Beruflich Dokumente
Kultur Dokumente
2011.07.10
VMS Project Overview TSS & Design Workflow Typical Configuration Equipment Introduction RF Solution Scenario Swap Principle Cable Connection Specification About TSSR Template
1. These sites are located in Center IV: Ca Mau, Kien Giang; Center III: Khanh Hoa, Phu Yen; for more details, please refer to the site list.
48
384
8E1+2GE/FE
15W/C
120
384
110set 03 dual band GSM900/1800 +03 broadband UMTS2100 10set 900/1800/2100 triple-band integrated cluster antenna
8E1+2GE/FE
15W/C
83
384
73set 03 dual band HSDPA+ 21Mbps GSM900/1800 HSUPA 5.76Mbps +03 broadband UMTS2100 10set 900/2100 Dual-band integrated cluster antenna
8E1+2GE/FE
15W/C
Output Power
138
384
03 dual band GSM900/1800 two ports+03 broadband UMTS2100 03 dual band GSM900/1800 two ports+03 broadband UMTS2100 6 Combiners (900M/1800 M )/Site
15W/C
384
15W/C
162
384
152sets 03 dual band HSDPA+ 21Mbps 8E1+2GE/FE GSM900/1800 two HSUPA 5.76Mbps ports+03 broadband UMTS2100 10sets triple-band integrated cluster antenna 107sets 03 dual band HSDPA+ 21Mbps 8E1+2GE/FE GSM900/1800 two HSUPA 5.76Mbps ports+03 broadband UMTS2100 10sets Dual-band integrated cluster antenna
15W/C
117
384
15W/C
Survey&Design Workflow
Equippent Introducaiton
ZXSDR BS8800 (Indoor 2G GSM) RRU(R8840 For 3G,R8860E For 2G) ILPB OLPB Power System ZXDU68 B201 And Battery RF Accessory
ZXSDR BS8800
Main information
Main rack dimension (H*W*L) 950*600*450 Cable from up side DC -48V Single Power input Support stack install. With BBU+RSU+Power Distributed Unit +Fan For this project, RSU for 900 or 900/1800 RF module. Weight/Rack Less than 135Kg (Full configuration) Maintenance requirement front side>800mm,back side
>100mm,other side,100mm .
ZXSDR BS8800
RF layer
Fan subrack
Baseband layer Notes: In VMS Project Only 1 main Rack and 1 Base Band Unit is configured.
PM
2U
SA Module
CC Module
FAN Module
Notes: 1. In VMS Project Configures 1 BBU for per site. 2. 2G and 3G shares 1 BBU 3. SA support 8 Dry-Contact Alarm. 4. Abis interface suport E1, FE, Optical Fiber .
10
11
ZXSDR RRU(R8840)
320mm 160mm
R8840:320mm(W)160mm(D)* 370 mm(H) Weight<16.5 Kg Power 48 V DC (-57 V DC~-40 V DC) Consumption <300 W
370mm
12
ZXSDR R8840-Interface
13
ZXSDR RRU(R8860E)
320mm
197mm
R8860E:320mm(W)197mm(D)* 370 mm(H) Weight<20 Kg Power 48 V DC (-57 V DC~-40 V DC) Consumption < 330 W
14
370mm
ZXSDR R8860E-Interface
15
Notes:
17
400mm(H)450mm(W)105mm (D) Weight <8 kg Support 3 Line output, 1 Line Input Install >1m above the Ground Use 25mm2 power cable to connect To the Power System Use 35 mm2 grounding cable Connected to the indoor or Outdoor Grounding Bar SA board of BBU will use the cable To connect to the ILPB for dry-contact Alarm.
Front View without cover Notes : 1. Support 2 RRU per one, but normal 1 OLPB for 1 RRU. 2. The distance between RRU and OLPB should less than 2 m due to the limited cable length 19
1. Integrated chassis 1. Integrated chassis 2. Power distribution unit front panel 2. Power distribution unit front panel 3. Input/output integrated socket 3. Input/output integrated socket 4. Slot 1 4. Slot 1 5. Slot 2 5. Slot 2 6. Slot 3 6. Slot 3 7. Slot 5 7. Slot 5 8. Slot 4 8. Slot 4
Notes : 1. This power system is configured for the BTS if not reuse the existing power system. 2. Every B201 configures 3 ZXD2400. 3. Support 3 phase AC input. 20
1. This battery bank will be configured together power system when necessary. 2. For Indoor site, will use 2*100Ah, and 2*135Ah for outdoor site. 3. 2*100Ah battery Installed in the DG-DJM12100-11 battery rack; 2*135Ah battery Installed in the PC8910A battery cabinet 21
Will be installed on 3m Pole with 76mm diameter GSM900&1800&UMTS triple-band Antenna- 4 Ports 23
Will be installed on 3m Pole with 76mm diameter GSM900 &1800 dual-band Antenna- 2 Ports
24
Will be installed on 4m Pole with 76mm diameter Cluster decoration antenna dual-band antenna- 4 Ports 25
Will be installed on 3m Pole with 76mm diameter Cluster decoration antenna triple-band Antenna- 6 Ports 26
RF Part-Acceessory
Andrew Combiner.
Comba Combiner.
Comba TMA
27
RF Solution-Scenario 1
240 sites 1. Where the RRU installed should accord with VMSs standard.
