Jitendra Singh Technical Director Rivers Monorail Company Port Harcourt Nigeria Email : js123india@yahoo.

com Mobile : 0091 9549302804, +2348163596261 KEY QUALIFICATIONS 23 years experience in Projects and Electrical Power Generation / Distribution Systems. Design, installation, testing and commissioning of electrical power distribution systems. Preparation of designs, specifications and tender documentation for electrical plant. Condition surveys for electrical plant/equipment for urban & rural distribution networks. Technical and financial control. Post tender administration of contracts. Supervision of M&E, civil and architectural contractors. Preparation and evaluation of operation and maintenance manuals. Purchase and stores exposure. Overseas and MEP experience is at Dubai. EDUCATION AND PROFESSIONAL STATUS Bachelor of Engineering (Electrical) National Institute of Technology Srinagar, (India) 1983-1987 (* 72 % ) Post-Graduate Diploma Project Planning and Infrastructure Management University of Rajasthan [Jaipur, India] Trained on Project Management Skills, (DBIM), Dubai FIDIC trained DBIM, Dubai. Supply Chain Management Trained in Dubai. Member, PMI, USA.PMI ID 1441845 Studying for PMP certification. EXPERIENCE RECORD Present Role Rivers Monorail Nigeria (RMC Website) Leading the project as the Technical Director for the client. The RMC is a JV between TSI Holdings and the Govt. Of Rivers State of Nigeria. The Rivers Monorail is a 19+ km long track, the longest in the world for a monorail and is the first in Africa. 2007 2010 ETASET GROUP (ETA Group Website)

Project Manager Maintenance DURL Dubai Metro DLP Maintenance of 27 Metro Stations for Electrical, Mechanical, Automation and Fire services. Preventive Maintenance of 27 Metro stations for MEP, Automation, FFS/ FAS. Snag rectification for final handover of stations to client. 24x7 call centre for fault/complaint handling for the project. Arabic, Turkish, European, Japanese client handling. Major Achievement: Maintenance venture already in profit over 9 months. Project Manager Commissioning DURL Dubai Metro Link Commissioning and Testing of LT Power systems Verification of Cause and Effect for Life safety systems. Project Manager Construction
JS/1 26/08/2011

DURL Dubai Metro Link Construction Management MEP services Dubai Metro rail Red Line stations 27 Nos. Multi nationality and multi language environment. Interaction with Atkins, Systra, Parsons, Mitsubishi Heavy Industries, Obayashi Testing and Commissioning Electrical Services 27 Metro rail Stations. Maintenance of MEP services in 10+17 stations. No accident till date Palm Jumeira Mono Rail Projects Manager Construction of Mechanical, Electrical, Plumbing, HVAC, Building Automation Management, Fire Alarm and Fire Fighting services for 3 stations out of 4. Testing and Commissioning of HVAC / Plumbing / Fire Systems / LV systems. Handing over of the assets successfully. Interaction with leading business partners Obayashi Japan, Nakheel Dubai, SMRT Singapore. The PJMR is a luxury train catering to the tourists visiting the Atlantis Aqua venture Resort of Kerzner. No accident. Major Achievements: Successful completion of project despite design changes and constraints.

Special focus on Environment Health Safety ensuring Zero accidents. ERP and SAP working.

The Dubai Metro Station fit-out is valued at AED 8 billion. 2005 2007 TATA POWER/DELHI GOVERNMENT JV (NDPL Website )

