BSC SITE SURVEY CHECK LIST

Site Solutions-India

BSC SITE SURVEY CHECKLIST (RFI)

Created by- Sanjay Majumder, Created on 24/04/2011 Document-NSN/SiSo-IND/ BSC SITE/SURVEY CHECKLIST /Ver.001

BSC SITE SURVEY CHECK LIST

Site Solutions-India

SITE INFORMATION
SITE NAME CUSTOMER CUSTOMER CONTACT DETAILS SITE NAME SITE ADDRESS

Date of Site Survey

CONTENTS
1 BSC EQUIPMENT ROOM DETAILS

Created by- Sanjay Majumder, Created on 24/04/2011 Document-NSN/SiSo-IND/ BSC SITE/SURVEY CHECKLIST /Ver.001

BSC SITE SURVEY CHECK LIST

Site Solutions-India

1. PROPOSED BSC EQUIPMENT ROOM DETAIL

Sl. No. 1.1


1.1.1 1.1.2 1.1.3 1.1.4 1.1.5 1.1.6 1.1.7

Description of Checks Equipment Room


Room Size(LxWxH) in mm Equipment Room Door Size Emergency Exit Door Size Equipment Room Overall Condition Equipment Room Floor No. Cable Trays for Power Cable existing/Required Cable Trays for Signal Cable existing/Required

Ok/Not Ok

Remarks

Equipment Room Flooring 1.2


False Flooring height from floor
1.2.1 1.2.2

Antistatic Mat installation (for Normal flooring) & its grounding

1.3

Equipment Room Lighting /Power Sockets (UPS/Raw Power).


Lights are installed on ceiling.(between proposed rows) Lights are operational Emergency Lights are installed

1.3.1 1.3.2 1.3.3

Power Sockets are installed


1.3.4

Power Sockets are operational.


1.3.5

1.4
1.4.1 1.4.2 1.4.3 1.4.4

Equipment Room AirConditioning


Air-Conditions are installed & number of ACs as per requirement. Air-Conditions are comm. & operational. Equipment Room is completely dust free. Room Temperature & Humidity

Fire Fighting /Security System


1.5
Fire detectors/sensors installed
1.5.1 1.5.2

Fire suppressions cylinders are installed.


3

Created by- Sanjay Majumder, Created on 24/04/2011 Document-NSN/SiSo-IND/ BSC SITE/SURVEY CHECKLIST /Ver.001

BSC SITE SURVEY CHECK LIST

Site Solutions-India

Fire Alarm Panel installed


1.5.3

Fire alarm system commissioned


1.5.4

1.6
1.6.1 1.6.2 1.6.3 1.6.44

DC Power Availability in Equipment Room


DCDB Installed in Equipment Room Required MCB's are in DCDB. DCDB body grounded. DCDB has been connected with SMPS DCDB Distance from Equipment.

1.6.5

1.7
1.7.1 1.7.2 1.7.3 1.7.4 1.7.5 1.7.6 1.7.7

Grounding System & Bus Bar Availability in Equipment Room


Grounding Bus Bars in Room. Size of Bus Bars. Sufficient/Spare Holes in Bus Bars. Earthing Values and measured date.

Bus Bars terminated with earth pits. Distance from proposed equipments. Cables sizes connected to bus bars.

ADDITIONAL REMARKS IF ANY RELATED TO SITE READINESS.

_______________________________________________________________________________________

Created by- Sanjay Majumder, Created on 24/04/2011 Document-NSN/SiSo-IND/ BSC SITE/SURVEY CHECKLIST /Ver.001

BSC SITE SURVEY CHECK LIST

Site Solutions-India

Customer Signature

Nokia Siemens Networks

________________________ Name, surname

___________________________________ Name, surname