Outer Ring Road - Phase II B

JBIC Package 5

Abstract of Cost Estimate

Abstract of Cost for JBIC Package 5 (From Km 72.00 to Km 83.00)


BILL NO: 1 BILL NO: 2 BILL NO: 3 BILL NO: 4 BILL NO: 5 BILL NO: 6 -

Item Description
SITE CLEARANCE
EARTHWORKS
SUB-BASE AND BASE COURSES
BITUMINOUS WORKS
CULVERTS
BRIDGES

BILL NO: 7 - ROAD JUNCTIONS


BILL NO: 8 - DRAINAGE AND PROTECTION WORKS
BILL NO: 9 - MISCELLANEOUS & SAFETY
BILL NO: 10 - MAINTENANCE , REPAIRS & REHABILITATION
AMOUNT FOR ELECTRIFICATION
Total Construction Cost
Cost/ Km
Contingencies @3%
Unforseen Items @ 2%
Supervision Charges @3%
Total Cost
Shifting of Utilities
Environmental Cost
Land Acquisition and R&R Cost
Total Project Completion Cost

1 of 41

Total Amount (in Rs.)

Outer Ring Road - Phase II B


JBIC Package 5

Cost Estimate

COST ESTIMATE for JBIC Package 5 (From Km 72.00 to Km 83.00)


Item No.

Description

Unit

Estimated Qty.

Unit Rate
(Rs.)

1.00
1.01

BILL NO: 1 SITE CLEARANCE


Clearing and grubbing for road land complete as per Technical
Specification Clause 201
Dismantling structures and pavement including disposal of resulting

Hect.

203.00

29517

Sqm
Sqm
Sqm

150.00
7000.00
900.00

40
55
80

6,000.00
385,000.00
72,000.00

Nr.
Nr.
Nr.
Nr.

25.00
63.00
25.00
13.00

132
254
467
862

3,300.00
16,002.00
11,675.00
11,206.00

Cum

21266.00

196

4,168,136.00

Cum

314

3460

1,086,440.00

1.02

Amount (Rs)

5,991,951.00

materials, stacking and/or salvaging useful materials with all leads

1.03

and lifts complete as per Technical Specifications Clause 202


Buildings
1) Kutcha structures (Hutments type)
2) Semi-Pucca structures (Tiled roof/AC sheet roof)
3) Pucca structures (RCC roof)
Cutting of trees including cutting of trunks, branches and removal of
stumps& roots including stacking of serviceable material with all
leads & lifts and back filling with approved material in depression / pit

1.04

1.05

2.00
2.01

2.02

2.03

2.04

2.05

and as per Technical Specifications Section 200.


a) Girth above 300mm to 600mm
b) Girth above 600mm to 900mm
c) Girth above 900mm to 1800mm
d) Girth above 1800 mm
Back filling with approved sand flooded with water in the Deep wells
as per Technical Specifications Clause 305 and as directed by the
Engineer.
Providing and laying Cement Concrete slab on wells including
centering and shuttering all complete as per Drawings and Technical
Specifications Sections 1500,1700, 2100
and Technical
Specifications Clause 304.
TOTAL FOR BILL NO: 1
(CARRIED FORWARD TO SUMMARY)
BILL NO: 2 - EARTHWORKS
Roadway excavation in all types of soils including ordinary rock
necessary for construction of roadway and drainage includes
dressing, trimming and compacting the cut formation in accordance
with requirements of lines, grades and cross fall complete and
disposal of all cut material including necessary stacking of suitable
material with all lifts and leads as per Technical Specification section
301.
a) In Soils
b) In marshy soils
c) In ordinary Rock
Excavation for roadway in hard rock (requiring blasting) by drilling,
blasting and breaking, trimming of bottom and side slopes in
accordance with requirements of lines, grades and cross sections,
loading and disposal of all cut material including necessary stacking
of suitable material with all lifts and leads complete as per Technical
Specification Section 301, 302 and additional technical specification.
a) Hard rock excavation
b) Hard rock excavation with controlled blasting where blasting is
prohibited
c) Hard rock excavation where blasting is prohibited
d) Rebate towards the excavated useful hard rock available under
item nos.202.
Construction of embankment with approved material obtained from
approved borrow areas complete with all leads and lifts as per
Technical Specification Clause 305.
Construction of subgrade with approved material obtained from
approved borrow areas complete with all leads and lifts, satisfying
the soaked CBR value of Not less than 10% as per drawing and
Technical Specification Clause 305.
Construction of earthen shoulder with approved granular material
obtained from selected source with all leads and lifts etc., complete

11,751,710.00

cum
cum
cum

211920.00
26490.00
291391.00

66
74
86

13,986,720.00
1,960,260.00
25,059,626.00

cum

33682.00

232

7,814,224.00

cum

9623.00

232

2,232,536.00

cum

4812.00

538

2,588,856.00

cum

38494.00

87

3,348,978.00

cum

3451577.00

223

769,701,671.00

cum

510473.00

254

129,660,142.00

cum

76741.00

254

19,492,214.00

cum

331528.00

99

32,821,272.00

as per drawing and Technical Specifications Clause 407.


2.06 (a) Construction of embankment with suitable materials deposited at site
from roadway and drainage excavation including all leads and lifts
etc., complete as per Technical Specification Clause 305..

2 of 41

Outer Ring Road - Phase II B


JBIC Package 5

Item No.

Cost Estimate

Description

Unit

Estimated Qty.

Unit Rate
(Rs.)

cum

112246.00

130

14,591,980.00

cum

28417.00

130

3,694,210.00

cum

1420.00

58

82,360.00

Cum

113.00

86

9,718.00

Cum

36653.00

56

2,052,568.00

Cum

21957.00

182

3,996,174.00

Sqm

155.00

Amount (Rs)

2.06 (b) Construction of subgrade with suitable materials deposited at site


from roadway and drainage excavation including all leads and lifts
etc., complete as per Technical Specification Clause 305..
2.06 (c) Construction of Shoulder with suitable materials deposited at site
from roadway and drainage excavation including all leads and lifts
etc., complete as per Technical Specification Clause 305..
2.06 (d) Construction of Median with suitable materials deposited at site from
roadway and drainage excavation including all leads and lifts etc.,
complete as per Technical Specification Clause 305..
2.07
Removal of existing pavement layers/road crust for reconstruction
(all types of layers) complete as per Technical Specification Clause
301.
2.08
Loosening and re compacting of existing ground where the existing
ground is serving/suitable as subgrade complete as per Technical
Specifications Clause 301 & 305.
2.09
Filling of median / island with approved material obtained from

2.10

3.00
3.01

3.02

4.00
4.01

4.02

4.03

4.04

4.05

4.06

4.07

4.08

4.09

selected source as per Technical Specifications Clause 305 and 407.


Scarifying Existing Bituminous Surface layer(s) as per Technical
Specifications Clause 305.
TOTAL FOR BILL NO: 2
(CARRIED FORWARD TO SUMMARY)
BILL NO: 3 - SUB-BASE AND BASE COURSES
Providing and Construction of Granular Sub-base complete as per
drawing and Technical Specifications Clause 401
Grading of Table - 400 -1 Grading I
Providing and Construction of wet mix macadam (WMM) base with
approved material complete as per MORTH Technical Specification
Clause No. 406
TOTAL FOR BILL NO: 3
(CARRIED FORWARD TO SUMMARY)
BILL NO: 4 - BITUMINOUS WORKS
Providing and applying bituminous Primer Coat over granular surface
with bitumen emulsion complete as per Technical Specification
Clause 502.
a) @ 7.5 kg/ 10 sqm
Providing and applying bituminous Tack coat over prepared surface
with bituminous emulsion all complete as per Technical Specification
Clause 503
a) @ 2.75 kg / 10 sqm over granular surface treated with primer
b) @ 2.25 kg /10 sqm over bituminous surface
Providing and laying Bituminous Macadam (BM, Grading-2) course in
PCC using at the rate of 3.3% by weight of total mix of 60/70 grade
of bitumen, all complete as per MORTH Technical Specification
Clause No. 501 & 504
Providing and laying Dense Bituminous Macadam (DBM, grading-2)
course using 60/70 grade of bitumen complete as per MORTH
Technical Specification Clause No. 507.
Providing and laying Semi-dense Bituminous concrete including cost
of cleaning and applying tack coat, as per the direction of the
Engineer and Technical Specifications Clauses 503 & 508.
Providing and laying Bituminous Concrete wearing course using
Modified Bitumen as per drawing and Technical Specification Clause
No. 509 & 521.
Providing and laying Dry Lean Cement concrete (DLC) as per Table
600-1of Technical Specification Clause 601 with a minimum cement
content of 150kg/Cum.
Providing un-reinforced, dowel jointed, Pavement Quality Concrete
(PQC) of M 40 grade concrete with minimum cement content of
400kg/Cum, including all costs of jointing, edge cutting, dowel bars
etc., all complete as per drawing and Technical Specification Clause
602.
Providing and Laying cement concrete wearing coat M 30 grade
including reinforcement complete as per Drawing and Technical
Specification 2702
TOTAL FOR BILL NO: 4
(CARRIED FORWARD TO SUMMARY)

3 of 41

775.00
1,033,094,284.00

cum

247915.00

1307

324,024,905.00

cum

217354.00

1349

293,210,546.00
617,235,451.00

Sqm

887054.00

21

18,628,134.00

Sqm
Sqm

887054.00
1497444.00

8
7

7,096,432.00
10,482,108.00

cum

2395.00

4573

10,952,335.00

cum

96912.00

5283

511,986,096.00

Cum

1198.00

5493

6,580,614.00

cum

39464.00

5844

230,627,616.00

Cum

4188.00

2521

10,557,948.00

Cum

8376.00

4788

40,104,288.00

Cum

273.00

8565

2,338,245.00
849,353,816.00

Outer Ring Road - Phase II B


JBIC Package 5

Cost Estimate

Item No.

Description

5.00
5.01

BILL NO: 5 - CULVERTS


Earthwork in excavation of foundation for structures complete with all
leads and lifts as per drawing and Technical Specification Clause
304.
a) In all types of soil including ordinary rock by mechanical means
(Excluding dewatering)
b) In all types of soil including ordinary rock by mechanical means
(Including dewatering)
c) In Hard rock requiring blasting
d) In Hard rock where blasting is prohibited
e) Rebate towards the excavated useful hard rock available under
item nos.501
Providing and laying approved sand filling in Foundation Trenches
as per Drawing & Technical Specification clause 1008 and
conforming to the IS-383
Back filling behind abutments, wing walls/ retaining walls and return

5.02

5.03

walls with selected granular material of approved quality complete as


5.04

5.05

5.06

5.07

per drawing and Technical Specification Clause 304 and 305.


Providing and laying of Filter media of Stone aggregate conforming
to Technical Specifications Clause 2504.2.2 behind abutment, wing
wall, retaining wall and return walls, complete as per drawing and
Technical Specifications Clause 305 & 2504
Providing and laying Plain cement concrete M 15 for leveling course
etc. including centering and shuttering all complete as per drawing
and Technical Specifications Section 1500 &1700
Providing and laying Plain cement concrete in open foundation &
substructure excluding cost of steel complete as per drawing and
Technical Specifications Section 1500,1700, 2100 & 2200
a) PCC Grade M 20
b) PCC Grade M 25
Providing and laying Reinforced cement concrete for foundations &

Unit

Estimated Qty.

Unit Rate
(Rs.)

cum

642.00

83

53,286.00

cum

3855.00

91

350,805.00

cum
cum

1285.00
642.00

227
340

291,695.00
218,280.00

cum

1542.00

87

134,154.00

cum

2670.00

368

982,560.00

cum

10255.00

193

1,979,215.00

cum

155.00

787

121,985.00

cum

974.00

3460

3,370,040.00

cum
cum

1106.00
99.00

4237
4612

4,686,122.00
456,588.00

cum

3496.00

4724

16,515,104.00

cum

1135.00

5022

5,699,970.00

Tonne
Tonne
Tonne

224.00
304.00
169.00

40155
40221
40766

8,994,720.00
12,227,184.00
6,889,454.00

Lm

800.00

8164

6,531,200.00

cum

178.00

867

154,326.00

Cum

435.00

667

290,145.00

Cum

508.00

667

338,836.00

Nr.

352.00

188

66,176.00

Sqm

210.00

461

96,810.00

Nr.

70.00

906

63,420.00

Amount (Rs)

substructure excluding cost of steel complete as per drawing and

5.08

Technical Specifications Section 1500,1700, 2100 & 2200


a) RCC M 25 grade
Providing and laying Reinforced cement concrete for box / slab
culverts in superstructure excluding cost of steel complete as per

5.09

(a)
(b)
(c)
5.10

5.11

5.12
5.13
5.14

5.15

5.16

drawing and Technical Specifications Sections 1500, 1700 and 2300


a) RCC Grade M 25
Providing, cutting, bending and fixing in position of TMT bar
reinforcement in reinforced concrete structures complete as per
drawing and Technical Specifications Section 1600
Foundation
Substructure
Superstructure
Providing, laying and jointing NP-4 (as per IS:458-2003) Pipes for
culverts, complete as per drawing and Technical Specifications
Section 2900 and IRC : SP No.13 - 1998.
a) H.P NP-4, 1200 mm Dia
Providing and laying filter material underneath stone pitching in
slopes complete as per drawing and Technical Specification Section
2500.
Providing and laying stone pitching in slopes complete as per
drawing and Technical Specifications Section 2500.
Providing and laying Dry Boulder apron complete as per Drawings
and Technical Specifications Clause 2503.
Providing and fixing Weep holes in abutments, wing walls and return
walls complete as per drawing and Technical Specification Clause
2706.
Providing and laying wearing course comprising of 50mm Bituminous
concrete on top of deck slab including cost of tack coat, using
modified bitumen meeting the requirements given in table 500-29,
laid to the required level and slope after cleaning the surface, all
complete as per clause 503, 509, 521, & 2702.
Providing Marker Post for buried culverts including synthetic enamel
painting with necessary details as per IRC: 7-1971 and direction of
Engineer.

4 of 41

Outer Ring Road - Phase II B


JBIC Package 5

Cost Estimate

Unit

Estimated Qty.

Unit Rate
(Rs.)

quality for Culvert numbering, Type of Culvert and Details of Span

Sqm

114.00

41

4,674.00

Arrangement as per IRC:7-1971 and as directed by Engineer


Providing and Applying ordinary paints of approved quality on
surface of parapet/Crash Barrier of culverts as per drawing and
Technical Specifications Section 800.
Providing and constructing RCC crash barrier M 20 grade including

Sqm

248.00

19

4,712.00

cost of centering, shuttering and reinforcement as per approved

Lm

180.00

2535

456,300.00

Nr.

16.00

509

8,144.00

Item No.

Description

5.17

Providing and painting with Synthetic enamel paint of approved

5.18

5.19

5.20

6.00
6.01

a)
b)
c)
d)
6.02

6.03

6.04

6.05

6.06

Drawings and Technical Specifications Clause 809 and as per IRC-6.


Providing and fixing galvanized Drainage Spouts along with drain
pipes complete as per drawing and Technical Specifications Clause
2705.
TOTAL FOR BILL NO: 5
(CARRIED FORWARD TO SUMMARY)
BILL NO: 6 - BRIDGES
Earthwork in excavation of foundation for structures complete as per
drawing and Technical Specifications Clause 304 with all leads and
lifts upto 5000m.
In ordinary soil by mechanical means(Excluding Dewatering) - (Depth
upto 3m)
In ordinary soil by mechanical means(including Dewatering) - (Depth
upto 3m)
In ordinary soil by mechanical means(Excluding Dewatering) - (3m6m)
In ordinary soil by mechanical means(Including Dewatering) - (3m6m)
Providing and laying approved granular material Filling in Foundation
Trenches as per Drawing & Technical Specification clause 1008 and
conforming to the IS-383
Providing and constructing Back Fill behind abutments, wing walls,
retaining walls and return walls with selected material of approved
quality complete as per drawings and Technical Specifications
Clause 304 and 305.
With selected granular material of approved quality
Providing and constructing filter media behind abutments, wing walls,
retaining walls and return walls complete as per Drawings and
Technical Specifications Clause 305 and 2504.
Providing and laying Cement Concrete in foundation including
centering and shuttering all complete as per Drawings and Technical
Specifications
Sections
1500,1700, 2100 and Technical
Specifications Clause 304. (Excluding the cost of surface
reinforcement
a) PCC Grade M 15
b) RCC Grade M 30
Providing and laying Cement Concrete in Sub-structure including

70,985,905.00

cum

26,602.00

73

1,941,946.00

cum

13,518.00

77

1,040,886.00

cum

2,650.00

84

222,600.00

cum

2,770.00

90

249,300.00

cum

7,827.00

426

3,334,302.00

cum

30,357.00

224

6,799,968.00

cum

10,742.00

911

9,785,962.00

cum
cum

6.07

6.08

5 of 41

2,755.00
14,807.00

4004
5167

11,031,020.00
76,507,769.00

5492
5656
5891

52,234,412.00
29,603,504.00
9,620,003.00

5651
5745

203,436.00
22,980.00

centering and shuttering etc. as per Drawings and Technical


Specifications Section 1500,1700 and 2200 (Excluding cost of steel)
a) RCC Grade M 30
(i) Upto 5m height
(ii) 5m - 10m height
(iii) >10m height
b) RCC Grade M 40
(i) Upto 5m height
(ii) 5m - 10m height
Providing and laying Reinforced Cement Concrete in Super
structure complete as per Drawing and Technical Specifications
Section 1500, 1700 & 2300.(Excluding cost of steel). All values for
mix from batching plant
a) RCC M 30
b) RCC M 35
Providing and laying Prestressed Cement Concrete in Super
structure complete as per Drawing and Technical Specifications
Section 1500, 1700,1800 & 2300.(Excluding cost of steel). All values
for mix from batching plant
a) PSC Grade M 40
b) PSC Grade M 45
c) PSC Grade M 50

Amount (Rs)

cum
cum
cum
cum
cum

9,511.00
5,234.00
1,633.00
36.00
4.00
-

cum
cum

4,822.00
11,160.00

6250
6513

30,137,500.00
72,685,080.00

6323
6750
7992

7,878,458.00
8,997,750.00
2,757,240.00

cum
cum
cum

1,246.00
1,333.00
345.00

Outer Ring Road - Phase II B


JBIC Package 5

Cost Estimate

Item No.

Description

6.09

Providing and laying Plain Cement concrete M-15 grade leveling


course below approach slab as per drawings and Technical
Specification Section 1500&1700
Providing and laying Reinforced Cement Concrete M-30 grade for
approach slabs including cost of reinforcement complete as per
Drawings and Technical Specifications Section 1500, 1600, 1700
and Clause 2704.
Providing and laying (65mm thick) wearing course comprising of
50mm asphalt concrete over 15 mm thick mastic asphalt on top of
deck slab including cost of prime coat meeting the requirements

6.10

6.11

6.12

given in table 500-29, prepared by using mastic cooker and laid to


required level and slope after cleaning the surface, all complete as
per Technical Specifications Clause 509,515 , 2702.
Crash Barrier
Providing and constructing RCC crash barrier M 40 grade including
cost of centering, shuttering and reinforcement as per approved

6.13

Unit Rate
(Rs.)

Unit

Estimated Qty.

Amount (Rs)

cum

742.00

4004

2,970,968.00

cum

2,061.00

7306

15,057,666.00

Sqm

29,251.00

585

17,111,835.00

3111

7,248,630.00

Lm

2,330.00

Drawings and Technical Specifications Clause 809 and as per IRC-6.


Providing and fixing the following types of expansion joints complete
-

6.14

6.15

6.16

6.17

6.18

6.19
6.20

6.21

6.22

6.23

6.24

6.25

as per Drawings and Technical Specifications Section 2600.


a) Strip Seal Expansion Joint as per T.S. Clause 2607
b) Burried expansion Joint as per Cl 2604
Providing and fixing galvanized Drainage Spouts along with drain
pipes complete as per drawing and Technical Specifications Clause
2705.
Providing and fixing bearings complete as per Drawings and
Technical Specifications Section 2000.
a) Elastomeric Bearings
b) Knuckle Bearing (POT TYPE) as per IRC-83 Part-I, Clause 904
and as per T.S.Clause 2003.2(b)
150.0 -200.0 MT Capacity
Providing, cutting, bending and fixing in position of TMT
reinforcement complete as per Drawings and Technical
Specifications Section 1600.
a) In Foundation
b) In Sub Structure
c) In Super Structure
High tensile steel wires/strands including all accessories for
stressing, stressing operations and grouting all complete as per
Technical Specifications Section 1800
Providing and laying filter material underneath Stone pitching on
embankment slopes complete as per Drawings and Technical
Specifications Section 2500.
Providing and laying Stone pitching in slopes complete as per
Drawings and technical Specifications Section 2500
Providing and fixing weep holes in abutments, wing walls and return
walls etc. as per Drawings and Technical Specifications Clause
2706.
Providing and painting with Synthetic enamel paints of approved
quality on bridges with Bridge No. and Span arrangements as per
IRC-7,1971 and as directed by Engineer
Providing and Applying ordinary paints of approved quality on
surface of parapets/Crash Barriers as per Drawings and Additional
Technical Specifications.
Providing and painting of flood gauge on sub-structure to full height
and 500 mm width as per the drawings and IRC:67 -2001 as directed
by the Engineer.
Providing HDPE Service pipe 150 mm dia (5.30 mm thick) of
approved quality in footpath complete as per Drawings and directions
of the Engineer
Supplying & placing inposition Void formers completeas per
additional technical specificatins
a)1000mm dia

6 of 41

Lm
Lm

999.00
651.00

7818
890

7,810,182.00
579,390.00

Nr.

220.00

590

129,800.00

0.82

1,627,247.36

35000

4,480,000.00

Cucm

Nr.

1,984,448.00

128.00
-

Tonne
Tonne
Tonne

1,168.00
1,699.00
2,219.00

46476
46552
47183

54,283,968.00
79,091,848.00
104,699,077.00

Tonne

113.00

96025

10,850,825.00

cum

561.00

1004

563,244.00

Cum

1,269.00

772

979,668.00

Nr.

6,775.00

217

1,470,175.00

Sqm

112.00

48

5,376.00

Sqm

5,806.00

25

145,150.00

Lm

46.00

106

4,876.00

Lm

946.00

350

331,100.00

Lm

2,754.00

2400

6,609,600.00

Outer Ring Road - Phase II B


JBIC Package 5

Item No.

Cost Estimate

Unit Rate
(Rs.)

Description

Unit

Estimated Qty.

Amount (Rs)

Providing and construction of a gabian structure for retaining earth


with segments of wire crates of size 7mx3mx0.6m each divided inti
1.5m compartments by cross netting, made from 4mm galvanised
steel wire @ 32kg per 10 sqm having minimum tensile strength of 30
Mpa confirming to IS:280 and galvanizing coating conforming to IS:
4826, woven into mesh with double twist, mesh size not exceeding
100x100mm, filled with boulders with leasr dimension of 200mm, all
loose ends to be tied with 4mm galvanized steel wire as per drawing
and Technical Specifications Clause 2503.3

Cum

1,380.00

1203

1,660,140.00

Providing and constructing Back Fill behind Gabian walls with


boulders as per drawings and Technical Specifications Clause 2500

Cum

7,150.00

772

5,519,800.00

Cum

567.00

772

437,724.00

6.26

6.27

6.28

7.00
7.01

Providing and Laying boulder apron on river bed for protection


against scour with stone boulders weighing not less than 40 kg, as
per Technical Specifications Section 2500
TOTAL FOR BILL NO: 6
(CARRIED FORWARD TO SUMMARY)
BILL NO: 7 - ROAD JUNCTIONS
Providing and Constructing footpath/paved separator platform/paved
part of medians and islands including cost of providing and laying
precast tiles of 25mm thick, preparation of base, drain pipes all

7.02

8.00
8.01

8.02

8.03

8.04
8.05

8.06

8.07

8.08
A
B

648,722,405.36

complete as per drawing and Technical Specifications Clause 409.


Providing and Laying NP-4 pipes of 1000 mm dia for utility culverts at
junctions complete as per drawing and Technical Specifications
Section 2900 and IRC: SP 13 1973.
TOTAL FOR BILL NO: 7
(CARRIED FORWARD TO SUMMARY)
BILL NO: 8 - DRAINAGE AND PROTECTION WORKS
Providing and Laying of Turfing on embankment slopes and on
median islands with green grass sods as per Technical Specification
Clause No. 307
Providing and Laying granular filter material underneath stone
pitching on embankment slopes complete as per drawing and as per
clause 2500 and Additional Technical Specifications.
Providing and Laying stone pitching on embankment slopes
complete as per drawing and Technical Specifications Section 2500
a) Dry Stone pitching with 300mm thick
Supplying & Planting flowering plants and shrubs in the median as
per additional technical specifications
Providing and constructing lined surface drains to the required lines
and grades as per drawing and Technical Specifications Clause 309
and Section 1700.
a) Covered drain with 100 mm thick M 25 grade RCC slab
b) Median Transverse chutes with M 15 grade concrete in
superelevated portions with 750mm and 450mm wide openings.
c) Lined surface drains to the required lines and grades as per
drawing and technical specification clause 309
Providing and laying Plain Cement Concrete M 20 kerb as per
drawing and Technical Specifications Clauses 408 and Section 1700.
a) M-20 Grade Median Kerb "A" Type Section
b) M-20 Grade Median Kerb "L" Type Section
Providing and Construction of water chutes with NP-2 (as per IS-4581988) 300 dia RCC pipe (Semi circular) embedded in PCC M 15
including all costs of material and concreting works as per drawing
and Additional Technical Specifications.
Retaining wall
Earthwork in excavation for foundation complete as per Technical
Specifications Clause 304 in all types of Soil.
Providing, laying and compacting filter material behind retaining walls
complete as per drawing and Technical specifications Clauses 305 &
2504
Providing and laying Plain cement concrete of M 15 grade in open
foundation & substructure complete as per drawing and Technical
Specifications Section 1500,1700, 2100 & 2200

7 of 41

Sqm

58370.00

550

32,103,500.00

Lm

456.00

14552

6,635,712.00
38,739,212.00

Sqm

256891.00

53

13,615,223.00

Cum

6086.00

867

5,276,562.00

Cum

12174.00

667

8,120,058.00

Km

10.00

29017

290,170.00

Lm

2821.00

3895

10,987,795.00

Lm

580.00

644

373,520.00

Lm

50631.00

937

47,441,247.00

Lm
Lm

24624.00
3460.00

289
421

7,116,336.00
1,456,660.00

Lm

7348.00

1095

8,046,060.00

Cum

35722.00

104

3,715,088.00

Cum

12285.00

787

9,668,295.00

Cum

4465.00

3460

15,448,900.00

Outer Ring Road - Phase II B


JBIC Package 5

Cost Estimate

Item No.

Description

Providing and laying M 30 grade Reinforced cement concrete for


foundation and structure complete as per drawing and Technical
Specifications Section 1500, 1700, 2100 and 2200 (Excluding Cost
of Steel)
Providing and laying M 30 grade Reinforced cement concrete for

substructure complete as per drawing and Technical Specifications


F

G
8.09

8.10

8.11

8.12

9.00
9.01

Section 1500, 1700 and 2200 (Excluding Cost of Steel)


Providing, Cutting, Bending and Fixing of TMT reinforcement (TMT
bars) for foundation, Structure complete as per Drawings and
Technical Specifications Section 1600
Providing and fixing weep holes in retaining walls as per Drawings
and Technical Specifications Section 2700.
Providing and Constructing Water harvesting unit at every 500m
intervals on either side of the carriage way as per the drawings and
as Additional Technical Specification.
Construction of Reinforced Earth structures including supply of all
components with facia panels. Soil Reinforcing element, foundation
beam, capping beam including treatment/ improvement/
strengthening of ground, if required, complete as per Additional
Technical Specification.
a) Facia Panels with Sloped Surcharge
b) Facia Panels with VerticalSurcharge
Providing and Laying of selected granular soil behind reinforced
earth structure including compaction complete as per Additional
Technical Specification.
Construction of RCC M 40 grade crash barrier and friction slab
including cost of reinforcement complete as per approved Drawings
and Additional Technical Specifications.
TOTAL FOR BILL NO: 8
(CARRIED FORWARD TO SUMMARY)
BILL NO: 9 - MISCELLANEOUS & SAFETY
Construction of HTM system which includes

Unit

Estimated Qty.

Unit Rate
(Rs.)

Cum

9624.00

4465

42,971,160.00

Cum

7761.00

4745

36,825,945.00

Tonne

1222.00

40221

49,150,062.00

Nr.

15520.00

188

2,917,760.00

Nr.

46.00

34005

1,564,230.00

Sqm
Sqm

16022.00
30487.00

4500
4000

72,099,000.00
121,948,000.00

Sqm

478376.00

254

121,507,504.00

Lm

6996.00

16546

115,755,816.00

Amount (Rs)

696,295,391.00

Emergency

communication system, Mobile communication system, Variable


Message Sign System, Meteoroligical Data system, Automatic traffic

10,000,000.00

Nr.

1.00

10000000

Nr.
Nr.
Nr.

176.00
36.00
8.00

330
1171
1954

58,080.00
42,156.00
15,632.00

Sqm

26086.00

520

13,564,720.00

Nr.

68.00

572

38,896.00

Sqm

459.00

520

238,680.00

Sqm
Sqm

398.00
136.00

3002
1877

1,194,796.00
255,272.00

Sqm

80.00

2118

169,440.00

Nr.
Nr.

50.00
58.00

1306
1510

65,300.00
87,580.00

Nr.
Nr.
Nr.

50.00
28.00
50.00

1313
1517
1510

65,650.00
42,476.00
75,500.00

counter-cum-classifier system & Power supply system as per


9.02

9.03

9.04

B
C

drawing and additional technical specifications


Providing and fixing PCC/RCC hectometre, kilometre and 5th
kilometre stones including cost of reinforcement complete as per
Technical Specifications Clause 804.
a) 200-metre stone
b) Kilometre stone
c) 5th km. stone
Providing and Laying Pavement marking with hot applied
thermoplastic material complete as per drawing and Technical
Specifications Clause 803.
a) Lane/ Centre line/ Edge marking/ Transverse marking and any
other marking
b) Directional Arrows, Lettering etc. as per drawing No.61 of MORTH
Type Designs for Intersections on National Highways
c) Pedestrian Crossing at junctions and median openings
Supplying and fixing sign boards and as directed by Engineer,
including the cost of posts, fitting and fixing. Sheeting will be retro
reflective sheeting confirming to Section 800 and messages/borders
will be screen printed complete as per Technical Specifications
Clause 801.
Informatory signs
a) Facility information Signs
b) Direction / Place Identification signs
c) Advance Direction / Destination / Reassurance / Place
Identification signs
d) Route marker signs(450mm x 600mm)
Cautionary signs, size triangular 1200mm side
Mandatory signs, size
a) Circular 600 mm dia
b) Circular 900 mm dia
c) Triangular 1200 mm side

8 of 41

Outer Ring Road - Phase II B


JBIC Package 5

Cost Estimate

Item No.

Description

9.05

Supplying and fixing overhead signs including cost of posts, truss,


erection, fitting and foundations. Sheeting will be retro reflective
micro sheeting confirming to section 800 and message/borders will
be screen-printed complete as per drawing and Technical
Specifications Section 800.
a) Four lane overhead Tubular Gantry Signs with retro reflective
sheeting of area 31.05 sqm
Providing and Fixing road delineators, Raised pavement markers etc.

9.06

Unit

Estimated Qty.

Unit Rate
(Rs.)

Nr.

12.00

186043

2,232,516.00

Nr.
Nr.
Nr.
Nr.