District Manager Operations and Management activities within the district Ensure uninterrupted power supply to the consumers in the district Interface between the management and the consumers. Techno-commercial and administrative function Chairperson of the Joint interaction forum between consumers and Zonal Managers Industrial relations The volume of consumers handled was approximately 350,000. The energy billing handled was several million units. No Accidents. Major Achievements: Eliminating power theft in notorious Rohini Area by demonstrating exemplary courage. Reducing power theft in the area from 38 % to less than 20 %. Realising 100 % revenue targets. Awarded Safety Awareness prize. Area Project Manager Execution and Commissioning/Testing of Electrical Power projects within budgetary limits and timelines, Improving the system reliability and consumer services. Achieving Capex targets. Monitor the work done by contractors. Co-ordination with Central Electricity Authority, State Government, Transmission Company, Power Grid Corporation, Electricity Regulator Clients, Consultants, Civic Authorities, etc. Drive Quality Culture across the department & lead necessary initiatives for the purpose. The volume handled was 400 schemes per year distributed across an area of 550 square kilometers. No accident. Major achievements: PWD and Railway works completed ahead of schedule in spite of constraints. Maintained good liaison with MLA / MPs LV-ABC and HVDS systems to reduce commercial losses.
JS/2 26/08/2011

1988 2005 RAJASTHAN STATE ELECTRICTY BOARD [RSEB] (Jaipur Discom Website) Junior Engineer Erection / Commissioning and operation of 210 MW TPS, Power distribution, maintenance of power distribution equipment and lines. Energy Audit activities. Full command on SCADA systems. Major Achievements: Independent single man operation of 210 MW unit (it was a challenge !). System design for computerisation of energy billing of RSEB. System design for computer networking of offices and integration with SCADA for Jaipur city. No Accident Assistant Engineer Planning and controlling load dispatch for the state Managing load shedding schedules. Procurement and Stores function related to power switchgear and transformers. Quality assurance functions regarding metering of energy. Power theft control and revenue realisation controls. Erection Testing, Commissioning and maintenance of power Grids of 33 kV level. Operation and maintenance of power transmission grids at132 and 220 KV level.

Major Achievements: Design of Load shedding algorithm for the state. Vendor development, streamlining stores and disposal of scrap functions. Research on power theft mechanisms and their detection and control. Implemented LTABC systems in city area. No accident Assistant Executive Engineer Planning Rural Electrification, Preparation of data and schemes and getting them executed through contractors. Ensuring timely completion while ensuring quality of construction. Interacting with Government offices for budget approvals and permissions etc. Dealing with public representatives like Members of Parliament etc. Major Achievements: Study and implementation of good earthing procedures in rural areas to prevent electrocution. Study and implementation of tamper proof transformers for rural irrigation power supply. No Accident. VOCATIONAL TRAINING Electronic Systems Punjab Limited (1.5 Months) Westinghouse Computer system for DACS for operating the 210 MW TPS unit. Trained on LISP software for programming the DAS of thermal power unit. Rajasthan Communications Limited (1 Month) Design, Construct and Test a message terminal (MODEM) for offshore applications. Focus on chip level working and advanced digital communication devices. BHEL (2 Months) Coil Insulation Manufacture Heavy engineering systems. Exposure to various workshops in the plant manufacturing Megawatt motors and Generators. BHEL Hardwar. Turbo Generator assembly. Guest Faculty
JS/3 26/08/2011

IIT Delhi for evaluation of projects prepared by post graduate engineering students. Focus on practical application aspects of the projects designed by the students. Centre for Power Efficiency in Distribution ( CENPEID ), Delhi NTPC Distribution Reform, Upgrade and Management (DRUM)

Member Interview Board of the Electrical Inspectorate, Delhi. (2005 to 2007) KEY SKILLS/ ABILITIES Use of project control software, including MS Office, SAP Team building ability, leading and motivation of team members. Ability to manage and lead Field Engineers & Technical Advisers designated by Original Equipment Manufacturers, Vendors and Suppliers Ability to maintain effective working relationships with senior level officials and executives internal and external agencies. Coordinating and communicating with Top Management, Owner, Client Engineers, Suppliers, Vendors, Sub-contractors Provide direction and solutions rather than just options. LANGUAGES: Hindi and English. Personal Details: DOB: 28 December 1963 ( age 47 years ) Family : Married, 2 sons. Parents : Both Alive, settled. Brothers : Justice in India, and Doctor in UK. Sisters : Married, settled.

Driving Licence : INDIA valid till 2013, UAE Light Vehicle valid till 2019.