(ZAMIL COOLCARE - PRD) - STATUS OF WEEKLY REPORT FOR EDS

NAME : PERIOD : Moh Salah Alddin 05-03-2011 TO 10-03-2011 WEEKLY REPORT NO. :2 AREA :

Date 3/5/2011

Project Name AL Noor Hospital

Assignment Description 1. Main building level-3, phase-2 fcu duct routes are updated.

Engr. MH

Cad MH 10

Notes

Remarks

2. coil connection sides are updated in schedule. 1. Main building level-4, phase-2 fcu coil connection sides are updated in schedule. 2. Level-3, phase -2 piping route, pipe sizing are started. 1. Level-3 pipe size updated according to gpm flow for fcu. 2. Level -4 fcu schedule updated with fcu tag number as per engg. Comments. 1. Main building level-3, phase-2 Gpm flow checked as per schedule. 2. Fresh air air ducting route started. 1. Main building level-3, Phase-2 fresh air ducting finished. 2. Exhaust air duct routing started. 1. Main building Level-3, Phase-2 exhaust ducting finished. 2. Fresh air and exhaust air flow are checked as per schedule. 3. Supply air ducting are updated as per engg. Comments. & Gpm flow corrected asper engg. 4. Pipe size Comments.

3/6/2011

AL Noor Hospital

10

3/7/2011

AL Noor Hospital

10

3/8/2011

AL Noor Hospital

10

3/9/2011

AL Noor Hospital

10

3/10/2011

AL Noor Hospital

10

(ZAMIL COOLCARE - PRD) - STATUS OF WEEKLY REPORT FOR EDS


NAME : PERIOD : Moh Salah Alddin 05-03-2011 TO 10-03-2011 WEEKLY REPORT NO. :1 AREA : Mecca

Date

Project Name

Assignment Description

Engr. MH

Cad MH

Notes

Remarks

3/12/2011

Saturday

1. Main building Level-3,phase-2 Exhaust duct routing finished and checked as per schedule. 2. Chilled water flow for fcu are checked and match with schedule. AL Noor Hospital 3. supply ducting are updated as per engg. comments. 4. level-3 ceiling layout updated in toilet with strip ceiling. 1. Continue updating the location of diffusers, lightings as per ceiling. 2. Main building Level-3 layout prepared for phase-2 ducting, piping, ventilation. 3.Main building level-4, Phase-2 ducting are started and updating airflow, unit sizes as per schedule. updating in Main building level-4, 1. Continue Phase-2 duct route, airflow, unit sizes as per schedule. 1.Duct route updated. 2. Pipe route and gpm flow updates started as per schedule. 3.Main building leve-3 secton detail layout are added as per engg request. 1.Continue updating Pipe route as per schedule. 1.Pipe route and gpm flow are updated and checked as per schedule.

10

3/13/2011

Sunday

AL Noor Hospital

10

3/14/2011

Monday

AL Noor Hospital

10

3/15/2011

Thuesday

AL Noor Hospital

10

3/16/2011 3/17/2011

Wednesday AL Noor Hospital Thursday AL Noor Hospital

10

(ZAMIL COOLCARE - PRD) - STATUS OF WEEKLY REPORT FOR EDS


NAME : PERIOD : Mohammed Salah 12-03-2011 TO 18-03-2011 WEEKLY REPORT NO. : 4 AREA :

Date

Day

Project Name

Assignment Description 1. Main building level-4,Phase-2 piping finished. 2. Section details are prepared on layout as per engg comments.

CAD MH

Notes

Remarks

3/19/2011

Saturday

AL Noor Hospital

3. Comments are updated in level-3 ventilation layout.

1. Main building level-4,Phase-2 Ventilation ducting are updated as per schedule. 3/20/2011 Sunday AL Noor Hospital

1. Exhaust duct routing are updated as per schedule. 3/21/2011 Monday AL Noor Hospital

3/22/2011

Tuesday

AL Noor Hospital

1. Printing/ Plotting ER-OR area. 2. Exhaust ducting finished. 3. Fresh air cfm are updated in fcu schedule. 4. Printing/ Plotting Main building level-4.Ventilation, Piping 1. Main building, Level-4 & LEVEL-3, SCD, RCD, SAHF, EAHF,FCU cfm isolation Schedule are updated. per schedule and 2.Fresh air TAG & FCU rooms are checked as updated.