400.00
104.00
2898.00
880.00

201
201
572
100

80,400.00
20,904.00
1,657,656.00
88,000.00

Sets

900.00

3778

3,400,200.00

3600.00

1200

4,320,000.00

5400.00

1000

5,400,000.00

500.00

23

11,500.00

200.00

10

2,000.00

10.00

6900

69,000.00

1395.00

2000

2,790,000.00

4185.00

2000

8,370,000.00

100.00
30.00
50.00
1000.00

181
120
3600
5

18,100.00
3,600.00
180,000.00
5,000.00

41933.00

2301

96,487,833.00

20.00

115100

2,302,000.00

36120.00

1918

69,278,160.00

13200.00

2719

35,890,800.00

1545.00
528.00

2941
1163

4,543,845.00
614,064.00

Amount (Rs)

complete as per drawing and Technical Specifications Clause 805,

9.07

9.08

9.09

9.10
9.11

812, 813 and as directed by Engineer.


a) Hazard Markers
b) Object Markers
c) Raised pavement markers (Road studs)
d) Crash barrier indicators
Providing & Maintenance of mobile cellular phones of Nokia,
Samsung or equivalent make with SIM card for Employer, Engineer
and his supervisory staff including cost of mobile cellular phone and
using charges complete as per Technical Specifications Clause
123A.
Providing and Maintaining vehicles for the Employer, Engineer and
other supervisory staff including providing driver, POL etc. complete
as per Technical Specification Clause 124 .
a) Air Conditioned New Vehicle of capacity more than 2000cc (A/C),

Veh. Day
Innova, Scropio, Quallis or Equivalent on Hire charges basis
b) Air Conditioned New Vehicle of capacity more than 1400cc, Sumo,
Veh. Day
Ambassador, Bolero or Equivalent on Hire charges basis
Supply of colour photographs (2 prints each) along with digital soft
copy stored in CD and printed photos mounted in album as per
Nr.
Technical Specifications Clause 125
Supplying additional prints (size 15cm x 10 cm) of colour record
Nr.
photographs as per Technical Specification Clause 125.
Supplying colour VCD/DVD records before the construction, during
construction stage & after construction, consisting of each set of
edited master cassettes and VCDs/DVDs with 4 copies each

9.12

A
B
C
D
E
F
9.13

9.14
9.15

9.16
9.17

Sets

complete as per Technical Specification Clause 126.


Providing and Maintaining the detour temporary diversion partial
closure of existing carriage way, switch over of the traffic from
widened and unwidened section and vice versa including additional
safety boards and safety apparatus during construction as per
drawing and Technical Specification Clause No. 112 and Additional
Technical Specification and as per directions of the Engineer.
Temporary barricading (Steel Type) with markings and arrows made
Lm - month
of retro reflective sheeting as directed by Engineer
Temporary barricading using HDPE blocks in red and white colours
Lm - month
Retro reflective Cautionary / Warning signs
Nr.- month
Cones
Nr.- month
Solar Blinkers
Nr.- month
Red reflective tapes
Lm
Providing and fixing Chain link fencing with L angles complete with
gate, painting, concrete base and foundation complete as per
Lm
drawing and Technical Specifications Section 1000 & 1900 and
Clause 807.
Providing passenger shelters for Bus Bays as per drawing and
Nr.
Technical Specifications Section 1500, 1600 and 1700.
Providing and fixing Galvanized Metallic "W" shape beam crash
barrier complete as per drawing and Technical Specifications Clause
810.
a) Metal Beam Crash barrier
Lm
Supplying & fixing of Noise barriers as per the drawing & additional
Lm
technical specification
Providing, Laying and Jointing NP-4 (as per IS:458-2000)
casing/conduit pipes for Main carriageway and NP-2 (as per IS:4582000) casing/conduit pipes for Service Roads for carrying the utility
line (cables etc.) complete as per Additional Technical Specification.
a) Dia 600 mm - NP 4
b) Dia 300 mm - NP 2

9 of 41

Lm
Lm

Outer Ring Road - Phase II B


JBIC Package 5

Cost Estimate

Item No.

Description

9.18

Providing, Laying and Jointing HDPE pipes (5.30mm thick) of


approved quality for carrying the utility cables, including bedding,
cost of pipes, labour charges, transportation charges, etc. complete
as per Drawing and as per Directions of the Engineer.
Dia 110mm ( a set of 8 pipes )
Dia 110mm
Dia 160mm
Construction of Utility chambers for Utility cables etc. complete as
per drawings and as per the directions of the engineer.
Construction of Toll Plaza, Administrative Block & Toll booth
buildings including arrangement of electric supply, All Electrical items
like fans, Lights, Socket receptacles, and Complete wiring, with
requisite earthing, providing fire alarm and fighting system like smoke
detector, electric hooter with battery back-up cabling and CO2 hand
extinguisher, providing water supply including all pipes, fittings,
tanks, tube wells, pumps, valves etc. complete with septic tank,
sewer lines, etc all complete as per drawing and Additional Technical
Specifications.
(a) Administrative block (6.1x2.43) +Change rooms (12.2x2.43)
(b) Single Toll booths
Providing, installing and commissioning electrically operated barrier
gates complete as per Additional Technical Specification and
Manufacturer's Specification or as directed by Engineer.
a) For 3.5 m wide Toll lane
Providing and casting M-20 guard post 200mm x 200mm x 650mm
length including reinforcements 4 nos 12mm dia TMT Vertical bars
and 4 nos 8mm dia TMT stirrups over retaining wall as per drawing
and Technical Specifications 800, 1500, 1600, 1700 and as directed
by the Engineer

a)
b)
c)
9.19
9.20

9.21

Unit

Estimated Qty.

Unit Rate
(Rs.)

Amount (Rs)

Lm
Lm
Lm

23080.00
21047.00
32075.00

2000
250
350

46,160,000.00
5,261,750.00
11,226,250.00

Nos

22.00

26100

574,200.00

Nos
Nos

3.00
24.00

600000
44000

1,800,000.00
1,056,000.00
2,400,000.00

Nos

24.00

100000

No

250.00

500

125,000.00

9.23(a) Construction of reinforced cement concrete M-15 grade Inlet


Chamber/Catch pit/Gully pit/Grease and Oil trap with GI bars grating
etc. all complete as per Drawing and Technical Specifications
Sections 1500, 1600, 1700 & 1900.

No

11.00

23200

255,200.00

9.23(b) Construction of reinforced concrete M-15 grade Hazardous Chemical


Holding Tank of suitable size at the locations approved by the
Engineer, as per Drawing and Technical Specifications 1500, 1600,
1700 & 1900.

No

1.00

61000

61,000.00

9.22

TOTAL FOR BILL NO: 9


(CARRIED FORWARD TO SUMMARY)

332,599,156.00

10.00

BILL NO: 10 - MAINTENANCE , REPAIRS & REHABILITATION

10.01

Carrying out routine maintenance of Highway embankment by


restoration of rain cuts, earthen shoulders as per Technical
Specifications Clause 3002 and as per the directions of the Engineer
(excluding bituminous work)
Carrying out treatment and repairs to pot holes and any necessary
patching to existing bituminous carriageway surfacing as per
Technical Specifications Clause 3004 and as per the directions of the
Engineer.
Shallow potholes (depth < 75 mm )
TOTAL FOR BILL NO: 10
(CARRIED FORWARD TO SUMMARY)

10.02

Cum

500.00

114

57,000.00

Sqm

700.00

257

179,900.00
236,900.00
23,135,428.00

AMOUNT FOR ELECTRICAL WORKS

GRAND TOTAL OF BILL OF QUANTITIES AMOUNT(Rs.)

10 of 41

4,322,149,658.00

Outer Ring Road - Phase II B


JBIC Package 5

Item
No.
1.00
1.01

Detailed Estimates

Detailed Quantity Calculations for JBIC Package 5 (From Km 72.00 to Km 83.00)


Breadth
Height
Nos.
Length (m)
(m)
(m)

Description

BILL NO: 1 SITE CLEARANCE


Clearing and grubbing for road land complete as per
Technical Specification Clause 201
Main Carriageway
Deductions in main Carriageway for structures
Service Roads
Rotaries
Road improvement
Service roads on rotary portion
Deductions in service road for structures
Diversion road
Interchange:
ORR to free left
Decceleration lane
Acceleration lane
ORR to Right
Decceleration lane

Acceleration lane
NH to free left
Decceleration lane
Acceleration lane

NH to Right (Loop)
Decceleration lane
Acceleration lane

ORR to free left


Decceleration lane
Acceleration lane
ORR to Right
Decceleration lane

Acceleration lane
NH to free left
Decceleration lane
Acceleration lane

NH to Right (Loop)
Decceleration lane
Acceleration lane

Road improvement under interchange


Service road in Inter change(From ORR)
Service road in Inter change (From NH)
Service road in Inter change (From ORR)
Service road in Inter change (From NH)
Total Clearing and Grubbing
Add Sundries 1 %
GRAND TOTAL
1.02

1
1
2
4
2
2
2
1

11000.00
516.83
8735.00
5541.77
565.00
1528
82.80
4650.00

95.00
95.00
27.50

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

333.00
100.00
100.00
100.00
100.00
1208.40
170.00
90.00
450.00
90.00
100.00
100.00
386.00
100.00
100.00
150.00
90.00
450.00
90.00
400.00
100.00
100.00
150.00
90.00
450.00
90.00
207.00
100.00
100.00
100.00
100.00
1158.40
170.00
90.00
450.00
90.00
100.00
100.00
370.00
100.00
100.00
150.00
90.00
450.00
90.00
298.00
100.00
100.00
150.00
90.00
450.00
90.00
1090.60
584.00
648.00
646.00
676.00

15.00
15.00
15.00
15.00
15.00
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
15.00
15.00
15.00
15.00
15.00
15.00
15.00
45.00
27.50
27.50
27.50
27.50

Dismantling structures and pavement including disposal of


resulting materials, stacking and/or salvaging useful
materials with all leads and lifts complete as per Technical
Specifications Clause 202.
Buildings
1) Kutcha structures (Hutments type)
2) Semi-Pucca structures (Tiled roof/AC sheet roof)
3) Pucca structures (RCC roof)

30.00
27.50
27.50
20.00

Quantity

Unit

1045000.00
-49099.23
480425.00
22167.08
33900.00
84040.00
-4554.00
93000.00
4995.00
1500.00
1500.00
1500.00
1500.00
21147.00
2975.00
1575.00
7875.00
1575.00
1750.00
1750.00
6755.00
1750.00
1750.00
2625.00
1575.00
7875.00
1575.00
6000.00
1500.00
1500.00
2250.00
1350.00
6750.00
1350.00
3105.00
1500.00
1500.00
1500.00
1500.00
20272.00
2975.00
1575.00
7875.00
1575.00
1750.00
1750.00
6475.00
1750.00
1750.00
2625.00
1575.00
7875.00
1575.00
4470.00
1500.00
1500.00
2250.00
1350.00
6750.00
1350.00
49077.00
16060.00
17820.00
17765.00
18590.00
2008109.85

150.00
7000.00
900.00

11 of 41

Total Quantity

201.00
2.01
203.00

Hect.
Hect.
Hect.

150.00
7,000.00
900.00

Sqm
Sqm
Sqm

Outer Ring Road - Phase II B


JBIC Package 5

Item
No.
1.03

Detailed Estimates

Detailed Quantity Calculations for JBIC Package 5 (From Km 72.00 to Km 83.00)


Breadth
Height
Nos.
Length (m)
(m)
(m)
Cutting of trees including cutting of trunks, branches and
removal of stumps& roots including stacking of serviceable
material with all leads & lifts and back filling with approved
material in depression / pit and as per Technical
Specifications Section 200.
a) Girth above 300mm to 600mm
b) Girth above 600mm to 900mm
c) Girth above 900mm to 1800mm
d) Girth above 1800 mm
Description

1.04

Back filling with approved sand flooded with water in the


Deep wells as per Technical Specifications Clause 305 and
as directed by the Engineer.

1.05

Providing and laying Cement Concrete slab on wells

Quantity

25.00
63.00
25.00
13.00

21266.00
including centering and shuttering all complete as per

313.50

Drawings and Technical Specifications Sections 1500,1700,

Total Quantity

Unit

25.00
63.00
25.00
13.00

Nr.
Nr.
Nr.
Nr.

21,266.00

Cum

314.00

Cum

2100 and Technical Specifications Clause 304.


2.00
2.01

BILL NO: 2 - EARTHWORKS


Roadway excavation in all types of soils including ordinary
rock necessary for construction of roadway and drainage
includes dressing, trimming and compacting the cut
formation in accordance with requirements of lines, grades
and cross fall complete and disposal of all cut material
including necessary stacking of suitable material with all lifts
and leads as per Technical Specification section 301.
a) In Soils
Main carriageway including Service roads on Both sides
(from Software Caclulations) - Annexure 1 (40% of
excavation Qty.)
for Rotary including ramps & Service Roads
for Interchange including ramps & Service Roads
Deduct for L&R Portions
Deduct for Structures
TOTAL EXCAVATION
Add Sundries 5 %
GRAND TOTAL
b) In marshy Soils
Main carriageway including Service roads on Both sides
(from Software Caclulations) - Annexure 1 (5% of
excavation Qty.)
for Rotary including ramps & Service Roads
for Interchange including ramps & Service Roads
Deduct for L&R Portions
Deduct for Structures
TOTAL EXCAVATION
Add Sundries 5 %
GRAND TOTAL
c) In ordinary rock
Main carriageway including Service roads on Both sides
(from Software Caclulations) - Annexure 1 (55% of
excavation Qty.)
for Rotary including ramps & Service Roads
for Interchange including ramps & Service Roads
Deduct for L&R Portions
Deduct for Structures
TOTAL EXCAVATION
Add Sundries 5 %
GRAND TOTAL

2.02

Excavation for roadway in hard rock (requiring blasting) by


drilling, blasting and breaking, trimming of bottom and side
slopes in accordance with requirements of lines, grades and
cross sections, loading and disposal of all cut material
including necessary stacking of suitable material with all lifts
and leads complete as per Technical Specification Section
301, 302 and additional technical specification.
a) Hard rock excavation
Main carriageway including Service roads on Both sides
(from Software Caclulations) - Annexure 1 (70% of Rock
excavation Qty.)
Deduct for Rocky Portions (70%)
Deduct for Structures
TOTAL EXCAVATION
Add Sundries 5 %
GRAND TOTAL

225.00

225.00

225.00

50.92

50.92

50.92

0.50

0.50

0.50

194746.21

194,746.21

10090.91
8433.31
-2291.40
-9150.13

10,090.91
8,433.31

24343.28

24,343.28

1261.36
1054.16
-286.43
-1143.77

1,261.36
1,054.16

b) Hard rock excavation with controlled blasting where


blasting is prohibited

12 of 41

225.00

50.92

0.50

(1,430.19)
25,228.61
1,261.00
26,490.00

267776.04

267,776.04

13875.00
11595.80
-3150.68
-12581.43

13,875.00
11,595.80

37867.32
1

(11,441.53)
201,828.90
10,091.00
211,920.00

-4009.95
-1779.19

(15,732.11)
277,514.74
13,876.00
291,391.00

Cum
Cum
Cum

Cum
Cum
Cum

Cum
Cum
Cum

37,867.32

(5,789.14)
32,078.18
1,604.00
33,682.00

Cum
Cum
Cum

Outer Ring Road - Phase II B


JBIC Package 5

Item
No.

Detailed Estimates

Detailed Quantity Calculations for JBIC Package 5 (From Km 72.00 to Km 83.00)


Breadth
Height
Nos.
Length (m)
(m)
(m)
Main carriageway including Service roads on Both sides
(from Software Caclulations) - Annexure 1 (20% of Rock
excavation Qty.)
Deduct for Rocky Portions (20%)
1
225.00
50.92
0.50
Deduct for Structures
TOTAL EXCAVATION
Add Sundries 5 %
GRAND TOTAL
Description

c) Hard rock excavation where blasting is prohibited


Main carriageway including Service roads on Both sides
(from Software Caclulations) - Annexure 1 (10% of Rock
excavation Qty.)
Deduct for Rocky Portions (10%)
Deduct for Structures
TOTAL EXCAVATION
Add Sundries 5 %
GRAND TOTAL

Construction

of

embankment

with

approved

Total Quantity

10819.23

10,819.23

-1145.70
-508.34

5409.62
1

225.00

50.92

0.50

d) Rebate towards the excavated useful hard rock available


under item nos.202
Total (by deducting 10% for wastage & 10% for Soil &
Unsuitable material from Items 2.02 a,b & c)
2.03

Quantity

-572.85
-254.17

38493.60

(1,654.04)
9,165.19
458.00
9,623.00

Unit

Cum
Cum
Cum

5,409.62

(827.02)
4,582.60
229.00
4,812.00

Cum
Cum
Cum

38,493.60
38,494.00

Cum

material

obtained from approved borrow areas complete with all


leads and lifts as per Technical Specification Clause 305.
Total embankment quantity as per Software calculations Main carriageway including Service roads on Both sides Annexure 1
for Rotary including ramps & Service Roads
for Interchange including ramps & Service Roads
Deduct for RE fill
Deduct for Excut Material used in embankment
Deduct for Structures
TOTAL EMBANKMENT
Add Sundries 3 %
GRAND TOTAL
2.04

3417824.13

3,417,824.13

329781.17
564275.12
-478376.00
-321872.22
-160586.16

329,781.17
564,275.12

(960,834.37)
3,351,046.05
100,531.00
3,451,577.00

Cum
Cum
Cum

Construction of subgrade with approved material obtained


from approved borrow areas complete with all leads and lifts,
satisfying the soaked CBR value of Not less than 10% as
per drawing and Technical Specification Clause 305.
i) Main Carriage Way
1
1
1

11000.00
225.00
476.58

Av.Width
50.92
50.92
50.92

Av.Depth
0.50
0.50
0.50

280060.00
-5728.50
-12133.83

262,197.67

Cum

2
2
1
1

8735.00
82.80
2260.00
1590.00

15.51
15.51
15.51
15.51

0.50
0.50
0.50
0.50

135479.85
-1284.23
-17526.30
-12330.45

104,338.87

Cum

iii) Diversion road

4650.00

14.80

0.50

34410.00

34,410.00

Cum

iv) Rotary
Main rotary
Service Road rotary
Ramps
Acceleration lane
Acceleration lane
Acceleration lane
Acceleration lane
Decceleration lane
Decceleration lane
Decceleration lane
Decceleration lane
Road Improvement
Service roads

2
4
8
4
4
4
4
4
4
4
4
2
2

370.71
226.19
331.25
150.00
90.00
450.00
90.00
170.00
90.00
450.00
90.00
532.00
1528.00

15.52
15.52
16.52
10.52
8.77
7.02
3.51
10.52
8.77
7.02
3.51
25.52
15.51

0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

5753.39
7021.08
21889.00
3156.00
1578.60
6318.00
631.80
3576.80
1578.60
6318.00
631.80
13576.64
23699.28

95,728.99

Cum

1
1
1
1
1
1
1
1
1
1

333.00
100.00
100.00
100.00
100.00
1208.40
170.00
90.00
450.00
90.00

13.02
11.52
5.76
11.52
5.76
16.52
16.52
14.02
11.52
5.76

0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

2167.83
576.00
288.00
576.00
288.00
9981.38
1404.20
630.90
2592.00
259.20

Subgrade quantity for 8 laned carriageway


Deduct for Cutting Portions
Deduct for Structures
ii) Service Roads (LHS)
Deduct for Structures
Deduct for Cutting Portions

v) Interchange
ORR to free left
Decceleration lane
Acceleration lane
ORR to Right
Decceleration lane

13 of 41

Outer Ring Road - Phase II B


JBIC Package 5

Item
No.

Detailed Estimates

Detailed Quantity Calculations for JBIC Package 5 (From Km 72.00 to Km 83.00)


Breadth
Height
Nos.
Length (m)
(m)
(m)
Acceleration lane
1
100.00
11.52
0.50
1
100.00
5.76
0.50
NH to free left
1
386.00
16.52
0.50
Decceleration lane
1
100.00
11.52
0.50
1
100.00
5.76
0.50
Acceleration lane
1
150.00
16.52
0.50
1
90.00
14.02
0.50
1
450.00
11.52
0.50
1
90.00
5.76
0.50
NH to Right (Loop)
1
400.00
13.02
0.50
Decceleration lane
1
100.00
11.52
0.50
1
100.00
5.76
0.50
Acceleration lane
1
150.00
13.02
0.50
1
90.00
12.27
0.50
1
450.00
11.52
0.50
1
90.00
5.76
0.50
ORR to free left
1
207.00
13.02
0.50
Decceleration lane
1
100.00
11.52
0.50
1
100.00
5.76
0.50
Acceleration lane
1
100.00
11.52
0.50
1
100.00
5.76
0.50
ORR to Right
1
1158.40
16.52
0.50
Decceleration lane
1
170.00
16.52
0.50
1
90.00
14.02
0.50
1
450.00
11.52
0.50
1
90.00
5.76
0.50
Acceleration lane
1
100.00
11.52
0.50
1
100.00
5.76
0.50
NH to free left
1
370.00
16.52
0.50
Decceleration lane
1
100.00
11.52
0.50
1
100.00
5.76
0.50
Acceleration lane
1
150.00
16.52
0.50
1
90.00
14.02
0.50
1
450.00
11.52
0.50
1
90.00
5.76
0.50
NH to Right (Loop)
1
298.00
13.02
0.50
Decceleration lane
1
100.00
11.52
0.50
1
100.00
5.76
0.50
Acceleration lane
1
150.00
13.02
0.50
1
90.00
12.27
0.50
1
450.00
11.52
0.50
1
90.00
5.76
0.50
Road improvement under interchange
1
1090.60
27.52
0.50
Service road in Inter change(From ORR)
1
584.00
15.51
0.50
Service road in Inter change (From NH)
1
648.00
15.51
0.50
Service road in Inter change (From ORR)
1
646.00
15.51
0.50
Service road in Inter change (From NH)
1
676.00
15.51
0.50
Deduct for excut Material
Description

vi) Busbays

20
20

90.00
30.00

1.75
3.50

0.50
0.50

Quantity
576.00
288.00
3188.36
576.00
288.00
1239.00
630.90
2592.00
259.20
2604.00
576.00
288.00
976.50
552.15
2592.00
259.20
1347.57
576.00
288.00
576.00
288.00
9568.38
1404.20
630.90
2592.00
259.20
576.00
288.00
3056.20
576.00
288.00
1239.00
630.90
2592.00
259.20
1939.98
576.00
288.00
976.50
552.15
2592.00
259.20
15006.66
4528.92
5025.24
5009.73
5242.38
-108976.74
1575.00
1050.00

Sub Total
Add Sundries 3 %
GRAND TOTAL
2.05

Total Quantity

Unit

105,281.13
(108,976.74)

2,625.00
495,604.93
14,868.00
510,473.00

Cum
Cum
Cum

Construction of earthen shoulder with approved granular


material obtained from selected source with all leads and lifts
etc., complete as per drawing and Technical Specifications
Clause 407.
i) Main Carriage Way
Total Hard shoulder quantity
Deduction for structures

2
2

11000.00
476.58

Av.Width
3.43
3.43

Av.Depth
0.43
0.43

32447.80
-1405.83

31,041.97

Cum

ii) Service Roads


under foot path
Traingle
Deduction for structures

2
2
2
2

8735.00
8735.00
8735.00
82.80

1.365
2.500
0.730
1.365

0.365
0.590
0.183
0.365

8703.99
25768.25
2327.44
-82.51

36,717.18

Cum

iii) Diversion Road

4650.00

1.25

0.25

2906.25

2,906.25

Cum

iv) Rotary
Main rotary
Service Road rotary
Ramps
Acceleration lane
Acceleration lane
Acceleration lane
Acceleration lane
Decceleration lane
Decceleration lane
Decceleration lane
Decceleration lane
Road Improvement
Service roads

4
8
16
4
4
4
4
4
4
4
4
4
2

370.708
226.195
331.250
150.000
90.000
450.000
90.000
170.000
90.000
450.000
90.000
532.000
1528.000

1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.365

0.000
0.000
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.365

0.00
0.00
3258.97
368.94
221.36
1106.82
221.36
418.13
221.36
1106.82
221.36
1308.51
1522.58

14 of 41

Outer Ring Road - Phase II B


JBIC Package 5

Detailed Estimates

Item
No.

Detailed Quantity Calculations for JBIC Package 5 (From Km 72.00 to Km 83.00)


Breadth
Height
Nos.
Length (m)
(m)
(m)
2
1528.00
2.500
0.590
2
1528.00
0.730
0.183

Description
under foot path
Traingle
v) Interchange
ORR to free left
Decceleration lane
Acceleration lane
ORR to Right
Decceleration lane

Acceleration lane
NH to free left
Decceleration lane
Acceleration lane

NH to Right (Loop)
Decceleration lane
Acceleration lane

ORR to free left


Decceleration lane
Acceleration lane
ORR to Right
Decceleration lane

Acceleration lane
NH to free left
Decceleration lane
Acceleration lane

NH to Right (Loop)
Decceleration lane
Acceleration lane

Road improvement under interchange


Service road in Inter change(From ORR)
Service road in Inter change (From NH)
Service road in Inter change (From ORR)
Service road in Inter change (From NH)
Deduct for excut Material
Sub Total
Add Sundries 3 %
GRAND TOTAL
2.06
a)

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
1
1
1
1

333.000
100.000
100.000
100.000
100.000
1208.400
170.000
90.000
450.000
90.000
100.000
100.000
386.000
100.000
100.000
150.000
90.000
450.000
90.000
400.000
100.000
100.000
150.000
90.000
450.000
90.000
207.000
100.000
100.000
100.000
100.000
1158.400
170.000
90.000
450.000
90.000
100.000
100.000
370.000
100.000
100.000
150.000
90.000
450.000
90.000
298.000
100.000
100.000
150.000
90.000
450.000
90.000
1090.600
584.000
648.000
646.000
676.000

1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430
1.430

0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430
0.430

Quantity

Total Quantity

Unit

4507.60
407.14

14,890.96

Cum

16,538.84
(27,589.00)
74,506.20
2,235.00
76,741.00

Cum
Cum
Cum
Cum
Cum

321,872.22
321,872.22
9,656.00
331,528.00

Cum
Cum
Cum

409.52
122.98
122.98
122.98
122.98
1486.09
209.07
110.68
553.41
110.68
122.98
122.98
474.70
122.98
122.98
184.47
110.68
553.41
110.68
491.92
122.98
122.98
184.47
110.68
553.41
110.68
254.57
122.98
122.98
122.98
122.98
1424.60
209.07
110.68
553.41
110.68
122.98
122.98
455.03
122.98
122.98
184.47
110.68
553.41
110.68
366.48
122.98
122.98
184.47
110.68
553.41
110.68
1341.22
359.10
398.46
397.23
415.67
-27589.05

Construction of embankment with suitable materials


deposited at site from roadway and drainage excavation
including all leads and lifts etc., complete as per Technical
Specification Clause 305.
321872.22
TOTAL CUT FILL
Add Sundries 3 %
GRAND TOTAL

b)

Construction of subgrade with suitable materials deposited at


site from roadway and drainage excavation including all
leads and lifts etc., complete as per Technical Specification
Clause 305.
108976.74
TOTAL CUT FILL
Add Sundries 3 %

15 of 41

108,976.74
108,976.74
3,269.00

Outer Ring Road - Phase II B


JBIC Package 5

Detailed Estimates

Detailed Quantity Calculations for JBIC Package 5 (From Km 72.00 to Km 83.00)


Breadth
Height
Nos.
Length (m)
(m)
(m)

Item
No.

Description

Quantity

GRAND TOTAL

c)

Construction of Shoulder with suitable materials deposited at


site from roadway and drainage excavation including all
leads and lifts etc., complete as per Technical Specification
Clause 305.
27589.05

27,589.05
27,589.05
828.00
28,417.00

1379.45

1,379.45
1,379.45
41.00
1,420.00

110.00

110.00
110.00
3.00
113.00

Cum
Cum
Cum

35,585.25
1,068.00
36,653.00

Cum
Cum
Cum

21,316.97
640.00
21,957.00

Cum
Cum
Cum

150.00
150.00
5.00
155.00

Sqm
Sqm
Sqm
Sqm

104,224.00

Cum

Construction of Median with suitable materials deposited at


site from roadway and drainage excavation including all
leads and lifts etc., complete as per Technical Specification
Clause 305.

TOTAL CUT FILL


Add Sundries 3 %
GRAND TOTAL
2.07

Removal of existing pavement layers/road crust for


reconstruction (all types of layers) complete as per Technical
Specification Clause 301.
TOTAL CUT FILL
Add Sundries 3 %
GRAND TOTAL

2.08

Unit

112,246.00

TOTAL CUT FILL


Add Sundries 3 %
GRAND TOTAL

d)

Total Quantity

Loosening and re compacting of existing ground where the


existing ground is serving/suitable as subgrade complete as
per Technical Specifications Clause 301 & 305.
i) Main Carriage Way
ii) Left service Road
iii) Right service Road

1
1
1

225.000
2260.000
1590.000

50.920
15.510
15.510

0.500
0.500
0.500

5728.50
17526.30
12330.45
35585.25

Add Sundries 3 %
GRAND TOTAL
2.09

2.10

Filling of median / island with approved material obtained


from selected source as per Technical Specifications Clause
305 and 407.
i) Main Carriage Way
Total Median fill quantity on main carriageway
Road Improvement for Rotary structure
Road Improvement for Interchange structure
Deduct for Excut Material
Deduct for Structures
Deduct for Median openings
TOTAL Median/island filling
Add Sundries 3 %
GRAND TOTAL

1
2
1

11000.00
532.00
1090.60

4.60
2.10
2.10

0.430
0.430
0.430

1
6

476.58
5.00

4.60
5.00

0.430
0.430

21758.00
960.79
984.81
-1379.45
-942.68
-64.50
21316.97

Scarifying Existing Bituminous Surface layer(s) as per


Technical Specifications Clause 305.
150.00
TOTAL SCARIFICATION
Add Sundries 3 %
GRAND TOTAL

3.00
3.01

BILL NO: 3 - SUB-BASE AND BASE COURSES


Providing and Construction of Granular Sub-base complete
as per drawing and Technical Specifications Clause 401
Grading of Table - 400 -1 Grading I
i) Main Carriage Way
GSB Quantity for 8 laned road
Deduct for Structures
ii) CC Pavement below VUPs
Total VUPs
Inter change structures

1
1

11000.00
476.58

Av.Width
49.520
49.52

0.200
0.200

108944.00
-4720.09

1
1
1
1
1

167.72
50.00
50.00
25.00
25.00

150.00
13.00
13.00
13.00
13.00

0.200
0.200
0.200
0.200
0.200

5031.60
130.00
130.00
65.00
65.00
5421.60

5,421.60

iii) Service Roads


Deduct for Structures

2
2

8735.00
82.80

14.11
14.11

0.200
0.200

49300.34
-467.32

48,833.00

Cum

iv) Diversion Road

4650.00

13.40

0.200

12462.00

12,462.00

Cum

16 of 41

Outer Ring Road - Phase II B


JBIC Package 5

Detailed Estimates

Detailed Quantity Calculations for JBIC Package 5 (From Km 72.00 to Km 83.00)


Breadth
Height
Nos.
Length (m)
(m)
(m)

Item
No.

