Vietnam VMS Project Site Survey & Design Training Material

2011.07.10

VMS Project Overview TSS & Design Workflow Typical Configuration Equipment Introduction RF Solution Scenario Swap Principle Cable Connection Specification About TSSR Template

VMS Uni-Ran Project Overview Work scope


SN 1 2 3 4 5 6 7 4 5 Type BSC RNC TC OMC OMCR ZXCTN ZXMP BTS BTS Qty 8 8 8 2 2 24 32 608 400 Vendor ZTE ZTE ZTE ZTE ZTE ZTE ZTE ZTE Huawei/ Ericsson Remark New New New New New New New 2G: 608 Swap+ New 174, 3G: New Remove high configure equip. to new site

1. These sites are located in Center IV: Ca Mau, Kien Giang; Center III: Khanh Hoa, Phu Yen; for more details, please refer to the site list.

VMS Uni-Ran Project Overview BTS Configuration


Area Center III BTS Type Macro Indoor: G9 S444+US222 Number CE 102 384 Antenna 03 dual band GSM900/1800 +03 broadband UMTS2100 Function HSDPA+ 21Mbps HSUPA 5.76Mbps Interface 8E1+2GE/FE

Output Power 15W/C

Macro Indoor: G9S444+G18 S444+US222

48

384

03 dual band GSM900/1800 +03 broadband UMTS2100 6 Combiners (900M/1800 M )/Site

HSDPA+ 21Mbps HSUPA 5.76Mbps

8E1+2GE/FE

15W/C

Macro Outdoor: G9 S444 +U S222

120

384

110set 03 dual band GSM900/1800 +03 broadband UMTS2100 10set 900/1800/2100 triple-band integrated cluster antenna

HSDPA+ 21Mbps HSUPA 5.76Mbps

8E1+2GE/FE

15W/C

Distributed: G9 S444 +U S222

83

384

73set 03 dual band HSDPA+ 21Mbps GSM900/1800 HSUPA 5.76Mbps +03 broadband UMTS2100 10set 900/2100 Dual-band integrated cluster antenna

8E1+2GE/FE

15W/C

Notes: Total: 353 sites; Phase1: 254 sites; Phase2: 99 sites


4

VMS Uni-Ran Project Overview BTS Configuration


Area Center IV BTS Type Number CE Antenna Function Interface

Output Power

Macro Indoor: G9 S444 +U S222

138

384

03 dual band GSM900/1800 two ports+03 broadband UMTS2100 03 dual band GSM900/1800 two ports+03 broadband UMTS2100 6 Combiners (900M/1800 M )/Site

HSDPA+ 21Mbps 8E1+2GE/FE HSUPA 5.76Mbps

15W/C

Macro Indoor: 12 G9 S444+G18 S444+U S222

384

HSDPA+ 21Mbps 8E1+2GE/FE HSUPA 5.76Mbps

15W/C

Macro Outdoor: G9 S444 +U S222

162

384

152sets 03 dual band HSDPA+ 21Mbps 8E1+2GE/FE GSM900/1800 two HSUPA 5.76Mbps ports+03 broadband UMTS2100 10sets triple-band integrated cluster antenna 107sets 03 dual band HSDPA+ 21Mbps 8E1+2GE/FE GSM900/1800 two HSUPA 5.76Mbps ports+03 broadband UMTS2100 10sets Dual-band integrated cluster antenna

15W/C

Distributed: G9 S444 +U S222

117

384

15W/C

Notes: Total: 429 sites; Phase1: 354 sites; Phase2: 75 sites


5

Survey&Design Workflow

TSSR&Drawings will provide 3 hardcopy and 1 softycopy to ZTE. 6

Equippent Introducaiton

ZXSDR BS8800 (Indoor 2G GSM) RRU(R8840 For 3G,R8860E For 2G) ILPB OLPB Power System ZXDU68 B201 And Battery RF Accessory

ZXSDR BS8800

Main information

Main rack dimension (H*W*L) 950*600*450 Cable from up side DC -48V Single Power input Support stack install. With BBU+RSU+Power Distributed Unit +Fan For this project, RSU for 900 or 900/1800 RF module. Weight/Rack Less than 135Kg (Full configuration) Maintenance requirement front side>800mm,back side

>100mm,other side,100mm .

ZXSDR BS8800

RF layer

Fan subrack

Baseband layer Notes: In VMS Project Only 1 main Rack and 1 Base Band Unit is configured.

ZXSDR BS8800-BBU Part

PM

Fabric Switch Module Baseband Processing Board

2U

SA Module

CC Module

FAN Module

Notes: 1. In VMS Project Configures 1 BBU for per site. 2. 2G and 3G shares 1 BBU 3. SA support 8 Dry-Contact Alarm. 4. Abis interface suport E1, FE, Optical Fiber .

