Sie sind auf Seite 1von 8

Note: This Time-Table is also applicable for Pre-Ph.D. students registered for August 2011 Examination. www.uceou.

edu

UNIVERSITY COLLEGE OF ENGINEERING (Autonomous)


Examination Centre: Civil Department UCE (A), O.U.

OSMANIA UNIVERSITY
M. E. (Civil) II - Semester (Regular & PTPG) and IV-Semester (PTPG) Main Examination August 2011

EXAMINATION TIME TABLE Geo-Technical Structural Time : 2.00 Engineering PM to 5.00 PM Engineering
Date and Day Regular II Semester

Hydro-Mechanics & Water Mgmt

Infrastructure Engineering

16-08-2011 TUESDAY 18-08-2011 THURSDA Y 20-08-2011 SATURDA Y

PTPG II Semester Pre stressed Concrete Structural Design Tall Building

PTPG IV Regular II Regular II PTPG II PTPG IV Reg Semester Semester Semester Semester Semester Sem Structural Pre stressed Theoretical Industrial Industrial Industrial Analysis Concrete Soil Wastewater Wastewater Wastewater Mechanics Treatment Treatment Treatment Systems Systems ===== ===== Rock Water Power = = = = = = = = = Mechanics Engineering

Tall Building

Tall Building

Expansive Soil Engineering

Hydraulic Structures

==== =

Hydraulic Structures

22-08-2011 MONDAY 24-08-2011 WEDNESD AY 26-08-2011 FRIDAY

Advance Concrete Technology Theory of Shells and folded plates Structural Dynamics

==== =
=====

=====

Adv. Concrete Technology Foundation Engg. - II

Adv. Concrete Technology Ground Water Development & Mgmt. Geographic Information System

=====

=====

Adv. Steel Design

Ground Water Development & Mgmt. Geographic Information System

Ground Water Development & Mgmt. =====

Structural Dynamics

=====

Ground Improvement Techniques

Note: This Time-Table is also applicable for Pre-Ph.D. students registered for August 2011 Examination. www.uceou.edu

UNIVERSITY COLLEGE OF ENGINEERING (Autonomous)


Examination Centre: Civil Department UCE (A), O.U.

OSMANIA UNIVERSITY
M. E. (Civil) II - Semester (Regular & PTPG) and IV-Semester (PTPG) Main Examination August 2011

EXAMINATION TIME TABLE Geo-Technical Structural Time : 2.00 Engineering PM to 5.00 PM Engineering
Date and Day Regular II Semester

Hydro-Mechanics & Water Mgmt

Infrastructure Engineering

16-08-2011 TUESDAY 18-08-2011 THURSDA Y

PTPG II Semester Pre stressed Concrete Structural Design

PTPG IV Regular II Regular II PTPG II PTPG IV Reg Semester Semester Semester Semester Semester Sem Structural Pre stressed Theoretical Industrial Industrial Industrial Analysis Concrete Soil Wastewater Wastewater Wastewater Mechanics Treatment Treatment Treatment Systems Systems ===== ===== Rock Water Power = = = = = = = = = Mechanics Engineering

20-08-2011 SATURDA Y

Tall Building

Tall Building

Tall Building

Expansive Soil Engineering

Hydraulic Structures

==== =

Hydraulic Structures

22-08-2011 MONDAY 24-08-2011 WEDNESD AY 26-08-2011 FRIDAY

Advance Concrete Technology Theory of Shells and folded plates Structural Dynamics

==== =
=====

=====

Adv. Concrete Technology Foundation Engg. - II

Adv. Concrete Technology Ground Water Development & Mgmt. Geographic Information System