Description
v) Rotary
Main rotary
Service Road rotary
Ramps
Acceleration lane
Acceleration lane
Acceleration lane
Acceleration lane
Decceleration lane
Decceleration lane
Decceleration lane
Decceleration lane
Road Improvement
Service roads
vi) Interchange
ORR to free left
Decceleration lane
Acceleration lane
ORR to Right
Decceleration lane

Acceleration lane
NH to free left
Decceleration lane
Acceleration lane

NH to Right (Loop)
Decceleration lane
Acceleration lane

ORR to free left


Decceleration lane
Acceleration lane
ORR to Right
Decceleration lane

Acceleration lane
NH to free left
Decceleration lane
Acceleration lane

NH to Right (Loop)
Decceleration lane
Acceleration lane

Road improvement under interchange


Service road in Inter change(From ORR)
Service road in Inter change (From NH)
Service road in Inter change (From ORR)
Service road in Inter change (From NH)
vii) Side Road Improvement
2 L VUPs
6L VUP
PUPs
Rotaries
Inter change
viii) Busbays

Quantity

Total Quantity

Unit

Cum

2
4
8
4
4
4
4
4
4
4
4
2
2

370.71
226.19
331.25
150.00
90.00
450.00
90.00
170.00
90.00
450.00
90.00
532.00
1528.00

14.12
14.12
15.12
9.12
7.37
5.62
2.81
9.12
7.37
5.62
2.81
23.62
14.11

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

2093.76
2555.10
8013.60
1094.40
530.64
2023.20
202.32
1240.32
530.64
2023.20
202.32
5026.34
8624.03

34,159.86

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

333.00
100.00
100.00
100.00
100.00
1208.40
170.00
90.00
450.00
90.00
100.00
100.00
386.00
100.00
100.00
150.00
90.00
450.00
90.00
400.00
100.00
100.00
150.00
90.00
450.00
90.00
207.00
100.00
100.00
100.00
100.00
1158.40
170.00
90.00
450.00
90.00
100.00
100.00
370.00
100.00
100.00
150.00
90.00
450.00
90.00
298.00
100.00
100.00
150.00
90.00
450.00
90.00
1090.60
584.00
648.00
646.00
676.00

11.62
11.62
5.81
11.62
5.81
15.12
15.12
12.62
10.12
5.06
10.12
5.06
15.12
10.12
5.06
15.12
12.62
10.12
5.06
11.62
11.62
5.81
11.62
10.87
10.12
5.06
11.62
11.62
5.81
11.62
5.81
15.12
15.12
12.62
10.12
5.06
10.12
5.06
15.12
10.12
5.06
15.12
12.62
10.12
5.06
11.62
11.62
5.81
11.62
10.87
10.12
5.06
23.62
14.11
14.11
14.11
14.11

0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

773.89
232.40
116.20
232.40
116.20
3654.20
514.08
227.16
910.80
91.08
202.40
101.20
1167.26
202.40
101.20
453.60
227.16
910.80
91.08
929.60
232.40
116.20
348.60
195.66
910.80
91.08
481.07
232.40
116.20
232.40
116.20
3503.00
514.08
227.16
910.80
91.08
202.40
101.20
1118.88
202.40
101.20
453.60
227.16
910.80
91.08
692.55
232.40
116.20
348.60
195.66
910.80
91.08
5151.99
1648.05
1828.66
1823.01
1907.67

37,929.64

8
0
14
4
2

30.00
30.00
30.00
30.00
30.00

14.00
47.12
10.12
29.99
29.99

0.20
0.20
0.20
0.20
0.20

672.00
0.00
850.08
719.76
359.88

2,601.72

Cum

20
20

90.00
30.00

1.75
3.50

0.20
0.20

630.00
420.00

1,050.00
246,681.82

Cum

TOTAL GSB

17 of 41

Outer Ring Road - Phase II B


JBIC Package 5

Detailed Estimates

Detailed Quantity Calculations for JBIC Package 5 (From Km 72.00 to Km 83.00)


Breadth
Height
Nos.
Length (m)
(m)
(m)

Item
No.

Description

Quantity

Add Sundries 1.5 %


GRAND TOTAL
3.02

Total Quantity

Unit

1,233.00
247,915.00

Cum
Cum

Providing and Construction of wet mix macadam (WMM)


base with approved material complete as per MORTH
Technical Specification Clause No. 406
i) Main Carriage Way
WMM Quantity for 8 laned road
Deduct for Structures

2
2

11000.00
476.58

18.38
18.38

0.25
0.25

101090.00
-4379.81

96,710.19

Cum

ii) Service Roads


Deduct for Structures

2
2

8735.00
82.80

8.87
8.87

0.25
0.25

38717.89
-367.01

38,350.88

Cum

iii) Diversion road

4650.00

10.00

0.225

10462.50

10,462.50

Cum

iv) Rotary
Main rotary
Service Road rotary
Ramps
Acceleration lane
Acceleration lane
Acceleration lane
Acceleration lane
Decceleration lane
Decceleration lane
Decceleration lane
Decceleration lane
Road Improvement
Service roads

2
4
8
4
4
4
4
4
4
4
4
4
2

370.71
226.19
331.25
150.00
90.00
450.00
90.00
170.00
90.00
450.00
90.00
532.00
1528.00

12.36
12.36
11.36
7.36
5.61
3.86
1.93
7.36
5.61
3.86
1.93
8.68
8.87

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

2290.98
2795.77
7526.00
1104.00
504.90
1737.00
173.70
1251.20
504.90
1737.00
173.70
4617.76
6772.86

31,189.76

Cum

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

333.00
100.00
100.00
100.00
100.00
1208.40
170.00
90.00
450.00
90.00
100.00
100.00
386.00
100.00
100.00
150.00
90.00
450.00
90.00
400.00
100.00
100.00
150.00
90.00
450.00
90.00
207.00
100.00
100.00
100.00
100.00
1158.40
170.00
90.00
450.00
90.00
100.00
100.00
370.00
100.00
100.00
150.00
90.00
450.00
90.00
298.00
100.00
100.00
150.00
90.00
450.00
90.00

7.86
7.86
3.93
7.86
3.93
11.36
11.36
9.61
7.86
3.93
7.86
3.93
11.36
11.36
5.68
11.36
9.61
7.86
3.93
7.86
7.86
3.93
7.86
7.11
6.36
3.18
7.86
7.86
3.93
7.86
3.93
11.36
11.36
9.61
7.86
3.93
7.86
3.93
11.36
11.36
5.68
11.36
9.61
7.86
3.93
7.86
7.86
3.93
7.86
7.11
6.36
3.18

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

654.35
196.50
98.25
196.50
98.25
3431.86
482.80
216.23
884.25
88.43
196.50
98.25
1096.24
284.00
142.00
426.00
216.23
884.25
88.43
786.00
196.50
98.25
294.75
159.98
715.50
71.55
406.76
196.50
98.25
196.50
98.25
3289.86
482.80
216.23
884.25
88.43
196.50
98.25
1050.80
284.00
142.00
426.00
216.23
884.25
88.43
585.57
196.50
98.25
294.75
159.98
715.50
71.55

v) Interchange
ORR to free left
Decceleration lane
Acceleration lane
ORR to Right
Decceleration lane

Acceleration lane
NH to free left
Decceleration lane
Acceleration lane

NH to Right (Loop)
Decceleration lane
Acceleration lane

ORR to free left


Decceleration lane
Acceleration lane
ORR to Right
Decceleration lane

Acceleration lane
NH to free left
Decceleration lane
Acceleration lane

NH to Right (Loop)
Decceleration lane
Acceleration lane

18 of 41

Outer Ring Road - Phase II B


JBIC Package 5

Item
No.

Detailed Estimates

Detailed Quantity Calculations for JBIC Package 5 (From Km 72.00 to Km 83.00)


Breadth
Height
Nos.
Length (m)
(m)
(m)
Road improvement under interchange
2
1090.60
8.68
0.25
Service road in Inter change(From ORR)
1
584.00
8.87
0.25
Service road in Inter change (From NH)
1
648.00
8.87
0.25
Service road in Inter change (From ORR)
1
646.00
8.87
0.25
Service road in Inter change (From NH)
1
676.00
8.87
0.25
Description

vi) Side Road Improvement


2 L VUPs
6 L VUPs
PUPs
Rotaries
Inter change
vii) Busbays

viii) Median openings


TOTAL WMM
Add Sundries 1.5 %
GRAND TOTAL
4.00
4.01

Quantity

Total Quantity

4733.20
1294.29
1436.13
1431.70
1498.19

33,961.68

8
0
14
8
4

30.00
30.00
30.00
30.00
30.00

7.86
9.11
7.86
9.11
9.11

0.25
0.25
0.25
0.25
0.25

471.60
0.00
825.30
546.60
273.30

2,116.80

20
20

90.00
30.00

1.75
3.50

0.25
0.25

787.50
525.00

1,312.50

5.00

5.00

0.25

37.50

Unit

Cum

37.50
214,141.81
3,212.00
217,354.00

Cum
Cum
Cum

BILL NO: 4 - BITUMINOUS WORKS


Providing and applying bituminous Primer Coat over granular
surface with bitumen emulsion complete as per Technical
Specification Clause 502.
a) @ 7.5 kg/ 10 sqm
i) Main Carriage Way
Prime Coat quantity on 8 laned road
Deduct for Structures

2
2

11000
476.584

18.38
18.38

404360.00
-17519.23

386,840.77

Sqm

ii) Service Roads


Deduct for Structures

2
2

8735
82.8

8.865
8.865

154871.55
-1468.04

153,403.51

Sqm

iii) Diversion road

4650.00

10.00

46500.00

46,500.00

Sqm

iv) Rotary
Main rotary
Service Road rotary
Ramps
Acceleration lane
Acceleration lane
Acceleration lane
Acceleration lane
Decceleration lane
Decceleration lane
Decceleration lane
Decceleration lane
Road Improvement
Service roads

2
4
8
4
4
4
4
4
4
4
4
4
2

370.71
226.19
331.25
150.00
90.00
450.00
90.00
170.00
90.00
450.00
90.00
532.00
1528.00

12.36
12.36
11.36
7.36
5.61
3.86
1.93
7.36
5.61
3.86
1.93
8.68
8.87

9163.90
11183.06
30104.00
4416.00
2019.60
6948.00
694.80
5004.80
2019.60
6948.00
694.80
18471.04
27091.44

124,759.04

Sqm

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

333.00
100.00
100.00
100.00
100.00
1208.40
170.00
90.00
450.00
90.00
100.00
100.00
386.00
100.00
100.00
150.00
90.00
450.00
90.00
400.00
100.00
100.00
150.00
90.00
450.00
90.00
207.00
100.00
100.00
100.00
100.00
1158.40
170.00

7.86
7.86
3.93
7.86
3.93
11.36
11.36
9.61
7.86
3.93
7.86
3.93
11.36
11.36
5.68
11.36
9.61
7.86
3.93
7.86
7.86
3.93
7.86
7.11
6.36
3.18
7.86
7.86
3.93
7.86
3.93
11.36
11.36

2617.38
786.00
393.00
786.00
393.00
13727.42
1931.20
864.90
3537.00
353.70
786.00
393.00
4384.96
1136.00
568.00
1704.00
864.90
3537.00
353.70
3144.00
786.00
393.00
1179.00
639.90
2862.00
286.20
1627.02
786.00
393.00
786.00
393.00
13159.42
1931.20

v) Interchange
ORR to free left
Decceleration lane
Acceleration lane
ORR to Right
Decceleration lane

Acceleration lane
NH to free left
Decceleration lane
Acceleration lane

NH to Right (Loop)
Decceleration lane
Acceleration lane

ORR to free left


Decceleration lane
Acceleration lane
ORR to Right
Decceleration lane

19 of 41

Outer Ring Road - Phase II B


JBIC Package 5

Item
No.

Detailed Estimates

Detailed Quantity Calculations for JBIC Package 5 (From Km 72.00 to Km 83.00)


Breadth
Height
Nos.
Length (m)
(m)
(m)
1
90.00
9.61
1
450.00
7.86
1
90.00
3.93
Acceleration lane
1
100.00
7.86
1
100.00
3.93
NH to free left
1
370.00
11.36
Decceleration lane
1
100.00
11.36
1
100.00
5.68
Acceleration lane
1
150.00
11.36
1
90.00
9.61
1
450.00
7.86
1
90.00
3.93
NH to Right (Loop)
1
298.00
7.86
Decceleration lane
1
100.00
7.86
1
100.00
3.93
Acceleration lane
1
150.00
7.86
1
90.00
7.11
1
450.00
6.36
1
90.00
3.18
Road improvement under interchange
2
1090.60
8.68
Service road in Inter change(From ORR)
1
584.00
8.87
Service road in Inter change (From NH)
1
648.00
8.87
Service road in Inter change (From ORR)
1
646.00
8.87
Service road in Inter change (From NH)
1
676.00
8.87
Description

vi) Side Road Improvement


2 L VUPs
6 L VUPs
PUPs
Rotaries
Inter change
vii) Busbays

viii) Median openings


TOTAL PRIME COAT
Add Sundries 3 %
GRAND TOTAL
4.02

Quantity

Total Quantity

864.90
3537.00
353.70
786.00
393.00
4203.20
1136.00
568.00
1704.00
864.90
3537.00
353.70
2342.28
786.00
393.00
1179.00
639.90
2862.00
286.20
18932.82
5177.16
5744.52
5726.79
5992.74

135,846.71

8
0
14
8
4

30.00
30.00
30.00
30.00
30.00

7.86
9.11
7.86
9.11
9.11

1886.40
0.00
3301.20
2186.40
1093.20

8,467.20

20
20

90.00
30.00

1.75
3.50

3150.00
2100.00

5,250.00

5.00

5.00

150.00

Unit

150.00
861,217.24
25,837.00
887,054.00

Sqm
Sqm
Sqm

Providing and applying bituminous Tack coat over prepared


surface with bituminous emulsion all complete as per
Technical Specification Clause 503
a) @ 2.75 kg / 10 sqm over granular surface treated with
primer
i) Main Carriage Way
Tack Coat (a) quantity on 8 laned road
Deduct fot Structures

2
2

11000.00
476.58

18.38
18.38

404360.00
-17519.23

386,840.77

Sqm

ii) Service Roads


Deduct fot Structures

2
2

8735.00
82.80

8.87
8.87

154871.55
-1468.04

153,403.51

Sqm

iii) Diversion Road

4650.00

10.00

46500.00

46,500.00

Sqm

iv) Rotary
Main rotary
Service Road rotary
Ramps
Acceleration lane
Acceleration lane
Acceleration lane
Acceleration lane
Decceleration lane
Decceleration lane
Decceleration lane
Decceleration lane
Road Improvement
Service roads

2
4
8
4
4
4
4
4
4
4
4
4
2

370.71
226.19
331.25
150.00
90.00
450.00
90.00
170.00
90.00
450.00
90.00
532.00
1528.00

12.36
12.36
11.36
7.36
5.61
3.86
1.93
7.36
5.61
3.86
1.93
8.68
8.87

9163.90
11183.06
30104.00
4416.00
2019.60
6948.00
694.80
5004.80
2019.60
6948.00
694.80
18471.04
27091.44

124,759.04

Sqm

1
1
1
1
1
1
1
1
1
1
1
1
1
1

333.00
100.00
100.00
100.00
100.00
1208.40
170.00
90.00
450.00
90.00
100.00
100.00
386.00
100.00

7.86
7.86
3.93
7.86
3.93
11.36
11.36
9.61
7.86
3.93
7.86
3.93
11.36
11.36

2617.38
786.00
393.00
786.00
393.00
13727.42
1931.20
864.90
3537.00
353.70
786.00
393.00
4384.96
1136.00

v) Interchange
ORR to free left
Decceleration lane
Acceleration lane
ORR to Right
Decceleration lane

Acceleration lane
NH to free left
Decceleration lane

20 of 41

Outer Ring Road - Phase II B


JBIC Package 5

Item
No.

Detailed Estimates

Detailed Quantity Calculations for JBIC Package 5 (From Km 72.00 to Km 83.00)


Breadth
Height
Nos.
Length (m)
(m)
(m)
1
100.00
5.68
Acceleration lane
1
150.00
11.36
1
90.00
9.61
1
450.00
7.86
1
90.00
3.93
NH to Right (Loop)
1
400.00
7.86
Decceleration lane
1
100.00
7.86
1
100.00
3.93
Acceleration lane
1
150.00
7.86
1
90.00
7.11
1
450.00
6.36
1
90.00
3.18
ORR to free left
1
207.00
7.86
Decceleration lane
1
100.00
7.86
1
100.00
3.93
Acceleration lane
1
100.00
7.86
1
100.00
3.93
ORR to Right
1
1158.40
11.36
Decceleration lane
1
170.00
11.36
1
90.00
9.61
1
450.00
7.86
1
90.00
3.93
Acceleration lane
1
100.00
7.86
1
100.00
3.93
NH to free left
1
370.00
11.36
Decceleration lane
1
100.00
11.36
1
100.00
5.68
Acceleration lane
1
150.00
11.36
1
90.00
9.61
1
450.00
7.86
1
90.00
3.93
NH to Right (Loop)
1
298.00
7.86
Decceleration lane
1
100.00
7.86
1
100.00
3.93
Acceleration lane
1
150.00
7.86
1
90.00
7.11
1
450.00
6.36
1
90.00
3.18
Road improvement under interchange
2
1090.60
8.68
Service road in Inter change(From ORR)
1
584.00
8.87
Service road in Inter change (From NH)
1
648.00
8.87
Service road in Inter change (From ORR)
1
646.00
8.87
Service road in Inter change (From NH)
1
676.00
8.87
Description

vi) Side Road Improvement


2 L VUPs
6 L VUPs
PUPs
Rotaries
Inter change
vii) Busbays

viii) Median openings


TOTAL TACK COAT (a)
Add Sundries 3 %
GRAND TOTAL

Quantity

Total Quantity

568.00
1704.00
864.90
3537.00
353.70
3144.00
786.00
393.00
1179.00
639.90
2862.00
286.20
1627.02
786.00
393.00
786.00
393.00
13159.42
1931.20
864.90
3537.00
353.70
786.00
393.00
4203.20
1136.00
568.00
1704.00
864.90
3537.00
353.70
2342.28
786.00
393.00
1179.00
639.90
2862.00
286.20
18932.82
5177.16
5744.52
5726.79
5992.74

135,846.71

8
0
14
8
4

30.00
30.00
30.00
30.00
30.00

7.86
9.11
7.86
9.11
9.11

1886.40
0.00
3301.20
2186.40
1093.20

8,467.20

20
20

90.00
30.00

1.75
3.50

3150.00
2100.00

5,250.00

5.00

5.00

150.00

Unit

150.00
861,217.24
25,837.00
887,054.00

Sqm
Sqm
Sqm

b) @ 2.25 kg /10 sqm over bituminous surface


i) Main Carriage Way
Tack Coat (b) quantity on 8 laned road
Deduct fot Structures

4
4

11000.00
476.58

18.25
18.25

803000.00
-34790.63

768,209.4

Sqm

ii) Service Roads


Deduct fot Structures

2
2

8735.00
82.80

8.79
8.79

153561.30
-1455.62

152,105.68

Sqm

iii) Rotary
Main rotary
Service Road rotary
Ramps
Acceleration lane
Acceleration lane
Acceleration lane
Acceleration lane
Decceleration lane
Decceleration lane
Decceleration lane
Decceleration lane
Road Improvement
Service roads

4
8
16
8
8
8
8
8
8
8
8
16
2

370.71
226.19
331.25
150.00
90.00
450.00
90.00
170.00
90.00
450.00
90.00
532.00
1528.00

12.10
12.10
11.10
7.10
5.35
3.60
1.80
7.10
5.35
3.60
1.80
8.55
8.79

17942.26
21895.64
58830.00
8520.00
3852.00
12960.00
1296.00
9656.00
3852.00
12960.00
1296.00
72777.60
26862.24

252,699.75

Sqm

iv) Interchange

21 of 41

Outer Ring Road - Phase II B


JBIC Package 5

Item
No.

Detailed Estimates

Detailed Quantity Calculations for JBIC Package 5 (From Km 72.00 to Km 83.00)


Breadth
Height
Nos.
Length (m)
(m)
(m)
ORR to free left
2
333.00
7.60
Decceleration lane
2
100.00
7.60
2
100.00
3.80
Acceleration lane
2
100.00
7.60
2
100.00
3.80
ORR to Right
2
1208.40
11.10
Decceleration lane
2
170.00
11.10
2
90.00
10.30
2
450.00
9.50
2
90.00
4.75
Acceleration lane
2
100.00
11.10
2
100.00
9.50
NH to free left
2
386.00
11.10
Decceleration lane
2
100.00
11.10
2
100.00
5.55
Acceleration lane
2
150.00
11.10
2
90.00
10.30
2
450.00
9.50
2
90.00
4.75
NH to Right (Loop)
2
400.00
7.60
Decceleration lane
2
100.00
7.60
2
100.00
3.80
Acceleration lane
2
150.00
7.60
2
90.00
6.80
2
450.00
6.00
2
90.00
3.00
ORR to free left
2
207.00
7.60
Decceleration lane
2
100.00
7.60
2
100.00
3.80
Acceleration lane
2
100.00
7.60
2
100.00
3.80
ORR to Right
2
1158.40
11.10
Decceleration lane
2
170.00
11.10
2
90.00
10.30
2
450.00
9.50
2
90.00
4.75
Acceleration lane
2
100.00
11.10
2
100.00
5.55
NH to free left
2
370.00
11.10
Decceleration lane
2
100.00
11.10
2
100.00
5.55
Acceleration lane
2
150.00
11.10
2
90.00
10.30
2
450.00
9.50
2
90.00
4.75
NH to Right (Loop)
2
298.00
7.60
Decceleration lane
2
100.00
7.60
2
100.00
3.80
Acceleration lane
2
150.00
7.60
2
90.00
6.80
2
450.00
6.00
2
90.00
3.00
Road improvement under interchange
4
1090.60
8.55
Service road in Inter change(From ORR)
1
584.00
8.79
Service road in Inter change (From NH)
1
648.00
8.79
Service road in Inter change (From ORR)
1
646.00
8.79
Service road in Inter change (From NH)
1
676.00
8.79
Description

v) Side Road Improvement


2 L VUPs
6 L VUPs
PUPs
Rotaries
Inter change
vii) Busbays

viii) Median openings


TOTAL TACK COAT (b)
Add Sundries 3 %
GRAND TOTAL
4.03

Providing and laying Bituminous Macadam (BM, Grading-2)


course in PCC using at the rate of 3.3% by weight of total
mix of 60/70 grade of bitumen, all complete as per MORTH
Technical Specification Clause No. 501 & 504
For Diversion Road
Profile Corrective Course
TOTAL BM quantity
Add Sundries 3 %
GRAND TOTAL

Quantity

Total Quantity

5061.60
1520.00
760.00
1520.00
760.00
26826.48
3774.00
1854.00
8550.00
855.00
2220.00
1900.00
8569.20
2220.00
1110.00
3330.00
1854.00
8550.00
855.00
6080.00
1520.00
760.00
2280.00
1224.00
5400.00
540.00
3146.40
1520.00
760.00
1520.00
760.00
25716.48
3774.00
1854.00
8550.00
855.00
2220.00
1110.00
8214.00
2220.00
1110.00
3330.00
1854.00
8550.00
855.00
4529.60
1520.00
760.00
2280.00
1224.00
5400.00
540.00
37298.52
5133.36
5695.92
5678.34
5942.04

253,813.94

16
0
28
16
8

30.00
30.00
30.00
30.00
30.00

7.50
8.75
7.50
8.75
8.75

3600.00
0.00
6300.00
4200.00
2100.00

16,200.00

40
40

90.00
30.00

1.75
3.50

6300.00
4200.00

10,500.00

12

5.00

5.00

300.00

22 of 41

4650

10

0.05

Unit

300.00
1,453,828.73
43,615.00
1,497,444.00

Sqm
Sqm
Sqm

2,325.00
2,325.00
70.00
2,395.00

Cum
Cum
Cum

2325.00

Outer Ring Road - Phase II B


JBIC Package 5

Item
No.
4.04

Detailed Estimates

Detailed Quantity Calculations for JBIC Package 5 (From Km 72.00 to Km 83.00)


Breadth
Height
Nos.
Length (m)
(m)
(m)
Providing and laying Dense Bituminous Macadam (DBM,
grading-2) course using 60/70 grade straight run bitumen
complete as per MORTH Technical Specification Clause No.
507 & 521
i) Main Carriage Way
2
11000.00
18.25
0.13
Deduct fot Structures
0.13
2
476.58
18.25
Description

Quantity

Total Quantity

Unit

52195.00
-2261.39

49,933.61

Cum

Cum

ii) Service Roads


Deduct fot Structures

2
2

8735.00
82.80

8.79
8.79

0.075
0.075

11517.10
-109.17

11,407.93

iii) Rotary
Main rotary
Service Road rotary
Ramps
Acceleration lane
Acceleration lane
Acceleration lane
Acceleration lane
Decceleration lane
Decceleration lane
Decceleration lane
Decceleration lane
Road Improvement
Service roads

2
4
8
4
4
4
4
4
4
4
4
8
2

370.71
226.19
331.25
150.00
90.00
450.00
90.00
170.00
90.00
450.00
90.00
532.00
1528.00

12.10
12.10
11.10
7.10
5.35
3.60
1.80
7.10
5.35
3.60
1.80
8.55
8.79

0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.075

1166.25
1423.22
3823.95
553.80
250.38
842.40
84.24
627.64
250.38
842.40
84.24
4730.54
2014.67

16,694.11

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1

333.00
100.00
100.00
100.00
100.00
1208.40
170.00
90.00
450.00
90.00
100.00
100.00
386.00
100.00
100.00
150.00
90.00
450.00
90.00
400.00
100.00
100.00
150.00
90.00
450.00
90.00
207.00
100.00
100.00
100.00
100.00
1158.40
170.00
90.00
450.00
90.00
100.00
100.00
370.00
100.00
100.00
150.00
90.00
450.00
90.00
298.00
100.00
100.00
150.00
90.00
450.00
90.00
1090.60
584.00
648.00
646.00
676.00

7.60
7.60
3.80
7.60
3.80
11.10
11.10
10.30
9.50
4.75
11.10
9.50
11.10
11.10
5.55
11.10
10.30
9.50
4.75
7.60
7.60
3.80
7.60
6.80
6.00
3.00
7.60
7.60
3.80
7.60
3.80
11.10
11.10
10.30
9.50
4.75
11.10
5.55
11.10
11.10
5.55
11.10
10.30
9.50
4.75
7.60
7.60
3.80
7.60
6.80
6.00
3.00
8.55
8.79
8.79
8.79
8.79

0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.075
0.075
0.075
0.075

329.00
98.80
49.40
98.80
49.40
1743.72
245.31
120.51
555.75
55.58
144.30
123.50
557.00
144.30
72.15
216.45
120.51
555.75
55.58
395.20
98.80
49.40
148.20
79.56
351.00
35.10
204.52
98.80
49.40
98.80
49.40
1671.57
245.31
120.51
555.75
55.58
144.30
72.15
533.91
144.30
72.15
216.45
120.51
555.75
55.58
294.42
98.80
49.40
148.20
79.56
351.00
35.10
2424.40
385.00
427.19
425.88
445.65

16,722.40

iv) Interchange
ORR to free left
Decceleration lane
Acceleration lane
ORR to Right
Decceleration lane

Acceleration lane
NH to free left
Decceleration lane
Acceleration lane

NH to Right (Loop)
Decceleration lane
Acceleration lane

ORR to free left


Decceleration lane
Acceleration lane
ORR to Right
Decceleration lane

Acceleration lane
NH to free left
Decceleration lane
Acceleration lane

NH to Right (Loop)
Decceleration lane
Acceleration lane

Road improvement under interchange


Service road in Inter change(From ORR)
Service road in Inter change (From NH)
Service road in Inter change (From ORR)
Service road in Inter change (From NH)

23 of 41

Outer Ring Road - Phase II B


JBIC Package 5

Detailed Estimates

Detailed Quantity Calculations for JBIC Package 5 (From Km 72.00 to Km 83.00)


Breadth
Height
Nos.
Length (m)
(m)
(m)

Item
No.

Description
v) Side Road Improvement
2 L VUPs
6 L VUPs
PUPs
Rotaries
Inter change
vi) Busbays

vii) Median openings


TOTAL DBM
Add Sundries 1%
GRAND TOTAL
4.05

4.06

Providing and laying Semi-dense Bituminous concrete


including cost of cleaning and applying tack coat, as per the
direction of the Engineer and Technical Specifications
Clauses 503 & 508.
i) Diversion road
Add Sundries 3 %
GRAND TOTAL

Quantity

Total Quantity

8
0
14
8
4

30.00
30.00
30.00
30.00
30.00

7.50
8.75
7.50
8.75
8.75

0.075
0.130
0.075
0.130
0.130

135.00
0.00
236.25
273.00
136.50

780.75

20
20

90.00
30.00

1.75
3.50

0.075
0.075

236.25
157.50

393.75

5.00

5.00

0.13

19.50

4650.00

10.00

0.025

1162.50

Unit

19.50
95,952.04
960.00
96,912.00

Cum
Cum
Cum

1,162.50
35.00
1,198.00

Cum
Cum

Providing and laying Bituminous Concrete wearing course


using Modified Bitumen as per drawing and Technical
Specification Clause No. 509 & 521.
i) Main Carriage Way
Deduct fot Structures

2
2

11000.00
476.584

18.20
18.20

0.05
0.05

20020.00
-867.38

19,152.62

Cum

ii) Service Roads


Deduct fot Structures

2
2

8735.00
82.8

8.75
8.75

0.04
0.04

6114.50
-57.96

6,056.54

Cum

iii) Rotary
Main rotary
Service Road rotary
Ramps
Acceleration lane
Acceleration lane
Acceleration lane
Acceleration lane
Decceleration lane
Decceleration lane
Decceleration lane
Decceleration lane
Road Improvement
Service roads

2
4
8
4
4
4
4
4
4
4
4
8
2

370.71
226.19
331.25
150.00
90.00
450.00
90.00
170.00
90.00
450.00
90.00
532.00
1528.00

12.00
12.00
11.00
7.00
5.25
3.50
1.75
7.00
5.25
3.50
1.75
8.50
8.75

0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.040

444.85
542.87
1457.50
210.00
94.50
315.00
31.50
238.00
94.50
315.00
31.50
1808.80
1069.60

6,653.62

Cum

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

333.00
100.00
100.00
100.00
100.00
1208.40
170.00
90.00
450.00
90.00
100.00
100.00
386.00
100.00
100.00
150.00
90.00
450.00
90.00
400.00
100.00
100.00
150.00
90.00
450.00
90.00
207.00
100.00
100.00
100.00
100.00
1158.40
170.00
90.00
450.00
90.00

7.50
7.50
3.75
7.50
3.75
11.00
11.00
10.25
9.50
4.75
11.00
9.50
11.00
11.00
5.50
11.00
10.25
9.50
4.75
7.50
7.50
3.75
7.50
6.75
6.00
3.00
7.50
7.50
3.75
7.50
3.75
11.00
11.00
10.25
9.50
4.75

0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050
0.050

124.88
37.50
18.75
37.50
18.75
664.62
93.50
46.13
213.75
21.38
55.00
47.50
212.30
55.00
27.50
82.50
46.13
213.75
21.38
150.00
37.50
18.75
56.25
30.38
135.00
13.50
77.63
37.50
18.75
37.50
18.75
637.12
93.50
46.13
213.75
21.38

iv) Interchange
ORR to free left
Decceleration lane
Acceleration lane
ORR to Right
Decceleration lane

Acceleration lane
NH to free left
Decceleration lane
Acceleration lane

NH to Right (Loop)
Decceleration lane
Acceleration lane

ORR to free left


Decceleration lane
Acceleration lane
ORR to Right
Decceleration lane

24 of 41

Outer Ring Road - Phase II B


JBIC Package 5

Item
No.