10

ZXSDR BS8800 Installation

Internal Cable Connection

External Cable Connection

11

ZXSDR RRU(R8840)
320mm 160mm

R8840:320mm(W)160mm(D)* 370 mm(H) Weight<16.5 Kg Power 48 V DC (-57 V DC~-40 V DC) Consumption <300 W

370mm

12

ZXSDR R8840-Interface

13

ZXSDR RRU(R8860E)
320mm

197mm

R8860E:320mm(W)197mm(D)* 370 mm(H) Weight<20 Kg Power 48 V DC (-57 V DC~-40 V DC) Consumption < 330 W

14

370mm

ZXSDR R8860E-Interface

15

ZXSDR RRU-Installation- On Pole

Notes:

In VMS Project, We only use the single RRU-pole installation 16

ZXSDR RRU-Installation-Mounted on Wall

Outdoor Mount on Wall

Indoor Mount on Wall

17

Indoor Lighting Protection Box


Dimension

400mm(H)450mm(W)105mm (D) Weight <8 kg Support 3 Line output, 1 Line Input Install >1m above the Ground Use 25mm2 power cable to connect To the Power System Use 35 mm2 grounding cable Connected to the indoor or Outdoor Grounding Bar SA board of BBU will use the cable To connect to the ILPB for dry-contact Alarm.

Install on the Wall


18

Outdoor Lighting Protection Box


Dimension: 305mm H)238mm(W)106mm(D) Weight:<3Kg

Install Type: Pole-Mounted

Front View without cover Notes : 1. Support 2 RRU per one, but normal 1 OLPB for 1 RRU. 2. The distance between RRU and OLPB should less than 2 m due to the limited cable length 19

Power System ZXDU68 B201

1. Integrated chassis 1. Integrated chassis 2. Power distribution unit front panel 2. Power distribution unit front panel 3. Input/output integrated socket 3. Input/output integrated socket 4. Slot 1 4. Slot 1 5. Slot 2 5. Slot 2 6. Slot 3 6. Slot 3 7. Slot 5 7. Slot 5 8. Slot 4 8. Slot 4

ZXD2400 Rectifier ZXD2400 Rectifier

Notes : 1. This power system is configured for the BTS if not reuse the existing power system. 2. Every B201 configures 3 ZXD2400. 3. Support 3 phase AC input. 20

Power System Battery

Battery Bank (12 V 100Ah) Battery Bank (12 V 100Ah)

Battery Bank (12 V 135Ah) Battery Bank (12 V 135Ah)

1. This battery bank will be configured together power system when necessary. 2. For Indoor site, will use 2*100Ah, and 2*135Ah for outdoor site. 3. 2*100Ah battery Installed in the DG-DJM12100-11 battery rack; 2*135Ah battery Installed in the PC8910A battery cabinet 21

RF Part-Antenna 1- UMTS ANT

Will be installed on 2m Pole of 76mm diameter UMTS Antenna- 2 Ports 22

RF Part-Antenna 2- GSM900&1800&UMTS triple-band ANT

Will be installed on 3m Pole with 76mm diameter GSM900&1800&UMTS triple-band Antenna- 4 Ports 23

RF Part-Antenna 3- GSM900 &1800 dual-band ANT

Will be installed on 3m Pole with 76mm diameter GSM900 &1800 dual-band Antenna- 2 Ports

24

RF Part-Antenna 5- Cluster dual-band ANT


TYPE Electrical Specifications (MHz) Gain(dBi) Polarization Horizontal-3dB Beamwidth() Vertical-3dB Beamwidth() Electrical Downtilt() First Suppression(dB) Cross polar ratio Maindirection 0 Sector 60 Front-to-Back Ratio(dB) V.S.W.R Isolation intrasystem(dB) Isolation intersystem(dB) PIM3(dBc) Impedance() Lightning Protection Maximum Input Power(W) 500 870-960 16.7 45 65 7.8 0-10 16 15 10 28 1.5 30 30 -150 50 Direct Ground 200 1920-2170 17.5 45 65 5.5 0-8 16 MBCIJS900/3G6517/18D E10/8-VN Integration Specifications Radiating Element Material Connector Type Sector Number Radome Material Radome Color Weight(kg) Dimension(mm) Packing Size(mm) Heightening Pole Height(m) Maximun Azimuth Angle () Pole Diameter(mm) Isolation Between Two Sectors(dB) Maximun Wind Speed (km/h) Operating Temperature() Reposition Temperature() MTBF(H) Aluminium 7/16DIN(F) 4 3 Equispaced FRP White/Custome-made 190 D540H2800 7506302900 1~15 15 165 45 200 -40~+70 -55~+80 100000

Will be installed on 4m Pole with 76mm diameter Cluster decoration antenna dual-band antenna- 4 Ports 25

RF Part-Antenna 4- Cluster triple-band ANT

Will be installed on 3m Pole with 76mm diameter Cluster decoration antenna triple-band Antenna- 6 Ports 26

RF Part-Acceessory

Andrew Combiner.

