures for conventional heat generation SNL Elevators in structures for steamwater cycle SNM Elevators in structures for main machine sets SNN Elevators in structures for process energy supply systems SNP Elevators in structures for circulating (cooling)water systems SNQ Elevators in structures for auxiliary systems SNS Elevators in structures for ancillary systems

SNU SNY SP ST* STA STC STE STG STG STP STY

Elevators in general service structures Control And Protection Equipment Railway installations Workshop, Stores, Laboratory Equipment & Staff Amenities Outside Controlled Area Workshop Equipment Outside Controlled Area Maintenance Areas Outside Controlled Area Stores And Filling Station Equipment Laboratory Equipment Staff Amenities Staff amenities Control And Protection Equipment

U** Structures
Structures For Grid And Distribution System UAA Switchyard Structure UAB 220 KV Indoor GIS Switchgear Building UAC Substation Buildings UAE Structure for pneumatic control system UAG Structure For Transformers UAH Structure for supports and equipment UAW Civil works for earthing/grounding outside buildings UAX Special Structure (Plant Specific) UAY Bridge structure UAZ Trenches/ducting structure UB* Structures For Power Trans. & Aux. Power Supplies UBA Switchgear Building UBC Structure For Offsite System Transformers UBD Structure for LV/LV auxiliary power transformer station UBE Structure for LV/LV auxiliary power transformer GT UBF Structure For Generator Transformers UBG Structure for MV/LV auxiliary power transformer station UBH Structure for MV/LV auxiliary power transformer GT UBJ Structure For Transformer Tracks UBK Transformer Maintenance Build UBL Structure for step-up transformer-ST UBM Structure for step-up auxiliary transformer UBN Structure for oil pits collecting/oil separators UBP Structure for transformer tracks UBQ Live line washing equipment building UBU Structure for electro-module for gas turbine UBV Gas turbine busduct foundations UBW Steam turbine busduct foundations UBX Special Structure (Plant Specific) UBY Bridge structures UBZ Trenches/ducting structures UA* Structures For Instrument. And Control UCA Aux. Control Room & Electrical Building UCB Control Station Building UCL Structure for measuring equipment UCP Cooling water monitoring structure UCX Special Structure (Plant Specific) UCY Bridge structures UCZ Ducting Structure UD* Structures For Desalination Plant UDA Desalination Plant UDB Desalination Plant C.B. UE* Structure For Conv. Fuel Supply And Res.Dis. UEF Structures for unloading and reception of liquid fuels UEG Structures for storage of liquid fuels UEH Structure For Unload And Rec. Of Liquid Fuel UEJ Structure For Storage Of Liquid Fuels UEL Fuel Oil Pump House UEM Fuel Oil Treatment Area UEK Structures for unloading and reception of gaseous fuels UEN structures for treatment of gaseous fuels UEX Special Structure (Plant Specific) UEY Bridge structures UEZ Trenches/ducting structures UG* Structures For Water Supply And Disposal UGA Structure For Raw Water Supply UGB Structures for neutralization system UGC Structures for demineralization system UGD Structure For Demineralising System (Water Treat.) UGE Structure For Neutralisation System UGF Fire Water Tank UGG Miscellaneous Tanks UGH Gen. Drainage Structure UGK Structures for drinking water supply system UGM Structures for process drainage system UGN Water Storage Tanks UC*

Sludge Thickener (I/A) Sludge Dewatering Building (I/E) Sludge Storage Structure (I/A) Structures for water recovery from waste water UGU Structure For Effluent Disposal UGV Structure For Sewerage Plant UGW Structures for water supply and disposal UGX Special (Plant Specific) UGY Bridge structures UGZ Ducting Structure UH* Structures For Conventional Heat. Gen. UHA Steam Gen. Encl. Steam Gen. Building (B.H.) UHC Steam generator superstructure (HRSG) UHN Smoke Stack, Incl. Structure For Fuel Gas Cir. UHQ Ventilators Structures UHU Structure For Fuel Gas Reheating System UHV Structure For Combustion Air Circulation UHX Special Structure (Plant Specific) UHY Bridge structures UHZ Ducting Structure UL* Structures For Steam, Water, Gas Cycles ULA Feed water Pump House ULB Structures for steam systems ULC Structure For Condensate System ULF Structures for common installations of steam-water cycle ULV Underground Septic Tank ULX Special Structure (Plant Specific) ULY Bridge structures ULZ Trenches/ducting structures UM* Structures For Main Machine Sets UMA Steam Turbine Building UMB Gas Turbine Generators Bldg. UMC ST-Foundation complete UMD GT-Foundation complete UME Foundation for ST-components incl. air cooled condenser UMF Foundation for GT-components incl. recooler UMG Structures for gas turbine bypass stack UMJ Diesel Engine Building UMK Structures for elec. generator plant UMM Compressor Building UMP Turbine Generator Pedestal UMX Special Structure (Plant Specific) UMZ Trenches/ducting structures UN Structures for process energy supply systems UNA Structures for process steam system UND Structures for process hot water systems UNX Special structures (plant-specific) UNY Bridge structures UNZ Trenches/ducting structures UP* Structures For Circulating (Cooling) Water System Intake UPA Sea Or River Cooling Water Intake