Detailed Estimates

Detailed Quantity Calculations for JBIC Package 5 (From Km 72.00 to Km 83.00)


Breadth
Height
Nos.
Length (m)
(m)
(m)
Acceleration lane
1
100.00
11.00
0.050
1
100.00
5.50
0.050
NH to free left
1
370.00
11.00
0.050
Decceleration lane
1
100.00
11.00
0.050
1
100.00
5.50
0.050
Acceleration lane
1
150.00
11.00
0.050
1
90.00
10.25
0.050
1
450.00
9.50
0.050
1
90.00
4.75
0.050
NH to Right (Loop)
1
298.00
7.50
0.050
Decceleration lane
1
100.00
7.50
0.050
1
100.00
3.75
0.050
Acceleration lane
1
150.00
7.50
0.050
1
90.00
6.75
0.050
1
450.00
6.00
0.050
1
90.00
3.00
0.050
Road improvement under interchange
2
1090.60
8.50
0.050
Service road in Inter change(From ORR)
1
584.00
8.75
0.040
Service road in Inter change (From NH)
1
648.00
8.75
0.040
Service road in Inter change (From ORR)
1
646.00
8.75
0.040
Service road in Inter change (From NH)
1
676.00
8.75
0.040
Description

v) Side Road Improvement


2 L VUPs
6 L VUPs
PUPs
Rotaries
Inter change
vi) Busbays

vii) Median openings


TOTAL BC
Add Sundries 1%
GRAND TOTAL
4.07

Providing and laying Dry Lean Cement concrete (DLC) as


per Table 600-1of Technical Specification Clause 601 with a
minimum cement content of 150kg/Cum.
CC Pavement below VUPs
Total VUPs
Interchange structures

Providing un-reinforced, dowel jointed, Pavement Quality


Concrete (PQC) of M 40 grade concrete with minimum
cement content of 400kg/Cum, including all costs of jointing,
edge cutting, dowel bars etc., all complete as per drawing
and Technical Specification Clause 602.
CC Pavement below VUPs
Total VUPs
Interchange structures

5.00
5.01

Providing and Laying cement concrete wearing coat M 30


grade including reinforcement complete as per Drawing and
Technical Specification 2702
Total PUPS
Sub Total
Add Sundries 3 %
GRAND TOTAL

6,637.45

30.00
30.00
30.00
30.00
30.00

7.50
8.75
7.50
8.75
8.75

0.040
0.050
0.040
0.050
0.050

72.00
0.00
126.00
105.00
52.50

355.50

20
20

90.00
30.00

1.75
3.50

0.04
0.04

126.00
84.00

210.00

5.00

5.00

0.05

7.50

1
1
1
1
1

167.72
50.00
50.00
25.00
25.00

150.00
13.00
13.00
13.00
13.00

0.15
0.15
0.15
0.15
0.15

1
1
1
1
1

167.72
50.00
50.00
25.00
25.00

150.00
13.00
13.00
13.00
13.00

0.30
0.30
0.30
0.30
0.30

Sub Total
Add Sundries 3 %
GRAND TOTAL
4.09

Total Quantity

55.00
27.50
203.50
55.00
27.50
82.50
46.13
213.75
21.38
111.75
37.50
18.75
56.25
30.38
135.00
13.50
927.01
204.40
226.80
226.10
236.60

8
0
14
8
4

Sub Total
Add Sundries 3 %
GRAND TOTAL
4.08

Quantity

BILL NO: 5 - CULVERTS


Earthwork in excavation of foundation for structures
complete with all leads and lifts as per drawing and
Technical Specification Clause 304.
a) In all types of soil including ordinary rock by mechanical
means (Excluding dewatering)
b) In all types of soil including ordinary rock by mechanical
means (Including dewatering)
c) In Hard rock requiring blasting
d) In Hard rock where blasting is prohibited
e) Rebate towards the excavated useful hard rock available
under item nos.501

47.40

8.00

0.10

7.50
39,073.22
391.00
39,464.00

Cum
Cum
Cum

4,066.00
122.00
4,188.00

Cum
Cum
Cum

8,132.00
244.00
8,376.00

Cum
Cum
Cum

265.00
8.00
273.00

Cum
Cum
Cum

642.00

642.00

Cum

3,855.00

3,855.00

Cum

1,285.00
642.00

1,285.00
642.00

Cum
Cum

1,542.00

Cum

3773.70
97.50
97.50
48.75
48.75
4066.20

7547.40
195.00
195.00
97.50
97.50
8132.40

265.44
265.44

1542.00

25 of 41

Unit

Outer Ring Road - Phase II B


JBIC Package 5

Item
No.
5.02

5.03

5.04

5.05

5.06

5.07

5.08

5.09

5.10

5.11

5.12

5.13
5.14

5.15

5.16

5.17

5.18

5.19

5.20

6.00
6.01

a)

Detailed Estimates

Detailed Quantity Calculations for JBIC Package 5 (From Km 72.00 to Km 83.00)


Breadth
Height
Nos.
Length (m)
(m)
(m)
Providing and laying approved sand filling in Foundation
Trenches as per Drawing & Technical Specification clause
1008 and conforming to the IS-383
Back filling behind abutments, wing walls/ retaining walls and
return walls with selected granular material of approved
quality complete as per drawing and Technical Specification
Clause 304 and 305.
a) With selected granular material of approved quality
b) With Sandy material
Providing and laying of Filter media of Stone aggregate
conforming to Technical Specifications Clause 2504.2.2
behind abutment, wing wall, retaining wall and return walls,
complete as per drawing and Technical Specifications
Clause 305 & 2504
Providing and laying Plain cement concrete M 15 for
leveling course etc. including centering and shuttering all
complete as per drawing and Technical Specifications
Section 1500 &1700
Providing and laying Plain cement concrete in open
foundation & substructure excluding cost of steel complete
as per drawing and Technical Specifications Section
1500,1700, 2100 & 2200
a) PCC Grade M 20
b) PCC Grade M 25
Providing and laying Reinforced cement concrete for
foundations & substructure excluding cost of steel complete
as per drawing and Technical Specifications Section
1500,1700, 2100 & 2200
a) RCC M 25 grade
Providing and laying Reinforced cement concrete for box /
slab culverts in superstructure excluding cost of steel
complete as per drawing and Technical Specifications
Sections 1500, 1700 and 2300
a) RCC Grade M 25
Providing, cutting, bending and fixing in position of TMT bar
Description

Quantity

Total Quantity

Unit

2,670.00

Cum

10,255.00
-

10,255.00
-

Cum
Cum

155.00

155.00

Cum

974.00

974.00

Cum

1,106.00
99.00

Cum
Cum

3,496.00

Cum

1,135.00

Cum

2,670.00

1,106.00
99.00
3,496.00
1,135.00

reinforcement in reinforced concrete structures complete as

per drawing and Technical Specifications Section 1600


a) In Foundation
b) In Substructure
c) In Superstructure
Providing, laying and jointing NP-4 (as per IS:458-2003)

224.00
304.00
169.00

Pipes for culverts, complete as per drawing and Technical

Specifications Section 2900 and IRC : SP No.13 - 1998.


a) H.P NP-4, 1200 mm Dia
Providing and laying filter material underneath stone pitching
in slopes complete as per drawing and Technical
Specification Section 2500.
Providing and laying stone pitching in slopes complete as per
drawing and Technical Specifications Section 2500.
Providing and laying Dry Boulder apron complete as per
Drawings and Technical Specifications Clause 2503.
Providing and fixing Weep holes in abutments, wing walls
and return walls complete as per drawing and Technical
Specification Clause 2706.
Providing and laying wearing course comprising of 50mm
Bituminous concrete on top of deck slab including cost of
tack coat, using modified bitumen meeting the requirements
given in table 500-29, laid to the required level and slope
after cleaning the surface, all complete as per clause 503,
509, 521, & 2702.
Providing Marker Post for buried culverts including synthetic
enamel painting with necessary details as per IRC: 7-1971
and direction of Engineer.
Providing and painting with Synthetic enamel paint of
approved quality for Culvert numbering, Type of Culvert
and Details of Span Arrangement as per IRC:7-1971 and as
directed by Engineer
Providing and Applying ordinary paints of approved quality
on surface of parapet/Crash Barrier of culverts as per
drawing and Technical Specifications Section 800.
Providing and constructing RCC crash barrier M 20 grade
including cost of centering, shuttering and reinforcement as
per approved Drawings and Technical Specifications Clause
809 and as per IRC-6.
Providing and fixing galvanized Drainage Spouts along with
drain pipes complete as per drawing and Technical
Specifications Clause 2705.
BILL NO: 6 - BRIDGES
Earthwork in excavation of foundation for structures
complete as per drawing and Technical Specifications
Clause 304 with all leads and lifts upto 5000m.
In ordinary soil by mechanical means(Excluding Dewatering) (Depth upto 3m)

26 of 41

224.00
304.00
169.00

Tonne
Tonne
Tonne

800.00

800.00

Cum

178.00

178.00

Cum

435.00

435.00

Cum

508.00

508.00

Cum

352.00

352.00

Nr.

210.00

210.00

Sqm

70.00

70.00

Nr.

114.00

114.00

Sqm

248.00

248.00

Sqm

180.00

180.00

Lm

16.00

16.00

Nr.

26,602.00

26,602.00

cum

Outer Ring Road - Phase II B


JBIC Package 5

Item
No.
b)
c)
d)
6.02

6.03

6.04

6.05

6.06

6.07

6.08

Detailed Estimates

Detailed Quantity Calculations for JBIC Package 5 (From Km 72.00 to Km 83.00)


Breadth
Height
Nos.
Length (m)
(m)
(m)
In ordinary soil by mechanical means(including Dewatering) (Depth upto 3m)
In ordinary soil by mechanical means(Excluding Dewatering) (3m-6m)
In ordinary soil by mechanical means(Including Dewatering) (3m-6m)
Providing and laying approved granular material Filling in
Foundation Trenches as per Drawing & Technical
Specification clause 1008 and conforming to the IS-383
Providing and constructing Back Fill behind abutments, wing
walls, retaining walls and return walls with selected material
of approved quality complete as per drawings and Technical
Specifications Clause 304 and 305.
With selected granular material of approved quality
Providing and constructing filter media behind abutments,
wing walls, retaining walls and return walls complete as per
Drawings and Technical Specifications Clause 305 and
2504.
Providing and laying Cement Concrete in foundation
including centering and shuttering all complete as per
Drawings and Technical Specifications Sections 1500,1700,
2100 and Technical Specifications Clause 304. (Excluding
the cost of surface reinforcement if any)
a) PCC Grade M 15
b) RCC Grade M 30
Providing and laying Cement Concrete in Sub-structure
including centering and shuttering etc. as per Drawings and
Technical Specifications Section 1500,1700 and 2200
(Excluding cost of steel)
a) RCC Grade M 30
(i) Upto 5m height
(ii) 5m - 10m height
(iii) >10m height
b) RCC Grade M 40
(i) Upto 5m height
(ii) 5m - 10m height
Providing and laying Reinforced Cement Concrete in Super
structure complete as per Drawing and Technical
Specifications Section 1500, 1700 & 2300.(Excluding cost of
steel). All values for mix from batching plant
a) RCC M 30
b) RCC M 35
Providing and laying Prestressed Cement Concrete in
Description

Super structure complete as per Drawing and Technical

6.10

6.11

6.12

6.13

6.14

6.15

6.16

Total Quantity

Unit

13,518.00

13,518.00

cum

2,650.00

2,650.00

cum

2,770.00

2,770.00

cum

7,827.00

7,827.00

cum

cost of steel). All values for mix from batching plant


a) PSC Grade M 40
b) PSC Grade M 45
c) PSC Grade M 50
Providing and laying Plain Cement concrete M-15 grade
leveling course below approach slab as per drawings and
Technical Specification Section 1500&1700
Providing and laying Reinforced Cement Concrete M-30
grade for approach slabs including cost of reinforcement
complete as per Drawings and Technical Specifications
Section 1500, 1600, 1700 and Clause 2704.
Providing and laying (65mm thick) wearing course
comprising of 50mm asphalt concrete over 15 mm thick
mastic asphalt on top of deck slab including cost of prime
coat meeting the requirements given in table 500-29,
prepared by using mastic cooker and laid to required level
and slope after cleaning the surface, all complete as per
Technical Specifications Clause 509,515 , 2702.
Crash Barrier
Providing and constructing RCC crash barrier M 40 grade
including cost of centering, shuttering and reinforcement as
per approved Drawings and Technical Specifications Clause
809 and as per IRC-6.
Providing and fixing the following types of expansion joints
complete as per Drawings and Technical Specifications
Section 2600.
a) Strip Seal Expansion Joint as per T.S. Clause 2607
b) Burried expansion Joint as per Cl 2604
Providing and fixing galvanized Drainage Spouts along with
drain pipes complete as per drawing and Technical
Specifications Clause 2705.
Providing and fixing bearings complete as per Drawings and
Technical Specifications Section 2000.
a) Elastomeric Bearings
b) Knuckle Bearing (POT TYPE) as per IRC-83 Part-I,
Clause 904 and as per T.S.Clause 2003.2(b)
150.0 -200.0 MT Capacity
Providing, cutting, bending and fixing in position of TMT
reinforcement complete as per Drawings and Technical
Specifications Section 1600.
a) In Foundation

30,357.00

cum

10,742.00

10,742.00

cum

2,755.00
14,807.00
9,511.00
5,234.00
1,633.00
36.00
4.00
4,822.00
11,160.00

2,755.00
14,807.00

cum
cum

9,511.00
5,234.00
1,633.00
36.00
4.00

cum
cum
cum
cum
cum

4,822.00
11,160.00

cum

1,246.00
1,333.00
345.00

1,246.00
1,333.00
345.00

cum
cum
cum

742.00

742.00

cum

2,061.00

2,061.00

cum

29,251.00

29,251.00

Sqm

2,330.00

2,330.00

Lm

999.00
651.00

999.00
651.00

Lm
Lm

220.00

220.00

Nr.

1,984,448.00

1,984,448.00

128.00

128.00

1,168.00

27 of 41

30,357.00

Specifications Section 1500, 1700,1800 & 2300.(Excluding

6.09

Quantity

1,168.00

Cucm

Nos

Tonne

Outer Ring Road - Phase II B


JBIC Package 5

Detailed Estimates

Detailed Quantity Calculations for JBIC Package 5 (From Km 72.00 to Km 83.00)


Breadth
Height
Nos.
Length (m)
(m)
(m)

Item
No.

Description

b) In Sub Structure
c) In Super Structure
High tensile steel wires/strands including all accessories for
stressing, stressing operations and grouting all complete as
per Technical Specifications Section 1800
Providing and laying filter material underneath Stone pitching
on embankment slopes complete as per Drawings and
Technical Specifications Section 2500.
Providing and laying Stone pitching in slopes complete as

6.17

6.18

6.19

per Drawings and technical Specifications Section 2500


Providing and fixing weep holes in abutments, wing walls
and return walls etc. as per Drawings and Technical
Specifications Clause 2706.
Providing and painting with Synthetic enamel paints of
approved quality on bridges with Bridge No. and Span
arrangements as per IRC-7,1971 and as directed by
Engineer
Providing and Applying ordinary paints of approved quality
on surface of parapets/Crash Barriers as per Drawings and
Additional Technical Specifications.
Providing and painting of flood gauge on sub-structure to full
height and 500 mm width as per the drawings and IRC:67 2001 as directed by the Engineer.
Providing HDPE Service pipe 150 mm dia (5.30 mm thick) of
approved quality in footpath complete as per Drawings and
directions of the Engineer
Supplying & placing inposition Void formers completeas per
additional technical specificatins
a)1000mm dia
Providing and construction of a gabian structure for retaining
earth with segments of wire crates of size 7mx3mx0.6m
each divided inti 1.5m compartments by cross netting, made
from 4mm galvanised steel wire @ 32kg per 10 sqm having
minimum tensile strength of 30 Mpa confirming to IS:280 and
galvanizing coating conforming to IS: 4826, woven into mesh
with double twist, mesh size not exceeding 100x100mm,
filled with boulders with leasr dimension of 200mm, all loose
ends to be tied with 4mm galvanized steel wire as per
drawing and Technical Specifications Clause 2503.3
Providing and constructing Back Fill behind Gabian walls
with boulders as per drawings and Technical Specifications
Clause 2500
Providing and Laying boulder apron on river bed for
protection against scour with stone boulders weighing not
less than 40 kg, as per Technical Specifications Section
2500
BILL NO: 7 - ROAD JUNCTIONS
Providing and Constructing footpath/paved separator
platform/paved part of medians and islands including cost of
providing and laying precast tiles of 25mm thick, preparation
of base, drain pipes all complete as per drawing and
Technical Specifications Clause 409.
Service Road
Service Roads in rotary portion
Service Roads in Interchange
Service road in Inter change(From ORR)
Service road in Inter change (From NH)
Service road in Inter change (From ORR)
Service road in Inter change (From NH)
Deduction for structures
Add Sundries 3 %
GRAND TOTAL

6.20

6.21

6.22

6.23

6.24

6.25

6.26

6.27

6.28

7.00
7.01

7.02

Quantity

Total Quantity

Unit

1,699.00
2,219.00

1,699.00
2,219.00

Tonne
Tonne

113.00

113.00

Tonne

561.00

561.00

cum

1,269.00

1,269.00

Cum

6,775.00

6,775.00

Nr.

112.00

112.00

Sqm

5,806.00

5,806.00

Sqm

46.00

46.00

Lm

946.00

946.00

Lm

2,754.00

2,754.00

Lm

1,380.00

1,380.00

Cum

7,150.00

7,150.00

Cum

567.00

567.00

Cum

56,669.54
1,700.00
58,370.00

Sqm
Sqm

2
2

8735.00
1528.00

2.50
2.50

43675.00
7640.00

1
1
1
1
1

584.00
648.00
646.00
676.00
412.18

2.50
2.50
2.50
2.50
2.50

1460.00
1620.00
1615.00
1690.00
-1030.46

Providing and Laying NP-4 pipes of 1000 mm dia for utility


culverts at junctions complete as per drawing and Technical
Specifications Section 2900 and IRC: SP 13 1973.
24

456.00

19.00

GRAND TOTAL

8.00

BILL NO: 8 - DRAINAGE AND PROTECTION WORKS

8.01

Providing and Laying of Turfing on embankment slopes and


on median islands with green grass sods as per Technical
Specification Clause No. 307
Main Carriage Way on Rly side(RS)
Deduction for Structures & RE/Retaining wall
Main Carriage Way on Left side
Deduction for Structures
Left service road inner side
Deduction for Structures & Retaining wall
Right service road inner side
Deduction for Structures & Retaining wall

i)
ii)
iii)
iv)

1
1
1
1
1
1
1
1

28 of 41

816.83

13.66

258.42

6.55

68.80

9.44

68.80

9.56

143705.36
-11158.10
21504.41
-1693.59
9719.73
-649.68
16244.64
-658.02

456.00
456.00

Lm
Lm

Outer Ring Road - Phase II B


JBIC Package 5

Detailed Estimates

Item
No.
v)
vi)
vii)
viii)

8.02

8.03

8.04

8.05

Detailed Quantity Calculations for JBIC Package 5 (From Km 72.00 to Km 83.00)


Breadth
Height
Nos.
Length (m)
(m)
(m)
1
Left service road outer side
1
68.80
3.06
Deduction for Structures & Retaining wall
1
Right service road outer side
1
68.80
3.46
Deduction for Structures & Retaining wall
8
331.25
8.94
Rotary Ramps
1
3160.80
11.74
Interchange
Add Sundries 3 %
GRAND TOTAL
Description

Providing and Laying granular filter material underneath


stone pitching on embankment slopes complete as per
drawing and as per clause 2500 and Additional Technical
Specifications.
i) Main Carriage Way Left Side
Deduction for Structures & RE/Retaining wall
TOTAL Filter Material quantity
Add Sundries 3 %
GRAND TOTAL
Providing and Laying stone pitching on embankment slopes
complete as per drawing and Technical Specifications
Section 2500
a) Dry Stone pitching with 300mm thick
i) Main Carriage Way Left Side
Deduction for Structures & RE/Retaining wall
TOTAL Dry Stone pitching quantity
Add Sundries 3 %
GRAND TOTAL
Supplying & Planting flowering plants and shrubs in the
median as per additional technical specifications
i) Main Carriage Way

Providing and constructing lined surface drains to the


required lines and grades as per drawing and Technical
Specifications Clause 309 and Section 1700.
a) Covered drain with 100 mm thick M 25 grade RCC slab at
Underpasses
b) At Busbays
TOTAL Covered Drain quantity
Add Sundries 3 %
GRAND TOTAL
b) Median Transverse chutes with M 15 grade concrete in
superelevated portions with 750mm and 450mm wide
openings.
i) Main Carriage Way
Total Median Transverse Drain quantity as per calculations
in Super Elevated Portions

1
1

1
1

42713.87
558.42

42713.87
558.42

5.94

5.94

0.15
0.15

0.30
0.30

Quantity
3970.76
-210.44
8064.03
-237.73
23702.32
37105.76

6407.08
-497.58

12814.16
-995.16

8.06

Unit

249,409.45
7,482.00
256,891.00

Sqm
Sqm
Sqm

6,407.08
(497.58)
5,909.50
177.00
6,086.00

Cum
Cum
Cum

12,814.16
(995.16)
11,819.00
355.00
12,174.00

Cum
Cum
Cum

10.48
10.00

10.48

Km

169.60

339.20

339.20

20

120.00

2400.00

2,400.00
2,739.20
82.00
2,821.00

Lm
Lm
Lm

562.50

Lm

562.50
17.00
580.00

Lm

125.00

4.50

562.50

TOTAL Median Transverse Drain quantity


Add Sundries 3 %
GRAND TOTAL
c) Lined surface drains to the required lines and grades as
per drawing and technical specification clause 309
Main carriage way
Left service road
Right service road
Service roads in rotary portion
Road improvement in rotary portion
Service roads in Interchange portion
Road improvement in Interchange portion
Add Sundries 3 %
GRAND TOTAL

Total Quantity

2
1
2
4
8
1
1

10033.17
4132.20
5472.20
1528.00
532
2554.00
1090.60

20066.33
4132.20
10944.40
6112.00
4256.00
2554.00
1090.60

Lm

49,155.53
1,475.00
50,631.00

Lm

23,907.43
23,907.43
717.00
24,624.00

Lm
Lm
Lm

Providing and laying Plain Cement Concrete M 20 kerb as


per drawing and Technical Specifications Clauses 408 and
Section 1700.
a) M-20 Grade Median Kerb "A" Type Section
i) Main Carriage Way
Road Improvement at Rotaries
Road improvement in Interchange portion
TOTAL Median Kerb quantity
Add Sundries 3 %
GRAND TOTAL

2
8
1

9280.42
532
1090.6

18560.83
4256.00
1090.60

b) M-20 Grade Median Kerb "L" Type Section


i) Main Carriage Way
At Rotaries on Main Carriageway
At Rotaries on Service Roads
TOTAL"L" Median Kerb quantity

2
2
2

29 of 41

1243.00
248.21
188.50

2486.00
496.42
376.99

2,486.00
496.42
376.99
3,359.41

Lm

Lm

Outer Ring Road - Phase II B


JBIC Package 5

Detailed Estimates

Detailed Quantity Calculations for JBIC Package 5 (From Km 72.00 to Km 83.00)


Breadth
Height
Nos.
Length (m)
(m)
(m)

Item
No.

Description

Quantity

Add Sundries 3 %
GRAND TOTAL
8.07

Providing and Construction of water chutes with NP-2 (as


per IS-458-1988) 300 dia RCC pipe (Semi circular)
embedded in PCC M 15 including all costs of material and
concreting works as per drawing and Additional Technical
Specifications.
i) Main Carriage Way
Water Chutes quantity (chutes kept at 10m interval at Super
elevated portions)
Water Chutes quantity (chutes kept at 20m interval at High
embankment portions)

Retaining wall
Earthwork in excavation for foundation complete as per
Technical Specifications Clause 304 in all types of Soil.
Providing, laying and compacting filter material behind
retaining walls complete as per drawing and Technical
specifications Clauses 305 & 2504
Providing and laying Plain cement concrete of M 15 grade in

G
8.09

Lm
Lm

17.92

2240.43

2,240.43

273.00

17.92

4893.10

4,893.10
7,133.53
214.00
7,348.00

Lm
Lm

Qty per meter


1

8090.00

35722.20

35,722.00

Cum

8090.00

12284.70

12,285.00

Cum

8090.00

4465.28

4,465.00

Cum

8090.00

9624.30

9,624.00

Cum

8090.00

7761.05

7,761.00

Cum

(TMT bars) for foundation, Structure complete as per

8090.00

1222.38

1,222.00

MT

Drawings and Technical Specifications Section 1600


Providing and fixing weep holes in retaining walls as per
Drawings and Technical Specifications Section 2700.
Providing and Constructing Water harvesting unit at every

8090.00

15520.00

15,520.00

Nos.

23.00

46.00

open foundation & substructure complete as per drawing and


D

Unit

101.00
3,460.00

125.00

Add Sundries 3 %
GRAND TOTAL
8.08
A

Total Quantity

Technical Specifications Section 1500,1700, 2100 & 2200


Providing and laying M 30 grade Reinforced cement
concrete for foundation and structure complete as per
drawing and Technical Specifications Section 1500, 1700,
2100 and 2200 (Excluding Cost of Steel)
Providing and laying M 30 grade Reinforced cement
concrete for substructure complete as per drawing and
Technical Specifications Section 1500, 1700 and 2200
(Excluding Cost of Steel)
Providing, Cutting, Bending and Fixing of TMT reinforcement

500m intervals on either side of the carriage way as per the


drawings and as Additional Technical Specification.
2
8.10

46.00

Nr.

Construction of Reinforced Earth structures including supply


of all components with facia panels. Soil Reinforcing
element,

foundation

beam,

capping

beam

including

treatment/ improvement/ strengthening of ground, if required,


complete as per Additional Technical Specification.
a) Facia Panels with Sloped Surcharge
Facia Panels area for Main Carriageway
Deduction
Deduction for vertical surcharge RE wall

b) Facia Panels with VerticalSurcharge


Rotary Rly side
Behind structures
Rly side vertical surcharge RE wall
Interchange
Rly side
Deductions for strucutres
at structure location

8.11

Providing and Laying of selected granular soil behind


reinforced earth structure including compaction complete as
per Additional Technical Specification.
Main Carriageway
Deduction
Rotary Rly side
Behind structures
Rly side vertical surcharge RE wall
Interchange
Rly side
Deductions for strucutres
at structure location

1
16
1
16

3220.00
13.00
294.78
15.00

5.54
5.54
5.54

17831.28
1151.83
-1632.41
-1329.04
16021.66

2
4
20
10

748.10
90.00
42.40
15.00

7.00
5.50
7.50
7.50

10473.40
1980.00
6360.00
1125.00

1
1
1

915.00
63.20
640

7.50
7.50
6.50

6862.50
-474.00
4160.00
30486.90

1
16
1
2
4
20
10

3220.00
13.00
294.78
748.10
90.00
42.40
15.00

10.00
10.00
10.00
10.00
10.00
10.00

5.54
5.54
7.00
5.50
7.50
7.50

178312.80
11518.34
-16324.15
104734.00
19800.00
63600.00
11250.00

1
1
1

915.00
63.20
640.00

10.00
10.00
10.00

7.50
7.50
6.50

68625.00
-4740.00
41600.00

30 of 41

16,021.66
16,022.00

Sqm

30,486.90
30,487.00

Sqm

Outer Ring Road - Phase II B


JBIC Package 5

Detailed Estimates

Detailed Quantity Calculations for JBIC Package 5 (From Km 72.00 to Km 83.00)


Breadth
Height
Nos.
Length (m)
(m)
(m)

Item
No.

Description

Quantity
478375.99

8.12

Rly side vertical surcharge RE wall


Interchange
Rly side
Deductions for strucutres
at structure location

2
4
10

748.10
90.00
15.00

1496.20
360.00
150.00

1
1
1

915.00
63.20
640.00

915.00
-63.20
640.00
3498.00

9.03

Cum

6,996.00
6,996.00

Rmt

1.00

Nr.

176.00
36.00

Nr.
Nr.

8.00

Nr.

BILL NO: 9 - MISCELLANEOUS & SAFETY


Construction of HTM system which includes Emergency
communication system, Mobile communication system,
Variable Message Sign System, Meteoroligical Data system,
Automatic traffic counter-cum-classifier system & Power
supply system as per drawing and additional technical
specifications
1.00

1
9.02

Unit

478,375.99
478,376.00

Construction of RCC M 40 grade crash barrier and friction


slab including cost of reinforcement complete as per
approved Drawings and Additional Technical Specifications.
Rotary Rly side

9.00
9.01

Total Quantity

Providing and fixing PCC/RCC hectometre, kilometre and


5th kilometre stones including cost of reinforcement
complete as per Technical Specifications Clause 804.
Length

No. per km

11000.00
11000.00
Length
11000.00

4.00
1.00
Interval
5.00

Length (m)

Interval

Width(m)

11000.00

0.33

0.10

2200.00

4
8
16
4
4
0
0
4
4
0
0
8

370.708
226.195
331.250
150.000
90.000
450.000
90.000
170.000
90.000
450.000
90.000
532.000

0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33

0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

49.43
60.32
176.67
20.00
12.00
0.00
0.00
22.67
12.00
0.00
0.00
141.87

0.00
0
0
0
0
1
1
1
0
0
1
1
1
1
1
1
1
0
0
0
0
0
0
0
0
0

333.00
100.00
100.00
100.00
100.00
1208.40
170.00
90.00
450.00
90.00
100.00
100.00
386.00
100.00
100.00
150.00
90.00
450.00
90.00
400.00
100.00
100.00
150.00
90.00
450.00
90.00

0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33

0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

0.00
0.00
0.00
0.00
0.00
40.28
5.67
3.00
0.00
0.00
3.33
3.33
12.87
3.33
3.33
5.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

a) 200-metre stone
b) Kilometre stone

2
2

c) 5th km. stone

176.00
36.00
8.00

Providing and Laying Pavement marking with hot applied


thermoplastic material complete as per drawing and
Technical Specifications Clause 803.
a) Lane/ Centre line/ Edge marking/ Transverse marking and
any other marking
i) Main Carriage Way

Lane Marking
Rotary
Main rotary
Service Road rotary
Ramps
Acceleration lane
Acceleration lane
Acceleration lane
Acceleration lane
Decceleration lane
Decceleration lane
Decceleration lane
Decceleration lane
Road Improvement
Interchange
ORR to free left
Decceleration lane
Acceleration lane
ORR to Right
Decceleration lane

Acceleration lane
NH to free left
Decceleration lane
Acceleration lane

NH to Right (Loop)
Decceleration lane
Acceleration lane

No. of
sides
6

31 of 41

Outer Ring Road - Phase II B


JBIC Package 5

Item
No.

Detailed Estimates

Detailed Quantity Calculations for JBIC Package 5 (From Km 72.00 to Km 83.00)


Breadth
Height
Nos.
Length (m)
(m)
(m)
0.33
0.10
ORR to free left
0
207.00
0.33
0.10
Decceleration lane
0
100.00
0.33
0.10
0
100.00
0.33
0.10
Acceleration lane
0
100.00
0.33
0.10
0
100.00
0.33
0.10
ORR to Right
1
1158.40
0.33
0.10
Decceleration lane
1
170.00
0.33
0.10
1
90.00
0.33
0.10
0
450.00
0.33
0.10
0
90.00
0.33
0.10
Acceleration lane
1
100.00
0.33
0.10
1
100.00
0.33
0.10
NH to free left
1
370.00
0.33
0.10
Decceleration lane
1
100.00
0.33
0.10
1
100.00
0.33
0.10
Acceleration lane
1
150.00
0.33
0.10
1
90.00
0.33
0.10
0
450.00
0.33
0.10
0
90.00
0.33
0.10
NH to Right (Loop)
0
298.00
0.33
0.10
Decceleration lane
0
100.00
0.33
0.10
0
100.00
0.33
0.10
Acceleration lane
0
150.00
0.33
0.10
0
90.00
0.33
0.10
0
450.00
0.33
0.10
0
90.00
0.33
0.10
Road improvement under interchange
2
1090.60
No. of
Width(m)
Length (m)
sides
0.15
4
11000.00
Edge Marking & Median kerb side marking
Rotary
0.15
4
370.71
Main rotary
0.15
8
226.19
Service Road rotary
0.15
16
331.25
Ramps
0.15
8
150.00
Acceleration lane
0.15
8
90.00
Acceleration lane
0.15
8
450.00
Acceleration lane
0.15
4
90.00
Acceleration lane
0.15
8
170.00
Decceleration lane
0.15
8
90.00
Decceleration lane
0.15
8
450.00
Decceleration lane
0.15
4
90.00
Decceleration lane
0.15
16
532.00
Road Improvement
Interchange
0.15
2
333.00
ORR to free left
0.15
2
100.00
Decceleration lane
0.15
1
100.00
0.15
2
100.00
Acceleration lane
0.15
1
100.00
0.15
2
1208.40
ORR to Right
0.15
2
170.00
Decceleration lane
0.15
2
90.00
0.15
2
450.00
0.15
1
90.00
0.15
2
100.00
Acceleration lane
0.15
1
100.00
0.15
2
386.00
NH to free left
0.15
2
100.00
Decceleration lane
0.15
1
100.00
0.15
2
150.00
Acceleration lane
0.15
2
90.00
0.15
2
450.00
0.15
1
90.00
0.15
2
400.00
NH to Right (Loop)
0.15
2
100.00
Decceleration lane
0.15
1
100.00
0.15
2
150.00
Acceleration lane
0.15
2
90.00
0.15
2
450.00
0.15
1
90.00
0.15
2
207.00
ORR to free left
0.15
2
100.00
Decceleration lane
0.15
1
100.00
0.15
2
100.00
Acceleration lane
0.15
1
100.00
0.15
2
1158.40
ORR to Right
0.15
2
170.00
Decceleration lane
0.15
2
90.00
0.15
2
450.00
0.15
1
90.00
0.15
2
100.00
Acceleration lane
0.15
1
100.00
0.15
2
370.00
NH to free left
0.15
2
100.00
Decceleration lane
Description

32 of 41

Quantity
0.00
0.00
0.00
0.00
0.00
38.61
5.67
3.00
0.00
0.00
3.33
3.33
12.33
3.33
3.33
5.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
72.71

6600.00
222.42
271.43
795.00
180.00
108.00
540.00
54.00
204.00
108.00
540.00
54.00
1276.80
99.90
30.00
15.00
30.00
15.00
362.52
51.00
27.00
135.00
13.50
30.00
15.00
115.80
30.00
15.00
45.00
27.00
135.00
13.50
120.00
30.00
15.00
45.00
27.00
135.00
13.50
62.10
30.00
15.00
30.00
15.00
347.52
51.00
27.00
135.00
13.50
30.00
15.00
111.00
30.00

Total Quantity

Unit

Outer Ring Road - Phase II B


JBIC Package 5

Item
No.