=====

=====

Adv. Steel Design

Ground Water Development & Mgmt. Geographic Information System

Ground Water Development & Mgmt. =====

Structural Dynamics

=====

Ground Improvement Techniques

STRUCTURAL DESIGN 2 RIBBED (JOIST), HOLLOW POT & WAFFLE SLAB DESIGN TO BS 8110

@Mr.Asish Seeboo 1
LECTURE 4: 1.0 RIBBED SLAB 1.0.1 INTRODUCTION 1.0.2 PRESENTATION OF RIBBED FLOOR PLAN 1.0.3 ADVANTAGES & DISADVANTAGES OF RIBBED SLAB 1.0.4 SIZING OF SLAB AND RIBS 1.0.5 DESIGN METHODOLOGY 1.0.6 SUMMARY 1.1 HOLLOW POT SLAB 1.1.1 INTRODUCTION 1.1.2 PLACING OF HOLLOW POT BLOCKS ON SITE 1.1.3 DESIGN METHODOLOGY 1.1.4 LIMITATION 1.2 WAFFLE SLAB DESIGN 1.2.1 INTRODUCTION 1.2.2 METHODOLOGY 1.3 CLASS EXAMPLES 1.3.1 ONE-WAY SPANNING RIBBED SLAB DESIGN EXAMPLE 1.3.2 HOLLOW POT SLAB DESIGN EXAMPLE 1.3.3 WAFFLE SLAB DESIGN EXAMPLE
STRUCTURAL DESIGN 2 RIBBED (JOIST), HOLLOW POT & WAFFLE SLAB DESIGN TO BS 8110

@Mr.Asish Seeboo 2
1.0.1 INTRODUCTION TO RIBBED SLAB DESIGN TO BS 8110 Consider the solid slab shown below. In general, it is seen that in solid slab a portion of concrete below the neutral axis remains ineffective. This ineffective concrete does not contribute to the bending strength of the slab. So, we can remove it. HOW? 1.0.2 PRESENTATION OF RIBBED FLOOR PLAN - Identify ly and lx - Determine the direction of span. (Load will always choose the shortest path to supports) - Place the ribs on the plan as shown below - The supporting beams will be of two types namely: o Main supporting beams o Secondary supporting beams
STRUCTURAL DESIGN 2 RIBBED (JOIST), HOLLOW POT & WAFFLE SLAB DESIGN TO BS 8110

@Mr.Asish Seeboo 3
1.0.3 ADVANTAGES AND DISADVANTAGES OF RIBBED SLABS ADVANTAGES o Longer spans with heavy loads (12-15m) o Reduction in dead loads due to voids o Electrical and mechanical installations can be placed between voids o Good resistance to vibrations DISADVANTAGE o Only moderate and uniformly distributed load can be accommodated 1.0.4 SIZING OF SLAB AND RIBS

CONCRETE FLANGE/ SLAB The thickness of the concrete slab or topping should not be less than o 30mm for slab with permanent blocks contributing to structural strength and where there is a clear distance between ribs not more than 500mm. o 25mm when blocks mentioned in (1) are jointed with a cement-sand mortar. o 40mm or 1/10th of the clear distance between ribs, whichever is greater, for all other slabs with permanent blocks. o 50mm or 1/10th of the clear distance between ribs, whichever is greater, for slabs without permanent blocks. Reinforcement in topping or slab shall constitute of a wire mesh. RIBS The rib width will be governed by Tables 3.2, 3.3, 3.4 & figure 3.2 of BS 8110: Part 1: 1997 Ribs spacing should be less or equal to 1.5m and their depth below the flange should not be greater than four times their width. 1.0.5 DESIGN METHODOLOGY When designing one way spanning ribbed slabs the following steps shall be followed: Step 1: Dead load calculations This will include the self-weight of the slabs and ribs. Characteristic superimposed loads due to screed, tiles etc. should be included. If no value is given, then assume CSP as 1.0 kPa.
STRUCTURAL DESIGN 2 RIBBED (JOIST), HOLLOW POT & WAFFLE SLAB DESIGN TO BS 8110

@Mr.Asish Seeboo 4
Step 2: Live Load calculations The live load might not be given in calculations. Use the necessary code of practice (BS 6399) Step 3: Ultimate design loads The ultimate design load is calculated from: @ULS , n = 1.4 Dead load + 1.6 Live load Step 4: Design data Before proceeding with calculations of moments, it is imperative to list down all known design data: strength of concrete, strength of steel used, assumed diameter of main steel, cover Effective depth shall be calculated. Step 5: Bending moment at mid-span The bending moment at mid-span shall be calculated using formulae or using coefficients in BS 8110. Step 6: Calculation of reinforcing steel at mid-span (Design as T-section) Once M is calculated, then the following parameters need to be calculated: K, z = 0.95d (maximum), As and As min Step 7: Bending moment at support if beam is continuous The bending moment at mid-span shall be calculated using formulae or using coefficients in BS 8110. Step 8: Calculation of reinforcing steel at mid-span (Design as rectangular section) Once M is calculated, then the following parameters need to be calculated: K, z = 0.95d (maximum), As and As min Step 9: Deflection check At mid-span, Service stress fs need to be calculated. M/bd2, Modification ratio, Basic l/d shall be known, Permissible l/d calculated and Actual l/d calculated. For deflection criteria to be satisfied, the permissible l/d ratio shall be greater than the actual l/d ratio. Step 10: Shear Check Maximum shear from the support center-line shall be determined and the shear stress calculated using: Shear stress = V/(brd) < 5Mpa or formula 8sqrt (fcu) 100As/bd From table 5.1, vc shall be determined
STRUCTURAL DESIGN 2 RIBBED (JOIST), HOLLOW POT & WAFFLE SLAB DESIGN TO BS 8110