UGP UGQ UGR UGT

Circ. Water Int. Culvert From Int. The P.H. UPC Pump House UPD Chlorination Building UPE Circ. Water Pipes From Pump House To T.B. UPX Chemical Dosing Plant UPY Bridge structures UPZ Trenches/ducting structures UQ* Structures For Circulating (Cooling) Water System Outlet UQA Discharge Channel Pipes From T.B. To Disc. Basin UQB Circ. Water Outfall Culvert From D.B. To Out Ch. UQC Outfall Channel UQD Bridge Channel UQE Routing Structure For Circ. Water Discharge UQG Structures for central gas supply for closed gas cycles UQH Structures for auxiliary steam generating system UQJ Structures for central gas supply system, incl. inert gas UQK Structures for chilled water systems UQL Structures for aux. steam distribution UQM Structures for air humidifying system UQN Sea Water Discharge Culvert UQP Hypo chlorination Plant UQS Structures for central oil supply and disposal system UQU Structures for sampling system UQX Special structures (plant-specific) UQY Bridge structures UQZ Trenches/ducting structures US* Structures For Ancillary Systems USA Condition Building USB Structures for space heating systems USC Structures for stationary compressed air supply system USD Structures for fire water storage USG Fire Pump House USH Civil works for fire water ring main USJ Civil works for fire water basin USK Special structures (plant-specific) USL Bridge structures USM Trenches/ducting structures USS Dirty Oil Pump UST Workshop And Stores Building USU Chlorination Plant Store USV Laboratories Building UT* Structures For Auxiliary Systems UTF Compressed Air System Building UTG Central Gas Sup. Sys. Build. H2, CO2 Sup. Sys. UTH Auxiliary Boilers UTJ Chimney For Aux. Boilers UX* Structures For External System (Power Plant Specific) UXA Ducts, Galleries, Structure For Slip., Cable Tunnel. UXX Special Structure (Plant-Specific) UY* General Service Structures UYA Service Building UYB Amenities Building

UPB

UYC Administration Building UYD Lockers And Canteen Building UYE Car Port & Guard House UYF Security Gate House UYG Information Centre UYH Training Facilities UYJ Medical Centre UYP Fire Station UYR Car Workshop And Garage UYS Fuel Filling Station UYY Bridge UZ* Structure For Transformer, Traffic Fence Guard.

Works Roadways, Paths, Incl. Assoc. Structure UZB Fencing, gates and barriers UZC P. Station Urbanisation Station UZD Car Parking Area UZJ Fencing And Gates UZM Protective structures against external impact UZX Special structures (plant-specific) UZY Bridge structures UZZ Trenches/ducting structures

UZA

X** Heavy Machinery (Not Main Machine Sets)


XJ* Diesel Engine Plant XJA Engine XJB Turbocharger, Blower XJG Liquid Cooling System XJH Air Inter-cooling System XJK Transmission Gear Between Prime Mover And Driven Machine XJN Fuel Systems XJP Starting Equipment (Included Flywheel) XJQ Air Intake System Exhaust Gas System Lubricant Supply System Sealing fluid supply system Fluid Supply System For Control And Protection Equipment XJY Control And Protection Equipment XK* Generator Plant XKA Gen. Frame Incl. Stat. Rot. And Cool Equip. XKC Exciter Set XJR XJV XJW XJX

Y** Site
YA* Same As Y YAE Site Preparation YAG Geognostic Survey YAP Piling (I/A) YAS YAZ Structures For Site Preparation Ducts (Temp. Provision For Site Prep.)

