66020422.xls
DESIGN OF ABUTMENT
Name of project :
DESIGN DATA :
Units
Foundation level
291.75
294.70
Seating Level
305.50
307.50
306.00
Pond level
303.00
1/12
0.63
Width at Seating
1.25
1.00
1.70
0.50
M
M
12 Braking force
2.00
13 Surcharge Intensity
0.584
Ton/Sq m
15.00
t/m
30.00
Degree
1.90
Ton/Cu m
1.60
Ton/Cu m
1.75
Ton/Cu m
2.00
Ton/Cu m
2.25
Ton/Cu m
30.00
Ton/Sq m
0.65
100.00
Ton/Sq m
10.00
Ton/Sq m
U/S
D/S
66020422.xls
66020422.xls
L.L. SURCHARGE @
R.L.
10
1 1.00
307.50
0.584
t/m2
L.L. SURCHARGE
5
R.L. 305.50
15 t
R.L.
306.00
2 t
8
17
7
R.L.
12
303.00
1
1
16
13
14
15
R.L. 294.70
0.90
1.25
1.00
7.10
8.3
(i)
66020422.xls
Checking the stability of abutment section at the junction level i.e.at R.L.
HORIZONTAL AND VERTICAL FORCES
S.No. Item
(A)
Description
Forces (t)
Lever arm
Vertical Horizontal
(m)
294.70
Moments in t-m
VM
HM
Vertical forces
1
1
2
3
4
1.90
1.90
1.90
1.90
9.234
25.650
24.320
76.216
0.600
1.525
2.650
5.517
5.540
39.116
64.448
420.454
15.00
15.000
1.525
22.875
6
7
8
9
6.700
7.642
4.407
8.511
124.866
209.233
21.803
368.408
10
0.584
4.146
6.700
27.780
11
Uplift Pressure
1/2 X
8.30 X 10.250 X
1.00
-42.537
6.833
-290.661
(B)
Horizontal forces
1
12
13
1.75 X
4.50 X
20.25
8.30
5.906
21.788
9.800
4.150
57.881
90.418
14
15
68.89
68.89
11.482
34.445
2.767
2.767
31.766
95.298
12.80
7.475
6.400
47.841
2.000
V=
H=
206.276
83.096
10.80
VM =
21.600
HM =
1013.863
344.804
0.584 X
Braking force
17
Total =
VM
10.25 ,
=
=
1013.863
669.058
66020422.xls
M
669.058
-------- = ----------- =
V
206.28
HM
344.804
3.244
b/2 - X
1.881
= V/b(1-6e/b) =
-2.039
t/m2
<
= V/b(1+6e/b) =
42.289
t/m2
<
<
0.65
Hence
safe
>
1.5
Hence
safe
Sliding factor =
H
V
83.096
=
206.276
0.403
VM
1013.86
HM = 344.804 =
2.94
10.00
safe
100.00
safe
t/m2
t/m2
66020422.xls
L.L. SURCHARGE @
R.L.
13
0 1.00
307.50
0.584
t/m2
L.L. SURCHARGE
7
6 15.00
R.L. 305.50
R.L.
306.00
10
2.00
9
20
8
R.L.
15
303.00
11
19
12
1
1
16
17
18
R.L. 294.70
5
2.95
1.70
0.90
1.25
1.00
7.10
0.50
12.45
14
11.25
(i)
66020422.xls
S.No. Item
Description
Forces (t)
Vertical
(A)
Lever arm
Horizontal
(m)
291.75
Moments in t-m
VM
HM
Vertical forces
7
8
9
10
11
12
13
0.584
4.438
8.400
37.281
14
Uplift Pressure
1/2 X 11.25 X 12.450 X
1.00
-70.030
8.300
-581.240
1
2
3
4
2
5
3
(B)
1.90
1.90
1.90
1.90
9.234
25.650
24.320
76.216
2.300
3.225
4.350
7.217
21.238
82.721
105.792
550.022
2.25
82.635
6.225
514.397
3.225
48.375
8.400
9.342
6.107
12.20
10.211
12.20
156.548
255.776
30.215
48.037
441.990
101.258
15.00
15.00
Horizontal forces
1
15
16
20.25
11.25
5.906
29.531
12.750
5.625
75.305
166.113
17
18
21.094
63.281
3.750
3.750
79.102
237.305
9.198
7.875
72.434
2.000
V=
H=
273.948 131.011
13.75
1.75 X
4.50 X
0.584 X
15.75
Braking force
20
Total =
VM =
27.500
HM =
1812.411
657.758
VM
HM
1812.411
657.758
1154.653
M
1154.653
-------- = ----------- =
4.215
V
273.95
12.45 ,
=
=
66020422.xls
b/2 - X
2.010
= V/b(1-6e/b) =
0.689
t/m2
<
= V/b(1+6e/b) =
43.320
t/m2
<
<
0.65
Hence
safe
>
1.5
Hence
safe
Sliding factor =
H
V
131.011
=
273.948
0.478
VM
HM
1812.41
657.758
2.76
********************
100.00
safe
100.00
safe
t/m2