3/23/2011

Wednesday

AL Noor Hospital

1. Main building Level-3, ceiling drawing speaker, smoke detectors are added in phase-1. 2. Level-3, Phase-2 ceiling drawing updated. 3/24/2011 Thursday AL Noor Hospital

(ZAMIL COOLCARE - PRD) - STATUS OF WEEKLY REPORT FOR EDS


NAME : PERIOD : Mohammed Salah 12-03-2011 TO 18-03-2011 WEEKLY REPORT NO. : 4 AREA :

Date

Day

Project Name

Assignment Description 1. Main building Level-3, Phase-1 ceiling drawing updated with speaker and smoke detector.

CAD MH

Notes

Remarks

3/26/2011

Saturday

AL Noor Hospital

1. Level-3,phase-2 ceiling drawing updated. 2. Isolation room drawing for ext.ccu, NICU are started. 3/27/2011 Sunday AL Noor Hospital 3. Main building Level-3 fresh air & exhaust duct cfm are checked.

1. Main building Level-4 fresh air & exhaust duct cfm are checked. 3/28/2011 Monday AL Noor Hospital

1. NICU isolation room hvac arrangement drawing started. 3/29/2011 Tuesday AL Noor Hospital

3/20/2011

Wednesday

AL Noor Hospital

1. NICU isolation room hvac arrangement drawing for room noFF-130, 171, 241, 246, 265 finished. 2. Prepared asbuilt for level-3 phase-1, as per site installation. 3. Ext.CCU isolation room no- FF-216 started.

1.NICU room hvac arrangement drawings with duct heater. 3/31/2011 Thursday AL Noor Hospital

(ZAMIL COOLCARE - PRD) - STATUS OF WEEKLY REPORT FOR EDS


NAME : PERIOD : Mohammed Salah 2-04-2011 TO 7-04-2011 WEEKLY REPORT NO. : 2 AREA :

Date

Day

Project Name

Assignment Description 1.NICU room hvac arrangement drawings with duct heater.

CAD MH

Notes

Remarks

4/2/2011

Saturday

AL Noor Hospital

1.NICU room hvac arrangement drawings with duct heater. 2.groung floor, level-1 coloured drawing. 4/3/2011 Sunday AL Noor Hospital

1.groung floor, level-1 coloured drawing. 2.NICU hvac arrangement drawing modified. 4/4/2011 Monday AL Noor Hospital

1.NICU hvac arrangement drawing. 2.NICU AHU duct opening location checked in site. 4/5/2011 Tuesday AL Noor Hospital

1.NICU room duct opening location are updated in drawing. 2.NICU hvac arrangement drawing. 4/6/2011 Wednesday AL Noor Hospital

1.NICU hvac arrangement drawing. 4/7/2011 Thursday AL Noor Hospital

(ZAMIL COOLCARE - PRD) - STATUS OF WEEKLY REPORT FOR EDS


NAME : PERIOD : Mohammed Salah 09-04-2011 TO 14-04-2011 WEEKLY REPORT NO. : 3 AREA :

Date

Day

Project Name

Assignment Description 1. NICU hvac arrangement drawing. 2. Level-3 main building ventilation air flow checked asper selection.

CAD MH

Notes

Remarks

4/9/2011

Saturday

AL Noor Hospital

1. Level-3 main building ventilation air flow checked asper selection. 4/10/2011 Sunday AL Noor Hospital

4/11/2011

Monday

AL Noor Hospital

1. Level-3 main building ventilation air flow checked asper selection. 2.ICU AHU duct opening checked and updated in drawing.

1. Level-4 main building ventilation air flow checked asper selection. 4/12/2011 Tuesday AL Noor Hospital

1. Level-4 main building ventilation air flow checked asper selection. 4/13/2011 Wednesday AL Noor Hospital

4/14/2011

Thursday

AL Noor Hospital

1. Level-4 main building ventilation air flow checked asper selection. 2.ICU BURN, MRI area AHU duct opening checked and updated in drawing. 3.Print/plot- admin, dental,rehab

(ZAMIL COOLCARE - PRD) - STATUS OF WEEKLY REPORT FOR EDS


NAME : PERIOD : Mohammed Salah 09-04-2011 TO 14-04-2011 WEEKLY REPORT NO. : 3 AREA :

Date

Day

Project Name

Assignment Description 1. Print/Plot main building level-4, phase-2, ducting, piping, ventilation. 2. NICU HVAC duct route arrangement.