Detailed Estimates

Detailed Quantity Calculations for JBIC Package 5 (From Km 72.00 to Km 83.00)


Breadth
Height
Nos.
Length (m)
(m)
(m)
0.15
1
100.00
0.15
2
150.00
Acceleration lane
0.15
2
90.00
0.15
2
450.00
0.15
1
90.00
0.15
2
298.00
NH to Right (Loop)
0.15
2
100.00
Decceleration lane
0.15
1
100.00
0.15
2
150.00
Acceleration lane
0.15
2
90.00
0.15
2
450.00
0.15
1
90.00
0.15
4
1090.60
Road improvement under interchange
ii) Service Roads
0.33
0.10
2
8735.00
1.00
0.15
4
8735.00
in rotary portion
0.33
0.10
2
1528.00
1.00
0.15
4
1528.00
in Interchange portion
0.33
0.10
1
2554.00
1.00
0.15
2
2554.00
TOTAL Pavement quantity
Add Sundries 3 %
GRAND TOTAL
Description

Quantity

Total Quantity

Unit

25,326.34
760.00
26,086.00

Sqm
Sqm
Sqm

15.00
45.00
27.00
135.00
13.50
89.40
30.00
15.00
45.00
27.00
135.00
13.50
654.36
582.33
5241.00
101.87
916.80
85.13
766.20

b) Directional Arrows, Lettering etc. as per drawing No.61 of


MORTH Type Designs for Intersections on National
Highways
68.00

68

68.00
68.00

Nr.

446.25

446.25
13.00
459.00

Sqm
Sqm
Sqm

398.00
136.00

398.00
136.00

Sqm
Sqm

80.00

80.00

Sqm

50.00

50.00

Nr.

GRAND TOTAL
c) Pedestrian Crossing at junctions and median openings
Total Pedestrain Crossings Quantity
Add Sundries 3 %
GRAND TOTAL
9.04

34

8.75

1.50

Supplying and fixing sign boards and as directed by


Engineer, including the cost of posts, fitting and fixing.
Sheeting will be retro reflective sheeting confirming to
Section 800 and messages/borders will be screen printed

complete as per Technical Specifications Clause 801.


Informatory signs
a) Facility information Signs
b) Direction / Place Identification signs
c) Advance Direction / Destination / Reassurance / Place
Identification signs
d) Route marker signs(450mm x 600mm)

Cautionary signs, size triangular 1200mm side

58.00

58.00

Nr.

Mandatory signs, size


a) Circular 600 mm dia
b) Circular 900 mm dia
c) Triangular 1200 mm side

50.00
28.00
50.00

50.00
28.00
50.00

Nr.
Nr.
Nr.

12.00

12.00

Nr.

400.00
104.00
2898.00
880.00

400.00
104.00
2,898.00
880.00

Nr.
Nr.
Nr.
Nr.

900.00

900.00

9.05

Supplying and fixing overhead signs including cost of posts,


truss, erection, fitting and foundations. Sheeting will be retro
reflective micro sheeting confirming to section 800 and
message/borders will be screen-printed complete as per
drawing and Technical Specifications Section 800.
a) Four lane overhead Tubular Gantry Signs with retro
reflective sheeting of area 31.05 sqm

9.06

9.07

Providing and Fixing road delineators, Raised pavement


markers etc. complete as per drawing and Technical
Specifications Clause 805, 812, 813 and as directed by
Engineer.
a) Hazard Markers
b) Object Markers
c) Raised pavement markers (Road studs)
d) Crash barrier indicators
Providing & Maintenance of mobile cellular phones of Nokia,
Samsung or equivalent make with SIM card for Employer,
Engineer and his supervisory staff including cost of mobile
cellular phone and using charges complete as per Technical
Specifications Clause 123A.
1

9.08

Providing and Maintaining vehicles for the Employer,


Engineer and other supervisory staff including providing
driver, POL etc. complete as per Technical Specification
Clause 124 .

33 of 41

Sets

Outer Ring Road - Phase II B


JBIC Package 5

Item
No.

9.09

Detailed Estimates

Detailed Quantity Calculations for JBIC Package 5 (From Km 72.00 to Km 83.00)


Breadth
Height
Nos.
Length (m)
(m)
(m)
a) Air Conditioned New Vehicle of capacity more than
1
2000cc (A/C), Innova, Scropio, Quallis or Equivalent on Hire
charges basis
b) Air Conditioned New Vehicle of capacity more than
1
1400cc, Sumo, Ambassador, Bolero or Equivalent on Hire
charges basis
Description

Quantity

Total Quantity

Unit

3600.00

3,600.00

Veh Day

5400.00

5,400.00

Veh Day

500.00

500.00

Nr.

200.00

200.00

Nr.

10.00

10.00

Nr.

Supply of colour photographs (2 prints each) along with


digital soft copy stored in CD and printed photos mounted in
album as per Technical Specifications Clause 125

9.10

9.11

9.12

Supplying additional prints (size 15cm x 10 cm) of colour


record photographs as per Technical Specification Clause
125.

Supplying colour VCD/DVD records before the construction,


during construction stage & after construction, consisting of
each set of edited master cassettes and VCDs/DVDs with 4
copies each complete as per Technical Specification Clause
126.

Providing and Maintaining the detour temporary diversion


partial closure of existing carriage way, switch over of the
traffic from widened and unwidened section and vice versa
including additional safety boards and safety apparatus
during construction as per drawing and Technical
Specification Clause No. 112 and Additional Technical
Specification and as per directions of the Engineer.
Temporary barricading (Steel Type) with markings and
arrows made of retro reflective sheeting as directed by
Engineer
Temporary barricading using HDPE blocks in red and white
colours
Retro reflective Cautionary / Warning signs

Cones

Solar Blinkers

Red reflective tapes

9.13

Providing and fixing Chain link fencing with L angles


complete with gate, painting, concrete base and foundation
complete as per drawing and Technical Specifications
Section 1000 & 1900 and Clause 807.

1395.00

1,395.00

4185.00

4,185.00

100.00

100.00

30.00

30.00

50.00

10483.17

50.00

1000.00

1,000.00

41932.66

41,933.00
41,933.00

9.14

Lm month
Lm month
Nr.month
Nr.month
Nr.month
Lm

Lm

Providing passenger shelters for Bus Bays as per drawing


20.00

20

20.00

and Technical Specifications Section 1500, 1600 and 1700.

9.15

Providing and fixing Galvanized Metallic "W" shape beam


crash barrier complete as per drawing and Technical
Specifications Clause 810.
a) Metal Beam Crash barrier
i) Main Carriage Way
All Along the road
Ramaps at rotary location
Ramaps at Interchanege location

2
16
2

10523.42
331.25
4360.80

20.00

Nr.

21,046.83
5,300.00
8,721.60
35,068.43
1,052.00
36,120.00

Lm
Lm

13,200.00
13,200.00

Lm

1120.24
124.16
300.20
1544.60

1,545.00

Lm.

527.34
527.34

528.00

Lm

21046.83
5300.00
8721.60

Add Sundries 3 %
GRAND TOTAL
9.16

Supplying & fixing of Noise barriers as per the drawing &


additional technical specification
2

9.17

Providing, Laying and Jointing NP-4 (as per IS:458-2000)


casing/conduit pipes for Main carriageway and NP-2 (as per
IS:458-2000) casing/conduit pipes for Service Roads for
carrying the utility line (cables etc.) complete as per
Additional Technical Specification.
a) Dia 600 mm - NP4
Rotaries
Interchange
b) Dia 300 mm - NP2
Service Roads

22
8
10

34

34 of 41

6600.00

50.92
15.52
30.02

15.51

13200.00

Outer Ring Road - Phase II B


JBIC Package 5

Item
No.
9.18

a)

b)

c)

9.19

9.20

9.21

9.22

Detailed Estimates

Detailed Quantity Calculations for JBIC Package 5 (From Km 72.00 to Km 83.00)


Breadth
Height
Nos.
Length (m)
(m)
(m)

Description

Providing, Laying and Jointing HDPE pipes (5.30mm thick)


of approved quality for carrying the utility cables, including
bedding, cost of pipes, labour charges, transportation
charges, etc. complete as per Drawing and as per Directions
of the Engineer.
Dia 110mm ( a set of 8 pipes )
Service road
Service Roads in rotary portion
Service road in Inter change(From ORR)
Service road in Inter change (From NH)
Service road in Inter change (From ORR)
Service road in Inter change (From NH)
Dia 110mm
Main Corridor (in earthen shoulders)
Dia 160mm
Main Corridor (in Median)
Service Road (in earthen shoulder)

Construction of Utility chambers for Utilitycables etc.


complete as perdrawings and as per the directionsof the
engineer.

2
2
1
1
1
1

8735.00
1528.00
584.00
648.00
646.00
676.00

Quantity

Total Quantity

Unit

17470.00
3056.00
584.00
648.00
646.00
676.00
23080.00

23,080.00

Lm

10523.42

21046.83

21,047.00

Lm

1
2
1

10523.42
8735
4082.00

10523.42
17470.00
4082.00
32075.42

32,075.00

Lm

22.00

Nos

22.00

22.00

Construction of Toll Plaza, Administrative Block & Toll booth


buildings including arrangement of electric supply, All
Electrical items like fans, Lights, Socket receptacles, and
Complete wiring, with requisite earthing, providing fire alarm
and fighting system like smoke detector, electric hooter with
battery back-up cabling and CO2 hand extinguisher,
providing water supply including all pipes, fittings, tanks, tube
wells, pumps, valves etc. complete with septic tank, sewer
lines, etc all complete as per drawing and Additional
Technical Specifications.
(a) Administrative block (6.1x2.43) +Change rooms
(12.2x2.43)
(b) Single Toll booths

3.00

3.00

Nos

24

24.00

24.00

Nos

Providing, installing and commissioning electrically operated


barrier gates complete as per Additional Technical
Specification and Manufacturer's Specification or as directed
by Engineer.
a) For 3.5 m wide Toll lane

24

24.00

24.00

Nos

Providing and casting M-20 guard post 200mm x 200mm x


650mm length including reinforcements 4 nos 12mm dia
TMT Vertical bars and 4 nos 8mm dia TMT stirrups over

250

250.00

250.00

Nos

11

11.00

11.00

Nos

1.00

1.00

No

retaining wall as per drawing and Technical Specifications


800, 1500, 1600, 1700 and as directed by the Engineer
9.23(a)

Construction of reinforced cement concrete M-15 grade Inlet


Chamber/Catch pit/Gully pit/Grease and Oil trap with GI bars
grating etc. all complete as per Drawing and Technical
Specifications Sections 1500, 1600, 1700 & 1900.

9.23(b)

10.00
10.01

Construction of reinforced concrete M-15 grade Hazardous


Chemical Holding Tank of suitable size at the locations
approved by the Engineer, as per Drawing and Technical
Specifications 1500, 1600, 1700 & 1900.
BILL NO: 10 - MAINTENANCE , REPAIRS &
REHABILITATION
Carrying out routine maintenance of Highway embankment
by restoration of rain cuts, earthen shoulders

as per

Technical Specifications Clause 3002 and as per the


directions of the Engineer (excluding bituminous work)

10.02

Carrying out treatment and repairs to pot holes and any


necessary patching to existing bituminous carriageway
surfacing as per Technical Specifications Clause 3004 and
as per the directions of the Engineer.
Shallow potholes (depth < 75 mm )

35 of 41

500.00

500.00

Cum

700.00

700.00

Sqm

Annexure 1

Details of Earthwork Cutting & Filling for JBIC Package 5 (From Km 72.00 to Km 83.00)
M

Chainage

Volume Cut (m3)

Volume Fill (m3)

72000.000
72010.000
72020.000
72030.000
72040.000
72050.000
72060.000
72070.000
72080.000
72090.000
72100.000
72110.000
72120.000
72130.000
72140.000
72150.000
72160.000
72170.000
72180.000
72190.000
72200.000
72210.000
72220.000
72230.000
72240.000
72250.000
72260.000
72270.000
72280.000
72290.000
72300.000
72310.000
72320.000
72330.000
72340.000
72350.000
72360.000
72370.000
72380.000
72390.000
72400.000
72410.000
72420.000
72430.000
72440.000
72450.000
72460.000
72470.000
72480.000
72490.000
72500.000
72510.000
72520.000
72530.000
72540.000
72550.000
72560.000
72570.000
72580.000
72590.000
72600.000
72610.000
72620.000
72630.000
72640.000
72650.000
72660.000
72670.000
72680.000
72690.000
72700.000
72710.000
72720.000
72730.000
72740.000
72750.000
72760.000
72770.000
72780.000
72790.000
72800.000
72810.000
72820.000
72830.000
72840.000
72850.000
72860.000
72870.000
72880.000
72890.000
72900.000
72910.000
72920.000
72930.000
72940.000
72950.000
72960.000
72970.000
72980.000
72990.000
73000.000
73010.000
73020.000
73030.000
73040.000
73050.000
73060.000
73070.000
73080.000
73090.000
73100.000
73110.000
73120.000
73130.000
73140.000
73150.000
73160.000
73170.000
73180.000
73190.000
73200.000
73210.000
73220.000
73230.000
73240.000
73250.000
73260.000
73270.000
73280.000
73290.000
73300.000
73310.000
73320.000
73330.000
73340.000
73350.000
73360.000
73370.000
73380.000
73390.000
73400.000
73410.000
73420.000
73430.000
73440.000
73450.000
73460.000
73470.000
73480.000
73490.000
73500.000
73510.000
73520.000
73530.000
73540.000
73550.000
73560.000
73570.000
73580.000
73590.000
73600.000
73610.000
73620.000
73630.000
73640.000
73650.000
73660.000
73670.000
73680.000
73690.000
73700.000
73710.000
73720.000
73730.000
73740.000
73750.000
73760.000
73770.000
73780.000
73790.000
73800.000
73810.000
73820.000
73830.000

0.000
787.668
799.185
848.727
914.032
973.694
1016.045
1051.183
1112.297
1130.318
1104.503
1094.627
1062.098
1031.750
1024.093
1022.020
1029.678
1061.036
1107.524
1148.880
1193.993
1203.977
1176.551
1158.515
1150.135
1134.167
1115.400
1047.542
912.263
766.806
641.144
558.346
475.733
368.233
266.339
171.307
89.912
61.140
74.975
88.065
100.020
122.454
163.252
209.366
246.661
273.608
235.083
205.248
244.277
286.317
337.215
385.386
421.915
449.823
464.233
457.096
453.411
452.702
430.463
415.681
411.743
396.981
371.456
352.556
337.919
305.957
268.279
232.481
174.573
119.673
75.930
54.956
52.085
36.306
26.452
47.214
61.384
73.710
116.200
183.779
228.312
244.847
295.951
404.427
531.289
653.120
777.031
899.689
1023.304
1137.071
1227.802
1293.108
1348.874
1407.366
1454.802
1474.014
1467.392
1394.294
1283.038
1257.933
1196.654
1037.936
912.967
787.498
653.571
557.489
503.136
480.616
438.210
375.696
341.511
322.535
285.845
247.048
214.040
173.216
125.278
75.078
36.821
24.418
53.641
44.329
7.156
6.394
8.198
8.944
22.048
38.684
75.707
148.820
234.665
317.204
373.044
416.161
465.310
514.827
550.395
589.904
642.318
688.872
719.171
735.046
758.502
790.691
820.182
848.313
875.060
886.173
882.948
883.531
882.332
885.212
882.499
863.279
856.025
896.838
961.616
1011.779
1074.797
1149.237
1202.505
1238.652
1333.327
1538.831
1863.844
2229.396
2505.737
2712.740
2881.836
2968.289
3154.215
3383.525
3451.166
3462.932
3517.412
3608.650
3715.398
3807.071
3872.914
3940.771
4014.509
4098.011
4154.230
4198.793

0.000
1267.357
1160.461
1034.298
936.295
877.662
829.051
823.473
857.368
831.862
749.276
648.272
586.824
563.937
536.990
509.587
482.136
452.965
412.286
369.055
332.146
290.138
257.519
240.568
227.249
215.860
216.799
301.309
465.252
646.915
866.539
1144.348
1491.151
1838.643
2117.982
2351.663
2569.797
2804.099
3037.465
3246.433
3428.110
3502.561
3429.685
3290.685
3154.636
3019.019
2965.423
2855.819
2648.641
2491.749
2361.212
2300.863
2300.747
2339.142
2402.379
2493.756
2623.146
2814.570
3062.434
3291.635
3200.166
3073.936
3211.418
3348.779
3499.651
3690.288
3955.668
4206.852
4389.957
4573.911
4771.334
4921.908
5025.649
5094.101
5123.730
5126.231
5146.524
5170.540
5192.445
5218.563
5175.519
4919.378
4689.246
4604.365
4472.500
4315.786
4154.457
4063.447
3950.980
3764.772
3590.859
3486.058
3411.954
3313.138
3266.836
3255.754
3337.412
3350.632
3306.525
3533.844
3885.076
4112.316
4249.224
4395.553
4517.814
4653.745
4791.018
4938.280
5100.190
5235.148
5407.737
5594.364
5729.124
5812.275
5827.038
5805.579
5851.091
5966.142
6081.233
6208.440
6444.925
6718.420
6722.086
6522.803
6280.083
6052.698
5824.710
5544.872
5233.515
4921.450
4625.768
4302.620
3972.250
3654.579
3321.472
3016.622
3034.047
3084.447
2875.420
2701.250
2630.580
2609.113
2485.385
2239.176
1987.961
1810.075
1693.278
1614.383
1538.251
1445.509
1350.997
1348.429
1386.690
1350.373
1278.766
1200.909
1086.402
925.790
758.220
601.870
461.846
327.559
193.811
63.589
1.274
2.311
1.976
0.881
5.425
9.572
9.434
4.672
0.010
0.054
0.108
1.243
4.543
12.154
8.855
0.316
0.249
1.762
2.946
6.048

Ht>4m
Embankment
(Rateaining
Ht (LS)
wall)
3.389
3.404
3.353
3.195
3.050
2.946
2.836
2.803
2.852
2.680
2.511
2.521
2.820
2.949
3.078
3.206
2.371
2.228
2.117
2.019
1.920
1.763
1.610
1.535
1.462
1.388
1.314
1.279
1.573
1.902
2.196
2.462
2.824
3.186
3.542
3.899
4.228
4.329
4.434
4.545
4.566
4.433
4.167
4.179
4.194
4.211
4.322
4.196
4.137
4.027
3.957
3.815
3.817
3.946
4.034
4.186
4.218
4.516
4.703
4.768
5.165
5.401
5.661
5.917
6.100
6.394
6.751
7.083
7.484
7.842
8.089
8.203
8.357
8.571
8.671
8.627
8.830
8.852
8.877
8.992
8.839
8.451
8.292
8.186
7.980
7.770
7.674
7.511
7.312
7.174
6.958
6.750
6.658
6.451
6.449
6.459
6.345
6.267
6.460
6.707
7.232
7.589
7.799
7.960
8.180
8.338
8.424
8.532
8.755
8.812
9.061
9.123
9.104
9.088
9.175
9.235
9.366
9.416
9.458
9.508
9.766
9.753
9.722
9.451
9.349
9.160
9.007
8.395
7.897
7.477
7.039
6.670
6.275
6.007
5.622
5.477
4.831
4.477
4.207
3.952
3.762
3.556
3.340
3.119
2.930
2.755
2.581
2.479
2.408
2.290
2.148
2.033
1.968
1.925
1.873
1.826
1.749
1.629
1.506
1.379
1.248
1.028
0.752
0.476
0.224
0.021
0.046
0.065
0.084
-0.144
-1.277
-1.182
-1.276
-1.397
-1.553
-1.699
-1.830
-1.964
-2.101
-2.239
-2.376
-2.400
-2.393
-2.404

4.23
4.33
4.43
4.54
4.57
4.43
4.17
4.18
4.19
4.21
4.32
4.20
4.14
4.19
4.22
4.52
4.70
4.77
5.17
5.40
5.66
5.92
6.10
6.39
6.75

6.96
6.75
6.66
6.45
6.45
6.46
6.35
6.27
6.46
6.71

6.67
6.27
6.01
5.62
5.48
4.83
4.48
4.21
-

Rateaining
wall Ht.
0.23
0.33
0.43
0.54
0.57
0.43
0.17
0.18
0.19
0.21
0.32
0.20
0.14
0.19
0.22
0.52
0.70
0.77
1.17
1.40
1.66
1.92
2.10
2.39
2.75

2.96
2.75
2.66
2.45
2.45
2.46
2.35
2.27
2.46
2.71

2.67
2.27
2.01
1.62
1.48
0.83
0.48
0.21
-

Rateaining Retaining
wall Avg wall Act.
Ht.
Ht.

0.23
0.28
0.38
0.49
0.56
0.50
0.30
0.17
0.19
0.20
0.27
0.26
0.17

0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75

0.19
0.20
0.37
0.61
0.74
0.97
1.28
1.53
1.79
2.01
2.25
2.57

0.75
0.75
0.75
0.75
0.75
1.00
1.50
1.50
2.00
2.00
2.50
2.50

2.96
2.85
2.70
2.55
2.45
2.45
2.40
2.31
2.36
2.58

2.67
2.47
2.14
1.81
1.55
1.15
0.65
0.34
-

3.00
3.00
3.00
2.50
2.50
2.50
2.50
2.50
2.50
2.50

3.00
2.50
2.00
2.00
1.50
1.50
0.75
0.75

Rateaining
wall length

10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00

10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00

10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
-

Ht>7m
(RE wall)

RE wall
Height

7.08
7.48
7.84
8.09
8.20
8.36
8.57
8.67
8.63
8.83
8.85
8.88
8.99
8.84
8.45
8.29
8.19
7.98
7.77
7.67
7.51
7.31
7.17
7.23
7.59
7.80
7.96
8.18
8.34
8.42
8.53
8.76
8.81
9.06
9.12
9.10
9.09
9.17
9.24
9.37
9.42
9.46
9.51
9.77
9.75
9.72
9.45
9.35
9.16
9.01
8.39
7.90
7.48
7.04
-

4.08
4.48
4.84
5.09
5.20
5.36
5.57
5.67
5.63
5.83
5.85
5.88
5.99
5.84
5.45
5.29
5.19
4.98
4.77
4.67
4.51
4.31
4.17
4.23
4.59
4.80
4.96
5.18
5.34
5.42
5.53
5.76
5.81
6.06
6.12
6.10
6.09
6.17
6.24
6.37
6.42
6.46
6.51
6.77
6.75
6.72
6.45
6.35
6.16
6.01
5.39
4.90
4.48
4.04
-

RE wall
length

10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
-

RE wall
Area

20.41
42.83
46.63
49.66
51.46
52.80
54.64
56.21
56.49
57.29
58.41
58.65
59.35
59.16
56.45
53.71
52.39
50.83
48.75
47.22
45.93
44.12
42.43
21.16
44.11
46.94
48.79
50.70
52.59
53.81
54.78
56.44
57.83
59.36
60.92
61.13
60.96
61.32
62.05
63.01
63.91
64.37
64.83
66.37
67.60
67.38
65.87
64.00
62.54
60.83
57.01
51.46
46.87
42.58
-

RE fill Qty

204.15
428.35
466.30
496.55
514.60
528.00
546.40
562.10
564.90
572.85
584.10
586.45
593.45
591.55
564.50
537.15
523.90
508.30
487.50
472.20
459.25
441.15
424.30
211.60
441.05
469.40
487.95
507.00
525.90
538.10
547.80
564.35
578.35
593.65
609.20
611.35
609.60
613.15
620.50
630.05
639.10
643.70
648.30
663.70
675.95
673.75
658.65
640.00
625.45
608.35
570.10
514.60
468.70
425.80
-

Embank
ment Ht
(LS)
(0.854)
(0.759)
(0.772)
(1.042)
(1.291)
(1.387)
(1.489)
(1.705)
(1.804)
(1.609)
(1.851)
(1.567)
(1.417)
(1.381)
(1.428)
(1.474)
(1.495)
(1.757)
(2.020)
(2.284)
(2.447)
(2.440)
(2.433)
(2.426)
(2.420)
(2.354)
(2.343)
(2.522)
(2.462)
(2.232)
(2.071)
(1.813)
(1.278)
(0.742)
(0.205)
0.328
0.595
0.477
0.341
0.188
0.185
(0.112)
(0.414)
(0.692)
(0.925)
(0.985)
(0.180)
(0.319)
(0.467)
(0.613)
(1.006)
(1.095)
(1.288)
(1.379)
(1.358)
(1.145)
(1.315)
(1.373)
(1.299)
(1.187)
(1.079)
(1.021)
(0.869)
(0.901)
(0.683)
(0.552)
(0.339)
(0.146)
0.108
0.309
0.364
0.500
0.699
0.864
0.722
0.584
0.457
0.235
0.130
(0.118)
(0.194)
(0.332)
(0.539)
(0.859)
(1.114)
(1.375)
(1.614)
(1.934)
(2.183)
(2.423)
(2.682)
(2.615)
(2.872)
(3.090)
(3.141)
(3.290)
(3.421)
(3.135)
(2.990)
(2.875)
(2.655)
(2.487)
(2.425)
(2.529)
(2.070)
(1.489)
(1.482)
(1.366)
(1.050)
(0.838)
(0.784)
(0.673)
(0.585)
(0.393)
(0.006)
0.239
0.483
0.724
1.035
0.877
0.831
0.973
0.930
0.987
0.982
0.909
0.838
0.743
0.492
0.045
(0.374)
(0.811)
(1.104)
(1.339)
(1.544)
(1.773)
(1.931)
(2.204)
(2.442)
(2.614)
(2.764)
(2.900)
(3.038)
(3.196)
(3.321)
(3.502)
(3.529)
(3.555)
(3.482)
(3.444)
(3.416)
(3.394)
(3.373)
(3.352)
(3.333)
(3.349)
(3.364)
(3.331)
(3.251)
(3.170)
(3.090)
(3.012)
(2.934)
(2.857)
(2.778)
(2.797)
(2.907)
(2.930)
(2.954)
(2.978)
(2.921)
(2.471)
(2.643)
(2.816)
(2.990)
(3.107)
(3.090)
(3.100)
(3.011)
(2.969)
(2.978)
(3.057)
(3.108)
(3.166)

Ht>2.5m
(Retaining
wall)
-

Retaining Rateaining
wall Height wall Avg Ht.
-

Retaining
wall Act.
Ht.