@Mr.Asish Seeboo 5
Step 11: Topping reinforcement Minimum steel shall be provided in the topping = 0.13%bh
STRUCTURAL DESIGN 2 RIBBED (JOIST), HOLLOW POT & WAFFLE SLAB DESIGN TO BS 8110

@Mr.Asish Seeboo 6

1.1 HOLLOW POT SLAB DESIGN TO BS 8110 1.1.1 INTRODUCTION Consider the ribbed sections below: For both types of joist systems there are two possible formworks: o Timber formwork o PVC/ Fibre glass formwork Timber formwork o If timber formwork is to be used, then a large amount shall be required o Time is lost in the manufacture of the formworks. o Timber formwork will not be permanent and thus on removal the resulting surfaces need to be screed. PVC/ Fibre glass formwork or moulds o Price of moulds is expensive (Readily available moulds may not correspond with the structural engineers proposal. So it will have to be a special command and thus resulting price will be special too) o Less time consuming only placing required o No screed since moulds are permanent. Nowadays on site, clients always want to have cost effective solutions that reduces construction time. One such solution is to use hollow pots to fill in the voids. Hollow pots are made from lightweight aggregates and have the following advantages: o Low price o Less time is lost require placing only. o The hollow pots are used as permanent formwork for ribs The only drawback is that after removal of shuttering, the surface needs to be plastered.
STRUCTURAL DESIGN 2 RIBBED (JOIST), HOLLOW POT & WAFFLE SLAB DESIGN TO BS 8110

@Mr.Asish Seeboo 7
1.1.2 PLACING OF HOLLOW POT BLOCKS ON SITE 1.1.3 DESIGN METHODOLOGY All the steps mentioned above are followed with the inclusion of the self-weight of the hollow pot blocks in the dead loads. 1.1.4 LIMITATIONS Compared to the one way spanning ribbed slab system, the hollow pots system is limited to have a clear rib span of ~450mm which is the width of a hollow block.
STRUCTURAL DESIGN 2 RIBBED (JOIST), HOLLOW POT & WAFFLE SLAB DESIGN TO BS 8110

@Mr.Asish Seeboo 8
1.2 WAFFLE SLAB DESIGN 1.2.1 INTRODUCTION Similar to one-way slab, it is seen that the weight of a solid two-way slab can be appreciably reduced by eliminating portions of concrete from the tensile zones without affecting the structural integrity of the the slab. The voids are formed by the use of steel or pre-cast concrete moulds. The reinforcement for the ribs and top slab are placed in position and the concrete cast. After curing and removal of moulds, the resulting two-way ribbed slab has a waffle like ceiling hence the name waffle slab. 1.2.2 DESIGN METHODOLOGY Steps as described in the design of one way spanning ribbed slab should be followed with the exception that moments are calculated using the formulae for restrained two-way slab.

BS 8110-1:1997

BSI 30 November 2005

45 Section 3

3.5.5.2 Shear stresses The design shear stress v at any cross-section should be calculated from equation 21: vVbd------= equation 21
BSI 30 November 2005

BS 8110-1:1997

45 Section 3

3.5.5.2 Shear stresses The design shear stress v at any cross-section should be calculated from equation 21: vVbd------= equation 21

1. Orkut 2. Gmail 3. Calendar 4. Documents 5. Photos 6. Web 7. more 1. Reader 2. Sites 3. Groups 4. YouTube

5.
6. Images 7. Maps 8. News 9. Translate 10. Books 11. Scholar 12. Blogs

13.
14. even more 1. Sign in

2. 3.
1. Documents settings

main.pdf - Powered by Google Docs


File View
6 / 37

Save in Google Docs

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

23 24 25 26 27 28 29 30 31 32 33 34 35 36 37

Das könnte Ihnen auch gefallen