CAD MH

Notes

Remarks

4/16/2011

Saturday

AL Noor Hospital

1. NICU HVAC return duct route arrangement. 4/17/2011 Sunday AL Noor Hospital

4/18/2011

Monday

AL Noor Hospital

1.Printing level-3 main building archi plan, ceiling plan. 2.NICU hvac Arrangement drawing modified as per engg. Comments.

1. NICU HVAC exhaust duct route arrangement. 4/19/2011 Tuesday AL Noor Hospital

1. NICU HVAC duct route arrangement. 4/20/2011 Wednesday AL Noor Hospital

1. NICU HVAC duct route arrangement. 4/21/2011 Thursday AL Noor Hospital

(ZAMIL COOLCARE - PRD) - STATUS OF WEEKLY REPORT FOR EDS


NAME : PERIOD : Mohammed Salah 23-04-2011 TO 28-04-2011 WEEKLY REPORT NO. : 3 AREA :

Date

Day

Project Name

Assignment Description 1. NICU HVAC duct route arrangement. 2. Asbuilt for main building level-3 asper site instalation

CAD MH

Notes

Remarks

4/23/2011

Saturday

AL Noor Hospital

1. NICU HVAC exhaust duct route arrangement. 2. NICU roof ducting. 4/24/2011 Sunday AL Noor Hospital

1. NICU roof ducting. 4/25/2011 Monday AL Noor Hospital

1. NICU HVAC exhaust duct route arrangement. 2. NICU roof ducting. 4/26/2011 Tuesday AL Noor Hospital

2. NICU roof duct routing for supply & return. 4/27/2011 Wednesday AL Noor Hospital

4/28/2011

Thursday

AL Noor Hospital

1. NICU roof duct routing for supply & return. 2.level-3 main building F/C area drawing prepared with Type-A, Type-B.

(ZAMIL COOLCARE - PRD) - STATUS OF WEEKLY REPORT FOR EDS


NAME : PERIOD : Mohammed Salah 23-04-2011 TO 28-04-2011 WEEKLY REPORT NO. : 3 AREA :

Date

Day

Project Name

Assignment Description 1.level-3 main building F/C area drawing prepared with Type-A, Type-B. 2.NICU HVAC drwaing layout, drwaing number finalized. 3.NICU Roof drawing finalized.

CAD MH

Notes

Remarks

4/30/2011

Saturday

AL Noor Hospital

5/1/2011

Sunday

AL Noor Hospital

1.Level-4 main building F/C area drawing prepared with Type-A, Type-B. 2. only diffusers are located with tag no,flow an ICU Burn room drawing. 3.E.R, level-1. supply & exhaust duct location changed as per site condition.

1. ICU Burn HVAC arrangement drawing with diffusers location. 5/2/2011 Monday AL Noor Hospital 2.Duct sizes are noted in level-2 OR area

5/3/2011

Tuesday

AL Noor Hospital

1. Only diffusers are located with tag no,flow an ICU Burn room drawing. 2.Exhaust duct added in OR area level-2 room no.17

1. Only diffusers are located with tag no,flow an CCU room drawing. 5/4/2011 Wednesday AL Noor Hospital

5/5/2011

Thursday

AL Noor Hospital

1. Only diffusers are located with tag no,flow an CCU room drawing. 2. Roof Duct slab opening location modified in emergency room level-1.

(ZAMIL COOLCARE - PRD) - STATUS OF WEEKLY REPORT FOR EDS


NAME : PERIOD : Mohammed Salah 23-04-2011 TO 28-04-2011 WEEKLY REPORT NO. : 3 AREA :

Date

Day

Project Name

Assignment Description 1. Only diffusers are located with tag no,flow an CCU room drawing.

CAD MH

Notes

Remarks

4/30/2011

Saturday

AL Noor Hospital

2. opening location modified in emergency room level-1& roof.

1.Slab opening location for SA&EA duct modified in emergency room level-1& roof. 5/1/2011 Sunday AL Noor Hospital 2.Main building Level-3&Level-4 SA duct routing modified. 3.Plotting level-3&level-4 phase-1,phase-2 for main building.

5/2/2011

Monday

AL Noor Hospital

1. CCU diffuser locating modified. 2.Slab opening location for EA duct modified in emergency room level-1& roof.

5/3/2011

Tuesday

AL Noor Hospital

1.Slab opening location for EA duct modified& finalised in emergency room level-1& roof. 2. NICU duct routing modified. 3. CCU diffuser location modified.

5/4/2011

Wednesday

AL Noor Hospital

5/5/2011

Thursday

AL Noor Hospital

'); // -->