Comba Combiner.

Comba TMA

Remark: This will be used according to the requirement.

27

RF Solution-Scenario 1
240 sites 1. Where the RRU installed should accord with VMSs standard.

2.When from ANT to RRU <20m will use jumper to connect ,or will use 7/8 feeder cable 3.All the old GSM single-band antenna will be replaced by new dual-band antenna. 4. The feeder cable will be reused when swap if possible

BTS Type G9 S444 +U S222

Num ber 102(III)+138(IV)

Antenna Dual-band 900/1800MHz Broadband 2100MHz (2 Ports/Combiner Integrated) (2 Ports)

5. Combiner will be installed for future expansion.

28

RF Solution-Scenario 2
60 sites 1. Where the RRU installed should accord with VMSs standard.

2. Used to Coastal Coverage. The detail site refer to the site list. 3. TMA for enhancing signal, and combiner for future 1800 expansion.

BTS Type G9 S444+G18 444 +U S222

Num ber 48(III)+12(IV)

Antenna Dual-band 900/1800MHz Broadband 2100MHz (2 Ports/Combiner Integrated) (2 Ports)

29

RF Solution-Scenario 3
242 sites 1. Where the RRU installed should accord with VMSs standard.

RF Category2 - O
BTS Type G9 S444 +U S222 Num ber 242 Antenna Dual-band 900/1800MHz Broadband 2100MHz (2 Ports/Combiner (2 Ports) Integrated)

30

RF Solution-Scenario 4
20 sites
ANT (6 ports) 900/1800/2100 7/8feeder Jumper Fiber GroundClamp FeederClamp

1. Where the RRU installed should accord with VMSs standard.

GSM 900

UMTS 2100

Outdoor Macro
BTS Type G9 S444 +U S222 Num ber 10(III)+10(IV) Antenna Triple-band 900/1800/2100MHz (6 Ports)

31

RF Solution-Scenario 5
20 sites
Cluster ANT (6 ports) 900/1800/2100 7/8feeder Jumper Fiber GroundClamp FeederClamp

1. The RRU should be installed on the rooftop by mounting pole.

2. The Antenna should be installed on the special 4m*165 pole.

GSM 900

UMTS 2100

Outdoor Macro
BTS Type G9 S444 +U S222 Num ber 10(III)+10(IV) Antenna 900/2100 Dual-band integrated cluster antenna

32

RF Solution-Scenario 6
180 sites
ANT 900/1800 (2 ports) ANT 2100 (2 ports)
Jumper Fiber Ground Clamp Feeder Clamp

1. This scenario is special for BS8700 system installation.

GSM 900

UMTS 2100

Distributed (BBU is indoor)

BTS Type G9 S444 +U S222

Num ber 73(III)+107(IV)

Antenna

Dual-band 900/1800MHz (2 Ports)

Broadband 2100MHz (2 Ports)

33

RF Solution-Scenario 7
20 sites
Cluster ANT (4 ports) 900/2100 7/8 feeder Jumper Fiber Ground Clamp Feeder Clamp

1. This scenario is special for BS8700 system installation.

GSM 900

UMTS 2100

Outdoor Macro
BTS Type G9 S444 +U S222 Num ber 10(III)+10(IV) Antenna 900/2100 Dual-band integrated cluster antenna

34

Swap Principle
1. Almost swap the existing site following 1: 1, to reduce the risk during the swap work 2. BTS Location: will pre-install in the new position before swap if sufficient space. will install the new BTS at the old BTS position if insufficient space. 3. Power Supply: Try to reuse existing power if available capacity and battery status. 4. RF :Try to reuse the feeder and 2G ANT if its status is acceptable, but All 3G ANT will be add. 5. Cable & Cable Tray installation: Install new power cable and new ladder as less as possible.

Notes: The detail and final swap principle not confirmed with VMS.

