Notes and Status Report Engineer: Monish Aurobind. K Period: 2011-08-16 to 2011-08-20 Holidays: 15th, 17th -8-2011

Notes: Points related to FTP server:  File Transfer Protocol (FTP) is a standard network protocol used to transfer files from one host to another over a TCP-based network, such as the Internet.  The original specification for the File Transfer Protocol was written by Abhay Bhushan and published as RFC 114 on 16 April 1971.  File Transfer Planet has the information you need to get informed and involved with your file transfers. Reference: http://en.wikipedia.org/wiki/File_Transfer_Protocol http://www.filetransferplanet.com/ftp-guides-resources/

Points related to files structuring:  exists(): It checks whether the file or directory denoted by this pathname exists or not.  Determining if a Filename path is a file or a directory:  isDirectory(): It checks whether the file is a directory or not.  getAbsolutePath(): It returns the absolute path of a file or directory.  Moving file or directory from one directory to another  This program illustrates you the method or procedure for moving a file or directory contents from one directory to another. Reference: http://www.roseindia.net/software-tutorials/detail/18698 http://www.roseindia.net/java/beginners/file-directory-exists.shtml http://www.roseindia.net/java/example/java/io/MovingFile.shtml

Monish Aurobind. K

Roll No: 10101D0056

Page: 1 of 3

10101D0056_Engineering Note Book_SEF_Week7


Deliverable Status Deliverables What did you plan to accomplish  Planned to prepare a SRS for the project which includes class diagrams and required other required functionalities to develop the project.  Planned to implement the Admin side functionalities and client side functionalities.  To write what are the concepts learned in this week What did you actually accomplish Completed SRS, which includes class diagrams, activity diagrams and tables which specify the implementation of use cases.  Implemented some admin functionalities and basic CUI for the Admin. Implemented some part of client functionalities like FTP implementation etc.  Wrote what I learned in this week Size Effort

Software Requirements Specification (SRS)

22 pages

8 hours

Implementation

12 hours

ENB submission

2 pages

2 hours

Lessons Learned Reflection Context (e.g. The gap between plan and actual) Additional work preparation etc. like placements Lesson I need to balance my project work and the placements preparations to keep the project in time.

Plan for the Next Week: Day Monday Tuesday Wednesday Thursday Friday Deliverable code code code code code What do you intend to accomplish and why To write the code to group the users To write the code to create directory structure To write the code to design GUI for client To write the code to delete the data and integrate the code. Testing the project

Monish Aurobind. K

Roll No: 10101D0056

Page: 2 of 3

10101D0056_Engineering Note Book_SEF_Week7


*SBS: Student Backup Server

Monish Aurobind. K

Roll No: 10101D0056

Page: 3 of 3

Das könnte Ihnen auch gefallen