Retaining
wall length

Embank Ht>2.5m
ment Ht (Retaining
(RS)
wall)
-0.598
-0.771
-0.898
-1.005
-1.091
-1.187
-1.303
-1.329
-1.413
-1.488
-1.562
-1.351
-1.531
-1.427
-1.323
-1.260
-1.281
-1.213
-1.146
-1.138
-1.130
-1.120
-1.040
-0.908
-0.776
-0.643
-0.509
0.009
0.443
0.879
1.313
1.763
2.246
2.618
2.965
3.283
3.549
3.678
3.787
3.879
3.951
3.749
3.488
3.250
3.453
3.083
2.659
2.475
2.345
2.135
2.022
1.949
1.804
1.679
1.630
1.595
1.716
1.810
2.046
2.282
2.324
2.412
2.542
2.500
2.772
2.780
2.758
2.762
2.119
2.272
2.428
2.407
2.378
2.358
2.295
2.219
2.154
1.946
1.835
1.784
1.512
1.142
0.745
0.405
0.116
-0.199
-0.577
-0.864
-1.129
-1.326
-1.419
-1.504
-1.582
-1.635
-1.630
-1.472
-1.164
-0.981
-0.603
-0.983
-0.276
-0.058
0.395
0.601
0.997
1.168
1.361
1.561
1.816
2.045
2.169
2.431
2.725
3.001
3.197
2.969
3.119
3.340
3.615
3.485
3.904
4.240
4.413
4.097
3.872
3.837
3.847
3.651
3.437
3.334
3.101
2.769
2.441
2.256
2.087
1.948
2.074
1.975
1.691
1.490
1.729
1.986
2.067
1.736
1.628
1.602
1.484
1.514
1.556
1.593
1.629
1.612
1.570
1.311
0.962
0.468
0.017
-0.223
-0.569
-0.706
-0.783
-0.860
-1.286
-1.692
-2.027
-2.239
-2.221
-2.209
-2.218
-2.328
-2.312
-2.117
-2.177
-2.244
-2.305
-2.281
-2.228
-2.174
-2.066
-1.957
-1.848
-1.810
-2.028
-2.056

2.97
3.28
3.55
3.68
3.79
3.88
3.95
3.75
3.49
3.25
3.45
3.08
-

3.00
3.20
2.97
3.12
3.34
3.62
3.49
3.90
4.24
4.41
4.10
3.87
3.84
3.85
3.65
3.44
3.33
3.10
2.77
-

Retaining Rateaining Retaining


Retaining
wall
wall Avg
wall Act.
wall length
Height
Ht.
Ht.
0.47
0.78
1.05
1.18
1.29
1.38
1.45
1.25
0.99
0.75
0.95
0.58
0.50
0.70
0.47
0.62
0.84
1.12
0.99
1.40
1.74
1.91
1.60
1.37
1.34
1.35
1.15
0.94
0.83
0.60
0.27
-

0.47
0.62
0.92
1.11
1.23
1.33
1.42
1.35
1.12
0.87
0.85
0.77

0.75
0.75
1.00
1.00
1.50
1.50
1.50
1.50
1.00
1.00
1.00
0.75

0.50
0.60
0.58
0.54
0.73
0.98
1.05
1.19
1.57
1.83
1.76
1.48
1.35
1.34
1.25
1.04
0.89
0.72
0.43

0.75
0.75
0.75
0.75
0.75
1.00
1.00
1.50
1.50
2.00
2.00
1.50
1.50
1.50
1.50
1.00
1.00
0.75
0.75

10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
-

Annexure 1

Main carriageway+SR on bothsides+Rlyportion

Chainage

Volume Cut (m3)

Volume Fill (m3)

73880.000
73890.000
73900.000
73910.000
73920.000
73930.000
73940.000
73950.000
73960.000
73970.000
73980.000
73990.000
74000.000
74010.000
74020.000
74030.000
74040.000
74050.000
74060.000
74070.000
74080.000
74090.000
74100.000
74110.000
74120.000
74130.000
74140.000
74150.000
74160.000
74170.000
74180.000
74190.000
74200.000
74210.000
74220.000
74230.000
74240.000
74250.000
74260.000
74270.000
74280.000
74290.000
74300.000
74310.000
74320.000
74330.000
74340.000
74350.000
74360.000
74370.000
74380.000
74390.000
74400.000
74410.000
74420.000
74430.000
74440.000
74450.000
74460.000
74470.000
74480.000
74490.000
74500.000
74510.000
74520.000
74530.000
74540.000
74550.000
74560.000
74570.000
74580.000
74590.000
74600.000
74610.000
74620.000
74630.000
74640.000
74650.000
74660.000
74670.000
74680.000
74690.000
74700.000
74710.000
74720.000
74730.000
74740.000
74750.000
74760.000
74770.000
74780.000
74790.000
74800.000
74810.000
74820.000
74830.000
74840.000
74850.000
74860.000
74870.000
74880.000
74890.000
74900.000
74910.000
74920.000
74930.000
74940.000
74950.000
74960.000
74970.000
74980.000
74990.000
75000.000
75010.000
75020.000
75030.000
75040.000
75050.000
75060.000
75070.000
75080.000
75090.000
75100.000
75110.000
75120.000
75130.000
75140.000
75150.000
75160.000
75170.000
75180.000
75190.000
75200.000
75210.000
75220.000
75230.000
75240.000
75250.000
75260.000
75270.000
75280.000
75290.000
75300.000
75310.000
75320.000
75330.000
75340.000
75350.000
75360.000
75370.000
75380.000
75390.000
75400.000
75410.000
75420.000
75430.000
75440.000
75450.000
75460.000
75470.000
75480.000
75490.000
75500.000
75510.000
75520.000
75530.000
75540.000
75550.000
75560.000
75570.000
75580.000
75590.000
75600.000
75610.000
75620.000
75630.000
75640.000
75650.000
75660.000
75670.000

4441.618
4422.183
4417.732
4364.877
4269.140
4186.945
4121.048
4066.181
3988.196
3857.879
3702.118
3565.268
3457.398
3375.400
3284.132
3170.108
3038.723
2883.573
2764.454
2674.739
2581.095
2439.211
2214.773
2021.787
1886.152
1755.892
1599.951
1393.753
1201.221
1072.709
964.691
827.371
654.522
550.205
530.606
481.388
366.446
272.910
351.158
318.322
177.505
155.130
130.910
112.956
115.122
112.989
99.004
94.015
86.474
82.931
87.660
91.965
97.239
89.912
51.651
11.536
0.184
0.396
0.533
0.956
7.641
13.374
10.980
9.223
9.708
10.429
13.937
19.978
22.062
29.849
57.772
93.221
103.689
104.630
116.811
132.477
150.850
172.424
195.666
219.960
246.926
283.062
319.018
349.038
363.039
355.128
352.871
380.615
408.048
430.191
462.168
492.219
498.055
490.671
479.755
443.367
396.001
375.147
416.873
469.745
487.702
421.547
285.276
222.391
207.208
226.540
249.078
244.285
243.727
260.828
258.245
246.309
258.779
277.812
280.804
285.751
289.280
303.316
343.801
377.198
335.535
263.684
235.495
273.748
273.160
177.309
131.172
125.929
157.773
317.241
433.216
418.569
386.024
364.403
339.860
308.349
288.922
271.933
252.849
231.174
200.191
162.797
127.682
87.305
50.919
33.223
25.241
17.755
13.621
17.630
21.180
10.321
0.196
3.913
20.128
47.228
77.436
110.079
145.888
131.846
82.429
44.972
19.374
3.633
0.000
0.064
0.340
0.867
1.558
3.106
0.755
0.000
0.182
1.155
1.162
0.677
1.061
0.977
0.384

0.112
9.788
22.327
14.125
2.109
0.635
37.565
140.918
118.569
17.909
2.693
0.545
0.545
0.000
0.031
1.737
17.927
64.629
59.883
39.308
80.372
82.231
44.807
21.573
8.111
13.301
22.873
35.709
32.848
12.366
22.018
37.406
40.472
38.957
32.778
49.029
138.494
194.415
269.164
348.762
390.074
489.743
566.796
641.470
747.269
870.290
988.350
1095.127
1147.142
1210.500
1320.814
1418.086
1508.821
1544.477
1556.879
1616.791
1665.688
1676.991
1661.796
1658.468
1658.201
1641.096
1628.463
1614.788
1604.238
1588.466
1576.365
1575.624
1571.345
1550.295
1531.330
1519.679
1500.636
1483.047
1485.783
1497.431
1508.826
1522.960
1540.225
1558.452
1523.246
1437.287
1376.899
1362.336
1423.267
1534.716
1600.218
1629.783
1696.249
1803.171
1894.151
1867.319
1778.875
1733.059
1708.959
1689.718
1689.829
1613.572
1532.921
1718.714
1993.821
2143.421
2324.879
2542.954
2642.866
2653.359
2686.298
2753.346
2830.880
2876.728
2916.618
2967.347
3008.952
3034.494
3047.992
3066.899
3081.682
3083.321
3038.746
2961.811
2857.407
2814.748
3005.139
3341.322
3527.689
3549.614
3576.170
3642.412
3769.023
3776.867
3649.410
3537.320
3447.450
3413.226
3418.882
3419.726
3420.515
3438.510
3469.858
3488.722
3501.842
3546.811
3643.429
3764.983
3878.273
3945.574
3997.763
4068.437
4146.276
4193.746
4208.086
4236.140
4291.626
4376.799
4501.391
4604.691
4668.505
4740.117
4830.140
4895.534
4909.606
4894.964
4865.263
4872.201
4965.931
5120.005
5326.150
5531.634
5735.187
5927.816
6078.029
6222.945
6384.533
6543.899
6660.551
6729.687
6824.314
6953.755
7203.806

Main Carriageway
Ht>4m
Embankment
(Rateaining
Ht (LS)
wall)
-2.749
-2.866
-2.987
-2.976
-2.719
-2.405
-2.387
-2.243
-2.203
-1.989
-1.827
-1.728
-1.631
-1.532
-1.498
-1.385
-1.218
-1.104
-0.992
-0.768
-0.559
-0.429
-0.283
-0.219
-0.146
-0.058
0.156
0.414
0.595
0.556
0.829
1.065
1.235
1.218
1.212
1.123
1.339
1.463
1.589
1.801
2.045
2.152
2.269
2.387
2.505
2.636
2.769
2.904
3.038
3.173
3.308
3.487
3.595
3.625
3.657
3.689
3.721
3.754
3.788
3.823
3.857
3.892
3.929
3.965
4.003
3.983
3.961
3.938
4.068
4.131
4.063
4.079
4.058
4.079
4.099
4.119
4.140
4.160
4.180
4.204
4.206
4.199
4.242
4.293
4.348
4.406
4.466
4.531
4.681
4.853
4.935
4.926
4.759
4.595
4.423
4.332
4.480
4.617
4.752
4.980
5.268
5.686
5.808
5.786
5.848
5.813
5.887
6.051
6.133
6.138
6.086
6.029
6.041
6.094
6.148
6.148
6.071
5.980
5.714
5.212
5.724
6.329
6.679
6.917
7.075
7.175
7.274
7.688
8.274
7.938
7.602
7.266
6.930
6.591
6.648
6.707
6.764
6.847
6.914
6.937
6.980
7.025
7.041
7.074
7.144
7.160
7.171
7.183
7.187
7.154
7.120
7.083
7.043
7.003
7.090
7.046
7.009
7.027
7.048
7.130
6.769
6.494
6.420
6.535
6.721
6.920
7.128
7.353
7.576
7.672
7.768
7.876
7.994
8.123
8.174
8.295
8.427
8.571
8.796

Rateaining
wall Ht.

Rateaining Retaining
wall Avg wall Act.
Ht.
Ht.

Rateaining
wall length

4.12
4.14
4.16
4.18
4.20
4.21
4.20
4.24
4.29
4.35
4.41
4.47
4.53
4.68
4.85
4.93
4.93
4.76
4.60
4.42
4.33
4.48
4.62
4.75
4.98
5.27
5.69
5.81
5.79
5.85
5.81
5.89
6.05
6.13
6.14
6.09
6.03
6.04
6.09
6.15
6.15
6.07
5.98
5.71
5.21
5.72
6.33
6.68
6.92

0.12
0.14
0.16
0.18
0.20
0.21
0.20
0.24
0.29
0.35
0.41
0.47
0.53
0.68
0.85
0.93
0.93
0.76
0.60
0.42
0.33
0.48
0.62
0.75
0.98
1.27
1.69
1.81
1.79
1.85
1.81
1.89
2.05
2.13
2.14
2.09
2.03
2.04
2.09
2.15
2.15
2.07
1.98
1.71
1.21
1.72
2.33
2.68
2.92

0.12
0.13
0.15
0.17
0.19
0.20
0.20
0.22
0.27
0.32
0.38
0.44
0.50
0.61
0.77
0.89
0.93
0.84
0.68
0.51
0.38
0.41
0.55
0.68
0.87
1.12
1.48
1.75
1.80
1.82
1.83
1.85
1.97
2.09
2.14
2.11
2.06
2.04
2.07
2.12
2.15
2.11
2.03
1.85
1.46
1.47
2.03
2.50
2.80

0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
1.00
1.00
0.75
0.75
0.75
0.75
0.75
0.75
0.75
1.00
1.00
1.50
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
1.50
1.50
2.00
2.50
3.00

10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00

6.93
6.59
6.65
6.71
6.76
6.85
6.91
6.94
6.98

2.93
2.59
2.65
2.71
2.76
2.85
2.91
2.94
2.98

2.93
2.76
2.62
2.68
2.74
2.81
2.88
2.93
2.96

3.00
3.00
2.50
3.00
3.00
3.00
3.00
3.00
3.00

10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00

6.77
6.49
6.42
6.53
6.72
6.92

2.77
2.49
2.42
2.53
2.72
2.92

2.77
2.63
2.46
2.48
2.63
2.82

3.00
2.50
2.50
2.50
2.50
3.00

10.00
10.00
10.00
10.00
10.00
10.00

Left Service Road

Ht>7m
(RE wall)

RE wall
Height

7.08
7.17
7.27
7.69
8.27
7.94
7.60
7.27
7.03
7.04
7.07
7.14
7.16
7.17
7.18
7.19
7.15
7.12
7.08
7.04
7.00
7.09
7.05
7.01
7.03
7.05
7.13
7.13
7.35
7.58
7.67
7.77
7.88
7.99
8.12
8.17
8.30
8.43
8.57
8.80

4.08
4.17
4.27
4.69
5.27
4.94
4.60
4.27
4.03
4.04
4.07
4.14
4.16
4.17
4.18
4.19
4.15
4.12
4.08
4.04
4.00
4.09
4.05
4.01
4.03
4.05
4.13
4.13
4.35
4.58
4.67
4.77
4.88
4.99
5.12
5.17
5.30
5.43
5.57
5.80

RE wall
length
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00

RE wall
Area
20.38
41.25
42.24
44.81
49.81
51.06
47.70
44.34
20.13
40.33
40.58
41.09
41.52
41.65
41.77
41.85
41.70
41.37
41.01
40.63
40.23
40.47
40.68
40.28
40.18
40.37
40.89
20.64
42.41
44.65
46.24
47.20
48.22
49.35
50.59
51.49
52.35
53.61
54.99
56.84

RE fill Qty

203.75
412.50
422.45
448.10
498.10
510.60
477.00
443.40
201.25
403.30
405.75
410.90
415.20
416.55
417.70
418.50
417.05
413.70
410.15
406.30
402.30
404.65
406.80
402.75
401.80
403.75
408.90
206.40
424.05
446.45
462.40
472.00
482.20
493.50
505.85
514.85
523.45
536.10
549.90
568.35

Embank
ment Ht
(LS)
(3.098)
(3.077)
(3.045)
(3.022)
(3.004)
(2.995)
(2.991)
(2.962)
(2.937)
(2.811)
(2.591)
(2.420)
(2.352)
(2.364)
(2.205)
(2.097)
(2.007)
(1.922)
(1.822)
(1.896)
(1.668)
(1.634)
(1.369)
(1.311)
(1.223)
(1.153)
(0.969)
(0.834)
(0.715)
(0.633)
(0.553)
(0.477)
(0.395)
(0.638)
(0.456)
(0.259)
(0.064)
0.127
0.223
0.319
0.423
0.536
0.650
0.763
0.877
1.109
1.356
1.412
1.417
1.424
1.430
1.438
1.446
1.454
1.464
1.473
1.484
1.495
1.506
1.512
1.513
1.508
1.499
1.484
1.464
1.435
1.402
1.354
1.308
1.257
1.201
1.146
1.092
1.037
0.984
0.931
0.878
0.827
0.776
0.725
0.644
0.562
0.477
0.392
0.307
0.223
0.165
0.139
0.126
0.129
0.148
0.182
0.237
0.329
0.334
0.339
0.345
0.371
0.362
0.191
0.237
0.487
0.517
0.950
1.144
1.059
0.929
0.828
0.782
0.735
0.781
0.835
0.662
0.640
0.602
0.581
0.507
0.203
(0.631)
0.102
0.544
0.759
0.974
1.189
1.390
1.592
1.794
1.997
1.777
1.512
1.221
0.938
0.841
0.787
0.732
0.677
0.637
0.640
0.671
0.679
0.711
0.764
0.826
0.900
0.979
1.060
1.131
1.203
1.127
1.067
1.213
1.370
1.479
1.713
2.053
2.186
2.295
2.405
2.515
2.673
2.828
2.982
3.138
3.276
3.386
3.490
3.595
3.698
3.803
3.997
4.074
4.148
4.222
4.296
4.308
4.261
4.267
4.422
4.573

Ht>2.5m
(Retaining
wall)
2.51
2.67
2.83
2.98
3.14
3.28
3.39
3.49
3.59
3.70
3.80
4.00
4.07
4.15
4.22
4.30
4.31
4.26
4.27
4.42
4.57

Retaining Rateaining
wall Height wall Avg Ht.
-

0.33
0.48
0.64
0.78
0.89
0.99
1.09
1.20
1.30
1.50
1.57
1.65
1.72
1.80
1.81
1.76
1.77
1.92
2.07

Right Service Road


Retaining
wall Act.
Ht.

0.33
0.40
0.56
0.71
0.83
0.94
1.04
1.15
1.25
1.40
1.54
1.61
1.69
1.76
1.80
1.78
1.76
1.84
2.00

Retaining
wall length
-

0.75
0.75
0.75
0.75
0.75
1.00
1.00
1.00
1.50
1.50
1.50
1.50
2.00
2.00
2.00
2.00
2.00
2.00
2.00

10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00

Embank Ht>2.5m
ment Ht (Retaining
(RS)
wall)
-2.589
-2.599
-2.683
-2.541
-2.475
-2.565
-2.655
-2.694
-2.696
-2.708
-2.718
-2.730
-2.751
-2.643
-2.470
-2.329
-2.249
-2.202
-2.117
-2.027
-1.924
-1.863
-1.671
-1.471
-1.287
-1.133
-1.103
-0.864
-0.653
-0.450
-0.239
-0.176
-0.010
0.189
0.444
1.929
1.833
0.845
0.551
0.682
0.814
0.866
0.994
1.030
1.072
1.121
1.182
1.243
1.262
1.635
1.756
1.936
1.888
1.509
1.297
1.320
1.319
1.266
1.298
1.189
1.042
0.869
0.845
0.843
0.834
0.822
0.819
1.060
0.920
0.689
0.568
0.375
0.354
0.344
0.332
0.320
0.307
0.290
0.170
0.053
-0.076
-0.122
-0.142
-0.161
-0.274
-0.315
-0.666
-0.807
-0.574
-0.538
-0.577
-0.525
-0.459
-0.379
-0.281
-0.164
-0.046
0.024
-0.139
-0.346
-0.239
0.067
-0.035
-0.105
-0.157
-0.201
-0.243
-0.234
-0.139
-0.021
0.036
-0.053
-0.243
-0.212
-0.230
-0.246
-0.227
0.244
0.064
0.026
0.209
0.071
-0.070
-0.318
-0.079
0.435
0.522
0.606
0.612
-0.599
-1.209
-1.154
-0.911
-0.660
-0.621
-0.307
-0.011
0.149
0.209
0.282
0.356
0.502
0.665
0.836
0.928
0.729
0.781
0.962
1.051
0.902
1.356
1.669
2.054
2.438
2.754
2.860
2.966
3.083
3.204
3.229
3.325
3.413
3.481
3.548
3.615
4.168
4.176
4.374
4.390
4.601
4.812
5.022
5.097
5.197
5.369
5.486
5.590
5.676
5.762

2.75
2.86
2.97
3.08
3.20
3.23
3.33
3.41
3.48
3.55
3.62
4.17
4.18
4.37
4.39
4.60
4.81
5.02
5.10
5.20
5.37
5.49
5.59
5.68
5.76

Retaining Rateaining Retaining


Retaining
wall
wall Avg
wall Act.
wall length
Height
Ht.
Ht.
0.25
0.36
0.47
0.58
0.70
0.73
0.83
0.91
0.98
1.05
1.12
1.67
1.68
1.87
1.89
2.10
2.31
2.52
2.60
2.70
2.87
2.99
3.09
3.18
3.26

0.25
0.31
0.41
0.52
0.64
0.72
0.78
0.87
0.95
1.01
1.08
1.39
1.67
1.78
1.88
2.00
2.21
2.42
2.56
2.65
2.78
2.93
3.04
3.13
3.22

0.75
0.75
0.75
0.75
0.75
0.75
0.75
1.00
1.00
1.00
1.00
1.50
2.00
2.00
2.00
2.00
2.50
2.50
2.50
2.50
3.00
3.00
3.00
3.00
3.50

10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00

Annexure 1

Main carriageway+SR on bothsides+Rlyportion

Chainage

Volume Cut (m3)

Volume Fill (m3)

75780.000
75790.000
75800.000
75810.000
75820.000
75830.000
75840.000
75850.000
75860.000
75870.000
75880.000
75890.000
75900.000
75910.000
75920.000
75930.000
75940.000
75950.000
75960.000
75970.000
75980.000
75990.000
76000.000
76010.000
76020.000
76030.000
76040.000
76050.000
76060.000
76070.000
76080.000
76090.000
76100.000
76110.000
76120.000
76130.000
76140.000
76150.000
76160.000
76170.000
76180.000
76190.000
76200.000
76210.000
76220.000
76230.000
76240.000
76250.000
76260.000
76270.000
76280.000
76290.000
76300.000
76310.000
76320.000
76330.000
76340.000
76350.000
76360.000
76370.000
76380.000
76390.000
76400.000
76410.000
76420.000
76430.000
76440.000
76450.000
76460.000
76470.000
76480.000
76490.000
76500.000
76510.000
76520.000
76530.000
76540.000
76550.000
76560.000
76570.000
76580.000
76590.000
76600.000
76610.000
76620.000
76630.000
76640.000
76650.000
76660.000
76670.000
76680.000
76690.000
76700.000
76710.000
76720.000
76730.000
76740.000
76750.000
76760.000
76770.000
76780.000
76790.000
76800.000
76810.000
76820.000
76830.000
76840.000
76850.000
76860.000
76870.000
76880.000
76890.000
76900.000
76910.000
76920.000
76930.000
76940.000
76950.000
76960.000
76970.000
76980.000
76990.000
77000.000
77010.000
77020.000
77030.000
77040.000
77050.000
77060.000
77070.000
77080.000
77090.000
77100.000
77110.000
77120.000
77130.000
77140.000
77150.000
77160.000
77170.000
77180.000
77190.000
77200.000
77210.000
77220.000
77230.000
77240.000
77250.000
77260.000
77270.000
77280.000
77290.000
77300.000
77310.000
77320.000
77330.000
77340.000
77350.000
77360.000
77370.000
77380.000
77390.000
77400.000
77410.000
77420.000
77430.000
77440.000
77450.000
77460.000
77470.000
77480.000
77490.000
77500.000

1.798
5.105
3.118
4.586
11.846
15.260
17.152
19.333
21.240
14.333
6.361
5.638
4.177
2.507
1.394
4.825
15.933
28.511
19.459
3.421
1.805
1.029
0.146
1.834
5.638
13.657
38.957
79.662
124.861
178.356
251.680
340.638
352.796
347.472
418.420
465.184
443.079
408.471
394.450
386.102
385.450
388.466
391.486
376.331
344.955
318.918
308.199
299.415
278.397
257.841
240.091
224.602
205.601
188.351
184.199
176.282
158.264
143.903
134.549
133.922
152.580
173.072
184.733
201.876
236.732
265.175
279.804
301.551
321.563
341.219
362.266
384.456
409.791
430.101
451.006
493.484
538.483
562.363
577.324
583.262
586.430
594.751
598.801
600.271
602.575
605.374
608.861
656.226
671.284
660.522
648.736
631.469
629.969
629.206
631.314
645.443
661.151
671.679
668.030
678.633
676.519
643.439
635.447
629.266
600.205
581.123
578.246
566.016
542.804
510.052
490.636
471.744
423.883
375.394
380.298
401.767
356.249
294.850
274.142
263.215
239.035
211.047
213.454
242.012
269.278
290.874
282.483
272.857
273.155
292.214
341.218
378.175
379.848
334.230
252.636
145.910
72.953
50.791
24.314
4.947
11.511
16.113
6.208
6.131
15.444
122.344
166.112
123.297
73.326
12.805
15.618
12.480
12.812
19.416
29.162
25.491
13.506
6.141
3.530
17.878
40.758
46.971
32.991
16.047
17.193
51.211
90.832
68.241
28.759
14.436
8.333
13.657
13.305

7419.568
7317.859
7157.302
6977.610
6806.969
6672.514
6589.559
6579.185
6672.646
6680.934
6562.576
6458.177
6372.129
6316.885
6230.727
6130.560
6055.933
5977.220
5915.948
5827.664
5680.405
5512.563
5352.021
5174.810
4958.339
4725.790
4516.975
4351.386
4212.364
4078.504
3914.119
3736.337
3477.522
3227.841
3099.325
3049.187
2982.997
2938.359
2951.830
2997.645
3067.906
3140.918
3193.924
3201.852
3218.321
3240.345
3252.389
3282.138
3311.899
3352.811
3398.827
3423.465
3440.748
3463.575
3533.071
3615.272
3661.661
3697.360
3718.653
3718.574
3694.350
3661.535
3643.588
3632.067
3593.576
3526.253
3443.792
3344.849
3495.754
3626.035
3496.676
3392.748
3284.652
3158.670
2954.864
2699.065
2456.780
2214.611
1983.636
1790.174
1647.980
1528.879
1412.560
1299.280
1189.618
1094.667
994.382
911.661
846.542
788.637
747.263
717.858
689.783
690.911
693.335
656.342
641.824
667.835
712.736
787.873
847.169
837.239
873.421
843.794
735.992
655.660
680.115
818.250
914.666
992.509
1072.879
1173.730
1228.500
1218.842
1210.337
1256.533
1364.356
1478.910
1593.685
1707.904
1813.988
1846.287
1832.902
1839.144
1847.876
1806.101
1700.340
1610.612
1594.262
1574.746
1564.161
1643.472
1779.359
1949.812
2124.481
2274.733
2313.627
2319.718
2421.194
2614.618
2725.730
2673.006
2585.094
2474.395
2352.346
2298.514
2309.300
2456.451
2792.733
3153.304
3404.441
3459.248
3407.760
3374.898
3333.660
3299.095
3264.027
3237.984
3261.068
3321.065
3432.096
3553.051
3633.399
3669.606
3648.952
3644.216
3537.203
3207.454
2808.428
2466.727
2199.119
1928.930
1637.273

Main Carriageway
Ht>4m
Embankment
(Rateaining
Ht (LS)
wall)
9.643
9.635
9.626
8.521
8.692
8.769
8.848
8.928
9.031
8.977
8.932
8.880
8.821
8.901
8.873
8.893
8.906
8.912
8.901
8.944
8.782
8.634
8.543
8.449
7.921
7.676
7.421
7.159
6.928
6.794
6.651
5.953
5.958
5.905
5.803
6.503
5.909
5.979
5.984
6.143
6.149
6.147
6.540
6.473
6.441
6.425
6.503
6.486
6.533
6.594
6.648
6.695
6.750
6.810
6.842
6.852
6.898
6.945
6.874
6.839
6.624
6.410
6.231
6.106
5.939
5.759
5.581
5.403
5.086
4.915
4.749
4.590
4.432
4.279
4.037
3.725
3.546
3.367
3.230
3.125
3.030
2.917
2.831
2.793
2.734
2.669
2.602
2.520
2.454
2.452
2.441
2.250
2.390
2.466
2.526
2.529
2.536
2.547
2.560
2.703
2.603
2.570
2.556
2.616
2.670
2.803
2.956
3.113
3.271
3.433
3.596
3.718
3.687
3.711
3.856
3.995
4.137
4.293
4.466
4.641
4.736
4.774
4.815
4.855
4.691
4.678
4.661
4.606
4.517
3.954
3.581
3.794
4.013
4.283
4.617
4.961
4.973
4.836
4.722
5.629
5.563
5.274
4.985
4.696
4.404
4.093
3.997
3.893
4.794
4.958
5.673
5.430
5.277
4.795
4.666
4.574
4.550
4.530
4.510
4.489
4.579
4.783
4.986
5.210
5.095
4.741
4.545
3.836
3.379
3.241
3.136
2.945
2.701

6.93
6.79
6.65
5.95
5.96
5.90
5.80
6.50
5.91
5.98
5.98
6.14
6.15
6.15
6.54
6.47
6.44
6.42
6.50
6.49
6.53
6.59
6.65
6.69
6.75
6.81
6.84
6.85
6.90
6.94
6.87
6.84
6.62
6.41
6.23
6.11
5.94
5.76
5.58
5.40
5.09
4.92
4.75
4.59
4.43
4.28
4.14
4.29
4.47
4.64
4.74
4.77
4.82
4.85
4.69
4.68
4.66
4.61
4.52
4.28
4.62
4.96
4.97
4.84
4.72
5.63
5.56
5.27
4.98
4.70
4.40
4.79
4.96
5.67
5.43
5.28
4.80
4.67
4.57
4.55
4.53
4.51
4.49
4.58
4.78
4.99
5.21
5.10
4.74
4.54
-

Rateaining
wall Ht.

2.93
2.79
2.65
1.95
1.96
1.90
1.80
2.50
1.91
1.98
1.98
2.14
2.15
2.15
2.54
2.47
2.44
2.42
2.50
2.49
2.53
2.59
2.65
2.69
2.75
2.81
2.84
2.85
2.90
2.94
2.87
2.84
2.62
2.41
2.23
2.11
1.94
1.76
1.58
1.40
1.09
0.92
0.75
0.59
0.43
0.28
0.14
0.29
0.47
0.64
0.74
0.77
0.82
0.85
0.69
0.68
0.66
0.61
0.52
0.28
0.62
0.96
0.97
0.84
0.72
1.63
1.56
1.27
0.98
0.70
0.40
0.79
0.96
1.67
1.43
1.28
0.80
0.67
0.57
0.55
0.53
0.51
0.49
0.58
0.78
0.99
1.21
1.10
0.74
0.54
-

Rateaining Retaining
wall Avg wall Act.
Ht.
Ht.

2.93
2.86
2.72
2.30
1.96
1.93
1.85
2.15
2.21
1.94
1.98
2.06
2.15
2.15
2.34
2.51
2.46
2.43
2.46
2.49
2.51
2.56
2.62
2.67
2.72
2.78
2.83
2.85
2.87
2.92
2.91
2.86
2.73
2.52
2.32
2.17
2.02
1.85
1.67
1.49
1.24
1.00
0.83
0.67
0.51
0.36

3.00
3.00
3.00
2.50
2.00
2.00
2.00
2.50
2.50
2.00
2.00
2.00
2.00
2.00
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
2.50
2.50
2.50
2.00
2.00
2.00
1.50
1.50
1.00
0.75
0.75
0.75
0.75

0.14
0.22
0.38
0.55
0.69
0.75
0.79
0.83
0.77
0.68
0.67
0.63
0.56

0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75

0.28
0.45
0.79
0.97
0.90
0.78
1.18
1.60
1.42
1.13
0.84
0.55

0.75
0.75
0.75
1.00
1.00
0.75
1.50
1.50
1.50
1.00
0.75
0.75

0.79
0.88
1.32
1.55
1.35
1.04
0.73
0.62
0.56
0.54
0.52
0.50
0.53
0.68
0.88
1.10
1.15
0.92
0.64

0.75
1.00
1.50
1.50
1.50
1.00
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
1.00
1.00
1.50
1.00
0.75

Rateaining
wall length

10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
-

Left Service Road

Ht>7m
(RE wall)

RE wall
Height

9.64
9.63
9.63
8.52
8.69
8.77
8.85
8.93
9.03
8.98
8.93
8.88
8.82
8.90
8.87
8.89
8.91
8.91
8.90
8.94
8.78
8.63
8.54
8.45
7.92
7.68
7.42
7.16
-

6.64
6.63
6.63
5.52
5.69
5.77
5.85
5.93
6.03
5.98
5.93
5.88
5.82
5.90
5.87
5.89
5.91
5.91
5.90
5.94
5.78
5.63
5.54
5.45
4.92
4.68
4.42
4.16
-

RE wall
length
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
-

RE wall
Area
66.47
66.39
66.30
60.74
56.07
57.31
58.08
58.88
59.80
60.04
59.54
59.06
58.50
58.61
58.87
58.83
58.99
59.09
59.07
59.22
58.63
57.08
55.88
54.96
51.85
47.98
45.48
42.90
-

RE fill Qty

664.70
663.90
663.05
607.35
560.65
573.05
580.85
588.80
597.95
600.40
595.45
590.60
585.05
586.10
588.70
588.30
589.95
590.90
590.65
592.25
586.30
570.80
558.85
549.60
518.50
479.85
454.85
429.00
-

Embank
ment Ht
(LS)
4.404
3.893
3.778
3.228
2.784
2.852
2.657
2.841
3.015
2.455
2.256
2.105
1.935
1.814
1.733
1.650
1.671
1.668
1.663
1.717
1.624
1.479
1.327
1.179
1.008
0.794
0.584
0.374
0.092
(0.319)
(0.593)
(0.492)
(0.644)
(0.864)
(1.045)
(1.186)
(0.883)
(0.828)
(0.768)
(0.747)
(0.825)
(0.784)
(0.705)
(0.627)
(0.548)
(0.469)
(0.405)
(0.367)
(0.325)
(0.263)
(0.202)
(0.140)
(0.078)
(0.015)
(0.018)
0.057
0.145
0.208
0.234
0.133
0.108
0.085
0.041
(0.236)
(0.459)
(0.586)
(0.679)
(0.773)
(0.865)
(0.974)
(1.074)
(1.151)
(1.201)
(1.250)
(1.314)
(1.441)
(1.657)
(1.823)
(1.926)
(1.834)
(1.859)
(1.884)
(1.909)
(1.905)
(1.881)
(1.857)
(1.849)
(1.840)
(1.875)
(1.801)
(1.753)
(1.706)
(1.580)
(1.460)
(1.360)
(1.326)
(1.297)
(1.267)
(1.238)
(1.209)
(1.008)
(0.913)
(0.824)
(0.750)
(0.676)
(0.593)
(0.606)
(0.507)
(0.412)
(0.232)
(0.035)
0.165
0.407
0.541
0.533
0.619
0.705
0.773
0.819
0.883
0.860
0.740
0.621
0.502
0.303
0.212
0.189
0.170
0.178
0.053
(0.167)
(0.370)
(0.485)
(0.332)
0.038
0.336
0.502
0.480
0.797
1.676
1.699
1.625
1.583
1.398
1.216
1.268
1.240
1.414
1.600
1.763
1.886
2.086
2.224
2.379
2.541
3.111
3.031
2.952
2.888
2.827
2.968
3.275
3.447
3.610
3.760
3.648
3.425
3.187
2.918
2.633
2.257
1.811

Ht>2.5m
(Retaining
wall)
4.40
3.89
3.78
3.23
2.78
2.85
2.66
2.84
3.02
2.54
3.11
3.03
2.95
2.89
2.83
2.97
3.27
3.45
3.61
3.76
3.65
3.43
3.19
2.92
2.63
-

Retaining Rateaining
wall Height wall Avg Ht.
1.90
1.39
1.28
0.73
0.28
0.35
0.16
0.34
0.52
0.04
0.61
0.53
0.45
0.39
0.33
0.47
0.77
0.95
1.11
1.26
1.15
0.93
0.69
0.42
0.13
-

1.91
1.65
1.34
1.00
0.51
0.32
0.25
0.25
0.43

Right Service Road


Retaining
wall Act.
Ht.