WORKSHOP AND OFFICE EQUIPMENT

Equipment Unit Key Main Groups A B C D E F G H Mechanical Equipment Mechanical Equipment Direct Measuring Circuits Closed Loop Control Circuits Analog And Binary Signal Conditioning Indirect Measuring Circuits (Gated, Corrected, Suppressed) Electrical Equipment Subassemblies Of Main And Heavy Machinery Equipment Unit Key Codes A Mechanical Equipment
AA AB AC AE AF AG AH AJ AK AM Valves, Dampers, Etc. (Incl. Actuators, Also Manual, Rupture Disk, Equipment) Isolating Elements, Air Locks Heat Exchangers, Heat Transfer Surfaces Turning, Driving, Lifting And Slewing Gear (Also Manipulator) Continuous Conveyors, Feeders (Escalators) Generator Units Heating, Cooling And Air Conditioning Units Size Reduction Equipment, Only As Part Of Process Compacting And Packaging Equipment, Only As Part Of Process Mixers, Agitators AN AP AS Compressor Units, Fans Pump Units Adjusting And Tensioning Equipment For Non Electrical Variable (Use Only If Final Control Element Itself Forms A Structural Entity With Another Equipment Unit) Cleaning, Drying, Filtering And Separating Equipment, Excl. "BT" Braking, Gearbox, Coupling Equipment, Non Electrical Converters Combustion Equipment Stationary Tooling, Treatment Equipment Test And Monitoring Equipment For Plant Maintenance

AT AU AV AW AX

Mechanical Equipment
BB BE BF BN BP Storage Equipment (Vessels, Tanks) Shafts (For Erection And Maintenance Only) Foundations Jet Pumps, Ejectors, Injectors Flow Restrictors, Limiters, Orifices (Not Metering Orifices) BQ BR BS BT BU Hangers, Supports, Racks, Piping Penetrations Piping, Ductwork, Chutes Silencers Flue Gas Catalytic Converter Modules Insulation, Sheathing

Direct Measuring Circuits


CD CE CF CG CH CJ CK CL CM Density Electrical Variables (E.G. Current, Voltage, Power, Electrical Frequency) Flow, Rate Distance, Length, Position, Direction Of Rotation Manual Input (As Manually Operated Sensor/E.G. Fire Detector) Power (Mechanical, Thermal) Time Level (Also For Dividing Line) Moisture, Humidity CP CQ CR CS CT CU CV CW CY Pressure Quality Variables (Analysis Material Properties Other Than "CD", "CM", "CV") Radiation variables Velocity, Speed, Frequency (Mechanical), Acceleration Temperature Combined And Other Variables Viscosity Weight, Mass Vibration, Expansion

Closed Loop Control Circuits


DD Density DE Electrical Variables (E.G. Current, Voltage, Power, Electrical Frequency)

DF DG DH DJ DK DL DM DP DQ

Flow Rate Distance, Length, Position, Direction Of Rotation Manual input as manually operated sensor (e.g. fire detector) Power (Mechanical, Thermal) Time Level (Also For Dividing Line) Moisture, Humidity Pressure Quality Variables (Analysis, Material Properties Other Than "DD","DM","DV")

DR DS DT DU DV DW DX DY

Radiation variables Velocity, Speed, Frequency (Mechanical) Acceleration Temperature Combined And Other Variables Viscosity Weight, Mass Neutron flux Vibration Expansion

Analog And Binary Signal Conditioning


EA EB EC EE EG EH EM Open Loop Control (Unit Control) Open Loop Control (Group Control) Open Loop Control (Subgroup Control) Open Loop Control (Sub loop Control) Alarm. Annunciation (Alarm Logics) Alarm, Annunciation (Hard Wired Alarm Annunciation System) Process Computer (Access Control And NPP Specific Tasks) EN EP ER EU EY EZ Process Computer (Status Display Computer, Criterion Display) Process Computer (Supervisory Computer) Reactor protection Combined Analogue And Binary Signal Conditioning Protection (Protective Logic, Priority, Non Equipment Unit Related) Protection (Equipment Unit Protection)

Indirect Measuring Circuits (Gated, Corrected, Suppressed, Calculated)