2.When from ANT to RRU <20m will use jumper to connect ,or will use 7/8 feeder cable 3.All the old GSM single-band antenna will be replaced by new dual-band antenna. 4. The feeder cable will be reused when swap if possible
28
RF Solution-Scenario 2
60 sites 1. Where the RRU installed should accord with VMSs standard.
2. Used to Coastal Coverage. The detail site refer to the site list. 3. TMA for enhancing signal, and combiner for future 1800 expansion.
29
RF Solution-Scenario 3
242 sites 1. Where the RRU installed should accord with VMSs standard.
RF Category2 - O
BTS Type G9 S444 +U S222 Num ber 242 Antenna Dual-band 900/1800MHz Broadband 2100MHz (2 Ports/Combiner (2 Ports) Integrated)
30
RF Solution-Scenario 4
20 sites
ANT (6 ports) 900/1800/2100 7/8feeder Jumper Fiber GroundClamp FeederClamp
GSM 900
UMTS 2100
Outdoor Macro
BTS Type G9 S444 +U S222 Num ber 10(III)+10(IV) Antenna Triple-band 900/1800/2100MHz (6 Ports)
31
RF Solution-Scenario 5
20 sites
Cluster ANT (6 ports) 900/1800/2100 7/8feeder Jumper Fiber GroundClamp FeederClamp
GSM 900
UMTS 2100
Outdoor Macro
BTS Type G9 S444 +U S222 Num ber 10(III)+10(IV) Antenna 900/2100 Dual-band integrated cluster antenna
32
RF Solution-Scenario 6
180 sites
ANT 900/1800 (2 ports) ANT 2100 (2 ports)
Jumper Fiber Ground Clamp Feeder Clamp
GSM 900
UMTS 2100
Antenna
33
RF Solution-Scenario 7
20 sites
Cluster ANT (4 ports) 900/2100 7/8 feeder Jumper Fiber Ground Clamp Feeder Clamp
GSM 900
UMTS 2100
Outdoor Macro
BTS Type G9 S444 +U S222 Num ber 10(III)+10(IV) Antenna 900/2100 Dual-band integrated cluster antenna
34
Swap Principle
1. Almost swap the existing site following 1: 1, to reduce the risk during the swap work 2. BTS Location: will pre-install in the new position before swap if sufficient space. will install the new BTS at the old BTS position if insufficient space. 3. Power Supply: Try to reuse existing power if available capacity and battery status. 4. RF :Try to reuse the feeder and 2G ANT if its status is acceptable, but All 3G ANT will be add. 5. Cable & Cable Tray installation: Install new power cable and new ladder as less as possible.
Notes: The detail and final swap principle not confirmed with VMS.
35
Cable Connection&Specification-BS8800
1. -48V &0 V power cable with 25 mm^2 2. Grounding cable with 35m^2
36
Type N
R8840
Outdoor Optical Cable
Optical Fiber
Outdoor
LC/PC Connector
Monitor cable
Indoor
Select From the 3 Access Modes Optical Fiber ,E1 Cable,Ethernet cable ) LC/PC Connector Optical Fiber DDF /Transmission Equipment Switch
ODF/ O pti cal Switch
Protection Gground - 48V Working Ground Ethernet Cable Optical Fiber Cable Supplied by Customer Cable Supplied by ZTE
2- cored Own
B8200
RNC or NODEB
Note:
1. It is applied to roof installation (single). 2. The outdoor lightning arrester is not needed when R 8840 is installed outdoors . 3. The equipment is grounded at nearest places (like outdoor cabling rack ). .
Antenna
Type D
Type D
Type D
Type N
Dedicated Power Cable For R 8840 Monitor
Type N
R8840
Connecting with power distribution cabinet when It is not used when indoors installing R 8840 indoors installing R8840 Grounding Clip For R8840 Power Cable
R8840
Outdoor Optical Cable Grounding Clip For R 8840 Power Cable
R8840
Outdoor Optical Cable Grounding Clip For R8840 Power Cable It is not used when indoors installing R 8840
Connecting with power distribution It is not used when cabinet when indoors installing R 8840 indoors installing R8840 Outdoor Optical Cable
Outdoor Indoor
Outdoor Indoor
Monitor Select From the 3 Access Modes Optical Fiber ,E1 Cable ,Ethernet cable ) LC/PC Connector Optical Fiber DDF /Transmission Equipment Switch 2 16 mm Yellow Green
ODF / Optical Switch
Protection Gground - 48V Working Ground Ethernet Cable Optical Fiber Cable Supplied by Customer Cable Supplied by ZTE
B 8200
35 mm Yellow Green
16 mm Yellow Green
RNC or NODEB
16 mm Yellow Green
2 16 mm Yellow Green
Note :
1. It is applied to tower installation , 2 sectors and 3 sectors pole installation modes . 2. The outdoor lightning arrester is unnecessary when R 8840 is installed indoors . 3. When two R 8840s are installed at one place , another independent R 8840 is nearly grounded .
38
1. 2. 3. 4. 5.
When do the site layout, should consider some fixed cable delivery from ZTE. The cable specification should strictly follow ZTE delivered material specification. The cable connection should follow VMSs installation standard . The cable layout will follow the cable re-used principle. Some connector is special one, So the cable length will be limited.
39