Retaining
wall length

2.00
1.50
1.50
1.00
0.75
0.75
0.75
0.75
0.75

10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00

0.33
0.57
0.49
0.42
0.36
0.40
0.62
0.86
1.03
1.19
1.20
1.04
0.81
0.55
0.28
-

0.75
0.75
0.75
0.75
0.75
0.75
0.75
1.00
1.00
1.50
1.50
1.00
0.75
0.75
0.75

10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
-

Embank Ht>2.5m
ment Ht (Retaining
(RS)
wall)
5.780
5.665
5.543
5.419
5.303
5.391
5.177
5.081
4.985
4.875
4.820
4.644
4.596
4.549
4.416
4.244
4.082
3.912
3.752
3.632
3.513
3.393
3.273
3.155
3.035
2.924
2.814
2.702
2.589
2.354
2.134
1.946
1.745
1.474
1.363
0.556
0.682
0.795
0.849
0.819
0.780
0.752
0.769
1.047
1.210
1.236
1.293
1.356
1.515
1.662
1.808
1.529
1.326
1.091
2.370
2.307
2.246
2.184
2.141
2.104
2.165
2.226
2.661
2.699
2.760
2.875
2.930
2.998
3.013
3.001
2.996
2.992
2.984
2.976
2.967
2.817
2.637
2.454
2.323
2.068
1.860
1.730
1.592
1.447
1.305
1.355
1.183
1.005
0.828
0.716
0.666
0.597
0.545
0.493
0.441
0.394
0.348
0.279
0.200
0.122
0.186
0.034
-0.130
-0.274
-0.204
-0.097
-0.142
-0.204
-0.111
-0.068
-0.147
-0.182
-0.161
-0.109
-0.045
0.019
-0.066
-0.237
-0.328
-0.446
0.013
0.269
0.256
0.282
0.307
0.332
0.355
0.384
0.427
0.485
0.559
0.691
0.897
1.118
0.589
0.890
1.206
1.413
1.598
1.762
1.992
2.221
2.299
2.529
2.776
3.006
2.859
2.591
2.659
3.633
3.893
4.022
4.148
4.274
4.405
4.511
4.616
4.718
4.817
4.911
4.637
4.700
4.762
4.820
4.838
5.206
5.631
5.379
5.089
4.381
4.046
3.802

5.78
5.67
5.54
5.42
5.30
5.39
5.18
5.08
4.99
4.88
4.82
4.64
4.60
4.55
4.42
4.24
4.08
3.91
3.75
3.63
3.51
3.39
3.27
3.16
3.03
2.92
2.81
2.70
2.59
2.70
2.76
2.88
2.93
3.00
3.01
3.00
3.00
2.99
2.98
2.98
2.97
2.82
2.53
2.78
3.01
2.86
2.59
2.66
3.63
3.89
4.02
4.15
4.27
4.40
4.51
4.62
4.72
4.82
4.91
4.64
4.70
4.76
4.82
4.84
5.21
5.63
5.38
5.09
4.38
4.05
3.80

Retaining Rateaining Retaining


Retaining
wall
wall Avg
wall Act.
wall length
Height
Ht.
Ht.
3.28
3.17
3.04
2.92
2.80
2.89
2.68
2.58
2.49
2.38
2.32
2.14
2.10
2.05
1.92
1.74
1.58
1.41
1.25
1.13
1.01
0.89
0.77
0.66
0.53
0.42
0.31
0.20
0.09
0.20
0.26
0.38
0.43
0.50
0.51
0.50
0.50
0.49
0.48
0.48
0.47
0.32
0.03
0.28
0.51
0.36
0.09
0.16
1.13
1.39
1.52
1.65
1.77
1.90
2.01
2.12
2.22
2.32
2.41
2.14
2.20
2.26
2.32
2.34
2.71
3.13
2.88
2.59
1.88
1.55
1.30

3.33
3.22
3.10
2.98
2.86
2.85
2.78
2.63
2.53
2.43
2.35
2.23
2.12
2.07
1.98
1.83
1.66
1.50
1.33
1.19
1.07
0.95
0.83
0.71
0.59
0.48
0.37
0.26
0.15

3.50
3.50
3.00
3.00
3.00
3.00
3.00
2.50
2.50
2.50
2.50
2.50
2.00
2.00
2.00
2.00
2.00
1.50
1.50
1.50
1.00
1.00
0.75
0.75
0.75
0.75
0.75
0.75
0.75

0.20
0.23
0.32
0.40
0.46
0.51
0.51
0.50
0.49
0.49
0.48
0.47
0.39

0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75

0.15
0.39
0.43
0.22
0.13
0.65
1.26
1.46
1.58
1.71
1.84
1.96
2.06
2.17
2.27
2.36
2.27
2.17
2.23
2.29
2.33
2.52
2.92
3.01
2.73
2.23
1.71
1.42

0.75
0.75
0.75
0.75
0.75
0.75
1.50
1.50
1.50
2.00
2.00
2.00
2.00
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
3.00
3.00
3.00
2.50
2.00
1.50

10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00

Annexure 1

Main carriageway+SR on bothsides+Rlyportion

Chainage

Volume Cut (m3)

Volume Fill (m3)

77680.000
77690.000
77700.000
77710.000
77720.000
77730.000
77740.000
77750.000
77760.000
77770.000
77780.000
77790.000
77800.000
77810.000
77820.000
77830.000
77840.000
77850.000
77860.000
77870.000
77880.000
77890.000
77900.000
77910.000
77920.000
77930.000
77940.000
77950.000
77960.000
77970.000
77980.000
77990.000
78000.000
78010.000
78020.000
78030.000
78040.000
78050.000
78060.000
78070.000
78080.000
78090.000
78100.000
78110.000
78120.000
78130.000
78140.000
78150.000
78160.000
78170.000
78180.000
78190.000
78200.000
78210.000
78220.000
78230.000
78240.000
78250.000
78260.000
78270.000
78280.000
78290.000
78300.000
78310.000
78320.000
78330.000
78340.000
78350.000
78360.000
78370.000
78380.000
78390.000
78400.000
78410.000
78420.000
78430.000
78440.000
78450.000
78460.000
78470.000
78480.000
78490.000
78500.000
78510.000
78520.000
78530.000
78540.000
78550.000
78560.000
78570.000
78580.000
78590.000
78600.000
78610.000
78620.000
78630.000
78640.000
78650.000
78660.000
78670.000
78680.000
78690.000
78700.000
78710.000
78720.000
78730.000
78740.000
78750.000
78760.000
78770.000
78780.000
78790.000
78800.000
78810.000
78820.000
78830.000
78840.000
78850.000
78860.000
78870.000
78880.000
78890.000
78900.000
78910.000
78920.000
78930.000
78940.000
78950.000
78960.000
78970.000
78980.000
78990.000
79000.000
79010.000
79020.000
79030.000
79040.000
79050.000
79060.000
79070.000
79080.000
79090.000
79100.000
79110.000
79120.000
79130.000
79140.000
79150.000
79160.000
79170.000
79180.000
79190.000
79200.000
79210.000
79220.000
79230.000
79240.000
79250.000
79260.000
79270.000
79280.000
79290.000
79300.000
79310.000
79320.000
79330.000
79340.000
79350.000
79360.000
79370.000
79380.000
79390.000
79400.000

1669.453
1605.282
1515.759
1414.384
1265.778
1110.611
986.379
884.384
808.621
743.429
682.318
625.421
574.916
530.228
487.550
434.648
418.258
449.314
428.229
314.994
230.284
198.755
167.961
161.303
168.658
150.390
107.402
78.886
68.360
72.142
111.123
141.900
152.565
170.196
168.950
197.354
266.792
328.806
393.782
428.523
434.182
456.940
479.399
499.173
512.612
512.294
504.588
491.989
476.499
462.512
440.041
407.781
373.231
343.271
356.789
421.454
489.999
542.003
515.945
484.029
520.780
545.734
555.095
570.911
578.660
536.336
507.662
563.534
581.404
556.186
560.673
568.086
567.894
543.538
527.282
534.416
538.432
528.397
473.230
411.831
386.192
372.095
368.556
381.556
380.610
343.398
291.592
244.324
208.349
179.542
155.832
140.945
127.232
104.228
80.645
64.149
64.272
59.496
49.465
52.814
43.711
25.785
17.829
15.981
15.850
15.372
14.627
13.846
10.352
3.821
0.026
0.025
0.001
0.001
0.004
0.005
0.069
13.369
73.571
156.627
218.894
265.092
309.562
352.103
380.523
398.908
410.604
423.677
459.072
499.195
502.715
465.387
417.645
368.190
301.025
216.378
127.020
78.070
107.666
178.251
241.995
260.645
233.662
215.703
213.296
211.946
215.583
235.567
268.221
278.520
259.731
220.162
303.584
329.665
266.615
199.243
127.925
136.571
206.220
230.064
147.703
82.394
35.249
15.755
4.839
2.045
0.544
0.008
0.140
0.648
0.752
1.116
2.735

25.380
26.266
42.862
55.557
33.772
30.176
76.153
151.295
242.955
340.792
440.775
542.236
644.079
746.202
856.721
962.067
1043.225
1112.878
1172.938
1301.274
1490.229
1650.939
1817.963
1965.229
2016.835
2091.928
2244.010
2319.496
2382.179
2524.670
2628.941
2658.447
2674.077
2676.925
2740.861
2727.357
2537.067
2363.862
2227.702
2071.426
1978.852
1960.187
1927.300
1907.122
1918.331
1918.768
1906.123
1926.402
2006.826
2121.774
2213.437
2261.257
2295.690
2329.606
2322.894
2204.928
2067.510
2009.400
2005.852
2058.985
2139.569
2087.969
1965.072
1909.611
1862.414
1856.754
1804.352
1706.484
1711.260
1802.838
1879.475
1892.505
1879.497
1875.848
1869.067
1851.528
1839.283
1830.304
1827.896
1854.395
1903.624
1959.416
2021.369
2102.609
2174.103
2215.291
2255.706
2301.582
2374.150
2418.975
2445.794
2562.082
2720.716
2809.532
2811.984
2788.363
2763.441
2728.713
2733.906
2785.939
2856.863
2952.375
3058.845
3141.699
3202.110
3284.607
3431.835
3762.572
4026.956
4060.658
4066.051
4126.088
4150.401
4121.162
4120.396
4098.517
4095.967
3968.285
3759.947
3627.158
3483.873
3329.031
3187.000
3114.916
3098.548
3084.308
3077.945
3082.853
3100.769
3150.647
3224.763
3305.997
3399.438
3506.210
3631.100
3768.907
3918.701
4027.103
4068.287
4093.711
4153.075
4219.377
4108.978
3931.105
3846.989
3742.348
3623.987
3583.776
3884.982
4232.620
4296.063
4316.940
3930.816
3265.403
2591.829
2575.315
3272.334
3657.949
3642.881
3674.193
3861.711
3977.062
4132.916
4290.352
4407.287
4530.272
4654.054
4756.935
4820.816
4845.372
4889.532
4849.103
4637.262

Main Carriageway
Ht>4m
Embankment
(Rateaining
Ht (LS)
wall)
0.268
0.422
0.576
0.731
0.890
1.048
1.329
1.563
1.785
2.002
2.215
2.420
2.624
2.825
3.024
3.185
3.222
3.342
3.463
3.953
4.323
4.680
5.079
5.477
5.824
5.309
5.589
5.049
5.073
5.097
5.114
5.067
5.021
4.976
4.809
4.545
4.165
4.038
3.866
3.712
3.625
3.565
3.537
3.543
3.713
3.772
3.674
3.611
3.686
3.778
3.919
4.047
4.175
4.337
4.289
3.982
3.675
3.441
3.614
3.779
3.787
3.707
3.607
3.421
3.466
3.853
3.573
3.318
3.439
3.566
3.557
3.514
3.324
3.546
3.664
3.745
3.859
3.966
4.014
4.000
3.987
3.973
3.961
4.167
4.145
4.158
4.319
4.546
4.743
4.907
5.041
5.176
5.339
5.447
5.484
5.572
5.594
5.490
5.546
5.672
5.797
5.978
6.092
6.041
5.987
5.913
6.138
6.640
6.738
6.808
6.879
6.880
6.849
6.818
6.787
6.758
6.727
6.497
6.341
6.185
6.030
5.877
5.790
5.879
5.968
6.048
6.131
6.091
5.855
5.884
6.033
6.183
6.504
6.513
6.773
7.064
7.455
7.607
7.302
6.988
6.694
6.099
6.028
6.380
6.404
6.329
6.294
6.201
6.060
5.833
5.862
5.805
5.789
5.689
5.496
5.812
4.885
5.955
6.124
6.316
6.504
6.689
6.909
7.047
7.119
7.187
7.311
7.383
7.401
7.405
7.366
7.173
6.862

4.32
4.68
5.08
5.48
5.82
5.31
5.59
5.05
5.07
5.10
5.11
5.07
5.02
4.98
4.81
4.55
4.16

Rateaining
wall Ht.

Rateaining Retaining
wall Avg wall Act.
Ht.
Ht.

Rateaining
wall length

0.32
0.50
0.88
1.28
1.65
1.57
1.45
1.32
1.06
1.09
1.11
1.09
1.04
1.00
0.89
0.68
0.35

0.75
0.75
1.00
1.50
2.00
1.50
1.50
1.50
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.75
0.75

0.18
0.26
0.31

0.75
0.75
0.75

4.17
4.14
4.16
4.32
4.55
4.74
4.91
5.04
5.18
5.34
5.45
5.48
5.57
5.59
5.49
5.55
5.67
5.80
5.98
6.09
6.04
5.99
5.91
6.14
6.64
6.74
6.81
6.88
6.88
6.85
6.82
6.79
6.76
6.73
6.50
6.34
6.19
6.03
5.88
5.79
5.88
5.97
6.05
6.13
6.09
5.86
5.88
6.03
6.18
6.50
6.51
6.77

0.32
0.68
1.08
1.48
1.82
1.31
1.59
1.05
1.07
1.10
1.11
1.07
1.02
0.98
0.81
0.55
0.16
0.18
0.34
0.29
0.17
0.14
0.16
0.32
0.55
0.74
0.91
1.04
1.18
1.34
1.45
1.48
1.57
1.59
1.49
1.55
1.67
1.80
1.98
2.09
2.04
1.99
1.91
2.14
2.64
2.74
2.81
2.88
2.88
2.85
2.82
2.79
2.76
2.73
2.50
2.34
2.19
2.03
1.88
1.79
1.88
1.97
2.05
2.13
2.09
1.86
1.88
2.03
2.18
2.50
2.51
2.77

0.17
0.16
0.15
0.24
0.43
0.64
0.82
0.97
1.11
1.26
1.39
1.47
1.53
1.58
1.54
1.52
1.61
1.73
1.89
2.04
2.07
2.01
1.95
2.03
2.39
2.69
2.77
2.84
2.88
2.86
2.83
2.80
2.77
2.74
2.61
2.42
2.26
2.11
1.95
1.83
1.83
1.92
2.01
2.09
2.11
1.97
1.87
1.96
2.11
2.34
2.51
2.64

0.75
0.75
0.75
0.75
0.75
0.75
0.75
1.00
1.00
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.50
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
2.50
2.50
2.50
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.50
2.50
2.50

10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00

6.99
6.69
6.10
6.03
6.38
6.40
6.33
6.29
6.20
6.06
5.83
5.86
5.81
5.79
5.69
5.50
5.81
4.88
5.96
6.12
6.32
6.50
6.69
6.91

2.99
2.69
2.10
2.03
2.38
2.40
2.33
2.29
2.20
2.06
1.83
1.86
1.81
1.79
1.69
1.50
1.81
0.88
1.96
2.12
2.32
2.50
2.69
2.91

2.99
2.84
2.40
2.06
2.20
2.39
2.37
2.31
2.25
2.13
1.95
1.85
1.83
1.80
1.74
1.59
1.65
1.35
1.42
2.04
2.22
2.41
2.60
2.80

3.00
3.00
2.50
2.00
2.50
2.50
2.50
2.50
2.50
2.00
2.00
2.00
2.00
2.00
2.00
1.50
2.00
1.50
1.50
2.00
2.50
2.50
2.50
3.00

10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00

6.86

2.86

2.86

3.00

10.00

4.18
4.34
4.29
-

Left Service Road

Ht>7m
(RE wall)

RE wall
Height

7.06
7.46
7.61
7.30
7.05
7.12
7.19
7.31
7.38
7.40
7.40
7.37
7.17
-

4.06
4.46
4.61
4.30
4.05
4.12
4.19
4.31
4.38
4.40
4.40
4.37
4.17
-

RE wall
length
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
-

RE wall
Area
20.32
42.60
45.31
44.54
20.23
40.83
41.53
42.49
43.47
43.92
44.03
43.86
42.70
-

RE fill Qty

203.20
425.95
453.10
445.45
202.35
408.30
415.30
424.90
434.70
439.20
440.30
438.55
426.95
-

Embank
ment Ht
(LS)
(1.914)
(1.821)
(1.729)
(1.637)
(1.544)
(1.432)
(1.249)
(1.046)
(0.833)
(0.619)
(0.316)
(0.192)
(0.067)
0.057
0.247
0.402
0.050
0.209
0.446
1.645
2.098
1.434
0.944
0.623
1.005
1.471
1.404
1.347
1.279
0.843
0.709
0.526
0.287
0.046
(0.192)
(0.555)
(0.679)
(0.918)
(1.064)
(1.186)
(1.313)
(1.575)
(1.593)
(1.604)
(1.613)
(1.650)
(1.616)
(1.548)
(1.479)
(1.375)
(1.268)
(1.147)
(1.014)
(0.881)
(1.106)
(1.529)
(1.938)
(1.811)
(1.916)
(1.908)
(1.907)
(1.931)
(1.954)
(1.980)
(1.912)
(1.629)
(1.558)
(1.875)
(1.639)
(1.559)
(1.566)
(1.599)
(1.638)
(1.697)
(1.772)
(1.816)
(1.772)
(1.628)
(0.952)
(0.722)
(0.776)
(0.832)
(0.897)
(0.755)
(0.608)
(0.437)
(0.256)
(0.141)
(0.013)
0.147
0.254
0.341
0.405
0.540
0.701
0.774
0.810
0.866
0.829
1.018
1.045
1.096
1.143
1.170
1.046
0.964
1.084
1.870
1.913
1.958
2.007
1.891
1.672
1.724
2.111
1.812
2.256
1.037
0.165
(0.270)
(0.428)
(0.606)
(0.757)
(0.810)
(0.867)
(0.932)
(0.977)
(1.138)
(1.295)
(1.399)
(1.656)
(1.282)
(1.068)
(0.738)
(0.349)
0.040
0.428
0.508
0.154
(0.237)
(0.628)
(0.456)
(0.280)
(0.225)
(0.264)
(0.298)
(0.295)
(0.345)
(0.383)
(0.263)
(0.143)
(0.038)
0.113
0.253
0.364
0.460
0.538
0.594
0.494
0.475
0.605
0.734
0.905
1.181
1.542
1.654
1.752
1.794
1.669
1.501
1.310
1.131
0.987

Ht>2.5m
(Retaining
wall)
-

Retaining Rateaining
wall Height wall Avg Ht.
-

Right Service Road


Retaining
wall Act.
Ht.

Retaining
wall length
-

Embank Ht>2.5m
ment Ht (Retaining
(RS)
wall)
-1.227
-1.275
-1.307
-1.339
-1.372
-1.360
-1.298
-1.186
-1.061
-0.935
-0.805
-0.675
-0.539
-0.401
-0.286
-0.215
-0.142
-0.068
0.008
0.085
0.163
0.244
0.325
0.408
0.492
0.578
0.665
0.753
0.843
0.935
1.027
1.121
1.216
1.313
1.380
1.483
1.454
1.426
1.441
1.431
1.429
1.436
1.449
1.470
1.500
1.536
1.579
1.628
1.675
1.723
1.770
1.819
1.867
1.915
1.963
2.011
2.059
2.108
2.156
2.204
2.253
2.301
2.349
2.372
2.379
2.387
2.394
2.403
2.412
2.421
2.432
2.386
2.289
2.186
2.079
1.974
1.870
1.769
1.798
1.849
1.901
1.954
2.007
2.062
2.116
2.209
2.309
2.345
2.373
2.402
2.418
2.376
2.335
2.295
2.390
2.292
2.176
2.058
1.940
1.824
1.707
1.643
1.774
1.906
2.037
2.168
2.248
2.272
2.295
2.319
2.343
2.367
2.488
2.611
2.709
2.691
2.555
2.396
2.214
2.010
1.788
1.561
1.363
1.206
1.062
0.949
0.867
0.816
0.843
0.945
1.077
1.201
1.178
1.293
1.408
1.523
1.638
1.752
1.868
1.983
2.097
2.212
2.328
2.443
2.557
2.672
2.788
2.902
2.909
5.619
5.792
5.058
2.256
-0.017
0.439
1.663
2.050
2.259
2.444
2.627
2.725
2.818
2.911
3.003
3.096
3.170
3.243
3.261
3.330
3.223
3.782
3.641

2.79
2.90
2.91
5.62
5.79
5.06
2.73
2.82
2.91
3.00
3.10
3.17
3.24
3.26
3.33
3.22
3.78
3.64

Retaining Rateaining Retaining


Retaining
wall
wall Avg
wall Act.
wall length
Height
Ht.
Ht.
0.29
0.40
0.41
3.12
3.29
2.56
0.23
0.32
0.41
0.50
0.60
0.67
0.74
0.76
0.83
0.72
1.28
1.14

0.29
0.34
0.41
1.76
3.21
2.92

0.75
0.75
0.75
2.00
3.50
3.00

0.23
0.27
0.36
0.46
0.55
0.63
0.71
0.75
0.80
0.78
1.00
1.21

0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
1.00
1.50

10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00

Annexure 1

Main carriageway+SR on bothsides+Rlyportion

Chainage

Volume Cut (m3)

Volume Fill (m3)

79580.000
79590.000
79600.000
79610.000
79620.000
79630.000
79640.000
79650.000
79660.000
79670.000
79680.000
79690.000
79700.000
79710.000
79720.000
79730.000
79740.000
79750.000
79760.000
79770.000
79780.000
79790.000
79800.000
79810.000
79820.000
79830.000
79840.000
79850.000
79860.000
79870.000
79880.000
79890.000
79900.000
79910.000
79920.000
79930.000
79940.000
79950.000
79960.000
79970.000
79980.000
79990.000
80000.000
80010.000
80020.000
80030.000
80040.000
80050.000
80060.000
80070.000
80080.000
80090.000
80100.000
80110.000
80120.000
80130.000
80140.000
80150.000
80160.000
80170.000
80180.000
80190.000
80200.000
80210.000
80220.000
80230.000
80240.000
80250.000
80260.000
80270.000
80280.000
80290.000
80300.000
80310.000
80320.000
80330.000
80340.000
80350.000
80360.000
80370.000
80380.000
80390.000
80400.000
80410.000
80420.000
80430.000
80440.000
80450.000
80460.000
80470.000
80480.000
80490.000
80500.000
80510.000
80520.000
80530.000
80540.000
80550.000
80560.000
80570.000
80580.000
80590.000
80600.000
80610.000
80620.000
80630.000
80640.000
80650.000
80660.000
80670.000
80680.000
80690.000
80700.000
80710.000
80720.000
80730.000
80740.000
80750.000
80760.000
80770.000
80780.000
80790.000
80800.000
80810.000
80820.000
80830.000
80840.000
80850.000
80860.000
80870.000
80880.000
80890.000
80900.000
80910.000
80920.000
80930.000
80940.000
80950.000
80960.000
80970.000
80980.000
80990.000
81000.000
81010.000
81020.000
81030.000
81040.000
81050.000
81060.000
81070.000
81080.000
81090.000
81100.000
81110.000
81120.000
81130.000
81140.000
81150.000
81160.000
81170.000
81180.000
81190.000
81200.000
81210.000
81220.000
81230.000
81240.000
81250.000
81260.000
81270.000
81280.000
81290.000
81300.000
81310.000
81320.000
81330.000
81340.000
81350.000
81360.000
81370.000
81380.000
81390.000
81400.000

60.893
50.896
43.764
53.745
54.917
31.855
9.673
0.920
0.352
7.280
10.658
3.668
0.276
7.495
6.792
0.663
15.007
35.223
40.912
45.049
58.106
33.443
0.000
63.651
225.762
230.297
78.248
28.606
21.847
3.446
15.083
23.403
27.193
37.627
33.234
33.377
33.663
24.369
23.883
21.249
13.909
18.887
27.328
27.931
11.947
0.285
0.239
0.240
0.241
0.261
1.279
1.995
1.578
0.928
5.041
21.603
59.097
99.863
129.423
177.641
263.176
326.555
372.555
427.781
435.148
411.121
399.151
392.338
378.181
354.067
322.854
321.994
383.161
417.738
392.432
372.893
352.187
378.275
428.568
419.930
354.566
259.855
207.428
207.477
230.623
228.344
163.903
106.492
74.690
44.698
25.696
21.693
44.682
142.043
245.575
213.111
128.420
83.865
47.770
16.126
1.842
0.344
0.000
2.428
1.538
0.490
0.623
0.327
0.001
0.000
4.040
4.041
0.002
0.002
23.073
84.391
113.428
79.924
76.425
129.234
182.709
247.287
372.370
497.580
619.854
728.849
772.074
817.724
976.869
1146.085
1244.303
1338.244
1475.016
1646.892
1799.220
1894.645
1927.876
1955.405
2011.370
2071.654
2125.641
2153.353
2156.354
2116.254
2072.299
2040.388
2009.009
1949.042
1865.645
1783.161
1698.623
1613.227
1532.679
1457.509
1382.527
1307.541
1235.083
1179.393
1144.106
1126.052
1107.930
1073.192
1051.551
1034.236
985.374
935.131
939.737
933.760
872.503
801.612
729.882
653.654
574.929
506.692
448.802
401.002
357.119
337.110
345.568
347.842
336.883
319.513
296.969

2901.441
2870.900
2862.632
2893.984
2895.159
2839.343
2786.329
2772.453
2814.138
2898.473
3016.148
3168.069
3378.695
3567.438
3610.742
3573.103
3586.460
3642.647
3752.501
4050.148
4468.694
4671.743
4598.410
4705.253
5121.962
5270.637
4664.420
4287.183
4679.287
4873.104
4996.752
5277.644
5160.168
4789.006
4532.606
4488.521
4545.675
4539.495
4495.160
4451.292
4404.533
4401.647
4415.044
4351.646
4247.108
4187.191
4210.058
4211.050
4100.723
4004.272
4008.032
4112.692
4194.592
4121.273
4023.762
3978.100
4001.302
3989.616
3902.611
3862.336
3822.372
3816.159
3888.924
3978.534
4005.663
4040.491
4173.759
4240.971
4214.575
4289.145
4406.778
4509.861
4572.366
4539.534
4568.761
4715.896
4892.228
5006.732
4993.532
4965.214
5040.281
5201.960
5383.395
5511.495
5558.627
5657.228
5841.841
5954.457
5988.340
6046.716
6182.237
6668.884
6956.635
6211.889
5714.881
6288.099
7065.942
7590.882
7866.241
8015.901
8112.480
8174.476
8236.238
8326.052
8514.832
8828.722
9212.999
9688.815
10176.727
10464.001
10488.185
10388.304
10097.689
9382.329
8276.094
7429.305
6976.487
6442.846
5904.017
5544.670
5217.048
5000.586
4818.272
4369.202
4035.998
3784.229
3579.010
3444.355
3318.987
3098.937
2838.401
2657.329
2404.766
2105.187
1906.892
1777.231
1670.507
1514.177
1321.178
1223.013
1205.098
1204.042
1237.571
1276.580
1306.344
1349.392
1409.071
1508.777
1629.843
1736.627
1845.617
1961.421
2105.405
2283.696
2459.801
2625.576
2792.767
2995.365
3141.412
3174.410
3181.076
3188.186
3212.531
3265.336
3332.371
3395.672
3464.618
3530.951
3583.384
3637.746
3697.051
3731.279
3721.787
3704.437
3734.930
3768.617
3669.909
3618.217
3669.489
3668.802
3683.302
3747.668
3840.820

Main Carriageway
Ht>4m
Embankment
(Rateaining
Ht (LS)
wall)
5.027
5.045
5.049
4.906
4.777
4.656
4.545
4.578
4.694
4.831
4.975
5.129
5.291
5.358
5.209
5.044
4.877
4.917
4.841
4.879
4.858
4.688
4.719
4.760
4.809
4.846
4.858
8.381
8.835
8.812
7.870
6.253
5.038
5.491
6.029
6.583
6.333
6.458
6.591
6.722
6.741
6.710
6.839
6.697
6.555
6.620
6.662
6.544
6.357
6.501
6.923
7.237
7.100
7.173
7.130
6.988
6.870
6.989
7.184
7.299
7.266
7.311
7.792
7.391
7.991
8.203
8.398
8.555
8.655
8.937
9.414
9.234
8.915
8.728
8.935
9.169
9.366
9.425
9.153
9.225
9.580
9.865
9.945
9.819
9.572
10.050
10.523
10.814
11.114
11.366
11.241
12.209
11.106
9.915
10.710
11.441
12.164
12.883
12.966
12.937
12.830
12.851
13.036
13.037
13.234
13.750
14.546
15.048
15.633
15.535
15.585
15.452
11.498
11.332
11.161
10.985
10.557
10.027
9.538
8.942
8.777
8.700
7.957
7.561
7.302
7.045
6.892
6.766
6.370
5.564
5.559
5.567
4.890
4.502
4.517
4.536
4.541
4.307
4.162
4.026
3.900
3.764
3.803
3.850
3.906
3.969
4.039
4.182
4.336
4.497
4.670
4.849
5.032
5.206
5.389
5.598
5.825
6.316
6.112
6.101
6.094
6.172
6.242
6.328
6.418
6.502
6.499
6.579
6.675
6.786
6.909
7.031
7.072
7.115
7.160
7.188
7.102
7.041
6.981
6.277
6.613
7.068
7.354

Rateaining
wall Ht.

Rateaining Retaining
wall Avg wall Act.
Ht.
Ht.