FD FE FF FG FJ FK FL FM FP Density Electrical Variables (E.G. Current, Voltage, Power, Electrical Frequency) Flow, Rate Distance, Length, Position, Direction Of Rotation Power (Mechanical, Thermal) Time Level (Also For Dividing Line) Moisture, Humidity Pressure FQ FR FS FT FU FV FW FX FY Quality Variables (Analysis, Material Properties Other Than "FD", "FM", "FV") Radiation variables Velocity, Speed, Frequency (Mechanical), Acceleration Temperature Combined And Other Variables Viscosity Weight, Mass Neutron flux Vibration, Expansion

Electrical Equipment
GA GB GC GD GE GF GG GH Junction Boxes And Cable/Bus Bar Penetrations (For Drive Related Binary) Junction Boxes And Cable/Bus Bar Penetrations (For Non Drive Related Binary Transmitters) Junction Boxes And Cable/Bus Bar Penetrations(For Analogue Safety I & C Transmitters Silt) Junction Boxes And Cable/Bus Bar Penetrations (For Power Cables > 1 KV) Junction Boxes And Cable/Bus Bar Penetrations (For Power Cables < 1 KV) Junction Boxes And Cable/Bus Bar Penetrations General Purpose < 60V) Penetrations/Cable Covers Electrical And Instrumentation And Control Installation Units Identified As Per Process System (E.G. Cubicles, Boxes Without Installation Space Code) GK GM GP GQ GR GS GT GU GV GW GX GY GZ Information Display And Operator Control Equipment For Process Computers And Automation System Junction Boxes For Light Current Systems Of National Telecommunications Services Junction Boxes For Lighting Sub distribution For Power Sockets DC Generating Equipment, Batteries Switchgear Equipment If Not Identified Under Process Equipment Transformer Equipment Converter Equipment Structure Related Earthing And Lightning Protection Equipment Surge Arrests Cabinet Power Supply Equipment Actuating Equipment For Electrical Variables Junction Boxes For Light Current System (Not National Common.) Hangers, Supports And Racks For Electrical And Instrumentation And Control Equipment)

Subassemblies Of Main And Heavy Machinery


HA HB Machine Stationary Assembly Machine Rotating Assembly HD Bearing Assembly

Component Key Main Groups K M Q - X Y Z Mechanical Components Mechanical Components Instrumentation and Control Components (non-electrical) Electrical Components Signal Origins Gated Signals Signal Applications Component Key Codes K Mechanical Components
KA KB KC KD KE KF KJ Gate Valves, Globe Valves, Dampers, Cocks, Rupture, Disks, Orifices Gates, Doors, Dam Boards Heat Exchangers, Coolers Vessels, Tanks, Pools, Surge Tanks (Fluid Systems) Turning, Driving, Lifting And Slewing Gear Continuous Conveyors, Feeders Size Reduction Machines KJ KK KM KN KP KT KV KW Size Reduction Machines Compacting, Packaging Machines Mixers, Agitators Compressors, Blowers, Fans Pumps Cleaning Machine, Dryers, Separators, Filters Burners, Grates Stationary Tooling And Treatment Machines For Maintenance

Mechanical Components
MB MF MG MK MM MP Brakes Foundations Gearboxes Clutches, Couplings Engines, Not Electrical Piping Supports MR MS MT MU Piping Components, Ductwork Components Positioners, Not Electrical Turbines Transmission Gear, Non Electrical, Converter And Boosters Other Than Coupling And Gearboxes

Instrumentation and Control Components (non-electrical)


QB QH QN QP Sensors if not structurally integral with *QP*, metering orifices Signaling devices Controllers, flybolt governor Measuring instruments, testing equipment QR QS QT Instrument piping Condensation chambers (datum reservoir)in measuring circuits Thermowells and pockets for protection of sensors

- Electrical Components

-A -B -C -D -E -F -G -H -K -L -M -N -P -Q -R -S -T -U -V -W -X -Y -Z

Assemblies And Subassemblies Transducers For Non Electrical Variables And Vice Versa Capacitors Binary Elements, Delay Devices, Memory Devices Special Components Protective Devices Generators, Power Supply Signalling Devices Relays, Contractors Inductors Motors Amplifiers, Controllers Measuring Instruments Testing Equipment Power Switchgear Resistors Switches, Selectors Transformers Modulators, Converters From Electrical To Other Electrical - Variables Tubes, Semiconductors Transmission Paths, Waveguides, Aerials Terminals, Plugs, Sockets Electrical Positioners E.G. Solenoids (Not Motors) Termination, Balancing, Equipment, Filters, Limits, Cable Termination, Equalisers, Hybrid Transformer

Das könnte Ihnen auch gefallen