Sie sind auf Seite 1von 6

Employee Profile

Photo

Personal Information Name-Surname: Age: Marital Status: Weight: Height: Education Background : Education Background (Highest education) : GPA: Institution: Commencement: Year of service: Current Position: Company: Supervisor:

Work experience 1. Period from Til Position: Job Responsibility

2. Period from Til Position: Job Responsibility

3. Period from Til Position: Job Responsibility

4. Period from Til Position: Job Responsibility

5. Period from Til Position: Job Responsibility

6. Period from Til

Position: Job Responsibility

7. Period from Til Position: Job Responsibility

Others job assignment

***Remark***

1. For Education Background please specify the degree when they joined aA. 2. For work experience please complete all the job title, company and year of service in each aA position

Employee Profile

Photo

Gopal Krishna Bagchi - Bagchi 47 Yrs. 6 Month Married 64 kg 5'-5" B.Sc.Engineering B.Sc.Engineering in Civil 2nd Class (GPA system was not introduced in my period) Bangladesh University of Engineering &Technology 25 May, 2011 21 Yrs. Civil Manager Quality Paper Mill Limited K. Wiroj Piamwiriya

1 Nov,2007 to 9 May, 2011 Head of Technical (AGM) (Seven Circle BD Ltd: Construction of Edible Oil & Cement Plant)
1. Coordination of construction work of edible oil plant at Mongla & cement plant at Gazipur by providing drawing, estimation, specification, evaluation of contractors etc from Dhaka 2.Provided technical support as per customers need and solving the problem if. 3. Arrange technical program for Engineers, masons, professionals. 4. Assist to concrete designing for consultant, engineers and RMC players. 5. Provided technical support for concrete structures to prestigious project.

1. Coordination of construction work of edible oil plant at Mongla & cement plant at Gazipur by providing drawing, estimation, specification, evaluation of contractors etc from Dhaka 2.Provided technical support as per customers need and solving the problem if. 3. Arrange technical program for Engineers, masons, professionals. 4. Assist to concrete designing for consultant, engineers and RMC players. 5. Provided technical support for concrete structures to prestigious project.

May, 1999 to Oct, 2007 Manger - Engineering (Holcim BD Ltd: Construction of Cement Plant)

Construction: 1. Planning, preparing & monitoring work schedule. Layout, Castin-situ pilling, concrete mass foundation, silo construction using sleeve form, steel fabrication & erection, grouting, covering with asbestos sheet, 2. Construction of embankment protection using geo-textile, cc block & gabion, flexible & rcc road, culvert, storage, electric submersible pump, drainage, gate, boundary wall, guard house, toilet 3. Review calculation & cost estimation, checking bill, voucher, and fund requirements 4.Quality control, material selection, project & manpower management and over all supervision of cement plant construction 5.Coordination with consultant govt. agencies. 6. Progress report writing. Repair & maintenance works: 1. of mill, lab. & residential building, mills foundations, road, jetty, drainage system 2. Renovation of office/guest house 3. Jetty dredging, flood action plan, 4. Installation of truck scale (weigh bridge), portable silo fabrication & providing/ installation to customer's project site, 5. Plantation & landscaping

April, 1996 to May, 1999 Civil Engineer (Hyundai Engineering & Construction Co. Ltd: Jamuna Multipurpose Bridge project- 4800m)
Construction, Installation, Repair & Maintenance work: 1. Planning, 2. Segment production 3. In-charge of production & installation of parapet & barrier 4. Repair & maintenance work of bridge using epoxy, grouting and other chemicals/instruments 5.Coordination of sites & consultant. 6. Installation of Gas pipeline (dia 30 ", 6 km) along bridge. 7. Handled construction materials and introduced to McMaster copy.

Sep,1995 to Mar,1996 Project Engineer (Development Construction Ltd: Approach Road of Jamuna Multipurpose Bridge project: Construction of Bridge, Culvert & Flexible Road)
1. Planning and In-charge of bridges & culverts (31 no.) construction. 2. Coordination among sub-contractors and local/ foreign consultant. 3. Pre-cast pile casting and hammer driving, cut -off-wall, chamfering, base casting, pile cap, pier, pier head, girder, slab, rail casting etc. Guided engineers and staffs.

Jan,1995 to Aug,1995 Civil Engineer (ETEP.S.A. Co.:Water Pump Stations 4 units on the shore of the Mediterranean Sea
1. Preparation of BOQ 2. Selection/ testing and supervision of construction materials as per BOQ, 3. Making monthly report, 4. Checking bills as per executed work

Nov, 1992 to Dec, 1994

Civil Engineer (Obayashi Corporation: Meghna-Gumti Bridge project, 1410m: project)


1. Construction of sub-structure & super-structure, 2. Quality control of concrete, 3. Project engineering works (progress report, schedule.) 4. Technology transfer program for the different organizations

Jan, 1989 to Apr,1992 Site Engineer (Engineering and Planning Consultant: Bridge-Culvert & Road project under USAID)
Construction and Supervision: 1. Construction, 2. Quality control 3. Overall supervision of three bridges & flexible pavement road (45km) 4. Pre-cast pile casting and driving with hammer, pile cap, pier, pier head, girder, slab, rail casting