Rateaining
wall length

5.03
5.05
5.05
4.91
4.78
4.66
4.55
4.58
4.69
4.83
4.98
5.13
5.29
5.36
5.21
5.04
4.88
4.92
4.84
4.88
4.86
4.69
4.72
4.76
4.81
4.85
4.86

1.03
1.05
1.05
0.91
0.78
0.66
0.55
0.58
0.69
0.83
0.98
1.13
1.29
1.36
1.21
1.04
0.88
0.92
0.84
0.88
0.86
0.69
0.72
0.76
0.81
0.85
0.86

1.02
1.04
1.05
0.98
0.84
0.72
0.60
0.56
0.64
0.76
0.90
1.05
1.21
1.32
1.28
1.13
0.96
0.90
0.88
0.86
0.87
0.77
0.70
0.74
0.78
0.83
0.85

1.00
1.00
1.00
1.00
0.75
0.75
0.75
0.75
0.75
0.75
1.00
1.00
1.50
1.50
1.50
1.00
1.00
1.00
1.00
1.00
1.00
0.75
0.75
0.75
0.75
0.75
1.00

10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00

6.25
5.04
5.49
6.03
6.58
6.33
6.46
6.59
6.72
6.74
6.71
6.84
6.70
6.56
6.62
6.66
6.54
6.36
6.50
6.92

2.25
1.04
1.49
2.03
2.58
2.33
2.46
2.59
2.72
2.74
2.71
2.84
2.70
2.56
2.62
2.66
2.54
2.36
2.50
2.92

2.25
1.65
1.26
1.76
2.31
2.46
2.40
2.52
2.66
2.73
2.73
2.77
2.77
2.63
2.59
2.64
2.60
2.45
2.43
2.71

2.50
1.50
1.50
2.00
2.50
2.50
2.50
2.50
3.00
3.00
3.00
3.00
3.00
2.50
2.50
2.50
2.50
2.50
2.50
3.00

10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00

6.99
6.87
6.99

2.99
2.87
2.99

2.99
2.93
2.93

3.00
3.00
3.00

10.00
10.00
10.00

6.89
6.77
6.37
5.56
5.56
5.57
4.89
4.50
4.52
4.54
4.54
4.31
4.16

2.89
2.83
2.57
1.97
1.56
1.56
1.23
0.70
0.51
0.53
0.54
0.42
0.23

3.00
3.00
2.50
2.00
1.50
1.50
1.50
0.75
0.75
0.75
0.75
0.75
0.75

4.18
4.34
4.50
4.67
4.85
5.03
5.21
5.39
5.60
5.82
6.32
6.11
6.10
6.09
6.17
6.24
6.33
6.42
6.50
6.50
6.58
6.68
6.79
6.91

2.89
2.77
2.37
1.56
1.56
1.57
0.89
0.50
0.52
0.54
0.54
0.31
0.16
0.18
0.34
0.50
0.67
0.85
1.03
1.21
1.39
1.60
1.82
2.32
2.11
2.10
2.09
2.17
2.24
2.33
2.42
2.50
2.50
2.58
2.68
2.79
2.91

0.18
0.26
0.42
0.58
0.76
0.94
1.12
1.30
1.49
1.71
2.07
2.21
2.11
2.10
2.13
2.21
2.29
2.37
2.46
2.50
2.54
2.63
2.73
2.85

0.75
0.75
0.75
0.75
0.75
1.00
1.00
1.50
1.50
2.00
2.00
2.50
2.00
2.00
2.00
2.50
2.50
2.50
2.50
2.50
2.50
2.50
3.00
3.00

10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00

6.98
6.28
6.61

2.98
2.28
2.61

2.98
2.63
2.45

3.00
2.50
2.50

10.00
10.00
10.00

Left Service Road

Ht>7m
(RE wall)

RE wall
Height

8.38
8.84
8.81
7.87
7.24
7.10
7.17
7.13
7.18
7.30
7.27
7.31
7.79
7.39
7.99
8.20
8.40
8.56
8.65
8.94
9.41
9.23
8.92
8.73
8.94
9.17
9.37
9.43
9.15
9.23
9.58
9.86
9.94
9.82
9.57
10.05
10.52
10.81
11.11
11.37
11.24
12.21
11.11
9.92
10.71
11.44
12.16
12.88
12.97
12.94
12.83
12.85
13.04
13.04
13.23
13.75
14.55
15.05
15.63
15.54
15.59
15.45
11.50
11.33
11.16
10.99
10.56
10.03
9.54
8.94
8.78
8.70
7.96
7.56
7.30
7.05
7.03
7.07
7.12
7.16
7.19
7.10
7.04
7.07
7.35

5.38
5.84
5.81
4.87
4.24
4.10
4.17
4.13
4.18
4.30
4.27
4.31
4.79
4.39
4.99
5.20
5.40
5.56
5.65
5.94
6.41
6.23
5.92
5.73
5.94
6.17
6.37
6.43
6.15
6.23
6.58
6.86
6.94
6.82
6.57
7.05
7.52
7.81
8.11
8.37
8.24
9.21
8.11
6.92
7.71
8.44
9.16
9.88
9.97
9.94
9.83
9.85
10.04
10.04
10.23
10.75
11.55
12.05
12.63
12.54
12.59
12.45
8.50
8.33
8.16
7.99
7.56
7.03
6.54
5.94
5.78
5.70
4.96
4.56
4.30
4.05
4.03
4.07
4.12
4.16
4.19
4.10
4.04
4.07
4.35

RE wall
length
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00

RE wall
Area
26.90
56.08
58.24
53.41
21.18
41.68
41.37
41.52
20.92
42.41
42.83
42.89
45.51
45.92
46.91
50.97
53.01
54.77
56.05
57.96
61.76
63.24
60.75
58.22
58.32
60.52
62.68
63.96
62.89
61.89
64.03
67.22
69.05
68.82
66.96
68.11
72.86
76.68
79.64
82.40
83.03
87.25
86.58
75.11
73.13
80.76
88.03
95.24
99.25
99.51
98.83
98.41
99.44
100.37
101.36
104.92
111.48
117.97
123.41
125.84
125.60
125.19
104.75
84.15
82.47
80.73
77.71
72.92
67.83
62.40
58.60
57.38
53.28
47.59
44.32
41.74
20.16
40.52
40.94
41.38
41.74
41.45
40.71
20.34
42.11

RE fill Qty

269.05
560.80
582.35
534.10
211.85
416.85
413.65
415.15
209.20
424.15
428.25
428.85
455.15
459.15
469.10
509.70
530.05
547.65
560.50
579.60
617.55
632.40
607.45
582.15
583.15
605.20
626.75
639.55
628.90
618.90
640.25
672.25
690.50
688.20
669.55
681.10
728.65
766.85
796.40
824.00
830.35
872.50
865.75
751.05
731.25
807.55
880.25
952.35
992.45
995.15
988.35
984.05
994.35
1,003.65
1,013.55
1,049.20
1,114.80
1,179.70
1,234.05
1,258.40
1,256.00
1,251.85
1,047.50
841.50
824.65
807.30
777.10
729.20
678.25
624.00
585.95
573.85
532.85
475.90
443.15
417.35
201.55
405.15
409.35
413.75
417.40
414.50
407.15
203.40
421.10

Embank
ment Ht
(LS)
1.212
1.390
1.534
1.655
1.782
1.914
2.090
2.356
2.564
2.850
3.136
3.423
3.697
3.964
4.230
4.491
4.670
4.688
4.653
4.618
4.583
4.548
4.513
4.478
4.444
4.408
4.373
4.338
4.356
4.974
6.366
8.341
8.032
5.758
3.975
3.300
4.323
4.099
3.895
3.680
3.467
3.660
3.657
3.302
3.183
3.384
3.197
3.049
2.531
2.337
2.250
2.168
2.068
1.969
1.870
1.603
1.424
1.149
0.805
0.510
0.127
0.236
0.089
0.110
0.143
0.192
0.311
0.379
0.471
0.576
0.644
0.461
0.228
0.118
0.445
0.282
0.459
0.148
0.279
0.260
0.415
0.570
0.592
0.502
0.750
1.195
1.639
1.441
1.342
1.356
1.497
2.256
0.839
0.584
1.169
2.501
3.500
3.633
3.495
3.497
3.477
3.468
2.945
3.031
4.544
4.968
5.233
5.313
6.631
5.379
3.129
2.287
2.896
3.087
2.563
1.813
1.586
1.279
0.927
0.784
0.449
0.509
(0.265)
(0.505)
(0.696)
(0.770)
(0.728)
(0.815)
(1.675)
(1.606)
(1.615)
(1.658)
(1.818)
(2.116)
(2.416)
(2.440)
(2.338)
(2.553)
(2.583)
(2.614)
(2.648)
(2.598)
(2.514)
(2.416)
(2.318)
(2.233)
(2.190)
(2.032)
(1.872)
(1.709)
(1.540)
(1.371)
(1.233)
(1.094)
(0.955)
(0.814)
(0.705)
(0.701)
(0.661)
(0.608)
(0.581)
(0.512)
(0.537)
(0.546)
(0.380)
(0.443)
(0.813)
(0.560)
(0.295)
(0.017)
0.273
0.539
0.621
0.735
0.852
0.956
1.113
1.356
1.524
1.483
1.460
1.478
1.316

Ht>2.5m
(Retaining
wall)
2.85
3.14
3.42
3.70
3.96
4.23
4.49
4.67
4.69
4.65
4.62
4.58
4.55
4.51
4.48
4.44
4.41
4.37
4.34
4.36
4.97
6.37
8.34
8.03
5.76
3.97
3.30
4.32
4.10
3.89
3.68
3.47
3.66
3.66
3.30
3.18
3.38
3.20
3.05
3.50
3.63
3.50
3.50
3.48
3.47
2.94
3.03
4.54
4.97
5.23
5.31
6.63
5.38
3.13
2.90
3.09
-

Retaining Rateaining
wall Height wall Avg Ht.
0.35
0.64
0.92
1.20
1.46
1.73
1.99
2.17
2.19
2.15
2.12
2.08
2.05
2.01
1.98
1.94
1.91
1.87
1.84
1.86
2.47
3.87
5.84
5.53
3.26
1.47
0.80
1.82
1.60
1.39
1.18
0.97
1.16
1.16
0.80
0.68
0.88
0.70
0.55
1.00
1.13
1.00
1.00
0.98
0.97
0.44
0.53
2.04
2.47
2.73
2.81
4.13
2.88
0.63
0.40
0.59
-

0.35
0.49
0.78
1.06
1.33
1.60
1.86
2.08
2.18
2.17
2.14
2.10
2.07
2.03
2.00
1.96
1.93
1.89
1.86
1.85
2.16
3.17
4.85
5.69
4.40
2.37
1.14
1.31
1.71
1.50
1.29
1.07
1.06
1.16
0.98
0.74
0.78
0.79
0.62

Right Service Road


Retaining
wall Act.
Ht.

0.75
0.75
0.75
1.00
1.50
1.50
2.00
2.00
2.50
2.50
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.50
3.50
5.00
5.50
4.50
2.50
1.00
1.50
2.00
1.50
1.50
1.00
1.00
1.50
1.00
0.75
0.75
0.75
0.75

1.00
1.07
1.06
1.00
0.99
0.97
0.71
0.49
1.29
2.26
2.60
2.77
3.47
3.51
1.75

1.00
1.00
1.00
1.00
1.00
1.00
0.75
0.75
1.50
2.50
2.50
2.50
3.50
3.50
2.00

0.40
0.49

0.75
0.75

Retaining
wall length
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
-

Embank Ht>2.5m
ment Ht (Retaining
(RS)
wall)
3.526
3.643
3.760
3.878
3.863
3.800
4.037
4.010
3.954
3.898
3.842
3.786
4.138
4.339
4.317
4.296
4.893
4.984
6.440
7.419
7.124
6.334
6.243
6.199
6.155
6.112
6.009
5.667
5.622
5.608
5.585
5.404
5.218
5.050
4.761
4.337
4.488
3.754
3.685
3.610
3.537
3.462
3.389
3.314
3.240
3.166
3.037
2.848
2.674
2.500
2.321
2.133
1.925
1.717
1.501
1.287
1.071
0.883
0.707
0.536
0.378
0.233
0.013
-0.125
-0.233
-0.251
-0.449
-0.437
-0.355
-0.298
-0.226
-0.162
-0.132
-0.102
-0.071
-0.042
-0.054
-0.396
-0.205
0.019
0.243
0.469
0.694
0.368
0.467
0.566
0.870
0.992
1.047
1.083
1.119
1.090
0.799
0.577
-0.340
1.036
1.027
1.145
1.356
1.510
1.632
1.736
1.921
2.106
2.267
2.472
2.657
2.741
2.825
3.010
3.242
3.552
4.028
5.198
5.134
4.786
3.926
2.884
1.755
0.957
0.870
0.641
0.447
0.125
-0.203
-0.534
-0.761
-1.138
-1.571
-2.018
-2.481
-2.947
-3.273
-3.582
-3.894
-4.206
-4.407
-4.635
-4.856
-5.077
-5.298
-5.520
-5.459
-5.311
-5.185
-5.079
-4.957
-4.759
-4.552
-4.334
-4.113
-3.922
-3.761
-3.561
-3.370
-3.166
-2.944
-2.860
-2.814
-2.737
-2.638
-2.584
-2.507
-2.401
-2.306
-1.773
-2.197
-2.174
-2.064
-1.860
-1.641
-1.404
-1.167
-0.940
-0.723
-0.541
-0.450
-0.582
-0.715
-0.712
-0.627
-0.518

3.53
3.64
3.76
3.88
3.86
3.80
4.04
4.01
3.95
3.90
3.84
3.79
4.14
4.34
4.32
4.30
4.89
4.98
6.44
7.42
7.12
6.33
6.24
6.20
6.16
6.11
6.01
5.67
5.62
5.61
5.58
5.40
5.22
5.05
4.76
4.34
4.49
3.75
3.69
3.61
3.54
3.46
3.39
3.31
3.24
3.17
3.04
2.85
2.74
2.83
3.01
3.24
3.55
4.03
5.20
5.13
4.79
3.93
2.88
-

Retaining Rateaining Retaining


Retaining
wall
wall Avg
wall Act.
wall length
Height
Ht.
Ht.
1.03
1.14
1.26
1.38
1.36
1.30
1.54
1.51
1.45
1.40
1.34
1.29
1.64
1.84
1.82
1.80
2.39
2.48
3.94
4.92
4.62
3.83
3.74
3.70
3.66
3.61
3.51
3.17
3.12
3.11
3.08
2.90
2.72
2.55
2.26
1.84
1.99
1.25
1.19
1.11
1.04
0.96
0.89
0.81
0.74
0.67
0.54
0.35
0.24
0.33
0.51
0.74
1.05
1.53
2.70
2.63
2.29
1.43
0.38
-

0.97
1.08
1.20
1.32
1.37
1.33
1.42
1.52
1.48
1.43
1.37
1.31
1.46
1.74
1.83
1.81
2.09
2.44
3.21
4.43
4.77
4.23
3.79
3.72
3.68
3.63
3.56
3.34
3.14
3.12
3.10
2.99
2.81
2.63
2.41
2.05
1.91
1.62
1.22
1.15
1.07
1.00
0.93
0.85
0.78
0.70
0.60
0.44

1.00
1.00
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
2.00
2.00
2.00
2.00
2.50
3.50
4.50
5.00
4.50
4.00
4.00
4.00
3.50
3.50
3.50
3.00
3.00
3.00
3.00
3.00
2.50
2.50
2.00
2.00
1.50
1.50
1.00
1.00
1.00
1.00
1.00
0.75
0.75
0.75
0.75

0.24
0.28
0.42
0.63
0.90
1.29
2.11
2.67
2.46
1.86
0.91

0.75
0.75
0.75
0.75
1.00
1.50
2.00
3.00
2.50
2.00
1.00

10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
-

Annexure 1

Main carriageway+SR on bothsides+Rlyportion

Chainage

Volume Cut (m3)

Volume Fill (m3)

81480.000
81490.000
81500.000
81510.000
81520.000
81530.000
81540.000
81550.000
81560.000
81570.000
81580.000
81590.000
81600.000
81610.000
81620.000
81630.000
81640.000
81650.000
81660.000
81670.000
81680.000
81690.000
81700.000
81710.000
81720.000
81730.000
81740.000
81750.000
81760.000
81770.000
81780.000
81790.000
81800.000
81810.000
81820.000
81830.000
81840.000
81850.000
81860.000
81870.000
81880.000
81890.000
81900.000
81910.000
81920.000
81930.000
81940.000
81950.000
81960.000
81970.000
81980.000
81990.000
82000.000
82010.000
82020.000
82030.000
82040.000
82050.000
82060.000
82070.000
82080.000
82090.000
82100.000
82110.000
82120.000
82130.000
82140.000
82150.000
82160.000
82170.000
82180.000
82190.000
82200.000
82210.000
82220.000
82230.000
82240.000
82250.000
82260.000
82270.000
82280.000
82290.000
82300.000
82310.000
82320.000
82330.000
82340.000
82350.000
82360.000
82370.000
82380.000
82390.000
82400.000
82410.000
82420.000
82430.000
82440.000
82450.000
82460.000
82470.000
82480.000
82490.000
82500.000
82510.000
82520.000
82530.000
82540.000
82550.000
82560.000
82570.000
82580.000
82590.000
82600.000
82610.000
82620.000
82630.000
82640.000
82650.000
82660.000
82670.000
82680.000
82690.000
82700.000
82710.000
82720.000
82730.000
82740.000
82750.000
82760.000
82770.000
82780.000
82790.000
82800.000
82810.000
82820.000
82830.000
82840.000
82850.000
82860.000
82870.000
82880.000
82890.000
82900.000
82910.000
82920.000
82930.000
82940.000
82950.000
82960.000
82970.000
82980.000
82990.000
83000.000
Total including SR

97.331
86.104
62.403
57.207
68.134
91.518
128.233
171.393
209.883
233.212
237.648
236.430
252.419
269.014
292.288
337.277
386.204
441.974
508.296
567.129
611.178
655.601
679.168
675.256
646.025
580.010
506.699
444.295
398.589
370.592
344.684
311.123
270.688
262.757
269.037
215.713
190.959
186.529
161.864
132.078
85.712
32.630
9.049
7.016
4.626
8.173
6.646
0.284
1.565
1.771
2.557
2.834
3.210
4.060
2.715
5.022
10.701
32.778
77.351
138.754
205.968
256.150
276.442
294.488
327.031
289.597
212.682
188.779
222.198
286.395
317.800
319.711
344.891
405.205
483.044
550.432
598.304
646.161
673.691
660.950
632.472
615.387
588.513
525.518
456.249
377.306
285.090
218.684
197.882
171.743
87.439
147.031
248.709
242.019
219.668
161.105
128.862
122.488
123.829
130.952
138.622
164.008
218.716
313.044
438.030
569.889
642.314
583.370
415.047
228.684
77.863
5.480
0.484
0.000
3.687
22.204
43.221
36.146
15.083
5.983
4.513
2.714
0.542
7.252
10.675
12.091
8.934
0.527
2.062
12.448
21.728
23.243
24.411
24.667
28.387
35.345
37.774
26.647
8.250
1.897
14.629
25.023
20.823
16.595
26.556
78.772
169.484
227.099
263.744
338.722
327.722
266.103
283.129
540961.707

4205.920
4278.641
4305.012
4314.821
4325.680
4332.256
4327.321
4334.323
4344.284
4350.604
4373.161
4391.350
4364.792
4272.429
4161.571
4117.284
4052.385
3673.988
3293.862
3161.902
3077.653
3086.899
3193.241
3359.260
3536.453
3705.924
3867.697
4006.118
4155.943
4321.927
4468.178
4712.598
4971.028
5168.573
5356.727
5575.455
5803.877
5796.193
5643.397
5617.079
5719.577
5843.740
5949.683
6080.423
6044.010
5989.357
6127.769
6182.949
6132.481
6107.943
6024.614
5793.623
5500.937
5293.843
5158.827
4974.058
4649.418
4168.838
3735.281
3348.964
3047.744
2981.026
2909.799
2669.228
2471.211
2285.013
2115.135
1905.340
1611.197
1337.014
1108.789
921.586
743.713
575.694
426.142
296.433
193.186
117.664
88.825
145.220
249.489
343.750
440.988
577.974
740.691
886.719
1088.786
1281.389
1313.157
1284.401
1334.872
1535.066
1729.135
1704.627
1607.113
1599.694
1602.615
1579.887
1547.399
1505.053
1540.529
1631.876
1714.432
1745.171
1619.929
1257.010
1005.555
1071.181
1275.786
1677.348
2292.073
2998.980
3569.598
3933.020
4186.364
4325.032
4481.412
4662.313
4778.509
4816.880
4686.358
4511.881
4424.185
4477.278
4705.768
4953.361
5063.830
5056.483
5079.884
5154.451
5235.006
5274.404
5269.093
5232.802
5184.506
5139.191
5054.224
4920.262
4779.285
4666.597
4685.101
4833.342
4937.472
4959.485
4964.847
4982.947
5030.903
5092.532
5121.367
5168.107
5235.112
5211.082
5045.132
3417824.134

Main Carriageway
Ht>4m
Embankment
(Rateaining
Ht (LS)
wall)
7.044
7.099
7.151
7.214
7.251
7.347
7.479
7.421
7.421
7.518
7.430
7.379
7.227
7.086
6.961
6.792
6.566
6.363
6.143
6.031
6.092
6.243
6.429
6.663
6.947
7.301
7.664
8.003
8.162
8.230
8.296
8.478
8.527
8.751
9.074
9.454
9.479
9.428
9.349
9.271
9.200
9.249
9.311
9.392
9.521
9.545
9.610
9.707
9.726
9.720
9.669
9.275
9.094
9.097
9.069
8.703
8.281
7.855
7.596
7.101
6.691
6.454
6.102
5.826
5.615
5.362
5.196
4.665
4.358
3.934
3.503
3.153
2.898
2.612
2.355
2.142
1.943
1.769
1.620
1.569
1.666
1.677
1.792
1.893
2.236
2.600
2.924
3.137
3.088
2.957
3.368
2.987
3.105
3.111
3.347
3.950
4.282
4.112
4.141
4.219
4.346
4.767
5.183
5.597
5.250
4.198
4.545
4.935
5.351
5.766
6.193
6.445
6.718
7.080
7.195
7.287
7.351
7.399
7.447
7.096
6.632
6.819
7.395
6.836
6.437
7.466
7.628
7.631
7.790
8.255
8.452
8.518
8.630
8.508
8.508
8.476
8.435
8.394
8.353
8.312
8.273
8.236
8.206
8.176
8.147
8.198
8.485
8.852
9.056
9.045
9.036
8.823
8.526

Rateaining
wall Ht.

6.96
6.79
6.57
6.36
6.14
6.03
6.09
6.24
6.43
6.66
6.95

6.69
6.45
6.10
5.83
5.62
5.36
5.20
4.67
4.36
4.28
4.11
4.14
4.22
4.35
4.77
5.18
5.60
5.25
4.20
4.55
4.94
5.35
5.77
6.19
6.44
6.72

6.63
6.82
7.40
6.84
6.44

2.96
2.79
2.57
2.36
2.14
2.03
2.09
2.24
2.43
2.66
2.95

2.69
2.45
2.10
1.83
1.62
1.36
1.20
0.67
0.36
0.28
0.11
0.14
0.22
0.35
0.77
1.18
1.60
1.25
0.20
0.55
0.94
1.35
1.77
2.19
2.44
2.72

2.63
2.82
3.40
2.84
2.44

Rateaining Retaining
wall Avg wall Act.
Ht.
Ht.

2.96
2.88
2.68
2.46
2.25
2.09
2.06
2.17
2.34
2.55
2.81

3.00
3.00
3.00
2.50
2.50
2.00
2.00
2.50
2.50
2.50
3.00

2.69
2.57
2.28
1.96
1.72
1.49
1.28
0.93
0.51

3.00
2.50
2.50
2.00
2.00
1.50
1.50
1.00
0.75

0.28
0.20
0.13
0.18
0.28
0.56
0.97
1.39
1.42
0.72
0.37
0.74
1.14
1.56
1.98
2.32
2.58

0.75
0.75
0.75
0.75
0.75
0.75
1.00
1.50
1.50
0.75
0.75
0.75
1.00
1.50
2.00
2.50
2.50

2.63
2.73
3.11
3.12
2.64

2.50
3.00
3.00
3.00
2.50

Rateaining
wall length

10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00

10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00

10.00
10.00
10.00
10.00
10.00

4430.000

Left Service Road

Ht>7m
(RE wall)

RE wall
Height

7.04
7.10
7.15
7.21
7.25
7.35
7.48
7.42
7.42
7.52
7.43
7.38
7.23
7.09
7.30
7.66
8.00
8.16
8.23
8.30
8.48
8.53
8.75
9.07
9.45
9.48
9.43
9.35
9.27
9.20
9.25
9.31
9.39
9.52
9.55
9.61
9.71
9.73
9.72
9.67
9.27
9.09
9.10
9.07
8.70
8.28
7.85
7.60
7.10
7.08
7.19
7.29
7.35
7.40
7.45
7.10
-

4.04
4.10
4.15
4.21
4.25
4.35
4.48
4.42
4.42
4.52
4.43
4.38
4.23
4.09
4.30
4.66
5.00
5.16
5.23
5.30
5.48
5.53
5.75
6.07
6.45
6.48
6.43
6.35
6.27
6.20
6.25
6.31
6.39
6.52
6.55
6.61
6.71
6.73
6.72
6.67
6.27
6.09
6.10
6.07
5.70
5.28
4.85
4.60
4.10
4.08
4.19
4.29
4.35
4.40
4.45
4.10
4.47
4.63
4.63
4.79
5.26
5.45
5.52
5.63
5.51
5.51
5.48
5.44
5.39
5.35
5.31
5.27
5.24
5.21
5.18
5.15
5.20
5.49
5.85
6.06
6.05
6.04
5.82
5.53

7.47
7.63
7.63
7.79
8.26
8.45
8.52
8.63
8.51
8.51
8.48
8.44
8.39
8.35
8.31
8.27
8.24
8.21
8.18
8.15
8.20
8.49
8.85
9.06
9.05
9.04
8.82
8.53

RE wall
length
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
3220.000

RE wall
Area

RE fill Qty

40.47
404.75
40.72
407.15
41.25
412.50
41.83
418.25
42.32
423.25
42.99
429.90
44.13
441.30
44.50
445.00
44.21
442.10
44.69
446.95
44.74
447.40
44.04
440.45
43.03
430.30
41.56
415.65
21.50
215.05
44.82
448.25
48.34
483.35
50.83
508.25
51.96
519.60
52.63
526.30
53.87
538.70
55.03
550.25
56.39
563.90
59.13
591.25
62.64
626.40
64.67
646.65
64.54
645.35
63.88
638.85
63.10
631.00
62.36
623.55
62.24
622.45
62.80
628.00
63.51
635.15
64.57
645.65
65.33
653.30
65.78
657.75
66.59
665.85
67.17
671.65
67.23
672.30
66.95
669.45
64.72
647.20
61.84
618.45
60.96
609.55
60.83
608.30
58.86
588.60
54.92
549.20
50.68
506.80
47.25
472.55
43.49
434.85
20.40
204.00
41.38
413.75
42.41
424.10
43.19
431.90
43.75
437.50
44.23
442.30
42.72
427.15
22.33
223.30
45.47
454.70
46.29
462.95
47.11
471.05
50.23
502.25
53.54
535.35
54.85
548.50
55.74
557.40
55.69
556.90
55.08
550.80
54.92
549.20
54.56
545.55
54.15
541.45
53.74
537.35
53.33
533.25
52.93
529.25
52.55
525.45
52.21
522.10
51.91
519.10
51.61
516.15
51.72
517.25
53.42
534.15
56.69
566.85
59.54
595.40
60.51
605.05
60.41
604.05
59.29
592.95
56.74
567.45
17831.280 178312.800

Embank
ment Ht
(LS)
2.529
2.559
2.596
2.703
2.730
2.683
2.594
2.588
2.396
2.035
1.829
1.655
1.455
1.223
0.849
0.543
0.214
(0.047)
(0.192)
(0.217)
(0.157)
(0.095)
0.024
0.173
0.343
0.706
0.681
0.949
1.081
1.275
1.548
1.941
2.120
2.301
2.835
2.143
2.185
2.666
2.751
2.802
2.880
2.948
2.943
3.123
3.326
3.571
3.656
3.655
3.734
3.902
3.954
3.995
3.869
3.737
3.593
3.542
3.413
2.984
2.547
2.080
1.807
1.828
1.769
1.683
1.538
1.401
1.351
1.107
0.950
0.695
0.476
0.289
0.140
(0.005)
(0.178)
(0.398)
(0.469)
(0.566)
(0.667)
(0.727)
(0.773)
(0.793)
(0.815)
(0.787)
(0.682)
(0.543)
0.015
0.069
(0.046)
0.480
0.634
(0.347)
(0.177)
(0.055)
0.060
0.234
0.266
0.268
0.271
0.193
(0.248)
0.049
0.552
1.229
1.447
1.174
0.994
0.845
0.672
0.764
1.101
1.555
2.064
2.199
2.236
2.233
2.205
2.193
2.180
2.169
2.020
1.595
1.698
1.740
1.783
1.829
1.876
1.924
1.974
2.026
2.080
2.135
2.098
1.944
1.907
2.263
2.249
2.137
2.026
1.811
1.893
1.886
1.738
1.611
1.401
1.142
1.090
1.026
0.965
0.804
0.526
0.429
0.144

Ht>2.5m
(Retaining
wall)

2.83
2.75
2.80
2.88
2.95
2.94
3.12
3.33
3.57
3.66
3.66
3.73
3.90
3.95
4.00
3.87
3.74
3.59
3.54
3.41
2.98
-

Retaining Rateaining
wall Height wall Avg Ht.
0.33
0.25
0.30
0.38
0.45
0.44
0.62
0.83
1.07
1.16
1.16
1.23
1.40
1.45
1.50
1.37
1.24
1.09
1.04
0.91
0.48
-

Right Service Road


Retaining
wall Act.
Ht.

0.33

0.75

0.25
0.28
0.34
0.41
0.45
0.53
0.72
0.95
1.11
1.16
1.19
1.32
1.43
1.47
1.43
1.30
1.16
1.07
0.98
0.70

0.75
0.75
0.75
0.75
0.75
0.75
0.75
1.00
1.00
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.00
1.00
0.75

Retaining
wall length
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
1310.000

Embank Ht>2.5m
ment Ht (Retaining
(RS)
wall)
0.489
0.408
0.472
0.496
0.436
0.373
0.168
-0.097
-0.304
-0.530
-0.587
-0.512
-0.405
-0.493
-0.612
-0.683
-0.676
-0.646
-0.617
-0.721
-0.914
-1.211
-1.382
-1.456
-1.418
-1.239
-1.154
-1.044
-0.948
-0.824
-0.703
-0.473
-0.317
-0.164
-0.003
0.155
0.318
0.516
0.583
0.258
0.442
0.848
0.925
1.041
1.232
1.490
1.449
1.282
1.210
1.233
1.066
1.172
0.998
1.105
1.172
0.926
0.711
0.548
0.388
0.148
-0.157
-0.321
-0.455
-0.547
-0.618
-0.638
-0.571
-0.398
0.414
0.460
0.645
1.013
0.925
0.699
0.330
0.614
0.429
0.346
0.288
0.336
0.252
0.286
0.465
0.688
0.817
1.113
1.565
2.043
2.062
2.027
1.893
2.220
2.313
2.413
2.444
2.474
2.425
2.364
2.304
2.241
1.965
1.294
0.717
0.146
-0.423
-1.028
-0.133
0.901
1.771
1.970
2.098
2.224
2.356
2.490
2.620
2.347
2.356
2.367
2.421
2.474
2.457
2.400
2.387
2.374
2.360
2.346
2.338
2.283
2.253
2.223
2.194
2.213
2.229
2.244
2.143
1.937
1.944
1.800
1.551
0.933
0.335
0.367
0.423
0.454
0.482
-0.047
-0.686
-0.817
-0.814
-0.438
-0.402
-0.367
-0.358

Retaining Rateaining Retaining


Retaining
wall
wall Avg
wall Act.
wall length
Height
Ht.
Ht.
-

2350.000

Excavation in Ordinary soil

486865.5363 Cum

Total
2410 0.75m

1210

0.75m

400

0.75m

800

Excavation in Hard Rock

54096.1707 Cum

940 1.00m
1060 1.50m

430
490

1.00m
1.50m

220
230

1.00m
1.50m

290
340

3417824.134 Cum

1370 2.00m
1150 2.50m

790
850

2.00m
2.50m

330
70

2.00m
2.50m

250
230

850 3.00m
220 3.50m

660

3.00m
3.50m

30

3.00m
3.50m

190
190

Normal Embankment

RE Wall Length

3220.000 Rmt

30 4.00m

4.00m

4.00m

30

RE Wall Area

17831.280 Sqm

30 4.50m

4.50m

10

4.50m

20

5.00m
5.50m

10
10

5.00m
5.50m

10

178312.800 Cum

20 5.00m
10 5.50m

RE Wall Fill

Retaining wall(MCW)

4430.000

1.500 Avg. Ht

Retaining wall(LSR)

1310.000

1.500 Avg. Ht

Retaining wall(RSR)

2350.000

1.500 Avg. Ht

8090

4430

1310

8090.000

41 of 41

2350

Das könnte Ihnen auch gefallen