35

Cable Connection&Specification-BS8800

1. -48V &0 V power cable with 25 mm^2 2. Grounding cable with 35m^2

36

Cable Connection&Specification-1 RRU8840


16 mm2 Yellow green 16 mm2 Yellow green 16 mm2 Yellow green Antenna Type D

The Nearest Outdoor Grounding Point


Dedicated Power Cable For R8840 Monitor Connecting with power distribution cabinet when It is not used when indoors installing indoors installing R8840 R8840

Type N

Outdoor lightning arrester

R8840
Outdoor Optical Cable

Outdoor Grounding Bar Closed to The Feeder Window


0 Pow er Cable Grounding Clip For R884

er Ca ble Grounding Clip For R8840 Pow

Optical Fiber

Outdoor
LC/PC Connector

Outdoor Indoor 35 mm2 Yellow green


25 mm2 Bl ue

Indoor lightning arrester 25 mm2 Bl ack

Monitor cable

Indoor
Select From the 3 Access Modes Optical Fiber ,E1 Cable,Ethernet cable ) LC/PC Connector Optical Fiber DDF /Transmission Equipment Switch
ODF/ O pti cal Switch

Single Mode 0ptical Fiber -

Protection Gground - 48V Working Ground Ethernet Cable Optical Fiber Cable Supplied by Customer Cable Supplied by ZTE

2- cored Own

Power Distribution Cabinet

B8200

E1 Cable Ethernet cable

E1 Cable Ethernet cable

35 mm2 Yellow Green

16 mm2 Yellow Green


2

RNC or NODEB

16 mm Yellow Green 16 mm Yellow Green 16 mm2Yellow Green Indoor Grounding Bar


2

Note:
1. It is applied to roof installation (single). 2. The outdoor lightning arrester is not needed when R 8840 is installed outdoors . 3. The equipment is grounded at nearest places (like outdoor cabling rack ). .

Diagram of equipment connection (single installation)


37

Cable Connection&Specification- 3 RRU8840


16 mm2 Yellow green 16 mm2 Yellow green 16 mm2 Yellow green 16 mm2 Yellow green 16 mm2 Yellow green 16 mm2 Yellow green
Antenna Antenna

Antenna

Type D

Type D

Type D

Outdoor Grounding Bar Closed to R 8840

Type N 16 mm2 Yellow green 16 mm2 Yellow green


Dedicated Power Cable For R8840 Monitor Dedicated Power Cable For R8840 Monitor

Type N
Dedicated Power Cable For R 8840 Monitor

Type N

16 mm2 Yellow green


Outdoor Grounding Point

Outdoor lightning 16mm2 arrester

R8840

Grounding Clip For R 8840 Power Cable

Connecting with power distribution cabinet when It is not used when indoors installing R 8840 indoors installing R8840 Grounding Clip For R8840 Power Cable

Outdoor lightning 16mm2 arrester

R8840
Outdoor Optical Cable Grounding Clip For R 8840 Power Cable

Outdoor lightning mm2 arrester

R8840

Outdoor Optical Cable Grounding Clip For R8840 Power Cable It is not used when indoors installing R 8840

Outdoor grounding bar ( Near the feeder ) window

Connecting with power distribution cabinet when indoors installing R8840

Connecting with power distribution It is not used when cabinet when indoors installing R 8840 indoors installing R8840 Outdoor Optical Cable

Outdoor Indoor

Outdoor Indoor

35 mm2 Yellow green


25 mm2 B ue l

Indoor lightning arrester

Monitor Select From the 3 Access Modes Optical Fiber ,E1 Cable ,Ethernet cable ) LC/PC Connector Optical Fiber DDF /Transmission Equipment Switch 2 16 mm Yellow Green
ODF / Optical Switch

Protection Gground - 48V Working Ground Ethernet Cable Optical Fiber Cable Supplied by Customer Cable Supplied by ZTE

25 mm2 B ack l 2- ored Own c Power Cable Power Distribution Cabinet

Single Mode 0ptical Fiber -

B 8200

E1 Cable Ethernet cable

E1 Cable Ethernet cable

35 mm Yellow Green

16 mm Yellow Green

RNC or NODEB

16 mm Yellow Green
2 16 mm Yellow Green

Indoor Grounding Bar

Note :

1. It is applied to tower installation , 2 sectors and 3 sectors pole installation modes . 2. The outdoor lightning arrester is unnecessary when R 8840 is installed indoors . 3. When two R 8840s are installed at one place , another independent R 8840 is nearly grounded .

Diagram of equipment connection (installation mode of over 2 sectors )

38

Cable Connection Specification- Design Guideline

1. 2. 3. 4. 5.

When do the site layout, should consider some fixed cable delivery from ZTE. The cable specification should strictly follow ZTE delivered material specification. The cable connection should follow VMSs installation standard . The cable layout will follow the cable re-used principle. Some connector is special one, So the cable length will be limited.

39